CN106677121B - Protect the movable permeable spur structure and construction method of Coastal erosion - Google Patents

Protect the movable permeable spur structure and construction method of Coastal erosion Download PDF

Info

Publication number
CN106677121B
CN106677121B CN201611251030.5A CN201611251030A CN106677121B CN 106677121 B CN106677121 B CN 106677121B CN 201611251030 A CN201611251030 A CN 201611251030A CN 106677121 B CN106677121 B CN 106677121B
Authority
CN
China
Prior art keywords
open caisson
seashore
anchorage device
groynes
coastal erosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611251030.5A
Other languages
Chinese (zh)
Other versions
CN106677121A (en
Inventor
梁娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Ocean University ZJOU
Original Assignee
Zhejiang Ocean University ZJOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ocean University ZJOU filed Critical Zhejiang Ocean University ZJOU
Priority to CN201611251030.5A priority Critical patent/CN106677121B/en
Publication of CN106677121A publication Critical patent/CN106677121A/en
Application granted granted Critical
Publication of CN106677121B publication Critical patent/CN106677121B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention provides a kind of movable permeable spur structure for protecting Coastal erosion, including seashore, open caisson and anchorage device, seashore side is equipped with the open caisson of several row's interleaveds, adjacent caissons are connected by anchor chain, open caisson center is in Openworks shape, upper end is equipped with opening, open caisson two sides are symmetrically arranged with connection ring, open caisson is equipped with inlet opening, open caisson bottom is equipped with trapezoidal bottom hull, trapezoidal bottom hull is placed on seashore ground, open caisson two sides are equipped with anchorage device, anchorage device is connected and fixed on seashore ground by several anchor chains and open caisson, the movable permeable spur structure and construction method of this protection Coastal erosion provided by the invention, it can not only achieve the effect that seashore LP blades, it can also easily be removed after completing requirement of shelter, the permeable structure of groynes, wave can be mitigated, impact failure of the trend to groynes, it is opposite to reduce engineering Amount improves construction efficiency, and the groynes construction material after dismounting is also can be recycled, avoids the waste of construction material.

