CN102787205A - 转炉干法除尘蒸发冷却塔喷水量调节装置及方法 - Google Patents
转炉干法除尘蒸发冷却塔喷水量调节装置及方法 Download PDFInfo
- Publication number
- CN102787205A CN102787205A CN201210260081XA CN201210260081A CN102787205A CN 102787205 A CN102787205 A CN 102787205A CN 201210260081X A CN201210260081X A CN 201210260081XA CN 201210260081 A CN201210260081 A CN 201210260081A CN 102787205 A CN102787205 A CN 102787205A
- Authority
- CN
- China
- Prior art keywords
- valve
- flow rate
- cooling tower
- injection flow
- control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/25—Process efficiency
Landscapes
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
Abstract
本发明公开了一种转炉干法除尘蒸发冷却塔喷水量调节装置及方法,特别涉及冶金炼钢行业转炉干法除尘蒸发冷却塔喷水量控制。所述装置包括电磁流量计、冷却水压力检测仪、冷却水压力报警仪、切断阀、流量调节阀、蒸发冷却塔、入口温度检测仪及出口温度检测仪。所述调节方法包括吹炼初期开环控制和当烟气温度趋于稳定后闭环PID控制。开环控制主要是通过电磁流量计、切断阀、流量调节阀以及出口温度检测仪的控制信号与PLC系统连接,实现信号的传递,使水流量跟随烟气温度的变化而变化,平衡整个控制过程的供水量,以达到喷水量的自动控制调节。
Description
技术领域
本发明涉及一种转炉干法除尘蒸发冷却塔喷水量调节装置及方法,特别涉及冶金炼钢行业转炉干法除尘蒸发冷却塔喷水量控制。
背景技术
在冶金炼钢行业,干法除尘的核心是温度的控制。转炉干法除尘蒸发冷却器的供水管上设有一个流量调节阀,当转炉吹氧后开始投入,一般控制方式是先将调节阀打到一个预设定的开度,延时一段时间后再转PID控制。但是由于喷水量与转炉烟气的温度有关,在吹炼初期,烟气温度是不断快速上升的,所以相应的冷却水流量设定值也不断增加,但如果调节阀过早投入PID自动控制,则由于设定值变化太快,阀门动作无法跟上变化的温度,而如果在初期采用开环控制,设定在一个固定的阀位,则可能出现初期水量给多了,后期又不够的情况。
初期水量过多,气流温度低,所产生的灰尘将出现板结现象,影响除尘器的除尘效率,更严重的是加剧电场内设备的腐蚀,降低设备的使用寿命;而后期水量少,气流温度高,造成设备的额外烧损,降低电场的除尘效果。
发明内容
有鉴于此,本发明要解决的技术问题在于提供一种于转炉干法除尘蒸发冷却塔喷水量调节装置及方法,使水流量跟随烟气温度的变化而变化,从而平衡整个控制系统前后期的供水量,以达到喷水量自动控制调节。
为解决上述技术问题,本发明的技术方案是这样实现的:一种转炉干法除尘蒸发冷却塔喷水量调节装置,该装置包括蒸发冷却塔、冷却塔上具有两个输入口和一个输出口,其中一个输入口连接烟气通道,该烟气通道上设有入口温度检测仪,另一个输入口连接蒸发冷却水通道,该蒸发冷却水通道上依次设有电磁流量计、冷却水压力检测仪、冷却水压力报警仪、切断阀以及流量调节阀;所述输出口连接有出口温度检测仪;所述电磁流量计、切断阀、流量调节阀以及出口温度检测仪的控制信号接入PLC系统。
另一种技术方案为:一种转炉干法除尘蒸发冷却塔喷水量调节方法,所述调节方法包括:吹炼初期,开环控制所述冷却水流量调节阀的开度,阀位的输出跟随烟气温度的变化而变化;当烟气温度趋于稳定后,开环启动延时时间达到设定值,开始闭环PID控制;
作为优选方案,所述开环控制包括以下步骤:
a、将所述电磁流量计、切断阀、流量调节阀以及出口温度检测仪的控制信号接入PLC系统,完成单点调试,并记录对应于5点以上不同水流量所述流量调节阀的开度;
b、在所述PLC系统中设定的所述开环控制不同阶段的流量对应不同的流量调节阀的阀位输出;
c、进行实际的热负荷调试阶段,在吹炼初期,根据出口温度的不同,由PLC系统计算出需要的喷水量;根据次喷水量的大小,PLC系统直接调节对应的流量调节阀的开度;
