CN102808453A - Corner fitting device for cellular building, cellular building and construction method - Google Patents

Corner fitting device for cellular building, cellular building and construction method Download PDF

Info

Publication number
CN102808453A
CN102808453A CN2011101624367A CN201110162436A CN102808453A CN 102808453 A CN102808453 A CN 102808453A CN 2011101624367 A CN2011101624367 A CN 2011101624367A CN 201110162436 A CN201110162436 A CN 201110162436A CN 102808453 A CN102808453 A CN 102808453A
Authority
CN
China
Prior art keywords
pair
plate
corner fittings
corner
fittings device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101624367A
Other languages
Chinese (zh)
Other versions
CN102808453B (en
Inventor
董鑫
蔡秩培
吴瑞清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan villa Integrated Housing Co., Ltd.
Original Assignee
SHENZHEN MEIZUN LIGHT STEEL HOUSING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN MEIZUN LIGHT STEEL HOUSING CO Ltd filed Critical SHENZHEN MEIZUN LIGHT STEEL HOUSING CO Ltd
Priority to CN201110162436.7A priority Critical patent/CN102808453B/en
Publication of CN102808453A publication Critical patent/CN102808453A/en
Application granted granted Critical
Publication of CN102808453B publication Critical patent/CN102808453B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention discloses a corner fitting device for a cellular building; the corner fitting device is provided with a through cavity structure, a pair of first panels and a pair of second panels; the first panels are mutually connected fixedly to form a corner which is towards the outer side of the cellular building; the second panels are fixedly connected mutually to form the corner which is towards the inner side of the cellular building; the second panels are respectively connected with the first panels fixedly, wherein each second panel is provided with an unfilled angle with a present length on the top side so as to form a gap in a corner area on the inner side of the corner fitting device which is towards the cellular building. According to the corner fitting device, a plurality of parts which are adjacent to one cellular building are movably connected, assembled or detached. In a cellular building group, a plurality of adjacent cellular buildings can be movably connected to for a building group, and are easily assembled and detached. In addition, the corner fitting device in the through cavity structure can easily drain rainwater.