Description

Protect the movable permeable spur structure and construction method of Coastal erosion
Technical field
The present invention relates to coast protection field, especially a kind of movable permeable spur structure for protecting Coastal erosion and apply Work method.
Background technique
As the fast development of coastal economy and coastal zone resources develop and use increasing considerably for intensity, littoral zone is made Intensity is also increasing.Meanwhile generated that sea level rise by global warming and the wave of ocean, tide, The destruction of the seawater movements such as ocean current and chemical action to seashore, the degree that Coastal erosion retreats are increasingly sharpened.It is invaded in seashore In the control measure of erosion, groynes is the protection works building generally used, and groynes changes the flow dynamic condition of seashore, mud The Scour and Accretion of husky motion process and seashore has reached good protection effect to seashore is corroded.But it is several in engineering practice All groynes are all gravity type or pile foundation type building, and the construction materials such as block stone, the concrete body of casting or caisson are launched Or piling enters on seashore bottom, is fixed on seabed.Fixed groynes, which is once built, to be finished, even if eroding bank section has been completed The requirement of shelter on beach, but still leave in situ, the natural landscape of littoral zone is on the one hand destroyed, the function category of seashore is changed Property, the development and utilization again of seashore are restricted, cannot achieve the sustainable utilization of marine resources.
Summary of the invention
Technical problem to be solved by the present invention lies in provide it is a kind of can not only achieve the effect that seashore LP blades, and The movable permeable spur structure and construction method for the protection Coastal erosion that can be easily removed after completing requirement of shelter.
In order to solve the above-mentioned prior art problems, the present invention uses following scheme: a kind of to protect the movable of Coastal erosion Permeable spur structure, including seashore, open caisson and anchorage device, the seashore side are equipped with the open caisson of several row's interleaveds, phase Adjacent open caisson is connected by anchor chain, and open caisson center is in Openworks shape, and upper end is equipped with opening, and open caisson two sides are symmetrically arranged with connection ring, open caisson It is equipped with inlet opening, open caisson bottom is equipped with trapezoidal bottom hull, and trapezoidal bottom hull is placed on seashore ground, and open caisson two sides are filled equipped with anchorage It sets, anchorage device is connected and fixed on seashore ground by several anchor chains and open caisson.
Successively reduce preferably, the spacing of open caisson is rested the head on from dam to abutment, center of the dam pillow into dam away from for 2.0-10m, To the center of abutment away from for 1.0-2.0m in dam, the spacing of every row's open caisson is 2-3 times of one group of open caisson total length, is sufficiently stopped extra large The impact of water, protects the erosion of seashore, and permeable structure can reduce wave, impact of the trend to open caisson.
Preferably, the angle between anchor chain is 50-70 °, the angle between anchor chain and anchorage device is 50-60 °, reinforcement pair The support of open caisson improves ability to bear when sea beat open caisson.
Preferably, it is 10-30cm that inlet opening, which penetrates the inner wall of open caisson and the diameter of inlet opening, enter open caisson convenient for seawater Inside make well sinking, increase open caisson ballast, keeps steady the bottom of open caisson.
Preferably, trapezoidal bottom hull is equipped with cylindrical hole, cylindrical hole upper end is equipped with the gradient, is equipped with permeable hole in cylindrical hole, Open caisson is fixed in the cylindrical hole in trapezoidal bottom hull, and convenient for the replacement and dismounting of open caisson, resource is recycled.
Preferably, the material of open caisson, trapezoidal bottom hull, anchorage device is armored concrete, the steel in armored concrete Muscle and anchor chain are equipped with erosion shield, increase the service life of groynes group, improve the quality of groynes group.
Preferably, the ingredient and its parts by weight of erosion shield are as follows: 40-45 parts of epoxy acrylic resin, benzoic acid two 3-6 parts of fourth rouge, 5-8 parts of hydroxy-ethyl acrylate, 2-3 parts of polytetrafluoroethylene (PTFE), 12-15 parts of polyvinyl alcohol, p methoxy phenol 2-3 Part, take charge of 80 0.01-0.02 parts of benzene, 0.02-0.03 parts of 1,3-PD.
