CN202836384U - Steel pipe pile foundation blasthole for trestle - Google Patents

Steel pipe pile foundation blasthole for trestle Download PDF

Info

Publication number
CN202836384U
CN202836384U CN201220427134.8U CN201220427134U CN202836384U CN 202836384 U CN202836384 U CN 202836384U CN 201220427134 U CN201220427134 U CN 201220427134U CN 202836384 U CN202836384 U CN 202836384U
Authority
CN
China
Prior art keywords
pipe pile
trestle
steel pipe
pile foundation
blasthole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201220427134.8U
Other languages
Chinese (zh)
Inventor
王员根
付小莲
李书学
李忠翔
郑自元
李慧明
吴昕
凌喜
纪淑峰
王继东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Jiujiang Bridge Engineering Co Ltd
Original Assignee
China Railway Jiujiang Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Jiujiang Bridge Engineering Co Ltd filed Critical China Railway Jiujiang Bridge Engineering Co Ltd
Priority to CN201220427134.8U priority Critical patent/CN202836384U/en
Application granted granted Critical
Publication of CN202836384U publication Critical patent/CN202836384U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

A steel pipe pile foundation blasthole for a trestle includes a steel pipe pile foundation and blastholes. Three blastholes are arranged on the circumference of the steel pipe pile foundation. The depth of each of the blastholes is 8 meters, the hole spacing is 2.5 meters, and the array space is 1 meter. The three blastholes form an isosceles triangle and are filled with explosives. The diameter phi of the explosive is 80 millimeters, and the diameter of the broken tablet is 0.4 meter. The steel pipe pile foundation blasthole for the trestle has the advantages of safety, swiftness and economy. A great deal of limited time for a project and river clean-up work is saved, and the safety of the trestle is guaranteed. The steel pipe pile foundation blasthole for trestle can be widely applied to the temporary structure foundation construction in water areas with glossy rockfaces in the foundation construction in deep water.

Description

A kind of high trestle steel pipe pile foundation blast hole
Technical field
The utility model relates to a kind of high trestle steel pipe pile foundation blast hole.
Background technology
Because the landforms situation in river course makes the change of river water (flow) direction, cause current that the convolution tendency is arranged, a bank washes away another bank alluvial, thereby intectate smooth scar occurs, and this situation is more in deep water construction.Deepwater foundation construction mainly is to construct by pier and trestle passage, and therefore, the construction method of platform and trestle has several method at the intectate place, the one, and construction is beaten concrete filling pile as platform and Conveyor belt.The 2nd, make cover layer, manually be thrown into backfill gravelly soil in the trestle position, artificially make trestle pile foundation cover layer, again injection pile foundation on cover layer.These two kinds of method construction methods all need longer construction period and cost, and the latter also needs carry out the riverbed cleaning after the journey completion, and workload is large.
The utility model content
Its purpose of the utility model just is to provide a kind of high trestle steel pipe pile foundation blast hole, has safe, quick, economic characteristics, and has saved a large amount of durations and stream course clearance, has guaranteed the safety of trestle.Can be widely used in light scar waters temporary structure foundation construction in the deepwater foundation construction.
The technical scheme that realizes above-mentioned purpose and take is, comprises steel-pipe pile and blast hole, and described steel-pipe pile periphery is provided with three blast holes, explosion hole depth 8m, and pitch-row 2.5m, array pitch 1m becomes isosceles triangle, completely puts explosive, explosive diameter phi 80mm, the about 0.4m of broken particle diameter.
Compared with prior art the utlity model has following advantage.
Owing to adopted the blast hole design of isosceles triangle, have safe, quick, economic characteristics, and saved a large amount of durations and stream course clearance, guaranteed the safety of trestle.Can be widely used in light scar waters temporary structure foundation construction in the deepwater foundation construction.
Description of drawings
The utility model is described in further detail below in conjunction with accompanying drawing.
Fig. 1 is the utility model blast plane schematic diagram.
The specific embodiment
As shown in Figure 1, comprise steel-pipe pile 1 and blast hole 2, described steel-pipe pile 1 periphery is provided with three blast holes 2, blast hole 2 dark 8m, and pitch-row 2.5m, array pitch 1m becomes isosceles triangle, completely puts explosive, explosive diameter phi 80mm, the about 0.4m of broken particle diameter.
The described blast hole 2 triangles layout that when arranged in rows, can be staggered.
Embodiment, certain riverbed, riverbank face is weak weathering argillaceous sandstone, it is the light scar, high trestle steel pipe pile anchors into difficulty, according to construction condition, and argillaceous sandstone intensity is not high, layering is even, broken particle diameter evenly, in the stable characteristics of water performance, adopt the artificial cover layer of method of position control particle diameter explosion rock stratum, as the anchor layer of high trestle steel pipe pile foundation, injection steel-pipe pile on the riverbed after this explosion is guaranteed safety and stability that trestle is constructed.The explosion of position control particle diameter refers to that carrying out hidden hole drilling by the explosion designing requirement on steel pipe pile foundation stake position carries out explosion, and requires the explosion particle diameter less than 400mm, makes steel-pipe pile be convenient to squeeze into.
1, to weak weathering shale grittiness can research
May examine according to the scene, weak weathering mud sandstone even laminating, easy-weathering not in water keeps intensity better, and weathering speed is accelerated after the dehydration, easily is broken into small particle diameter piece stone, forms at last to pulverize grain.
2, control particle diameter blasting scheme design
Three blast holes of each position design, explosion hole depth 8m, pitch-row 2.5m, array pitch 1m, become isosceles triangle, pitch-row is the bottom side length of isosceles triangle, and array pitch is the height of isosceles triangle, completely puts explosive, explosive diameter phi 80mm, the about 0.4m of broken particle diameter, as shown in drawings.The pile tube driving depth is greater than 5m after requiring the riverbed explosion and crushing.
3, explosion bulge test
Design according to explosion, carry out explosion bulge test at bridge axis downstream position, drilling depth 8m is completely put explosive, after explosion is finished, carry out the steel-pipe pile injection by design attitude with the DZ60 vibration hammer, driving depth 3.6m does not meet designing requirement, and phase is felt, taken the photograph to water under the diver, particle diameter has and reaches individually 1m, and is also undesirable.Withdrawal resistance pulls out on employing 25t loop wheel machine carries out, and 15t power is not extracted, and substantially meets the requirements.Need to revise design to explosion, adopt the DZ90 hammer to carry out injection during the injection steel-pipe pile, that guarantees steel-pipe pile anchors into the degree of depth and bearing capacity.
4, steel-pipe pile injection
Through explosion correction design, change array pitch into 1.0m by 2.0m, explosion is carried out in existing trestle steel pipe pile stake position, adopt DZ60 hammer first strike steel-pipe pile, hammer strike-on into shape with DZ90 again, all can squeeze into more than the 5m, meet designing requirement.
5, the monitoring of trestle use procedure
Adopt the artificial cover layer injection of explosion steel pipe to carry out the trestle construction, in use, carrying gross weight 100t car cargo lotus, and the lifting of 50t loop wheel machine, indivedual pile tube maximum settlements are 2cm in two months early stages, meet the design and use requirement.Because the riverbank is to wash away bank, washing away of broken rock is to affect one of stable factor of trestle, and trestle to the monitoring of riverbed face scour survey, without significant change, experiences one time flood in use procedure, and also without obviously washing away, trestle crosses safely flood.Before the construction blasting broken stone is taken a sample, up to the present the river maintenance, does not have the variations such as softening, broken.