Description

A kind of corner fittings device that is used for cellular building, cellular building and building method
Technical field
The present invention relates to a kind of building, especially relate to a kind of improved corner fittings device and constructed cellular building and a kind of building method thereof.
Background technology
Along with popular all over the world of the building that is spliced into container repacking or architectural complex, the container construction of buildings there have been a lot of previous schemes for using.The manufacturing technology of container has been a mature technique, has formed the production line of mechanization, continuous productive process in each manufacturing shop.Yet, need utilize container to reconstruct into the place of building, usually away from these manufacturing shops.Therefore, how container is transported to the construction site, and how forms container at the scene and become an a series of difficult problem.
In some versions, be used to make up each base part of container, for example sheet material, corner fittings, crossbeam and longeron etc. are created and are transported to the scene in advance, are assembled into building at the scene.Though the transportation that each base part is scattered is quite simple, also greatly saved transport space,, build the building of such prior art, its on-the-spot assembling has very large workload, because the building site is different from the space of pipelining.
In other scheme, have with whole building building by prefabricated and transportation saving workload at the scene, but it faces the difficult problem of transportation inevitably, the architectural complex scale ten minutes that causes utilizing such method to form is limited.Cost is also very expensive.
Be through several prefabricated three-dimensional module construction of buildings and assemble this module at the scene in other selection, but transport under these circumstances and assemble all consuming time and expensive because building block is all being continued to use the steel frame construction that is used for container.The effect that the corner fittings of the corner fittings of common container and the building that utilizes the container reconstruction only has lifting and loads and transports, several parts that they will close on the mode of welding couple together, and are not convenient to dismounting and assembling.What one Chinese patent application CN1867742 showed is exactly the prefabricated building block 10 of this prior art, and as shown in Figure 1, it remains the corner fittings that utilizes the TEU (Twenty-foot Equivalent Unit) casting structure, for example: bottom corner fittings 21 and top corner fittings 22.According to iso standard; The corner fittings of these casting structures all need satisfy the needs of the desired load-bearing of standard; Therefore; The corner fittings foundry goods of these prior aries has less hole, and is in fact only porose on their end face or the end/end face, so that with conventional load handling appliance handling easily (stretching into from the hole portion of drift angle spare).Hole on these bottom surfaces also is used for cooperating with fastener, and when container piled up, the base angle part of these upper strata casees and the drift angle spare of lower floor's case cooperatively interacted and fixing fastener in the time of perhaps.。
In sum; Box house facing aspect the building in box house, owing to when utilizing part to form the house, separate room or being combined into architectural complex by the house, separate room, all will be realized through corner fittings; Accomplish the cellular building standardization; Modularization, and reduce on-the-spot workload as much as possible, must improve the corner fittings structure of prior art.
Summary of the invention
One object of the present invention is, a kind of improved corner fittings device that is used for the cellular building thing is provided, and makes it be easy to assemble at the scene or dismantle, and promptly the frame construction with this cellular building thing is connected.
For realizing above-mentioned purpose, the present invention proposes a kind of corner fittings device that is used for cellular building, this corner fittings device is provided with a pair of first plate, and formula fixed to one another connects to form a bight towards the said cellular building outside; A pair of second plate; Formula fixed to one another connects to form one towards the inboard bight of said cellular building; Said a pair of second plate respectively with said a pair of fixed connection of first plate; Wherein each second plate has the unfilled corner of a predetermined length on its top margin, is used for forming a breach at the folding corner region of said corner fittings device towards the inboard of cellular building.
Corner fittings device of the present invention comprises the bracket of a taper, is arranged on the bottom of said corner fittings device, and the bottom of wherein said bracket is provided with a through hole.At least one taper surface that can said bracket is provided with a leaking hole.