A kind of movable permeable spur construction method for protecting Coastal erosion, comprising the following steps:
1) prefabricated reinforced concrete open caisson is transported to engineering sea area by way of lightering and lifting and combine;
2) sea-floor relief of open caisson placement position is flattened, leveling area is greater than the area of base of open caisson, by spacing size The fixed trapezoidal bottom hull of piling and anchorage device;
3) open caisson into the water, is fixed in trapezoidal bottom hull, removes lifting appliance;
4) open caisson lower end is connect by anchor chain with anchorage device, and open caisson upper end connect to form fourth by anchor chain with adjacent caissons Dam group, groynes group one end is fixed by the sea, and several row's groynes groups form groynes group.
Preferably, groynes group constructs, using first downstream, upstream, groynes group are constructed using method is attacked and occupied again, each open caisson is adopted With first backshore, then foreshore, last interior shore is successively promoted to sea.
The utility model has the advantages that the movable permeable spur structure and construction method of this protection Coastal erosion provided by the invention, Can not only achieve the effect that seashore LP blades, and can easily be removed after completing requirement of shelter, meanwhile, groynes it is saturating Water construction, can mitigate the impact failure of wave, trend to groynes, opposite to reduce project amount, improve construction efficiency, and after dismounting Groynes construction material it is also can be recycled, avoid the waste of construction material.
Present invention employs above-mentioned technical proposal provide it is a kind of protect Coastal erosion movable permeable spur structure and apply Work method compensates for the deficiencies in the prior art, reasonable design, easy operation.
Figure of description
Fig. 1 is the movable permeable spur plane figure schematic diagram of the present invention;
Fig. 2 is the structural schematic diagram of open caisson of the present invention connection;
Fig. 3 is the movable permeable spur horizontal section schematic diagram of the present invention.
Specific embodiment
It is described in further detail below in conjunction with drawings and examples:
Embodiment 1:
As shown in Figure 1, 2, 3, a kind of movable permeable spur structure for protecting Coastal erosion, including seashore 1,2 and of open caisson Anchorage device 3,1 side of seashore are equipped with the open caisson 2 of several row's interleaveds, and adjacent caissons 2 are connected by anchor chain 4,2 center of open caisson In Openworks shape, upper end is equipped with opening, and 2 two sides of open caisson are symmetrically arranged with connection ring 5, and open caisson 2 is equipped with inlet opening, and 2 bottom of open caisson is set There is trapezoidal bottom hull 6, trapezoidal bottom hull 6 is placed on seashore ground 7, and 2 two sides of open caisson are equipped with anchorage device 3, if anchorage device 3 passes through Dry anchor chain 4 is connected and fixed on seashore ground 7 with open caisson 2.
The spacing of open caisson 2 is rested the head on from dam successively to be reduced to abutment, and center of the dam pillow into dam is away from for 5m, in dam into abutment The heart is 2 times of one group of 2 total length of open caisson away from the spacing for 2m, every row's open caisson 2, sufficiently stops the impact of seawater, protects seashore It corrodes, permeable structure can reduce wave, impact of the trend to open caisson 2.
Angle between anchor chain 4 is 50 °, and the angle between anchor chain 4 and anchorage device 3 is 50 °, reinforces the support to open caisson 2, Improve ability to bear when sea beat open caisson 2.
It is 20cm that inlet opening, which penetrates the inner wall of open caisson and the diameter of inlet opening, and entering in open caisson 2 convenient for seawater makes under open caisson 2 It is heavy, increase by 2 ballast of open caisson, keeps steady the bottom of open caisson 2.
Trapezoidal bottom hull 6 is equipped with cylindrical hole, and cylindrical hole upper end is equipped with the gradient, permeable hole is equipped in cylindrical hole, and open caisson 2 is installed It is fixed in the cylindrical hole in trapezoidal bottom hull 6.
Open caisson 2, trapezoidal bottom hull 6, the material of anchorage device 3 are armored concrete, reinforcing bar in armored concrete and Anchor chain 4 is equipped with erosion shield, increases the service life of groynes group, improves the quality of groynes group.