作为优选方案,所述的流量调节阀阀位输出值在相邻两点采用折线方式计算。
本发明达到的技术效果如下:本发明转炉干法除尘蒸发冷却塔喷水量调节装置及方法,可以实现喷水量的自动控制调节,合理提供喷水量以保持烟气温度在一定的范围内变化。气流含有一定的水汽,并且气流在除尘器内不会产生冷凝,不会造成电场内的放电次数的加剧,也不会造成灰尘的潮湿,不会破坏电场内的设备,延长设备的使用寿命。
附图说明
图1是本发明转炉干法除尘蒸发冷却塔喷水量调节装置的流程图;
图2是本发明转炉干法除尘蒸发冷却塔喷水量调节方法的开环控制流程图。
具体实施方式
如图1所示,本发明转炉干法除尘蒸发冷却塔喷水量调节装置包括蒸发冷却塔7、冷却塔上具有两个输入口和一个输出口,其中一个输入口连接烟气通道,该烟气通道上设有入口温度检测仪6,另一个输入口连接蒸发冷却水通道,该蒸发冷却水通道上依次设有电磁流量计1、冷却水压力检测仪2、冷却水压力报警仪3、切断阀4以及流量调节阀5;输出口连接出口温度检测仪8。
本发明转炉干法除尘蒸发冷却塔喷水量调节方法分为了两个过程:吹炼初期,开环控制所述流量调节阀5的开度;当烟气温度趋于稳定后,开环启动延时时间达到设定值,开始闭环PID控制,PLC系统会根据烟气温度的变化给出流量调节阀5的PID运算的设定值 为水量设定值,为干烟气流量(通过设置于其他位置的检测装置测量得出),ΔT为蒸发冷却塔进出口温度差,ρN为气体混合物的正常密度(1.35 kg/Nm3),cp为过程气体的比热容量(1.11 J/(kg K)),为水蒸发的热焓(2500000 J/kg))。
如图2所示,本发明转炉干法除尘蒸发冷却塔喷水量调节方法开环控制包括电磁流量计1、冷却水压力检测仪2、冷却水压力报警仪3、切断阀4以及流量调节阀5、入口温度检测仪6、蒸发冷却塔7及出口温度检测仪8。其中电磁流量计1、切断阀4、流量调节阀5以及出口温度检测仪8的控制信号接入PLC系统。
开环控制的调节方法包括以下步骤:
a、将电磁流量计1、切断阀4、流量调节阀5以及出口温度检测仪8的控制信号接入PLC控制系统,并完成系统的单点调试,并记录下尽可能多的不同水量下的流量调节阀5的开度值。
b、在PLC程序中设定开环控制阶段不同的流量设定值对应的不同的流量调节阀5阀位输出,在相邻的2点间可采用折线方式计算出相应的阀位输出值。
c、在进行实际的热负荷调试阶段,在转炉吹炼的初期,根据蒸发冷却塔7的出口烟气温度的不同,由PLC系统根据公式自动的计算出需要的喷水量,再根据次喷水量的大小,利用上述调试阶段得出的不同的喷水量所对应的不同的流量调节阀5的开度,由PLC系统直接给出阀门的开度,此环节系统处于开环状态,由于开环的响应很快,所以喷水量的变化跟得上烟气温度的变化。
以上所述,仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。
Claims (4)
1.一种转炉干法除尘蒸发冷却塔喷水量调节装置,该装置包括蒸发冷却塔、冷却塔上具有两个输入口和一个输出口,其中一个输入口连接烟气通道,该烟气通道上设有入口温度检测仪,另一个输入口连接蒸发冷却水通道,该蒸发冷却水通道上依次设有电磁流量计、冷却水压力检测仪、冷却水压力报警仪、切断阀以及流量调节阀;所述输出口连接有出口温度检测仪;其特征在于,所述电磁流量计、切断阀、流量调节阀以及出口温度检测仪的控制信号接入PLC系统。
2.一种转炉干法除尘蒸发冷却塔喷水量调节方法,其特征在于,所述调节方法包括:吹炼初期,开环控制所述冷却水流量调节阀的开度,阀位的输出跟随烟气温度的变化而变化;当烟气温度趋于稳定后,开环启动延时时间达到设定值,开始闭环PID控制。
3.根据权利要求2所述的转炉干法除尘蒸发冷却塔喷水量调节方法,其特征在于,所述开环控制包括以下步骤:
将所述电磁流量计、切断阀、流量调节阀以及出口温度检测仪的控制信号接入PLC系统,完成单点调试,并记录对应于5点以上不同水流量所述流量调节阀的开度;
在所述PLC系统中设定的所述开环控制不同阶段的流量对应不同的流量调节阀的阀位输出;
进行实际的热负荷调试阶段,在吹炼初期,根据出口温度的不同,由PLC系统计算出需要的喷水量;根据次喷水量的大小,PLC系统直接调节对应的流量调节阀的开度。
