CN102808509B - Pouring construction method for anchor assembly of prefabricated concrete prefabricated external wall panel - Google Patents

Pouring construction method for anchor assembly of prefabricated concrete prefabricated external wall panel Download PDF

Info

Publication number
CN102808509B
CN102808509B CN201210300211.8A CN201210300211A CN102808509B CN 102808509 B CN102808509 B CN 102808509B CN 201210300211 A CN201210300211 A CN 201210300211A CN 102808509 B CN102808509 B CN 102808509B
Authority
CN
China
Prior art keywords
external wall
prefabricated
cast
wall panel
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210300211.8A
Other languages
Chinese (zh)
Other versions
CN102808509A (en
Inventor
毛志兵
吴月华
魏凯
谢小林
徐巍
孙建运
田广平
薛刚
任书华
周立新
刘歆
袁江
乔宇
刘成利
杨晓杰
耿娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction First Group Corp Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201210300211.8A priority Critical patent/CN102808509B/en
Publication of CN102808509A publication Critical patent/CN102808509A/en
Application granted granted Critical
Publication of CN102808509B publication Critical patent/CN102808509B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

一种装配式混凝土预制外挂墙板锚固组件及安装方法,锚固组件包括带有连接孔的条形直角连接板和条型平直连接板、若干具有内螺纹孔的预埋套筒以及通过内螺纹连接的若干紧固螺栓或者若干带有紧固螺母的对拉螺杆。预埋套筒由套筒部分和强化预埋部分构成,强化预埋部分由水平杆以及与水平杆垂直相连接的十字杆构成。对拉螺杆上套接有PVC套管。本发明的锚固组件结构简单、造价低廉、通用性强,部分配件可重复使用,极大地降低了工程造价。使用本发明的装配式混凝土预制外挂墙板锚固组件并利用其安装方法,可使外挂墙板与现浇钢模板及斜撑杆之间快速可靠地连接和调整,并使外挂墙板与现浇钢模板形成了稳固的连接体系,加快了现浇混凝土的施工速度。

A prefabricated concrete prefabricated external wall panel anchoring assembly and installation method, the anchoring assembly includes a strip-shaped right-angled connecting plate and a strip-shaped straight connecting plate with connecting holes, a number of embedded sleeves with internal threaded holes, and through internal threaded Several fastening bolts connected or several pull-screws with fastening nuts. The embedded sleeve is composed of a sleeve part and a reinforced embedded part, and the reinforced embedded part is composed of a horizontal rod and a cross rod vertically connected with the horizontal rod. A PVC sleeve is sleeved on the pull screw. The anchor assembly of the invention has the advantages of simple structure, low cost and strong versatility, and some parts can be reused, which greatly reduces the construction cost. Using the prefabricated concrete prefabricated external wall panel anchoring assembly of the present invention and utilizing its installation method can quickly and reliably connect and adjust the external wall panel and cast-in-place steel formwork and diagonal bracing rods, and make the external wall panel and cast-in-place The steel formwork forms a stable connection system and speeds up the construction of cast-in-place concrete.

Description

装配式混凝土预制外挂墙板锚固组件的浇筑施工方法Pouring construction method of prefabricated concrete prefabricated external wall panel anchor components

技术领域 technical field

本发明涉及一种混凝土浇筑施工中组合连接模板的构件,特别是涉及一种装配式混凝土预制外挂墙板锚固组件及浇筑施工方法。 The invention relates to a component of a combined connection formwork in concrete pouring construction, in particular to an assembled concrete prefabricated external wall board anchor component and a pouring construction method.

背景技术 Background technique

装配式结构在国外应用广泛,而国内则处于发展阶段,装配式结构的构件主要分为:叠合楼板、预制外挂墙板、叠合梁、楼梯等构件,这些构件必须通过连接件临时连接装配后,才能完成现浇结构的施工,形成建筑整体。目前,市场上的连接配件多为外企进口商品,这些连接配件结构复杂,多为铸造成形后再进行机械加工而成,并且这些连接件各造型部位设计不完全相同,通用性差,制造成本高,售价高昂,在一定程度上阻碍了装配式结构在国内的发展。 The prefabricated structure is widely used abroad, but it is in the development stage in China. The components of the prefabricated structure are mainly divided into: laminated floor slabs, prefabricated external wall panels, laminated beams, stairs and other components. These components must be temporarily connected and assembled through connectors. Finally, the construction of the cast-in-place structure can be completed to form the whole building. At present, most of the connecting parts on the market are imported by foreign companies. These connecting parts have complex structures and are mostly cast and then machined. Moreover, the design of each part of these connecting parts is not exactly the same, which leads to poor versatility and high manufacturing costs. The high price hinders the development of prefabricated structures in China to a certain extent.