The ingredient of erosion shield and its preferred weight part are as follows: 40 parts of epoxy acrylic resin, 6 parts of benzoic acid dibutylester, 5 parts of hydroxy-ethyl acrylate, 2 parts of polytetrafluoroethylene (PTFE), 12 parts of polyvinyl alcohol, 3 parts of p methoxy phenol, 80 0.01 parts of benzene of department, 1,3- 0.02 part of propylene glycol.
A kind of movable permeable spur construction method for protecting Coastal erosion, comprising the following steps:
1) prefabricated reinforced concrete open caisson 2 is transported to engineering sea area by way of lightering and lifting and combine;
2) sea-floor relief of 2 placement position of open caisson is flattened, leveling area is greater than the area of base of open caisson, by spacing size The fixed trapezoidal bottom hull 6 of piling and anchorage device 3;
3) open caisson 2 into the water, is fixed in trapezoidal bottom hull 6, removes lifting appliance;
4) 2 lower end of open caisson is connect by anchor chain 4 with anchorage device 3, and 2 upper end of open caisson is connect by anchor chain 4 with adjacent caissons 2 Groynes group is formed, groynes group one end is fixed by the sea, and several row's groynes groups form groynes group.
Using first downstream, upstream, groynes group are constructed using method is attacked and occupied again for groynes group construction, each open caisson uses first backshore, Foreshore again, last interior shore, successively promotes to sea.
Embodiment 2:
When seashore 1 will be by sea water intrusion, need to establish the movable permeable spur of protection Coastal erosion on seashore 1 Group, is transported to engineering sea area for prefabricated reinforced concrete open caisson 2, by open caisson 2 by way of lightering and lifting and combine The sea-floor relief of placement position flattens, and leveling area is greater than the area of base of open caisson 2, and the spacing according to open caisson 2 is 5m, and every row is heavy The spacing of well 2 is the fixed trapezoidal bottom hull 6 of 2-3 times of distance piling and anchorage device 3 of 2 total length of row's open caisson, then will be sunk Into the water, open caisson 2 is equipped with inlet opening to well 2, and seawater is entered in open caisson 2 by inlet opening, relies on the relationship of buoyancy and gravity, Open caisson 2 is sunk to through the country slowly, and inlet opening increases the ballast of open caisson 2, keeps steady bottom, the open caisson 2 of open caisson 2 that will reach sea Bottom is, will be fixed in cylindrical hole that each open caisson 2 is squeezed into trapezoidal bottom hull 6, trapezoidal bottom hull 6 and seashore ground contact area Greatly, forced area when open caisson 2 sits bottom is increased, the footing that groynes is easily sent out is eliminated and empties the hidden danger for causing groynes to collapse, open caisson 2 The connection ring 5 on open caisson 2 is passed through by anchor chain 4 after being fixed in trapezoidal bottom hull 6 to connect with anchorage device 3, Parallel to the flow direction with Inverse water (flow) direction is equipped with two anchor chains 4, and the angle between anchor chain 4 is 60 °, angle when tension between anchor chain 4 and anchorage device 3 It is 60 °, stable can more fixes open caisson 2, improves the endurance that sea washes open caisson 2 is, the length of anchor chain 4 includes seawater The distance rocked is generated when impacting open caisson 2, is passed through anchor chain 4 between the open caisson 2 in every row and is passed through the connection ring 5 of 2 upper end of open caisson mutually Connection, the last one open caisson 2 are connect by anchor chain 4 with seashore 1, improve the stability of open caisson 2, every row's open caisson 2 intersects peace It sets, greatly improves the ability for stopping sea washes, the quantity of every row's open caisson 2, can root depending on the width of 1 wave band of seashore Establish the groynes group of different in width according to different seashores 1, groynes group constructs using first downstream upstream again, the construction of groynes group using into Account for method, each open caisson 2 using first backshore, then foreshore, it is last in shore, successively promoted to sea, can be by rising when completing protection Motivation extracts open caisson 2, transports, and can be inserted directly into the open caisson 2 shipped when needing to protect seashore 1 again next time and be left In trapezoidal bottom hull 6, resource can be recycled, reduce the waste of resource, the natural landscape of 1 band of seashore will not be destroyed.
Specific embodiment described herein is only to give an example to the present invention.The technical field of the invention Technical staff can make various modifications or additions to the described embodiments or be substituted in a similar manner, but Without departing from of the invention or beyond the scope of the appended claims.