4.根据权利要求3所述的转炉干法除尘蒸发冷却塔喷水量调节方法,其特征在于,所述的流量调节阀阀位输出值在相邻两点采用折线方式计算。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210260081XA CN102787205A (zh) | 2012-07-19 | 2012-07-19 | 转炉干法除尘蒸发冷却塔喷水量调节装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210260081XA CN102787205A (zh) | 2012-07-19 | 2012-07-19 | 转炉干法除尘蒸发冷却塔喷水量调节装置及方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102787205A true CN102787205A (zh) | 2012-11-21 |
Family
ID=47152791
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210260081XA Pending CN102787205A (zh) | 2012-07-19 | 2012-07-19 | 转炉干法除尘蒸发冷却塔喷水量调节装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102787205A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103146874A (zh) * | 2013-03-08 | 2013-06-12 | 中冶南方工程技术有限公司 | 转炉炼钢一次干法除尘蒸发冷却塔喷水量的控制方法 |
CN103673652A (zh) * | 2013-12-26 | 2014-03-26 | 中冶东方工程技术有限公司 | 一种电炉除尘过程中的烟气冷却控制方法和系统 |
CN111910042A (zh) * | 2020-06-07 | 2020-11-10 | 广东韶钢松山股份有限公司 | 一种lt干法除尘蒸发冷却喷雾系统 |
CN113215351A (zh) * | 2021-04-23 | 2021-08-06 | 合肥工业大学 | 一种用于转炉干法除尘蒸发冷却塔的温度控制系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5681613A (en) * | 1979-12-05 | 1981-07-03 | Kawasaki Heavy Ind Ltd | Treatment of pressure type converter exhaust gas |
CN102352422A (zh) * | 2011-10-31 | 2012-02-15 | 中冶南方工程技术有限公司 | 一种转炉煤气干法除尘用的蒸发冷却塔 |
CN202786302U (zh) * | 2012-07-19 | 2013-03-13 | 中冶南方工程技术有限公司 | 转炉干法除尘蒸发冷却塔喷水量调节装置 |
-
2012
- 2012-07-19 CN CN201210260081XA patent/CN102787205A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5681613A (en) * | 1979-12-05 | 1981-07-03 | Kawasaki Heavy Ind Ltd | Treatment of pressure type converter exhaust gas |
CN102352422A (zh) * | 2011-10-31 | 2012-02-15 | 中冶南方工程技术有限公司 | 一种转炉煤气干法除尘用的蒸发冷却塔 |
CN202786302U (zh) * | 2012-07-19 | 2013-03-13 | 中冶南方工程技术有限公司 | 转炉干法除尘蒸发冷却塔喷水量调节装置 |
Non-Patent Citations (4)
Title |
---|
《冶金标准化与质量》 20090430 张志强等 转炉干法除尘蒸发冷却器系统的控制__PCS7-PID级联控制器的应用和FUZZY控制器的研究 第47卷, 第02期 * |
吴晓峰等: "转炉干法除尘智能控制系统的设计应用", 《测控技术》, vol. 25, no. 03, 18 March 2006 (2006-03-18) * |
张志强等: "转炉干法除尘蒸发冷却器系统的控制――PCS7-PID级联控制器的应用和FUZZY控制器的研究", 《冶金标准化与质量》, vol. 47, no. 02, 30 April 2009 (2009-04-30) * |