发明内容 Contents of the invention

本发明的一个目的是针对已有技术的不足,给出一种结构简单、制造容易、成本低、规格标准统一、通用性强、操作简便、有利于装配式结构发展的装配式混凝土预制外挂墙板锚固组件。 One purpose of the present invention is to provide a prefabricated concrete external hanging wall with simple structure, easy manufacture, low cost, uniform specification and standard, strong versatility, easy operation and favorable for the development of prefabricated structure. Plate anchor components.

本发明的目的是能够实现的。本发明装配式混凝土预制外挂墙板锚固组件包括带有连接孔的条形直角连接板和带有连接孔的条型平直连接板,本发明装配式混凝土预制外挂墙板锚固组件特征在于:所述装配式混凝土预制外挂墙板锚固组件还包括若干具有内螺纹孔的预埋套筒以及通过内螺纹连接的若干紧固螺栓2或者若干带有紧固螺母的对拉螺杆。 The purpose of the present invention can be achieved. The prefabricated concrete prefabricated external wall panel anchoring assembly of the present invention includes a strip-shaped right-angled connecting plate with a connecting hole and a strip-shaped straight connecting plate with a connecting hole. The prefabricated concrete prefabricated external wall panel anchoring assembly of the present invention is characterized in that: The prefabricated concrete prefabricated external wall panel anchoring assembly also includes several embedded sleeves with internal thread holes and several fastening bolts 2 connected by internal threads or several tension screws with fastening nuts.

本发明装配式混凝土预制外挂墙板锚固组件,其中所述预埋套筒由套筒部分和强化预埋部分构成,所述强化预埋部分由水平杆以及与所述水平杆垂直相连接的十字杆构成。 The prefabricated concrete prefabricated external wall panel anchoring assembly of the present invention, wherein the embedded sleeve is composed of a sleeve part and a reinforced embedded part, and the reinforced embedded part is composed of a horizontal bar and a cross vertically connected to the horizontal bar Rod composition.

本发明装配式混凝土预制外挂墙板锚固组件,其中所述强化预埋部分的水平杆与所述套筒部分同轴心。 The prefabricated concrete prefabricated exterior wall panel anchoring assembly of the present invention, wherein the horizontal bar of the reinforced pre-embedded part is coaxial with the sleeve part.

本发明装配式混凝土预制外挂墙板锚固组件,其中所述对拉螺杆上套接有PVC套管。 The prefabricated concrete prefabricated exterior wall panel anchoring assembly of the present invention, wherein the pull screw is sleeved with a PVC sleeve.

本发明另一个目的是给出装配式混凝土预制外挂墙板锚固组件及浇筑的施工方法,本发明的装配式混凝土预制外挂墙板锚固组件及浇筑的施工方法是通过以下步骤完成的,其中包括: Another object of the present invention is to provide the prefabricated concrete prefabricated external wall panel anchor assembly and the construction method of pouring. The prefabricated concrete prefabricated external wall panel anchor assembly of the present invention and the construction method of pouring are completed through the following steps, including:

步骤1、首先根据图样加工制造装配式混凝土预制外挂墙板锚固组件的条形直角连接板7、条型平直连接板8、预埋套筒1、紧固螺栓2以及对拉螺杆3和紧固螺母4; Step 1. First process and manufacture the strip-shaped right-angle connecting plate 7, the strip-shaped straight connecting plate 8, the embedded sleeve 1, the fastening bolt 2, the tension screw 3 and the tensioning assembly according to the drawing. fixed nut 4;

步骤2、根据预制构件施工设计详图在外挂墙板10的规定位置,将若干预埋套筒1埋置在外挂墙板10中,并浇筑好所需全部外挂墙板10; Step 2. According to the construction design details of the prefabricated components, embed several pre-embedded sleeves 1 in the external wall panels 10 at the specified positions of the external wall panels 10, and pour all the required external wall panels 10;

步骤3、将浇筑好的预制外挂墙板10现场吊装就位后,将外挂墙板10平面墙体处的若干预埋套筒1均螺纹连接上对拉螺杆3,之后在每个对拉螺杆3上套接PVC管11; Step 3. After the poured prefabricated external hanging wall panels 10 are hoisted in place on site, a number of pre-embedded sleeves 1 at the plane walls of the external hanging wall panels 10 are all screwed to the pull screw 3, and then each pull screw 3 upper sleeve PVC pipe 11;