Corner fittings device of the present invention comprises a dividing plate, is arranged on the inner chamber that is limited said first plate and said second plate, is used to strengthen the intensity of said corner fittings device.Dividing plate is provided with at least one drain hole.
The precalculated position of each said second plate that can corner fittings device of the present invention is provided with at least one pair of connecting hole.Correspondingly, then this each first plate is provided with at least one pair of fabrication hole.
The precalculated position of each said first plate that also can corner fittings device of the present invention is provided with a pair of counterbore that caves in that is used to connect.Correspondingly, this each second plate is provided with at least one fabrication hole.
Another object of the present invention is, a kind of box building construction that is easy to build at the scene is provided.
For realizing above-mentioned purpose, the present invention proposes a kind of cellular building, comprise a top frame; One under(-)chassis is limited a pair of longeron, pair of beams and four corner fittings devices, wherein is equipped with the floor on this under(-)chassis; With four corner posts; Be erected at four bights of said under(-)chassis respectively; And support said top frame respectively, and the said corner fittings device that wherein is limited at said under(-)chassis is provided with a pair of first plate, and formula fixed to one another connects to form a bight towards the said cellular building outside; A pair of second plate; Formula fixed to one another connects to form one towards the inboard bight of said cellular building; Said a pair of second plate respectively with said a pair of fixed connection of first plate; Wherein each second plate has the unfilled corner of a predetermined length on its top margin, is used for forming a breach at the folding corner region of said corner fittings device towards the inboard of cellular building; And at least one pair of junction plate, be used for being connected said corner fittings device and corner post are movable.
Cellular building of the present invention, this each junction plate utilize its underpart to be connected with said corner fittings device is fixed, and are being provided with a pair of connecting hole near its top, are used for flexibly connecting with the bottom of said corner post.
Cellular building of the present invention; This each junction plate utilizes its top to be connected with said corner post is fixed; And on said each junction plate, be provided with at least one pair of connecting hole near the bottom, corresponding with at least one pair of connecting hole that is provided with on the precalculated position, top of said corner fittings device.
Cellular building of the present invention, said each second plate is being provided with at least one pair of connecting hole towards the inboard folding corner region of said cellular building, and at least one pair of connecting hole that is provided with bottom near said a pair of junction plate is corresponding.
Cellular building of the present invention, each said first plate is provided with a pair of counterbore that caves in that is used to connect.
Cellular building of the present invention, said corner fittings device comprises the bracket of a taper, is arranged on the bottom of said corner fittings device, the bottom of wherein said bracket is provided with a through hole.At least one taper surface of said bracket is provided with a leaking hole.
Cellular building of the present invention is provided with a dividing plate in the inner chamber of said corner fittings device, be used to strengthen intensity.Preferably, said dividing plate is provided with a drain hole.
A further object of the present invention provides a kind of building method, makes through this method that corner fittings device of the present invention and corner post are movable and is connected, thereby realized building the cellular building thing at the scene.
For realizing above-mentioned purpose, the present invention proposes a kind of building method, comprise forming a top frame; Form a under(-)chassis, limited a pair of longeron, pair of beams and four corner fittings devices, wherein this under(-)chassis is used to be equipped with the floor; With four corner posts are provided; Be erected at respectively on four corner fittings devices of said under(-)chassis; And support said top frame; The step of wherein said formation one under(-)chassis comprises formation one corner fittings device, and wherein this corner fittings device is provided with a pair of first plate, and formula fixed to one another connects to form a bight towards the said cellular building outside; A pair of second plate; Formula fixed to one another connects to form one towards the inboard bight of said cellular building; Said a pair of second plate respectively with said a pair of fixed connection of first plate; Wherein each second plate has the unfilled corner of a predetermined length on its top margin, is used for forming a breach at the folding corner region of said corner fittings device towards the inboard of cellular building; And at least one pair of junction plate, be used for being connected said corner fittings device and corner post are movable.
