CN102828530A - Resin inspection well and manufacturing method thereof - Google Patents
Resin inspection well and manufacturing method thereof Download PDFInfo
- Publication number
- CN102828530A CN102828530A CN 201110161719 CN201110161719A CN102828530A CN 102828530 A CN102828530 A CN 102828530A CN 201110161719 CN201110161719 CN 201110161719 CN 201110161719 A CN201110161719 A CN 201110161719A CN 102828530 A CN102828530 A CN 102828530A
- Authority
- CN
- China
- Prior art keywords
- resin
- inspection well
- well
- manufacturing
- inspection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Compositions Of Macromolecular Compounds (AREA)
Abstract
The invention discloses a resin inspection well and a manufacturing method thereof. The resin inspection well comprises a well body, a flange ring, a plurality of reinforcing ribs and a pipeline joint, wherein the reinforcing ribs are evenly distributed on the outer side of the well body; the pipeline joint is arranged at the lower end of the well body; and the flange ring is sheathed with the upper end of the well body. The detailed manufacturing method comprises the steps as follows: 1, stirring resin, glass fibers, a bulking agent, a coloring agent and a curing agent (group A); 2, mixing the stirred resin with the curing agent (group B) and casting into a mold; and 3, demolding. According to the invention, the resin is used as a primary material for manufacturing the inspection well, and is mixed with the materials such as the bulking agent and the like, so that the inspection well has the effects of corrosion resistance, high-pressure resistance, aging resistance and the like; the manufactured flange ring is sleeved on the well body, so that the overall height of the inspection well can be adjusted; and in addition, the reinforcing bars enable the inspection well to bear higher pressure. Therefore, the resin inspection well provided by the invention can completely replace the existing inspection wells built by bricks and cement. As a result, the mounting period is shortened greatly, and a large amount of construction cost is saved.
Description
Technical field
The present invention relates to a kind of resin inspection shaft and manufacturing approach thereof.
Background technology
In the prior art field, inspection shaft generally is to utilize common brick and cement, mortar to pile up to form, and integral body belongs to rigid structures; Its inwall mortar in use drops easily, not only hinder draining and can make that also sewage oozes out from inwall, or underground water infiltrates from outer wall; Cause the dirty shunting of rain not thorough, polluted water environment, strengthened the water treatment pressure of Wastewater Treatment Plant indirectly; In addition, a workman of brick inspection shaft can only build one every day, and can receive weather effect; All can't normal construction under weather conditions such as rainy day, high temperature, severe cold, delayed the construction period, simultaneously brick inspection shaft complicated integral structure; Cause the waste of the energy easily, do not meet the requirement of setting up conservation-minded society.
Summary of the invention
The present invention is directed to the deficiency of prior art, energy-conserving and environment-protective, robust a kind of resin inspection shaft and manufacturing approach thereof are provided.
The technical scheme that the present invention adopts is:
A kind of resin inspection shaft is made up of well bore, flange circle, reinforcing rib and pipe joint, and wherein the outside of well bore is evenly distributed with reinforcing rib, and the lower end of well bore is provided with pipe joint, flange circle and well bore upper end socket.
Concrete manufacturing approach is:
1. resin, glass fiber, filler, colorant, curing compound (first group) are stirred;
2. the resin after will stirring is poured in the mould with after curing compound (second group) mixes;
3. the demoulding.
Described resin is 191 unsaturated-resins, and filler is a stone flour, and curing compound is a potassium peroxide second copper; The shared percentage by weight of various compositions is: unsaturated-resin 40-60%, and glass fiber 10%-20%, filler 10%-18%, colorant 1%-2%, curing compound are surplus.
The present invention is with the main material of resin as the manufacturing inspection shaft; Add and to make after the material mixing such as filler inspection shaft can reach corrosion-resistant, anti-high pressure, effect such as anti-aging; The flange snare of processing is connected on the well bore, can regulate the whole height of inspection shaft, has adapted to the blowdown drainage works of underground pipeline better; Reinforcing rib can make inspection shaft bear bigger pressure; The inspection shaft that the present invention can replace existing brick, cement to be built into has fully shortened installation period greatly, has practiced thrift a large amount of construction costs.
Description of drawings
Fig. 1 is a structure chart of the present invention;
The specific embodiment:
As shown in Figure 1, a kind of resin inspection shaft is made up of well bore 1, flange circle 2, reinforcing rib 3 and pipe joint 4, and wherein the outside of well bore 1 is evenly distributed with reinforcing rib 3, and the lower end of well bore 1 is provided with pipe joint 4, flange circle 2 and well bore 1 upper end socket; During practical implementation; Resin inspection shaft material with preparation 1000g is an example, earlier resin, glass fiber, filler, colorant, curing compound (first group) is stirred, and the weight that various compositions account for is: resin 500g; Glass fiber 180g; Filler 160g, colorant 10g, curing compound (first group) is 75g; Resin after will stirring again is poured in the mould with after curing compound (second group) 75g mixes, and carries out the demoulding at last, can obtain finished product.