步骤4、将转角处的外挂墙板10由条形直角连接板7通过外挂墙板10边角处的所有预埋套筒1以及紧固螺栓2成直角连接固定在一起;将处在同一平面的外挂墙板10由条形平直连接板8通过外挂墙板10上的预埋套筒1以及紧固螺栓2连接固定在一起;将现浇钢模板9通过连接孔安装在套接有PVC管11的所有对拉螺杆3上并通过紧固螺母4固定;将处在现浇钢模板9最底端的套接有PVC管11的对拉螺杆3通过紧固螺母4均连接其根部由膨胀螺栓6固定在建筑结构上的若干斜撑杆5,用以支撑固定现浇钢模板9,经过对拉螺杆3连接的外挂墙板10与现浇钢模板9之间形成结构待现浇筑空间; Step 4. Connect and fix the external wall panels 10 at the corners at right angles by the strip right-angle connecting plates 7 through all the embedded sleeves 1 and fastening bolts 2 at the corners of the external wall panels 10; The external hanging wall panels 10 are connected and fixed together by the strip-shaped straight connecting plates 8 through the embedded sleeves 1 and fastening bolts 2 on the external hanging wall panels 10; All the pull-screws 3 of the pipe 11 are fixed by fastening nuts 4; the pull-screws 3 at the bottom of the cast-in-place steel formwork 9 are connected with the PVC pipes 11 through the fastening nuts 4, and their roots are expanded Bolts 6 are fixed on a number of diagonal braces 5 on the building structure to support and fix the cast-in-place steel formwork 9, and a space to be cast-in-place is formed between the external wall panels 10 connected by the pull screw 3 and the cast-in-place steel formwork 9;

步骤5、向外挂墙板10与现浇钢模板9之间的空间进行现浇混凝土工作; Step 5, perform cast-in-place concrete work in the space between the externally hung wall panels 10 and the cast-in-place steel formwork 9;

步骤6、现浇结构混凝土达到设计强度后,松开紧固螺母4并拆除所有对拉螺杆3,拆卸现浇钢模板9,将全部对拉螺杆3、卸现浇钢模板9及紧固螺母4进行保管以备重复使用。 Step 6. After the cast-in-place structural concrete reaches the design strength, loosen the fastening nut 4 and remove all the tensioning screws 3, remove the cast-in-place steel formwork 9, and remove all the tensioning screws 3, unload the cast-in-place steel formwork 9 and the fastening nuts 4 Keep it for reuse.

本发明装配式混凝土预制外挂墙板锚固组件及浇筑施工方法与现有技术不同之处在于本发明装配式混凝土预制外挂墙板锚固组件设计的条形直角连接板、条型平直连接板、预埋套筒、紧固螺栓以及对拉螺杆结构简单、造价低廉、通用性强,部分配件可重复使用,极大地降低了工程造价。使用本发明的装配式混凝土预制外挂墙板锚固组件并利用其安装方法,使连接的各个部件定位准确而且施工方便,既满足了外挂墙板安装时的稳固要求,又提高了外挂墙板安装速度。 The difference between the prefabricated concrete prefabricated external wallboard anchor assembly and the pouring construction method of the present invention and the prior art lies in the strip-shaped right-angled connecting plate, strip-shaped straight connecting plate, The buried sleeve, the fastening bolt and the pull screw are simple in structure, low in cost and strong in versatility, and some parts can be reused, which greatly reduces the project cost. Using the prefabricated concrete prefabricated external wall panel anchoring assembly of the present invention and its installation method make the positioning of the connected parts accurate and convenient for construction, which not only meets the stability requirements of the external wall panel installation, but also improves the installation speed of the external wall panel .

下面结合附图对本发明的装配式混凝土预制外挂墙板锚固组件及浇筑施工方法作进一步说明。 The prefabricated concrete prefabricated external wall panel anchor assembly and pouring construction method of the present invention will be further described below in conjunction with the accompanying drawings.

附图说明 Description of drawings

图1为装配式混凝土预制外挂墙板锚固组件预埋套筒的结构主视示意图。 Figure 1 is a schematic front view of the structure of the pre-embedded sleeve of the prefabricated concrete prefabricated external wall panel anchor component.

图2为装配式混凝土预制外挂墙板锚固组件预埋套筒的结构侧视示意图。 Fig. 2 is a schematic side view of the structure of the pre-embedded sleeve of the prefabricated concrete prefabricated external wall panel anchor component.

图3为预埋套筒与紧固螺栓连接状态示意图。 Fig. 3 is a schematic diagram of the connection state of the embedded sleeve and the fastening bolt.

图4为预埋套筒与对拉螺杆连接状态示意图。 Fig. 4 is a schematic diagram of the connection state between the embedded sleeve and the pull screw.

图5为装配式混凝土预制外挂墙板锚固组件条形直角连接板的结构示意图。 Fig. 5 is a structural schematic diagram of a strip-shaped right-angle connecting plate of the prefabricated concrete prefabricated external wall panel anchoring component.

图6为装配式混凝土预制外挂墙板锚固组件条形平直连接板的结构示意图。 Fig. 6 is a structural schematic diagram of a strip-shaped straight connecting plate of the prefabricated concrete prefabricated external wall panel anchor assembly.

图7为本发明外挂墙板在转角部位应用图。 Fig. 7 is an application diagram of the external hanging wall panel of the present invention at a corner.

图8为本发明外挂墙板在对接部位应用图。 Fig. 8 is an application diagram of the external hanging wall panel of the present invention at the docking position.