According to an aspect of the present invention, the corner fittings device with cavity structure of the present invention can flexibly connect the adjacent several component of cellular building thing, can assemble, and is detachable, and practiced thrift cost of transportation greatly.
According to another aspect of the present invention, the corner fittings device of special construction of the present invention in a case building construction crowd, can flexibly connect adjacent several cellular building things with the formation architectural complex, and assemble easily and dismantle.
According to a further aspect of the invention, the corner fittings device that has a cavity structure also is easy to discharge rainwater.
Description of drawings
Below in conjunction with accompanying drawing and detailed embodiment the present invention is elaborated, wherein:
The sketch map of the pre-cast building unit module of a kind of prior art of Fig. 1;
What Fig. 2 showed is the block construction of cellular building thing of the present invention;
That Fig. 3 A shows is an embodiment of corner fittings device of the present invention;
That Fig. 3 B shows is another embodiment of corner fittings device of the present invention, has wherein removed a pair of second plate, has shown the dividing plate that is arranged in the inner chamber;
That Fig. 4 A shows is another embodiment of corner fittings device of the present invention;
What Fig. 4 B showed is the sketch map of bracket among Fig. 4 A;
Fig. 5 is the decomposing schematic representation of an embodiment being connected with corner post of corner fittings device of the present invention, shows the junction plate that cooperates with corner fittings device of the present invention;
Fig. 6 is the decomposing schematic representation of another embodiment of being connected with corner post of corner fittings device of the present invention;
Fig. 7 is the decomposing schematic representation of another embodiment that is connected with corner post of corner fittings device of the present invention.
The specific embodiment
Below, through exemplary embodiment the present invention is specifically described.Yet should be appreciated that under the situation that is not having further narration element, structure and characteristic in embodiment also can be attached in other embodiment valuably.
Fig. 2 has shown the block construction of cellular building thing 30 of the present invention, and its frame construction comprises: go up corner fittings device 301, a pair of upward longeron 302 and a pair of top rail 303 for four and be welded into top frame; Four following corner fittings devices 308 are welded into the underframe frame with a pair of longeron 310 down with a pair of lower transverse beam 309; Four corner posts 306 adopt the mode (for example: screw or bolt) of flexible connection to form the framework of cellular building with last corner fittings 301 and corner fittings device 308.Further, still adopt the mode (for example: screw or bolt) that flexibly connects can framed side wallboard 307 be connected with framework with end wall panel 309, form whole cellular building.The mode that flexibly connects is easy to on-the-spot installation and removal.Because the thickness of top frame and underframe frame is little, framed side wallboard, end wall panel and corner post repeatedly put away to transport and deposit together all only accounts for very little space.In addition, if desired, door 305 or window can on headwall that is fit to or side wall, be offered, to be suitable for people's inhabitation.
A preferred embodiment of the following corner fittings device (to call corner fittings device in the following text) of the cellular building of the present invention that Fig. 3 A shows.At first, corner fittings device 70 is the cavity structures that are made up of four plate bodys, has a pair of first plate 72, and formula fixed to one another (for example: welding) to form a bight A towards the cellular building (not shown) outside connects; A pair of second plate 74, formula fixed to one another (for example: welding) to form one towards the inboard bight B of said cellular building connect.Said a pair of second plate 74 respectively with said a pair of 72 fixed connections of first plate.Specifically, each second plate 74 all has the unfilled corner 75 of a predetermined length on its top margin, is used for forming a breach C at the folding corner region of said corner fittings device towards the inboard of cellular building.A dividing plate 76 can be set, to strengthen intensity, shown in Fig. 3 B in the inner chamber of corner fittings device 70.Preferably, a through hole 77 can be set on dividing plate 76, be beneficial to discharge rainwater.