Claims (2)

1. one kind high trestle steel pipe pile foundation blast hole, comprise steel-pipe pile (1) and blast hole (2), it is characterized in that described steel-pipe pile (1) periphery is provided with three blast holes (2), the dark 8m of blast hole (2), pitch-row 2.5m, array pitch 1m becomes isosceles triangle, completely puts explosive, explosive diameter phi 80mm, the about 0.4m of broken particle diameter.
2. a kind of high trestle steel pipe pile foundation blast hole according to claim 1 is characterized in that, described blast hole (2) the triangle layout that can be staggered when arranged in rows.
CN201220427134.8U 2012-08-27 2012-08-27 Steel pipe pile foundation blasthole for trestle Expired - Lifetime CN202836384U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220427134.8U CN202836384U (en) 2012-08-27 2012-08-27 Steel pipe pile foundation blasthole for trestle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220427134.8U CN202836384U (en) 2012-08-27 2012-08-27 Steel pipe pile foundation blasthole for trestle

Publications (1)

Publication Number Publication Date
CN202836384U true CN202836384U (en) 2013-03-27

Family

ID=47948071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220427134.8U Expired - Lifetime CN202836384U (en) 2012-08-27 2012-08-27 Steel pipe pile foundation blasthole for trestle

Country Status (1)

Country Link
CN (1) CN202836384U (en)

Similar Documents

Publication Publication Date Title
CN101349064B (en) Construction method of hydroelectric power station surge chamber vertical shaft under soft rock geological condition
CN105241510B (en) The assay method of tunnel surrounding prestressed reinforcement rock-bolt length and radial direction prestress value
CN102953341B (en) A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock
CN105737697B (en) A kind of outlining blasting method suitable for joints development rock mass
CN105697021B (en) The prefabricated tunnel and construction method in the shallow earthing riverbed of shield crossing
CN102305075A (en) Vertical shaft construction method under unfavorable geological condition
CN102979039B (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
JP3230883U (en) Combined single pile foundation structure for offshore wind power generation
CN103967496B (en) A kind ofly be suitable for the new method of mountain valley-type tailing dam dam slope mine tailing being carried out to back production
CN203049443U (en) High level trestle structure arranged on steep bare rock of deepwater torrent unsheathed layer
CN211646450U (en) Offshore wind power single pile-wing plate-rockfill composite foundation
CN204608815U (en) Raft plate gravity offshore wind turbine foundation
CN106096162A (en) A kind of method determining shield support pressure and mathematical model thereof and construction method
CN103397634A (en) Anchoring construction method for fastener steel tube pile cofferdam
CN202836384U (en) Steel pipe pile foundation blasthole for trestle
CN204298836U (en) A kind of pile film cofferdam skeleton structure
CN103938651A (en) Underwater large-particle-diameter porous concrete pile and treatment method for composite foundation thereof
CN102817373A (en) Construction process for blasting artificial cover layer of steel tube pile foundation of high trestle
CN110645856A (en) Blasting method for bridge demolition
CN205399469U (en) Wind turbine foundation structure
CN107905792A (en) A kind of embedded shaft excavation construction technology
CN202672165U (en) Grouting water-blocking cofferdam
CN209603167U (en) A kind of offshore wind turbine gravity type foundation composite foundation
CN105674826B (en) A kind of method of influence of the reduction blasting vibration to nuclear island bottom plate basement rock
CN203729961U (en) Device for improving drilling gas extraction efficiency

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130327

CX01 Expiry of patent term