图9为本发明外挂墙板、现浇钢模板、斜撑杆三者连接状态应用图。 Fig. 9 is an application diagram of the connection state of the external hanging wallboard, the cast-in-place steel formwork and the diagonal braces of the present invention.

具体实施方式 Detailed ways

如图1~图6所示,本发明装配式混凝土预制外挂墙板锚固组件包括带有连接孔的条形直角连接板7和带有连接孔的条型平直连接板8,还包括若干具有内螺纹孔的预埋套筒1以及通过内螺纹连接的若干紧固螺栓2或者若干带有紧固螺母4的对拉螺杆3。 As shown in Figures 1 to 6, the prefabricated concrete prefabricated external wall panel anchor assembly of the present invention includes a strip-shaped right-angled connecting plate 7 with connecting holes and a strip-shaped straight connecting plate 8 with connecting holes, and also includes several A pre-embedded sleeve 1 of an internally threaded hole and several fastening bolts 2 connected by internal threads or several pull-screws 3 with fastening nuts 4 .

如图1、图2所示,预埋套筒1由套筒部分1-1和强化预埋部分1-2构成,强化预埋部分1-2由水平杆以及与水平杆垂直相连接的十字杆构成。强化预埋部分1-2的水平杆与套筒部分1-1同轴心。 As shown in Figure 1 and Figure 2, the embedded sleeve 1 is composed of a sleeve part 1-1 and a reinforced embedded part 1-2, and the reinforced embedded part 1-2 is composed of a horizontal rod and a cross vertically connected with the horizontal rod Rod composition. The horizontal bar of the reinforced embedded part 1-2 is coaxial with the sleeve part 1-1.

如图7、图9所示,对拉螺杆3上套接有PVC套管。 As shown in Fig. 7 and Fig. 9, a PVC sleeve is sleeved on the pull screw 3.

如图7、图8、图9所示,本发明的装配式混凝土预制外挂墙板锚固组件及浇筑的施工方法包括以下步骤完成: As shown in Fig. 7, Fig. 8, and Fig. 9, the construction method of the prefabricated concrete prefabricated external wall panel anchor assembly and pouring of the present invention includes the following steps:

步骤1、首先根据图样加工制造装配式混凝土预制外挂墙板锚固组件的条形直角连接板7、条型平直连接板8、预埋套筒1、紧固螺栓2以及对拉螺杆3和紧固螺母4; Step 1. First process and manufacture the strip-shaped right-angle connecting plate 7, the strip-shaped straight connecting plate 8, the embedded sleeve 1, the fastening bolt 2, the tension screw 3 and the tensioning assembly according to the drawing. fixed nut 4;

步骤2、根据预制构件施工设计详图在外挂墙板10的规定位置,将若干预埋套筒1埋置在外挂墙板10中,并浇筑好所需全部外挂墙板10; Step 2. According to the construction design details of the prefabricated components, embed several pre-embedded sleeves 1 in the external wall panels 10 at the specified positions of the external wall panels 10, and pour all the required external wall panels 10;

步骤3、将浇筑好的预制外挂墙板10现场吊装就位后,将外挂墙板10平面墙体处的若干预埋套筒1均螺纹连接上对拉螺杆3,之后在每个对拉螺杆3上套接PVC管11; Step 3. After the poured prefabricated external hanging wall panels 10 are hoisted in place on site, a number of pre-embedded sleeves 1 at the plane walls of the external hanging wall panels 10 are all screwed to the pull screw 3, and then each pull screw 3 upper sleeve PVC pipe 11;

步骤4、将转角处的外挂墙板10由条形直角连接板7通过外挂墙板10边角处的所有预埋套筒1以及紧固螺栓2成直角连接固定在一起;将处在同一平面的外挂墙板10由条形平直连接板8通过外挂墙板10上的预埋套筒1以及紧固螺栓2连接固定在一起;将现浇钢模板9通过连接孔安装在套接有PVC管11的所有对拉螺杆3上并通过紧固螺母4固定;将处在现浇钢模板9最底端的套接有PVC管11的对拉螺杆3通过紧固螺母4均连接其根部由膨胀螺栓6固定在建筑结构上的若干斜撑杆5,用以支撑固定现浇钢模板9,经过对拉螺杆3连接的外挂墙板10与现浇钢模板9之间形成结构待现浇筑空间; Step 4. Connect and fix the external wall panels 10 at the corners at right angles by the strip right-angle connecting plates 7 through all the embedded sleeves 1 and fastening bolts 2 at the corners of the external wall panels 10; The external hanging wall panels 10 are connected and fixed together by the strip-shaped straight connecting plates 8 through the embedded sleeves 1 and fastening bolts 2 on the external hanging wall panels 10; All the pull-screws 3 of the pipe 11 are fixed by fastening nuts 4; the pull-screws 3 at the bottom of the cast-in-place steel formwork 9 are connected with the PVC pipes 11 through the fastening nuts 4, and their roots are expanded Bolts 6 are fixed on a number of diagonal braces 5 on the building structure to support and fix the cast-in-place steel formwork 9, and a space to be cast-in-place is formed between the external wall panels 10 connected by the pull screw 3 and the cast-in-place steel formwork 9;