What Fig. 4 A and Fig. 4 B showed is another preferred embodiment of the corner fittings device 80 of cellular building of the present invention; With embodiment illustrated in fig. 3 different; The present invention can preferably be provided with the bracket 90 of a taper in the bottom of said corner fittings device; Have 92 and four taper surfaces 94 in bottom, the bottom 92 of wherein said bracket is provided with a bigger through hole 93, has the function of leaking.Preferably, the taper surface 94 of said bracket is provided with at least one leaking hole 95, certainly, can on four taper surfaces 94, leaking hole 95 be set all.According to preferred embodiment of the present invention, bracket 90 is except having the effect of strengthening intensity, and taper surface also when cellular building piles up, plays the effect of guiding.
Because corner fittings device of the present invention is to have movable connection method flexibly with corner post.Preferably, corner fittings device of the present invention can utilize a pair of junction plate 311 to realize flexibly connecting.After corner fittings device and longitudinal and cross beam are welded into framework, both can be (for example: angle steel) be welded on the bottom of corner post, be connected with corner fittings device through screw 312 then with junction plate 311.Therefore; Utilize this connected mode; Appropriate location that at first need corner fittings device is provided with connecting hole; For example: in the embodiment shown in Fig. 3 A and Fig. 4 A, all a pair of connecting hole 78 need be set on the appropriate location of second plate 74, a pair of fabrication hole 79 that is easy to the attaching/detaching operation is set on the appropriate location of first plate 72 then.
As shown in Figure 5, correspondingly, on the correspondence position of junction plate 311, a pair of connecting hole 316 and a pair of fabrication hole 314 need be set too.So; Screw 312 can pass the connecting hole 316 on connecting hole 78 and the junction plate 311 on the corner fittings device 70, the cover top nut, and box spanner 313 once passes fabrication hole 79 and/or the fabrication hole 314 on the junction plate 311 on the corner fittings 70; The cover top nut can tighten the screws 312 and nut.After connect accomplishing, more than these flexibly connect, the screw ledge is stayed the inboard of corner post.
Certainly can understand, corner fittings device of the present invention also can be with junction plate 311 (for example: angle steel) be welded on the top of corner fittings device, be connected through the bottom of screw with corner post 306.Similarly, in the precalculated position of corner post connecting hole is set and the fabrication hole (not shown) can be accomplished attended operation.
Because connecting is the inboard at corner post, the outside does not have ledge, like this, when case links with case, can be close to corner post by corner post, and is very close to each other; Can holding screw through fabrication hole, after assembling is accomplished, available shutoff with fabrication hole stifled on.
Should be appreciated that this connecting hole can that kind as shown in Figure 5 be arranged on a pair of second plate 74, that kind as shown in Figure 5 also can be arranged on a pair of first plate 42.
Consult Fig. 6, screw terminal can also be arranged on the outer side plane of corner post.At this moment, connecting hole 71 is arranged on first plate 72, and connecting hole 71 is the screw hole on recessed plane.The precalculated position is provided with groove 315 on the junction plate 311, and it is provided with screw hole 316.Corner post 306 is connected with junction plate 311 earlier, goes again to be connected with corner fittings device 70 usefulness screws, and recessed screw hole 71 concentric butt joints the on the screw hole 316 on the groove and the corner fittings, connection screw 64 is fastening with its link.Like this, the design of depressed screw hole has guaranteed that screw terminal is in the corner fittings outerplanar.Should be appreciated that Fig. 6 and Fig. 7 have schematically shown, still needs fabrication hole and come compounding practice, and has omitted at this in these holes in order to accomplish fitting operation according to multiple connected mode of the present invention.
That shown in Figure 7 is another kind of embodiment, does not wherein have groove on the junction plate, but the same with recessed screw hole on the corner fittings, and method of attachment is the same with method among Fig. 6.
Though should be pointed out that invention has been described through above-mentioned embodiment, yet the present invention also can have other numerous embodiments.Under the prerequisite that does not break away from spirit and scope of the invention; Those of ordinary skill in the art obviously can make various corresponding changes and distortion to the present invention, but these changes and distortion all should belong in the scope that accompanying claims of the present invention and equivalent thereof protect.