Claims (8)

1. a kind of movable permeable spur structure for protecting Coastal erosion, including seashore (1), open caisson (2) and anchorage device (3), It is characterized in that, seashore (1) side is equipped with the open caisson (2) of several row's interleaveds, adjacent caissons (2) pass through anchor chain (4) Connection, open caisson (2) center are in Openworks shape, and upper end is equipped with opening, and open caisson (2) two sides are symmetrically arranged with connection ring (5), on open caisson (2) Equipped with inlet opening, open caisson (2) bottom is equipped with trapezoidal bottom hull (6), and trapezoidal bottom hull (6) is placed on seashore ground (7), open caisson (2) Two sides are equipped with anchorage device (3), and anchorage device (3) is connected and fixed to seashore ground by several anchor chains (4) and open caisson (2) (7) on;
Above-mentioned permeable spur structure is constructed with the following method:
1) prefabricated reinforced concrete open caisson (2) is transported to engineering sea area by way of lightering and lifting and combine;
2) sea-floor relief of open caisson (2) placement position is flattened, leveling area is greater than the area of base of open caisson, beats by spacing size The fixed trapezoidal bottom hull (6) of stake and anchorage device (3);
3) open caisson (2) into the water, is fixed on trapezoidal bottom hull (6), removes lifting appliance;
4) open caisson (2) lower end is connect by anchor chain (4) with anchorage device (3), and it is anchor chain (4) and adjacent heavy that open caisson (2) upper end passes through Well (2) connection forms groynes group, and groynes group one end is fixed by the sea, and several row's groynes groups form groynes group.
2. a kind of movable permeable spur structure for protecting Coastal erosion according to claim 1, which is characterized in that described The spacing of open caisson (2) is rested the head on from dam successively to be reduced to abutment, and center of the dam pillow into dam is away from for 2.0-10m, in dam into abutment For the heart away from for 1.0-2.0m, the spacing of every row's open caisson (2) is 2-3 times of row's open caisson (2) total length.
3. a kind of movable permeable spur structure for protecting Coastal erosion according to claim 1, which is characterized in that described Angle between anchor chain (4) is 50-70 °, and the angle between anchor chain (4) and anchorage device (3) is 50-60 °.
4. a kind of movable permeable spur structure for protecting Coastal erosion according to claim 1, which is characterized in that described It is 10-30cm that inlet opening, which penetrates the inner wall of open caisson (2) and the diameter of inlet opening,.
5. a kind of movable permeable spur structure for protecting Coastal erosion according to claim 1, which is characterized in that described Trapezoidal bottom hull (6) is equipped with cylindrical hole, and cylindrical hole upper end is equipped with the gradient, and permeable hole is equipped in cylindrical hole, and open caisson (2) installation is fixed In the cylindrical hole on trapezoidal bottom hull (6).
6. a kind of movable permeable spur structure for protecting Coastal erosion according to claim 1, which is characterized in that described Open caisson (2), trapezoidal bottom hull (6), the material of anchorage device (3) are armored concrete, reinforcing bar and anchor in armored concrete Chain is equipped with erosion shield on (4).
7. a kind of movable permeable spur structure for protecting Coastal erosion according to claim 6, which is characterized in that described The ingredient and its parts by weight of erosion shield are as follows: 40-45 parts of epoxy acrylic resin, 3-6 parts of benzoic acid dibutylester, acrylic acid hydroxyl 5-8 parts of ethyl ester, 2-3 parts of polytetrafluoroethylene (PTFE), 12-15 parts of polyvinyl alcohol, 2-3 parts of p methoxy phenol take charge of 80 0.01-0.02 of benzene Part, 0.02-0.03 parts of 1,3-PD.
8. a kind of movable permeable spur structure for protecting Coastal erosion according to claim 1, which is characterized in that described Using first downstream, upstream, groynes group are constructed using method is attacked and occupied again for groynes group construction, each open caisson uses first backshore, then foreshore, Shore in last is successively promoted to sea.
CN201611251030.5A 2016-12-30 2016-12-30 Protect the movable permeable spur structure and construction method of Coastal erosion Active CN106677121B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611251030.5A CN106677121B (en) 2016-12-30 2016-12-30 Protect the movable permeable spur structure and construction method of Coastal erosion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611251030.5A CN106677121B (en) 2016-12-30 2016-12-30 Protect the movable permeable spur structure and construction method of Coastal erosion

Publications (2)

Publication Number Publication Date
CN106677121A CN106677121A (en) 2017-05-17
CN106677121B true CN106677121B (en) 2018-12-28

Family

ID=58873543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611251030.5A Active CN106677121B (en) 2016-12-30 2016-12-30 Protect the movable permeable spur structure and construction method of Coastal erosion

Country Status (1)