步骤5、向外挂墙板10与现浇钢模板9之间的空间进行现浇混凝土工作; Step 5, perform cast-in-place concrete work in the space between the externally hung wall panels 10 and the cast-in-place steel formwork 9;

步骤6、现浇结构混凝土达到设计强度后,松开紧固螺母4并拆除对所有拉螺栓3,拆卸现浇钢模板9,将对全部拉螺栓3、钢模板9及紧固螺母4进行保管以备重复使用。 Step 6. After the cast-in-place structural concrete reaches the design strength, loosen the fastening nuts 4 and remove all the pull bolts 3, remove the cast-in-place steel formwork 9, and keep all the pull bolts 3, steel formwork 9 and fastening nuts 4 for repeated use.

本发明提供了一套设计简单、操作简便、制作成本低、成标准化可通用的的锚固组件。使用本发明的锚固组件可使外挂墙板10相互之间、外挂墙板10与现浇钢模板9及斜撑杆5之间快速可靠地连接,方便了外挂墙板10垂直度调整及防止倾倒,并使外挂墙板10与现浇钢模板9形成了稳固的连接体系,加快了现浇混凝土的施工速度。 The invention provides a set of standardized and universal anchoring components with simple design, convenient operation, low manufacturing cost. Using the anchor assembly of the present invention can quickly and reliably connect the external wall panels 10 to each other, the external wall panels 10 and the cast-in-place steel formwork 9 and the diagonal braces 5, which facilitates the verticality adjustment of the external wall panels 10 and prevents them from toppling over , and make the external wall panel 10 and the cast-in-place steel formwork 9 form a stable connection system, which speeds up the construction speed of the cast-in-place concrete.

以上所述的实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明权利要求书确定的保护范围内。 The above-mentioned embodiments are only descriptions of preferred implementations of the present invention, and are not intended to limit the scope of the present invention. Variations and improvements should fall within the scope of protection defined by the claims of the present invention.

Claims (4)

