CN102817373A - Construction process for blasting artificial cover layer of steel tube pile foundation of high trestle - Google Patents

Construction process for blasting artificial cover layer of steel tube pile foundation of high trestle Download PDF

Info

Publication number
CN102817373A
CN102817373A CN2012103068242A CN201210306824A CN102817373A CN 102817373 A CN102817373 A CN 102817373A CN 2012103068242 A CN2012103068242 A CN 2012103068242A CN 201210306824 A CN201210306824 A CN 201210306824A CN 102817373 A CN102817373 A CN 102817373A
Authority
CN
China
Prior art keywords
blasting
explosion
steel pipe
pipe pile
trestle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103068242A
Other languages
Chinese (zh)
Inventor
王员根
付小莲
李书学
李忠翔
郑自元
李慧明
吴昕
凌喜
纪淑峰
王继东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Science and Industry Group Co Ltd
China Railway Jiujiang Bridge Engineering Co Ltd
Original Assignee
China Railway Science and Industry Group Co Ltd
China Railway Jiujiang Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Science and Industry Group Co Ltd, China Railway Jiujiang Bridge Engineering Co Ltd filed Critical China Railway Science and Industry Group Co Ltd
Priority to CN2012103068242A priority Critical patent/CN102817373A/en
Publication of CN102817373A publication Critical patent/CN102817373A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a construction process for blasting an artificial cover layer of a steel tube pile foundation of a high trestle. A cover layer is made artificially by adopting a method of fixed-point control of a particle size for blasting of a rock layer and is used as an anchoring layer of the steel tube pile foundation of the high trestle, a steel tube pile is arranged on the anchoring layer, the position of the steel tube pile is designed with three blasting holes, the blasting holes are 8m deep, the spacing of the blasting holes is 2.5m, the pitch of the blasting holes is 1m, an isosceles triangle is formed by the blasting holes, the blasting holes are filled with explosives, the diameter of the explosives is 80mm, the crushing particle size is approximately 0.4m, and the tube pile depth is more than 5m after crushing of the rock layer in a blasting manner. The construction process has the advantages of good safety, rapidness and economical performance. Moreover, a large amount of time and watercourse cleaning work can be saved, and the safety of the trestle can be ensured. The construction process can be widely applied in construction of temporary structural foundations in waters with smooth rock surfaces during construction of deepwater foundations.