Country Link
CN (1) CN106677121B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755570B (en) * 2018-06-04 2020-07-24 李国松 Rescue system for dealing with large-scale flowing flood
CN112144470B (en) * 2020-09-17 2021-05-18 河海大学 Movable permeable pile spur dike and operation method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060023036A (en) * 2004-09-08 2006-03-13 송병무 Marine structure and construction method thereof
CN1818231A (en) * 2006-03-10 2006-08-16 陈明宪 Water-ponding construction and its facilities
CN201459674U (en) * 2009-09-01 2010-05-12 黄河水利委员会黄河水利科学研究院 PHC tubular pile dam
CN102108710A (en) * 2010-12-30 2011-06-29 中铁大桥局集团第二工程有限公司 Method for stopping horizontal oscillation in large-scale steel open caisson construction
CN103485341A (en) * 2013-09-22 2014-01-01 江苏科技大学 Double-truncated-cone type pile shoe
CN103526721A (en) * 2013-10-29 2014-01-22 中国水电顾问集团成都勘测设计研究院有限公司 Permeable spur dike with pile foundations
CN104480865A (en) * 2014-12-24 2015-04-01 中铁大桥局集团有限公司 Precise positioning method for large-scale steel open caisson
CN204456157U (en) * 2014-12-24 2015-07-08 中铁大桥局集团有限公司 A kind of major diameter combination cable system for open caisson foundation location

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060023036A (en) * 2004-09-08 2006-03-13 송병무 Marine structure and construction method thereof
CN1818231A (en) * 2006-03-10 2006-08-16 陈明宪 Water-ponding construction and its facilities
CN201459674U (en) * 2009-09-01 2010-05-12 黄河水利委员会黄河水利科学研究院 PHC tubular pile dam
CN102108710A (en) * 2010-12-30 2011-06-29 中铁大桥局集团第二工程有限公司 Method for stopping horizontal oscillation in large-scale steel open caisson construction
CN103485341A (en) * 2013-09-22 2014-01-01 江苏科技大学 Double-truncated-cone type pile shoe
CN103526721A (en) * 2013-10-29 2014-01-22 中国水电顾问集团成都勘测设计研究院有限公司 Permeable spur dike with pile foundations
CN104480865A (en) * 2014-12-24 2015-04-01 中铁大桥局集团有限公司 Precise positioning method for large-scale steel open caisson
CN204456157U (en) * 2014-12-24 2015-07-08 中铁大桥局集团有限公司 A kind of major diameter combination cable system for open caisson foundation location

Also Published As

Publication number Publication date
CN106677121A (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN111493006B (en) Device for preventing basic scour by utilizing fishing net in offshore wind farm
CN101545462B (en) A steel-concrete combined weight type offshore wind fan foundation structure
CN205822279U (en) A kind of marine structure anti-scouring system
CN103866817B (en) Water intake pumping station
CN106284199A (en) Tide response type barrier
CN103556651A (en) Precast concrete jacket type offshore wind turbine foundation
CN211646450U (en) Offshore wind power single pile-wing plate-rockfill composite foundation
JP3230883U (en) Combined single pile foundation structure for offshore wind power generation
CN106677121B (en) Protect the movable permeable spur structure and construction method of Coastal erosion
CN103158839A (en) Wave-proofing float bowl combination device
CN109423982A (en) From the interim breakwater structure of steady floating type
CN109356186B (en) Bridge tower composite foundation applicable to deep water soft soil areas and construction method
CN106638651A (en) Sea fan buoyant foundation integral installing technology
CN105926531B (en) A kind of case net type floating breakwater based on FRP material
CN205329632U (en) Utilize geotechnique to fill provisional manger plate dykes and dams of irritating bag and construction of steelframe support system
Xujakulov Interaction of hydraulic structures and their subsidence bases
CN105401564A (en) Construction method for fixing tidal current energy power generation device to water bottom and tidal current energy power generation device
CN203613551U (en) Precast concrete jacket type offshore wind turbine foundation
CN212026234U (en) Combined cofferdam of jet grouting pile and submerged large-diameter cylinder
CN103215934A (en) Offshore foundation platform
KR20230045588A (en) Offshore building structure and its construction method
CN216007007U (en) Detachable water conservancy construction cofferdam
Antonina et al. Construction of low-rise buildings in the coastland and water areas
RU145661U1 (en) Sheet piling
CN216195114U (en) Seaside water taking well device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant