CN109208908A - The cast-in-place region construction method of precast facade - Google Patents
The cast-in-place region construction method of precast facade Download PDFInfo
- Publication number
- CN109208908A CN109208908A CN201811154161.0A CN201811154161A CN109208908A CN 109208908 A CN109208908 A CN 109208908A CN 201811154161 A CN201811154161 A CN 201811154161A CN 109208908 A CN109208908 A CN 109208908A
- Authority
- CN
- China
- Prior art keywords
- split bolt
- cast
- bolt hole
- place
- siphonal lobe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The present invention provides a kind of cast-in-place region construction method of precast facade: 1) prefabricated assembled wall while the prefabricated split bolt hole on the corresponding siphonal lobe in cast-in-place region;The split bolt hole is according to prefabrication cast-in-place area size and the length of overhanging siphonal lobe, by calculating true aperture and spacing;2) after wall being mounted on rigging position, the fixation that suitable split bolt carries out two side templates is installed in the split bolt hole of siphonal lobe;3) concreting of Cast-in-Situ Segment is carried out;4) after concrete initial set, withdraw from split bolt, and split bolt hole is blocked, this construction method no longer needs live punching, flying dust is avoided to influence construction environment, execute-in-place is avoided to cause component damage, the method fundamentally solves the trouble of construction in later period, substantially increases the efficiency of construction.
Description
Technical field
The invention belongs to prefabricated shear wall construction technical fields, and in particular to fabricated shear wall cast-in-place section construction
Method.
Background technique
Assembled architecture is now very widely used, and precast facade is wherein than a kind of more typical new technique.But
Wherein still have and much needs to have cast-in-place region, the outside in cast-in-place region among perfect place, such as two panels precast facade
It is the siphonal lobe wallboard that two panels precast facade cantilevers out, is needed after precast facade installs in cast-in-place region casting concrete,
But overhanging siphonal lobe wallboard is insufficient for acting as template, needs the formwork on the outside of siphonal lobe wallboard or punches installation pair in siphonal lobe wallboard
Bolt is drawn to fix with cast-in-place area inside template, this two methods operates more troublesome, it needs to take considerable time, and such as
Fruit takes no action to direct casting concrete, and precast wall body siphonal lobe can cause to rupture because of intensity deficiency in casting concrete,
Siphonal lobe is destroyed influence construction, and many troubles can be caused to construction.
Summary of the invention
It is outer the technical problem to be solved by the present invention is to often result in overhanging when the precast wall body cast-in-place section construction of the prior art
The impaired problem of leaf.
Goal of the invention of the invention is to provide a kind of easy construction, guarantees that siphonal lobe is intact, does not damage the outer foliar spray of precast wall body
Work method, the technical solution adopted by the present invention specifically:
A kind of cast-in-place region construction method of precast facade:
1) prefabricated assembled wall while the prefabricated split bolt hole on the corresponding siphonal lobe in cast-in-place region.The split bolt
Hole is according to prefabrication cast-in-place area size and the length of overhanging siphonal lobe, by calculating true aperture and spacing.
2) after wall being mounted on rigging position, suitable split bolt is installed in the split bolt hole of siphonal lobe and carries out two
Side template is fixed.
3) concreting of Cast-in-Situ Segment is carried out.
4) after concrete initial set, split bolt is withdrawn from, and split bolt hole is blocked.
This construction method no longer needs live punching, avoids flying dust from influencing construction environment, execute-in-place is avoided to cause component
It destroys, the method fundamentally solves the trouble of construction in later period, substantially increases the efficiency of construction.
Specific embodiment
The present invention is applied to the cast-in-place region among two panels precast facade, it is therefore an objective to siphonal lobe damage is protected, for construction
Convenience is provided.
The specific technical proposal of the invention is:
A kind of cast-in-place region construction method of precast facade:
1) prefabricated assembled wall while the prefabricated split bolt hole on the corresponding siphonal lobe in cast-in-place region.The split bolt
Hole is according to prefabrication cast-in-place area size and the length of overhanging siphonal lobe, by calculating true aperture and spacing.
2) after wall being mounted on rigging position, suitable split bolt is installed in the split bolt hole of siphonal lobe and carries out two
The fixation of side template.
3) concreting of Cast-in-Situ Segment is carried out.
4) after concrete initial set, split bolt is withdrawn from, and split bolt hole is blocked.
The prefabricated split bolt hole in the cast-in-place region of precast facade of the invention is complete together when wall is prefabricated in factory.
After grasping practical prefabrication size and overhanging the length of siphonal lobe, by prefabricated split bolt diameter is calculated, then determining pair
Draw bolt hole aperture, spacing.Guarantee that prefabricated bolt hole hole point position is accurate.