王永忠等: "蒸发冷却塔的设计和应用分析", 《宝钢技术》, no. 05, 25 October 2004 (2004-10-25) * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103146874A (zh) * | 2013-03-08 | 2013-06-12 | 中冶南方工程技术有限公司 | 转炉炼钢一次干法除尘蒸发冷却塔喷水量的控制方法 |
CN103146874B (zh) * | 2013-03-08 | 2015-03-04 | 中冶南方工程技术有限公司 | 转炉炼钢一次干法除尘蒸发冷却塔喷水量的控制方法 |
CN103673652A (zh) * | 2013-12-26 | 2014-03-26 | 中冶东方工程技术有限公司 | 一种电炉除尘过程中的烟气冷却控制方法和系统 |
CN103673652B (zh) * | 2013-12-26 | 2015-12-09 | 中冶东方工程技术有限公司 | 一种电炉除尘过程中的烟气冷却控制方法和系统 |
CN111910042A (zh) * | 2020-06-07 | 2020-11-10 | 广东韶钢松山股份有限公司 | 一种lt干法除尘蒸发冷却喷雾系统 |
CN113215351A (zh) * | 2021-04-23 | 2021-08-06 | 合肥工业大学 | 一种用于转炉干法除尘蒸发冷却塔的温度控制系统 |
CN113215351B (zh) * | 2021-04-23 | 2022-05-03 | 合肥工业大学 | 一种用于转炉干法除尘蒸发冷却塔的温度控制系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111350595A (zh) | 一种微型燃气轮机发电机井口页岩气供气装置控制系统 | |
JP5946279B2 (ja) | 煙道ガスの再循環を伴うガスタービン発電プラントでの気体成分の制御 | |
CN106644612B (zh) | 锅炉水冷壁近壁区烟气分组在线监测系统 | |
CN102239363B (zh) | 用于运行废热蒸汽发生器的方法 | |
CN104007072B (zh) | 用于脱硝反应器氨逃逸在线测量装置 | |
CN102787205A (zh) | 转炉干法除尘蒸发冷却塔喷水量调节装置及方法 | |
US9562473B2 (en) | Gas turbine facility | |
CN111362723B (zh) | 用于混凝土施工的智能管冷循环控制系统及控制方法 | |
CN202348634U (zh) | 一种制冷压缩机试验台控制系统 | |
Huang et al. | Pressure drop and flow distribution in a mini-hydrocyclone group: UU-type parallel arrangement | |
CN109126408A (zh) | 一种湿法脱硫装置及智能控制方法 | |
CN103146874B (zh) | 转炉炼钢一次干法除尘蒸发冷却塔喷水量的控制方法 | |
CN105543443B (zh) | 一种用于转炉煤气加压机防喘振控制系统的方法 | |
CN104315496B (zh) | 基于等温差原理的锅炉排烟余热回收系统 | |
CN208791552U (zh) | 一种净化空气的干熄炉空气导入管 | |
CN202786302U (zh) | 转炉干法除尘蒸发冷却塔喷水量调节装置 | |
CN203117017U (zh) | 用于环己烷氧化尾氧测量的分析仪预处理装置 | |
CN201890887U (zh) | 富氧宽幅流量调节供应装置 | |
CN110500184B (zh) | 一种提升燃气轮机联合循环经济性的余热利用系统 | |
CN109813850B (zh) | 自动控制分析仪预处理装置以及预处理方法 | |
CN101268366B (zh) | 燃料气体的水分监视装置以及水分监视方法 | |
CN102792142A (zh) | 用于监控颗粒的设备和方法 | |
CN103320568B (zh) | 一种多功能智能型喷雾除尘冷却器 | |
JP5549804B2 (ja) | 蒸気質モニタリング装置 | |
CN103007726A (zh) | 防止湿法脱硫出口烟道低温腐蚀的装置及控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20121121 |