Description

The artificial tectal construction technology of a kind of high trestle steel pipe pile basis explosion
Technical field
The present invention relates to the artificial tectal construction technology of a kind of high trestle steel pipe pile basis explosion.
Background technology
Because the landforms situation in river course makes the change of river water (flow) direction, cause the current tendency of circling round, a bank washes away another bank alluvial, thereby intectate smooth scar occurs, and this situation is more in deep water is constructed.The deep water foundation construction mainly is to construct through pier and trestle passage, and therefore, the job practices of platform and trestle has several method at the intectate place, the one, and construction is beaten concrete filling pile as platform and trestle basis.The 2nd, make covering layer, be thrown into backfill gravelly soil in the manual work of trestle position, artificially make trestle pile foundation covering layer, again injection pile foundation on covering layer.These two kinds of method job practicess all need longer construction period and cost, and the latter also needs after the journey completion, carry out the riverbed cleaning, and workload is big.
Summary of the invention
Its purpose of the present invention just is to provide a kind of high trestle steel pipe pile basis explosion artificial tectal construction technology, has safe, quick, economic characteristics, and has practiced thrift a large amount of durations and stream course clearance, has guaranteed the safety of trestle.Can be widely used in light scar waters temporary structure foundation construction in the deep water foundation construction.
The technical scheme that realizes above-mentioned purpose and take does, adopts the artificial covering layer of method of fixed point control particle diameter explosion rock stratum, and as the anchor layer on high trestle steel pipe pile basis, anchor layer is provided with steel pipe pile; Three shot holes of said steel pipe pile stake position design, explosion hole depth 8m, pitch-row 2.5m; Array pitch 1m becomes isosceles triangle, completely puts explosive; Explosive diameter phi 80mm, the about 0.4m of broken particle diameter, the pile tube depth of drive is greater than 5m behind the explosion and crushing of rock stratum.
Compared with prior art the present invention has the following advantages.
Owing to adopted the artificial covering layer of method of fixed point control particle diameter explosion rock stratum, have safe, quick, economic characteristics, and practiced thrift a large amount of durations and stream course clearance, guaranteed the safety of trestle.Can be widely used in light scar waters temporary structure foundation construction in the deep water foundation construction.
Description of drawings
Below in conjunction with accompanying drawing the present invention is made further detailed description.
Fig. 1 is a blast plane sketch map of the present invention.
The specific embodiment
As shown in Figure 1, adopt the artificial covering layer of method of fixed point control particle diameter explosion rock stratum, as the anchor layer on high trestle steel pipe pile basis, anchor layer is provided with steel pipe pile 1; Three shot holes 2 of 1 position design of said steel pipe pile, shot hole 2 dark 8m, pitch-row 2.5m; Array pitch 1m becomes isosceles triangle, completely puts explosive; Explosive diameter phi 80mm, the about 0.4m of broken particle diameter, the pile tube depth of drive is greater than 5m behind the explosion and crushing of rock stratum.
The said shot hole 2 triangles layout that when many arranged, can be staggered.
Embodiment, certain riverbed, riverbank face is weak weathering argillaceous sandstone, i.e. light scar; High trestle steel pipe pile anchors into difficulty, and according to construction condition, and argillaceous sandstone intensity is not high, layering is even, broken particle diameter even, the characteristics of stable performance in water; Adopt the artificial covering layer of method of fixed point control particle diameter explosion rock stratum; As the anchor layer on high trestle steel pipe pile basis, injection steel pipe pile on the riverbed after this explosion is guaranteed safety and stability that trestle is constructed.The explosion of fixed point control particle diameter is meant that on steel pipe pile foundation pile position, carrying out hidden hole drilling by the blasting Design requirement carries out explosion, and requires the explosion particle diameter less than 400mm, makes steel pipe pile be convenient to squeeze into.
1, to weak weathering shale grittiness can research
May examine according to the scene, weak weathering mud sandstone even laminating, easy-weathering not in water keeps intensity better, and weathering speeds up after the dehydration, is prone to be broken into small particle diameter piece stone, forms at last to pulverize grain.
2, control particle diameter blasting scheme design
Three shot holes of each position design, explosion hole depth 8m, pitch-row 2.5m, array pitch 1m; Become isosceles triangle, pitch-row is the bottom side length of isosceles triangle, and array pitch is the height of isosceles triangle, completely puts explosive; Explosive diameter phi 80mm, the about 0.4m of broken particle diameter is shown in accompanying drawing.The pile tube depth of drive is greater than 5m after requiring the riverbed explosion and crushing.
3, explosion bulge test
According to blasting Design, carry out explosion bulge test, drilling depth 8m at bridge axis downstream position; Completely put explosive, explosion is carried out the steel pipe pile injection by design attitude with the DZ60 vibration hammer after accomplishing; Depth of drive 3.6m does not meet designing requirement, and phase is felt, taken the photograph to water under the diver; Particle diameter has and reaches 1m individually, and is also undesirable.Uplift resistance pulls out on employing 25t loop wheel machine carries out, and 15t power is not extracted, and meets the requirements basically.Need to revise design to explosion, adopt the DZ90 hammer to carry out injection during the injection steel pipe pile, that guarantees steel pipe pile anchors into the degree of depth and bearing capacity.
4, steel pipe pile injection
Through explosion correction design, change array pitch into 1.0m by 2.0m, explosion is carried out in existing trestle steel pipe pile stake position, adopt DZ60 hammer first strike steel pipe pile, hammer strike-on into shape with DZ90 again, all can squeeze into more than the 5m, adhere to specification.
5, the monitoring of trestle use
Adopt the artificial covering layer injection of explosion steel pipe to carry out the trestle construction, in use, carry gross weight 100t car cargo lotus, and the lifting of 50t loop wheel machine, indivedual pile tube maximum settlements are 2cm in two months early stages, meet the design and use requirement.Because of the riverbank is to wash away bank, washing away of broken rock is to influence one of stable factor of trestle, and trestle washes away the riverbed face in use measures monitoring, and flood is experienced one time in no significant change, does not also have obviously and washes away, and trestle safety is crossed flood.Before the construction blasting broken stone is taken a sample, up to the present the river maintenance, does not have variations such as softening, fragmentation.