This construction method no longer needs live punching, avoids flying dust from influencing construction environment, execute-in-place is avoided to cause component
It destroys, the method fundamentally solves the trouble of construction in later period, substantially increases the efficiency of construction.
Claims (1)
1. a kind of cast-in-place region construction method of precast facade:
1) prefabricated assembled wall while the prefabricated split bolt hole on the corresponding siphonal lobe in cast-in-place region.Split bolt hole root
According to prefabrication cast-in-place area size and the length of overhanging siphonal lobe, by calculating true aperture and spacing;
2) after wall being mounted on rigging position, suitable split bolt is installed in the split bolt hole of siphonal lobe and carries out two side forms
Plate is fixed;
3) concreting of Cast-in-Situ Segment is carried out;
4) after concrete initial set, split bolt is withdrawn from, and split bolt hole is blocked.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811154161.0A CN109208908A (en) | 2018-09-30 | 2018-09-30 | The cast-in-place region construction method of precast facade |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811154161.0A CN109208908A (en) | 2018-09-30 | 2018-09-30 | The cast-in-place region construction method of precast facade |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109208908A true CN109208908A (en) | 2019-01-15 |
Family
ID=64982575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811154161.0A Withdrawn CN109208908A (en) | 2018-09-30 | 2018-09-30 | The cast-in-place region construction method of precast facade |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109208908A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102808509A (en) * | 2012-08-22 | 2012-12-05 | 中国建筑一局(集团)有限公司 | Assembled concrete prefabricated outer hanging wall plate anchoring component and pouring construction method thereof |
CN205935642U (en) * | 2016-08-26 | 2017-02-08 | 中国建筑西南设计研究院有限公司 | Cast -in -place node of prefabricated wallboard of an assembly type structure mode structure |
CN206784639U (en) * | 2017-02-24 | 2017-12-22 | 中国建筑第八工程局有限公司 | It is a kind of cast-in-place with the prefabricated wall pouring structure being combined |
-
2018
- 2018-09-30 CN CN201811154161.0A patent/CN109208908A/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102808509A (en) * | 2012-08-22 | 2012-12-05 | 中国建筑一局(集团)有限公司 | Assembled concrete prefabricated outer hanging wall plate anchoring component and pouring construction method thereof |
CN205935642U (en) * | 2016-08-26 | 2017-02-08 | 中国建筑西南设计研究院有限公司 | Cast -in -place node of prefabricated wallboard of an assembly type structure mode structure |
CN206784639U (en) * | 2017-02-24 | 2017-12-22 | 中国建筑第八工程局有限公司 | It is a kind of cast-in-place with the prefabricated wall pouring structure being combined |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109208908A (en) | The cast-in-place region construction method of precast facade | |
CN109505421A (en) | The method of H profile steel reinforced concrete floor | |
CN104453226A (en) | Secondary structure post formwork erecting and positioning device | |
US20040004174A1 (en) | Formwork system for concrete bodies | |
CN208152382U (en) | A kind of prefabricated spool partition plate | |
CN210552008U (en) | Window frame positioning structure applied to prefabricated outer wall | |
CN108661188A (en) | A kind of wall tie bar fastener inserts and construction method | |
EP2312088B1 (en) | Method and device for producing a point of connection in a concrete or reinforced concrete ceiling | |
CN204728475U (en) | A kind of secondary structure steel tie bar embedded part device | |
CN209538487U (en) | A kind of connection structure of crossbeam and column | |
CN201671339U (en) | Fixing device for wall bodies and beam column templates of buildings | |
CN202416574U (en) | Embedded interconnection type lacing bar component with external protrusive inside screwed hole | |
CN110130544A (en) | A kind of light partition wall and construction method with auxiliary mounting and positioning device | |
CN204266421U (en) | X-shaped fixing hole post-install | |
CN107152161B (en) | The drawknot construction method of external scaffolding and wall interconnecting piece | |
CN111456328A (en) | Novel bar planting structure and construction method thereof | |
CN112144867A (en) | Reserved joint bar template structure for combined steel template cast-in-place structure | |
CN202441055U (en) | Embedded bolted connection type lacing bar component | |
CN204001334U (en) | Be applicable to first seal the in-situ reinforced concrete slab punching afterwards | |
CN206397128U (en) | The template system of shear wall is poured on existing structures wall face | |
CN106567538B (en) | A kind of positioning mold of toilet concrete flanging | |
JP2009108585A (en) | Method of repairing reinforcing bar of concrete structure | |
CN203113526U (en) | Temporary fixing structure of rubber waterstop | |
CN214364070U (en) | Web plum blossom trompil die mould channel-section steel | |
CN216587798U (en) | Safety protection frame for steel structure support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190115 |
|
WW01 | Invention patent application withdrawn after publication |