Claims (17)

1. a corner fittings device that is used for cellular building is characterized in that, this corner fittings device has a cavity structure, is provided with
A pair of first plate, formula fixed to one another connect to form a bight towards the said cellular building outside;
A pair of second plate; Formula fixed to one another connects to form one towards the inboard bight of said cellular building; Said a pair of second plate respectively with said a pair of fixed connection of first plate; Wherein each second plate has the unfilled corner of a predetermined length on its top margin, is used for forming a breach at the folding corner region of said corner fittings device towards the inboard of cellular building.
2. corner fittings device as claimed in claim 1 is characterized in that said corner fittings device comprises the bracket of a taper, is arranged on the bottom of said corner fittings device, and the bottom of wherein said bracket is provided with a through hole.
3. corner fittings device as claimed in claim 2 is characterized in that, at least one taper surface of said bracket is provided with a leaking hole.
4. according to claim 1 or claim 2 corner fittings device is characterized in that said corner fittings device comprises a dividing plate, is arranged on the inner chamber that is limited said first plate and said second plate, is used to strengthen the intensity of said corner fittings device.
5. corner fittings device as claimed in claim 4 is characterized in that said dividing plate is provided with at least one drain hole.
6. according to claim 1 or claim 2 corner fittings device is characterized in that the precalculated position of each said second plate of said corner fittings device is provided with at least one pair of connecting hole; Each said first plate is provided with at least one pair of fabrication hole.
7. according to claim 1 or claim 2 corner fittings device is characterized in that the precalculated position of each said first plate of said corner fittings device is provided with a pair of counterbore that caves in that is used to connect; Each said first plate is provided with at least one pair of fabrication hole.
8. a cellular building comprises
One top frame;
One under(-)chassis is limited a pair of longeron, pair of beams and four corner fittings devices, wherein is equipped with the floor on this under(-)chassis; With
Four corner posts are erected at four bights of said under(-)chassis respectively, and support said top frame respectively,
It is characterized in that, be limited at the said corner fittings device of said under(-)chassis, have a cavity structure, be provided with
A pair of first plate, formula fixed to one another connect to form a bight towards the said cellular building outside;
A pair of second plate; Formula fixed to one another connects to form one towards the inboard bight of said cellular building; Said a pair of second plate respectively with said a pair of fixed connection of first plate; Wherein each second plate has the unfilled corner of a predetermined length on its top margin, is used for forming a breach at the folding corner region of said corner fittings device towards the inboard of cellular building; And
At least one pair of junction plate is used for being connected said corner fittings device and corner post are movable.
9. cellular building as claimed in claim 8 is characterized in that said corner fittings device comprises the bracket of a taper, is arranged on the bottom of said corner fittings device, and the bottom of wherein said bracket is provided with a through hole.
10. cellular building as claimed in claim 9 is characterized in that, at least one taper surface of said bracket is provided with a leaking hole.
11., it is characterized in that this at least one pair of junction plate utilizes its underpart to be connected with said corner fittings device is fixed, and is being provided with a pair of connecting hole near its top like claim 8 or 9 described cellular buildings, be used for flexibly connecting with the bottom of said corner post.
12. like claim 8 or 9 described cellular buildings; It is characterized in that; This each junction plate utilizes its top to be connected with the bottom of said corner post is fixed; And on said each junction plate, be provided with at least one pair of connecting hole near the bottom, and corresponding with at least one pair of connecting hole that is provided with on the precalculated position, top of said corner fittings device, flexibly connect realizing.
13. cellular building as claimed in claim 12; It is characterized in that; Said corner fittings device is provided with a pair of connecting hole at said each second plate; On said each first plate, a pair of fabrication hole is set all, corresponding with at least one pair of connecting hole and a pair of fabrication hole that are provided with near the bottom of said a pair of junction plate respectively.
14. cellular building as claimed in claim 12 is characterized in that, each said first plate of said corner fittings device is provided with a pair of counterbore that caves in that is used to connect, and said each second plate is provided with a pair of fabrication hole.
15., it is characterized in that like claim 8 or 9 described cellular buildings, be provided with a dividing plate in the inner chamber of said corner fittings device, be used to strengthen intensity.
16. cellular building as claimed in claim 15 is characterized in that, said dividing plate is provided with a drain hole.
17. a building method comprises
Form a top frame;
Form a under(-)chassis, limited a pair of longeron, pair of beams and four corner fittings devices, wherein this under(-)chassis is used to be equipped with the floor; With
Four corner posts are provided, are erected at respectively on four corner fittings devices of said under(-)chassis, and be supported on four bights of said top frame, wherein these four corner posts are used to be equipped with side wall and headwall, and this side wall or headwall are provided with at least one door or at least one window,
It is characterized in that the step of said formation one under(-)chassis comprises the corner fittings device that formation one has a cavity structure, is provided with
A pair of first plate, formula fixed to one another connect to form a bight towards the said cellular building outside;
A pair of second plate; Formula fixed to one another connects to form one towards the inboard bight of said cellular building; Said a pair of second plate respectively with said a pair of fixed connection of first plate; Wherein each second plate has the unfilled corner of a predetermined length on its top margin, is used for forming a breach at the folding corner region of said corner fittings device towards the inboard of cellular building; And
At least one pair of junction plate is used for being connected said corner fittings device and corner post are movable.
CN201110162436.7A 2011-05-30 2011-05-30 Corner fitting device for cellular building, cellular building and construction method Active CN102808453B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110162436.7A CN102808453B (en) 2011-05-30 2011-05-30 Corner fitting device for cellular building, cellular building and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110162436.7A CN102808453B (en) 2011-05-30 2011-05-30 Corner fitting device for cellular building, cellular building and construction method