1.一种装配式混凝土预制外挂墙板锚固组件的施工方法,其特征在于:所述装配式混凝土预制外挂墙板锚固组件,包括带有连接孔的条形直角连接板(7)和带有连接孔的条型平直连接板(8),所述装配式混凝土预制外挂墙板锚固组件还包括若干具有内螺纹孔的预埋套筒(1)以及通过内螺纹连接的若干紧固螺栓(2)或者若干带有紧固螺母(4)的对拉螺杆(3); 1. A construction method for a prefabricated concrete prefabricated external wall panel anchor assembly, characterized in that: the prefabricated concrete prefabricated external wall panel anchor assembly includes a strip-shaped right-angled connecting plate (7) with a connecting hole and a The strip-type straight connecting plate (8) of the connection hole, the prefabricated concrete prefabricated external wall panel anchor assembly also includes several embedded sleeves (1) with internal thread holes and several fastening bolts connected by internal threads ( 2) or several pull screws (3) with fastening nuts (4); 所述装配式混凝土预制外挂墙板锚固组件的施工方法中包括以下步骤: The construction method of the prefabricated concrete prefabricated external wallboard anchor assembly includes the following steps: 步骤1、首先根据图样加工制造装配式混凝土预制外挂墙板锚固组件的条形直角连接板(7)、条型平直连接板(8)、预埋套筒(1)、紧固螺栓(2)以及对拉螺杆(3)和紧固螺母(4); Step 1. First process and manufacture the strip-shaped right-angle connecting plate (7), the strip-shaped straight connecting plate (8), the embedded sleeve (1), and the fastening bolt (2) according to the drawing. ) and the pull screw (3) and fastening nut (4); 步骤2、根据预制构件施工设计详图在外挂墙板(10)的规定位置,将若干预埋套筒(1)埋置在外挂墙板(10)中,并浇筑好所需全部外挂墙板(10); Step 2. Embed a number of pre-embedded sleeves (1) in the external wall panels (10) at the specified positions of the external wall panels (10) according to the construction design details of the prefabricated components, and pour all the required external wall panels (10); 步骤3、将浇筑好的预制外挂墙板(10)现场吊装就位后,将外挂墙板(10)平面墙体处的若干预埋套筒(1)均螺纹连接上对拉螺杆(3),之后在每个对拉螺杆(3)上套接PVC管(11); Step 3. After the poured prefabricated external wall panel (10) is hoisted in place on site, several pre-embedded sleeves (1) at the plane wall of the external wall panel (10) are screwed to the pull screw (3) , and then socket PVC pipes (11) on each pull screw (3); 步骤4、将转角处的外挂墙板(10)由条形直角连接板(7)通过外挂墙板(10)边角处的所有预埋套筒(1)以及紧固螺栓(2)成直角连接固定在一起;将处在同一平面的外挂墙板(10)由条形平直连接板(8)通过外挂墙板(10)上的预埋套筒(1)以及紧固螺栓(2)连接固定在一起;将现浇钢模板(9)通过连接孔安装在套接有PVC管(11)的所有对拉螺杆(3)上并通过紧固螺母(4)固定;将处在现浇钢模板(9)最底端的套接有PVC管(11)的对拉螺杆(3)通过紧固螺母(4)均连接其根部由膨胀螺栓(6)固定在建筑结构上的若干斜撑杆(5),用以支撑固定现浇钢模板(9),经过对拉螺杆(3)连接的外挂墙板(10)与现浇钢模板(9)之间形成结构待现浇筑空间; Step 4. Connect the external wall panel (10) at the corner to form a right angle through all the pre-embedded sleeves (1) and fastening bolts (2) at the corners of the external wall panel (10) through the strip right-angle connecting plate (7) Connect and fix together; the external wall panels (10) on the same plane are connected by strip-shaped straight connecting plates (8) through the embedded sleeves (1) and fastening bolts (2) on the external wall panels (10) Connect and fix together; install the cast-in-place steel formwork (9) on all the pull screws (3) that are sleeved with PVC pipes (11) through the connection holes and fix them with fastening nuts (4); the cast-in-place The bottom of the steel formwork (9) is sleeved with a PVC pipe (11) and the pull screw (3) is connected to several diagonal struts whose roots are fixed on the building structure by the expansion bolt (6) through the fastening nut (4) (5), used to support and fix the cast-in-place steel formwork (9), and form a structure to be poured in-situ between the external wallboard (10) connected by the pull screw (3) and the cast-in-place steel formwork (9); 步骤5、向外挂墙板(10)与现浇钢模板(9)之间的空间进行现浇混凝土工作; Step 5, performing cast-in-place concrete work in the space between the externally hung wall panels (10) and the cast-in-place steel formwork (9); 步骤6、现浇结构混凝土达到设计强度后,松开紧固螺母(4)并拆除所有对拉螺杆(3),拆卸现浇钢模板(9),将全部对拉螺杆(3)、现浇钢模板(9)及紧固螺母(4)进行保管以备重复使用。 Step 6. After the cast-in-place structural concrete reaches the design strength, loosen the fastening nuts (4) and remove all the tension screws (3), remove the cast-in-place steel formwork (9), and place all the tension screws (3), cast-in-place Steel template (9) and fastening nut (4) are kept for repeated use. 2.根据权利要求1所述的装配式混凝土预制外挂墙板锚固组件的施工方法,其特征在于:所述预埋套筒(1)由套筒部分(1-1)和强化预埋部分(1-2)构成,所述强化预埋部分(1-2)由水平杆以及与所述水平杆垂直相连接的十字杆构成。 2. The construction method of the prefabricated concrete prefabricated external wallboard anchor assembly according to claim 1, characterized in that: the embedded sleeve (1) consists of a sleeve part (1-1) and a reinforced embedded part ( 1-2), the reinforced embedded part (1-2) is composed of horizontal rods and cross rods vertically connected to the horizontal rods. 3.根据权利要求2所述的装配式混凝土预制外挂墙板锚固组件的施工方法,其特征在于:所述强化预埋部分(1-2)的水平杆与所述套筒部分(1-1)同轴心。 3. The construction method of the prefabricated concrete prefabricated external wallboard anchor assembly according to claim 2, characterized in that: the horizontal bar of the reinforced pre-embedded part (1-2) and the sleeve part (1-1 ) concentric. 4.根据权利要求3所述的装配式混凝土预制外挂墙板锚固组件的施工方法,其特征在于:所述对拉螺杆(3)上套接有PVC套管。 4. The construction method of the prefabricated concrete prefabricated exterior wall panel anchoring assembly according to claim 3, characterized in that: said pull screw (3) is sleeved with a PVC sleeve.
CN201210300211.8A 2012-08-22 2012-08-22 Pouring construction method for anchor assembly of prefabricated concrete prefabricated external wall panel Active CN102808509B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210300211.8A CN102808509B (en) 2012-08-22 2012-08-22 Pouring construction method for anchor assembly of prefabricated concrete prefabricated external wall panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210300211.8A CN102808509B (en) 2012-08-22 2012-08-22 Pouring construction method for anchor assembly of prefabricated concrete prefabricated external wall panel

Publications (2)

Publication Number Publication Date
CN102808509A CN102808509A (en) 2012-12-05
CN102808509B true CN102808509B (en) 2014-09-24

Family

ID=47232364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210300211.8A Active CN102808509B (en) 2012-08-22 2012-08-22 Pouring construction method for anchor assembly of prefabricated concrete prefabricated external wall panel

Country Status (1)