The present invention is with the main material of resin as the manufacturing inspection shaft; The inspection shaft that can replace original brick, cement to be built into fully; Thoroughly solved rain sewage from problems such as the inspection shaft wall ooze out, and simple in structure, easy for installation, shortened installation period greatly; Practice thrift a large amount of construction costs, had great promotional value.
Claims (2)
1. resin inspection shaft, it is characterized in that: be made up of well bore, flange circle, reinforcing rib and pipe joint, wherein the outside of well bore is evenly distributed with reinforcing rib, and the lower end of well bore is provided with pipe joint, flange circle and well bore upper end socket;
Manufacturing approach is: 1. resin, glass fiber, filler, colorant, curing compound (first group) are stirred;
2. the resin after will stirring is poured in the mould with after curing compound (second group) mixes;
3. the demoulding.
2. a kind of resin inspection shaft according to claim 1 and manufacturing approach thereof is characterized in that: described resin is 191 unsaturated-resins, and filler is a stone flour, and curing compound is a potassium peroxide second copper; The shared percentage by weight of various compositions is: resin 40-60%, and glass fiber 10%-20%, filler 10%-18%, colorant 1%-2%, curing compound are surplus.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110161719 CN102828530A (en) | 2011-06-16 | 2011-06-16 | Resin inspection well and manufacturing method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110161719 CN102828530A (en) | 2011-06-16 | 2011-06-16 | Resin inspection well and manufacturing method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102828530A true CN102828530A (en) | 2012-12-19 |
Family
ID=47331822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110161719 Pending CN102828530A (en) | 2011-06-16 | 2011-06-16 | Resin inspection well and manufacturing method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102828530A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103183965A (en) * | 2013-04-12 | 2013-07-03 | 吕致平 | Inspection well and production method thereof |
CN103912020A (en) * | 2014-04-29 | 2014-07-09 | 宁夏钻通管道铺设服务有限公司 | Communication inspection well with water accumulation device |
-
2011
- 2011-06-16 CN CN 201110161719 patent/CN102828530A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103183965A (en) * | 2013-04-12 | 2013-07-03 | 吕致平 | Inspection well and production method thereof |
CN103912020A (en) * | 2014-04-29 | 2014-07-09 | 宁夏钻通管道铺设服务有限公司 | Communication inspection well with water accumulation device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103526835B (en) | External thermal insulation composite concrete prefabricated components and manufacture method thereof | |
CN103358387A (en) | Production technology of anti-corrosion prefabricated reinforced concrete inspection well | |
CN103979872A (en) | Preparation method of 2-meter lightweight prefabricated concrete U-shaped channel | |
CN102817375A (en) | Assembly type precast reinforced concrete inspection well system | |
CN102116092A (en) | Method for constructing reinforcing band for compensating contraction of concrete and preventing cracks | |
CN105643774B (en) | One kind is used for house unit integrally formed mold from outside to inside | |
CN103408274B (en) | For the production of the slag powder concrete material of concrete precast element and the production method of concrete precast element thereof | |
CN105019476A (en) | Prefabricated reinforced concrete inspection well | |
CN108049521A (en) | A kind of assembled wall structure of the assembled light raw-soil and bionical soil RPC materials | |
CN103741949B (en) | Treatment of juncture between vertical structure and horizontal structure | |
CN103570300B (en) | Regeneration concrete watt and manufacture method thereof | |
CN104912334A (en) | Steel structure column base secondary grouting process | |
CN102828530A (en) | Resin inspection well and manufacturing method thereof | |
CN207032468U (en) | Assembled architecture | |
CN104911999A (en) | Construction method for deeply burying anchor | |
CN102875112A (en) | Sludge poured colorful building board | |
CN104446310A (en) | Concrete formula and preparation method of concrete pipe pile | |
WO2013064849A4 (en) | Glass fiber reinforced thermoset plastic waste doped concrete composition and process for preparation the same | |
CN204552145U (en) | The house that wall body structure is integrated with agent structure after-pouring | |
CN107489258A (en) | The prefabricated pit of elevator hoistways, elevator hoistways pit method of construction and installation elevator | |
CN203007982U (en) | High-strength corrugated detachable assembled inspection well | |
CN207079869U (en) | The prefabricated pit of elevator hoistways and installation elevator | |
CN210507502U (en) | Prefabricated assembled concrete slab bed structure | |
CN207392377U (en) | Monolithic reinforced-concrete prefabricated rain sewage inspection well | |
CN204252337U (en) | Assembled architecture wall body construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20121219 |