Publications (2)

Publication Number Publication Date
CN102808453A true CN102808453A (en) 2012-12-05
CN102808453B CN102808453B (en) 2015-07-01

Family

ID=47232309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110162436.7A Active CN102808453B (en) 2011-05-30 2011-05-30 Corner fitting device for cellular building, cellular building and construction method

Country Status (1)

Country Link
CN (1) CN102808453B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327173A (en) * 2017-08-18 2017-11-07 四川英特空间影业有限公司 Expandable type modularization intelligent Movie House

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2749843Y (en) * 2004-11-11 2006-01-04 中国国际海运集装箱(集团)股份有限公司 Top angle device and container employing same on top
CN201003214Y (en) * 2007-01-11 2008-01-09 陈开玖 Container type movable house apical angle member
WO2010089535A2 (en) * 2009-02-05 2010-08-12 Blue Planet Buildings Limited Modular assembly shelter
CN201597955U (en) * 2010-01-29 2010-10-06 胜狮货柜技术研发(上海)有限公司 Container
CN102036887A (en) * 2008-04-08 2011-04-27 彼得·沃克 System for securing containers with multiple embodiments
CN102041905A (en) * 2011-01-05 2011-05-04 深圳市华凯丰轻钢有限公司 Container house
CN202139695U (en) * 2011-05-30 2012-02-08 深圳市美尊轻钢房屋有限公司 Corner piece device for cellular building and cellular building

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2749843Y (en) * 2004-11-11 2006-01-04 中国国际海运集装箱(集团)股份有限公司 Top angle device and container employing same on top
CN201003214Y (en) * 2007-01-11 2008-01-09 陈开玖 Container type movable house apical angle member
CN102036887A (en) * 2008-04-08 2011-04-27 彼得·沃克 System for securing containers with multiple embodiments
WO2010089535A2 (en) * 2009-02-05 2010-08-12 Blue Planet Buildings Limited Modular assembly shelter
CN201597955U (en) * 2010-01-29 2010-10-06 胜狮货柜技术研发(上海)有限公司 Container
CN102041905A (en) * 2011-01-05 2011-05-04 深圳市华凯丰轻钢有限公司 Container house
CN202139695U (en) * 2011-05-30 2012-02-08 深圳市美尊轻钢房屋有限公司 Corner piece device for cellular building and cellular building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327173A (en) * 2017-08-18 2017-11-07 四川英特空间影业有限公司 Expandable type modularization intelligent Movie House

Also Published As

Publication number Publication date
CN102808453B (en) 2015-07-01

Similar Documents

Publication Publication Date Title
CN104755678B (en) Modular building
CN100402765C (en) Box shaped house model of construction and fabricating method
KR100937196B1 (en) Unit module using light weight panel and modular structure using the same
JPH102018A (en) Building unit, unit building, and its constructing method
CN102808512A (en) Construction method of box type building
JP5932404B2 (en) Container house connection structure
CN104060695A (en) Modular building and construction method thereof
CN110145033B (en) Assembled combined house structure
JP2006152557A (en) Steel house structure and steel house construction method
CN201176366Y (en) Hook structure for suspensing transportation device added in buildings
JP2011140860A (en) Building unit and method for transporting the same
JP6667940B2 (en) Exterior wall panel and column layout structure of exterior wall and layout construction method
CN202139695U (en) Corner piece device for cellular building and cellular building
CN202176024U (en) Corner piece device for box type building and box type building
JP5172604B2 (en) Construction method of unit type building
CN102808453A (en) Corner fitting device for cellular building, cellular building and construction method
JP5702767B2 (en) Unit building
RU154791U1 (en) REINFORCED CONSTRUCTION COMPONENT OF BUILDING FROM CONTAINER MODULES
CN102808454A (en) Corner fitting device for cellular building, cellular building and construction method
CN202882109U (en) Light-duty wood connecting and assembling structure
WO2013166646A1 (en) Transportable, steel-structure, and sealed unit module and fabrication method for fabricating the unit module
KR101437083B1 (en) Method for constructing steel structure building with easy assembly
KR101320938B1 (en) Unit moduler structure for extension and connecting method therof
CN203066239U (en) Multi-storey moving combined building
CN205777676U (en) Monolayer container movable plank house

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170925

Address after: 523000 Guangdong province Dongguan city Changan town Shatou community Muyu Road No. 83

Patentee after: Dongguan villa Integrated Housing Co., Ltd.

Address before: 518052 Guangdong city of Shenzhen province Nanshan District Yuquanlu Road Yizhe building 12 floor

Patentee before: Shenzhen Meizun Light Steel Housing Co., Ltd.

TR01 Transfer of patent right