Country Link
CN (1) CN102808509B (en)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061267A (en) * 2013-01-15 2013-04-24 广州市市政工程设计研究院 Construction method of combined prefabricated bridge anti-collision wall
CN103422667B (en) * 2013-09-06 2016-02-03 南京工业大学 Double-plate prefabricated superposed wall supporting system
CN107386632B (en) * 2013-12-21 2019-10-25 中建四局第三建筑工程有限公司 An aluminum alloy formwork base
CN104912204B (en) * 2015-07-07 2017-12-26 钟智谦 Attachment structure and connection method
CN105064684A (en) * 2015-08-11 2015-11-18 中天建设集团有限公司 Construction structure using two sections of screw rods
CN105442833B (en) * 2015-12-30 2017-07-25 大连三川建筑科技有限公司 Assemble the cast-in-situ template bracing means of exterior wall and the T-shaped connecting portion of cast-in-place interior wall
CN106978852A (en) * 2016-01-18 2017-07-25 广州地铁设计研究院有限公司 A kind of embedded system of standardization and the construction method for standardizing built-in fitting
CN105484402B (en) * 2016-01-27 2018-08-07 南京奥捷墙体材料有限公司 Combined GRC wall panels and GRC curtain walls
CN106436966A (en) * 2016-12-08 2017-02-22 四川华构住宅工业有限公司 Wall transverse full-dry type connection structure based on assembled type building wall and assembly method of wall transverse full-dry type connection structure
CN106760158B (en) * 2017-01-23 2022-08-30 中国建筑第八工程局有限公司 External hanging type precast concrete sandwich heat-insulation wallboard and assembly system and construction method thereof
CN107143137A (en) * 2017-05-31 2017-09-08 中建科技成都有限公司 Cast-in-situ template structure and construction method at a kind of sandwich exterior wall J-shaped wall of prefabricated concrete structure
CN109577641A (en) * 2017-09-29 2019-04-05 中国二十冶集团有限公司 Prefabricated shear wall pours constrained edge template and its installation method with after
CN107724678B (en) * 2017-10-24 2023-09-01 中国建筑第八工程局有限公司 Thermal insulation precast slab connecting node structure and thermal insulation precast slab connecting node construction method
CN108086543A (en) * 2017-11-24 2018-05-29 泰安市联强远大住宅工业有限公司 A kind of construction method of exterior wall
CN108468355A (en) * 2018-05-18 2018-08-31 郑州大学 A kind of sky ditch H profile steel retaining wall vibration isolation measure
CN108673728A (en) * 2018-05-18 2018-10-19 中国二十二冶集团有限公司 The plug-in board mold of assembling type steel structure corner and its application method
CN108756012B (en) * 2018-06-06 2024-01-26 中国建材国际工程集团有限公司 Tension rope connection assembly for joining concrete wall panels and method of use
CN108973271A (en) * 2018-07-24 2018-12-11 芜湖易测自动化设备有限公司 A kind of corrosion-resistant hardware
CN109208908A (en) * 2018-09-30 2019-01-15 中国二十二冶集团有限公司 The cast-in-place region construction method of precast facade
CN109881811A (en) * 2019-01-29 2019-06-14 上海圣奎塑业有限公司 thermal insulation wall
CN109750775B (en) * 2019-03-06 2024-11-01 大连益德红太装饰工程有限公司 Bottom-expanding embedded anchoring structure
CN111395609A (en) * 2020-04-22 2020-07-10 深圳市方大建科集团有限公司 UHPC curtain wall system
CN112663834B (en) * 2021-01-14 2025-01-03 广东海龙建筑科技有限公司 Wall and hanging plate bolting assembly and construction method thereof
CN113718954A (en) * 2021-09-07 2021-11-30 浙江大东吴建筑科技有限公司 Beam-column joint of steel and concrete combined structure and mounting method
CN118979573B (en) * 2024-10-22 2025-01-10 三东筑工(德州)有限公司 Assembled double-skin wall and production method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0760410A1 (en) * 1995-08-30 1997-03-05 Yoshiyuki Hayakawa Concrete form spacing fixture
CN2866715Y (en) * 2005-12-14 2007-02-07 杨国龙 Structural Improvement of Formwork Fixing Rod
CN201665917U (en) * 2010-03-08 2010-12-08 浙江桔乡建设有限公司 Prefabricated part fastener
CN101949185A (en) * 2010-09-09 2011-01-19 长春工程学院 Outer hanging-wall plate connecting piece
CN102518300A (en) * 2011-12-15 2012-06-27 中国建筑第二工程局有限公司 Embedded conical bearing joint type steel structure support and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0760410A1 (en) * 1995-08-30 1997-03-05 Yoshiyuki Hayakawa Concrete form spacing fixture
CN2866715Y (en) * 2005-12-14 2007-02-07 杨国龙 Structural Improvement of Formwork Fixing Rod
CN201665917U (en) * 2010-03-08 2010-12-08 浙江桔乡建设有限公司 Prefabricated part fastener
CN101949185A (en) * 2010-09-09 2011-01-19 长春工程学院 Outer hanging-wall plate connecting piece
CN102518300A (en) * 2011-12-15 2012-06-27 中国建筑第二工程局有限公司 Embedded conical bearing joint type steel structure support and construction method thereof