Claims (2)

1. the one kind high artificial tectal construction technology of trestle steel pipe pile basis explosion is characterized in that, adopts the artificial covering layer of method of fixed point control particle diameter explosion rock stratum; As the anchor layer on high trestle steel pipe pile basis, anchor layer is provided with steel pipe pile (1), said steel pipe pile (1) stake position design three shot holes (2); Explosion hole depth 8m, pitch-row 2.5m, array pitch 1m; Become isosceles triangle, completely put explosive, explosive diameter phi 80mm; The about 0.4m of broken particle diameter, the pile tube depth of drive is greater than 5m behind the explosion and crushing of rock stratum.
2. the artificial tectal construction technology of a kind of high trestle steel pipe pile basis explosion according to claim 1 is characterized in that, said shot hole (2) the triangle layout that when many arranged, can be staggered.
CN2012103068242A 2012-08-27 2012-08-27 Construction process for blasting artificial cover layer of steel tube pile foundation of high trestle Pending CN102817373A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103068242A CN102817373A (en) 2012-08-27 2012-08-27 Construction process for blasting artificial cover layer of steel tube pile foundation of high trestle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103068242A CN102817373A (en) 2012-08-27 2012-08-27 Construction process for blasting artificial cover layer of steel tube pile foundation of high trestle

Publications (1)

Publication Number Publication Date
CN102817373A true CN102817373A (en) 2012-12-12

Family

ID=47301787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103068242A Pending CN102817373A (en) 2012-08-27 2012-08-27 Construction process for blasting artificial cover layer of steel tube pile foundation of high trestle

Country Status (1)

Country Link
CN (1) CN102817373A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763452A (en) * 2019-01-17 2019-05-17 广西新港湾工程有限公司 A kind of broken reef construction method of underwater hydraulic column

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110002741A1 (en) * 2009-06-30 2011-01-06 William Dennis Nottingham Modular offshore platforms and associated methods of use and manufacture
CN102312442A (en) * 2011-07-01 2012-01-11 中铁大桥局股份有限公司 Construction method of trestle steel pipe pile foundation
CN102486090A (en) * 2010-12-01 2012-06-06 中国华冶科工集团有限公司 Method for recovering upper boundary residual mine and forming lower mining cover layer of stope

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110002741A1 (en) * 2009-06-30 2011-01-06 William Dennis Nottingham Modular offshore platforms and associated methods of use and manufacture
CN102486090A (en) * 2010-12-01 2012-06-06 中国华冶科工集团有限公司 Method for recovering upper boundary residual mine and forming lower mining cover layer of stope
CN102312442A (en) * 2011-07-01 2012-01-11 中铁大桥局股份有限公司 Construction method of trestle steel pipe pile foundation

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
陆春昌等: "《爆破施工》", 31 March 2010, 重庆大学出版社 *
黄怀朋: "水上栈桥和平台在人造覆盖层中的优化设计", 《铁道工程学报》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763452A (en) * 2019-01-17 2019-05-17 广西新港湾工程有限公司 A kind of broken reef construction method of underwater hydraulic column

Similar Documents

Publication Publication Date Title
US10267008B2 (en) Offshore non-driven-in large-diameter monopile foundation structure and construction method
CN101349064B (en) Construction method of hydroelectric power station surge chamber vertical shaft under soft rock geological condition
CN102953341B (en) A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN102979039B (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
JP3230883U (en) Combined single pile foundation structure for offshore wind power generation
CN108677986A (en) Technology of Deepwater Mooring System body and its construction technology
CN110984214A (en) Offshore wind power single pile-wing plate-rockfill composite foundation and construction method thereof
CN108193606A (en) A kind of means of defence of local scour near pier
CN104532868A (en) Anchored high bearing platform grouped pile foundation building method for high-steep deformation slope area bridge
CN204139197U (en) Bottom enlarging prestress anchoring pile wind energy conversion system basis
CN203049443U (en) High level trestle structure arranged on steep bare rock of deepwater torrent unsheathed layer
CN204608815U (en) Raft plate gravity offshore wind turbine foundation
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN103321234A (en) Load-bearing structure built on high slope or geological complex area and constructing method thereof
CN106638579A (en) Construction method of coral sand foundation expanding cement mortar injection pile
CN103397634A (en) Anchoring construction method for fastener steel tube pile cofferdam
CN206034427U (en) Mountain area hinders smooth anti -floating pile
CN102817373A (en) Construction process for blasting artificial cover layer of steel tube pile foundation of high trestle
CN204298836U (en) A kind of pile film cofferdam skeleton structure
CN106120833A (en) A kind of underground truss-like pile foundation and construction method thereof
CN202836384U (en) Steel pipe pile foundation blasthole for trestle
CN106677121B (en) Protect the movable permeable spur structure and construction method of Coastal erosion
CN205712063U (en) Anchor pole-ball-star member basis
CN205742170U (en) The pile tube anchor pole composite foundation of tension compression bidirectional load can be born

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121212