Also Published As

Publication number Publication date
CN102808509A (en) 2012-12-05

Similar Documents

Publication Publication Date Title
CN102808509B (en) Pouring construction method for anchor assembly of prefabricated concrete prefabricated external wall panel
CN105863275A (en) Construction method for assembly type annular reinforcement buckling concrete shear wall system
CN105926942A (en) Construction method of combined aluminum/steel frame wood-plastic formwork system
CN102926554A (en) Steel hanging seat formwork support and construction method thereof
CN116816075A (en) A one-time pouring and molding construction method for reinforced concrete reverse sill reinforced by aluminum formwork
CN108661313A (en) A kind of cast-in-place linkage section mould plate supporting device of tool-type concrete folding plate
CN204960353U (en) Take bearing diagonal subassembly of drag hook
CN205063248U (en) Prefabricated exterior wall board and precast beam hang connection structure futilely
CN204983173U (en) Steel construction beam -column connection node
CN204402039U (en) A kind of aluminum alloy mould plate system exterior wall straightening board member
CN204983647U (en) Design instrument formula aluminum alloy template
CN216787893U (en) Prefabricated shear wall positioner
CN104196263B (en) The support system of concrete prefabricated element
CN205242684U (en) Wall body erection joint spare
CN104018655B (en) A kind of assembly type monomer bracing frame
CN209907935U (en) A support device for a prefabricated exterior wall panel and an aluminum formwork cast-in-place concrete beam system
CN219569575U (en) Adjustable anchor ear structure for reinforcing vertical member template
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN105256923A (en) Light gauge steel partition wall keel fixed connector
CN104805910A (en) Embedded part for cast-in-place concrete component and construction method of embedded part
CN117027163A (en) Fully assembled frame structure for low-rise building and construction method thereof
CN204455758U (en) Shape-setting clamp formula shuttering supporting leverage
CN103195079A (en) Installation type templates, installation type template group and set of installation type template devices
CN211597390U (en) Reinforcement connection structure of vertical reinforcement in prefabricated shear wall
CN207122132U (en) A kind of building template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Mao Zhibing

Inventor after: Zhou Lixin

Inventor after: Liu Xin

Inventor after: Yuan Jiang

Inventor after: Qiao Yu

Inventor after: Liu Chengli

Inventor after: Yang Xiaojie

Inventor after: Geng Jiao

Inventor after: Wu Yuehua

Inventor after: Wei Kai

Inventor after: Xie Xiaolin

Inventor after: Xu Wei

Inventor after: Sun Jianyun

Inventor after: Tian Guangping

Inventor after: Xue Gang

Inventor after: Ren Shuhua

Inventor before: Wei Kai

Inventor before: Qiao Yu

Inventor before: Liu Chengli

Inventor before: Xie Xiaolin

Inventor before: Xu Wei

Inventor before: Tian Guangping

Inventor before: Xue Gang

Inventor before: Ren Shuhua

Inventor before: Zhou Lixin

Inventor before: Liu Xin

Inventor before: Yuan Jiang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WEI KAI XIE XIAOLIN XU WEI TIAN GUANGPING XUE GANG REN SHUHUA ZHOU LIXIN LIU XIN YUAN JIANG QIAO YU LIU CHENGLI TO: MAO ZHIBING WU YUEHUA WEI KAI XIE XIAOLIN XU WEI SUN JIANYUN TIAN GUANGPING XUE GANG REN SHUHUA ZHOU LIXIN LIU XIN YUAN JIANG QIAO YU LIU CHENGLI YANG XIAOJIE GENG JIAO

ASS Succession or assignment of patent right

Owner name: CHINA CONSTRUCTION FIRST BUILDING (GROUP) CO., LTD

Effective date: 20140527

Owner name: CHINA STATE CONSTRUCTION ENG. CORP. LTD.

Free format text: FORMER OWNER: CHINA CONSTRUCTION FIRST BUILDING (GROUP) CO., LTD.

Effective date: 20140527

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100161 FENGTAI, BEIJING TO: 100037 HAIDIAN, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20140527

Address after: 100037 Beijing, Haidian District, Li River Road, No. three, No. 15

Applicant after: CHINA STATE CONSTRUCTION ENGINEERING Corp.,Ltd.

Applicant after: CHINA CONSTRUCTION FIRST Group Corp.,Ltd.

Address before: 100161 Beijing, West Fourth Ring Road South, No. 52, building a building, room 1311, Fengtai District

Applicant before: CHINA CONSTRUCTION FIRST Group Corp.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant