CN102786292A - Fabrication process of nixing pottery with chain - Google Patents

Fabrication process of nixing pottery with chain Download PDF

Info

Publication number
CN102786292A
CN102786292A CN2012102943398A CN201210294339A CN102786292A CN 102786292 A CN102786292 A CN 102786292A CN 2012102943398 A CN2012102943398 A CN 2012102943398A CN 201210294339 A CN201210294339 A CN 201210294339A CN 102786292 A CN102786292 A CN 102786292A
Authority
CN
China
Prior art keywords
base substrate
chain
chain link
time
blank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102943398A
Other languages
Chinese (zh)
Other versions
CN102786292B (en
Inventor
杨建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinzhou Qidian Nixing Ceramics Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210294339.8A priority Critical patent/CN102786292B/en
Publication of CN102786292A publication Critical patent/CN102786292A/en
Application granted granted Critical
Publication of CN102786292B publication Critical patent/CN102786292B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drying Of Solid Materials (AREA)
  • Compositions Of Oxide Ceramics (AREA)

Abstract

The invention discloses a fabrication process of nixing pottery with a chain. The fabrication process comprises the steps of: preparing a blank, molding a blank body, drying the blank body and burning the blank body, wherein the step of molding the blank body is performed for twice, the step of molding the blank body for the first time is as follows: twisting and kneading the prepared blank into circular rings with fractures, orderly sleeving a plurality of circular rings into a group of chain blank bodies, and cutting the circular rings at two ends of the chain blank bodies to finish fabrication of the chain blank bodies, the step of burning the blank body is performed for twice, the step of burning the blank body for the first time is as follows: putting the dried chain blank bodies into a kiln to burn, the step of burning the blank body for the second time is as follows: preparing into an apparatus blank body from the prepared blank, and sleeving the chain blank bodies burnt for the first time on the apparatus blank body to finish fabrication of the chain apparatus blank body, and the step of burning the blank body for the second time is as follows: putting the dried chain apparatus blank body into the kiln to burn. According to the invention, the chain blank body is burnt for twice, so that the rate of finished products is greatly improved.

Description

Manufacture craft with emerging pottery of mud of chain
Technical field
The present invention relates to the manufacture craft of the emerging pottery of mud, be specifically related to a kind of manufacture craft with emerging pottery of mud of chain.
Background technology
The emerging pottery of mud refers to the emerging pottery of Qiezhou mud, as a kind of folk tradition technology, has the history in more than 1300 year so far, and make pottery in itself and Yixing, Jiangsu, Yunnan Jian Shui makes pottery, Rongchang County, Sichuan makes pottery is named as " the four your name pottery " of China.At present the manufacture craft of the emerging pottery of Qiezhou mud mainly comprises following step: one, preparation blank: the earth of region to the west of the earth that blank is selected the Jiang Yidong that admires that crosses urban district, Qiezhou for use and the river of admiring; The weight proportion of 40~60 parts in mud to the east of both, 40~60 parts in western mud is mixed, process blank through series of process such as grinding, dehydrations; Two, blank forming: the base substrate of promptly fabricating various types with blank; Three, finishing base substrate: base substrate is repaired to reach design requirements; Four, dry base substrate: base substrate is carried out drying, the moisture of base substrate is discharged, adopt indoor seasoning method, aeration drying, suning method or other drying means usually, base substrate moisture is discharged; Five, fire base substrate: will decorate good base substrate loading of kiln and fire.Conventional now firing temperature generally is controlled at 1100~1200 ℃, and the firing time is about 10 hours; Sometimes also polish as required.Wherein blank forming is two in the important operation with firing base substrate; Existing forming method has hand throwing moulding, injection forming, moulding moulage and roll forming, and wherein injection forming, moulding moulage and roll forming are for some complex devices, and particularly contact connects many devices; Also there is not sophisticated skill; Such device normally hand throwing forms, but for like chain etc., general hand throwing also needs more sophisticated skill.
Above-mentioned traditional technology, when making the emerging pottery spare of common mud, the rate of burning till is higher; But making some strips, when particularly not possessing the inflexible device, as having the device of chain; Because chain is sagging, the weight of whole chain all is carried on the annulus at connecting device two places, when burning till; The annulus at this two place very easily ruptures, and causes whole finished product unavailable, and its yield rate is low.
Summary of the invention
Technical problem to be solved by this invention provides the manufacture craft of the high emerging pottery of mud with chain of a kind of yield rate.
For solving the problems of the technologies described above, the manufacture craft of the emerging pottery of mud with chain of the present invention's design comprises preparation blank, blank forming, dry base substrate and fires base substrate that said blank forming comprises twice,
For the first time blank forming is socketed into one group of chain base substrate with a plurality of annulus more successively for become the annulus of band fracture with the blank kneading for preparing, and with the annulus fracture at chain base substrate two ends, accomplishes the making of chain base substrate;
The said base substrate of firing comprises twice, fires to dried chain base substrate is put into kiln for the first time and fires;
Blank forming is socketed in the chain base substrate of firing completion for the first time on the device base substrate for processing the device base substrate with the blank for preparing for the second time, accomplishes the making of chain device base substrate;
Fire to dried chain device base substrate is put into kiln for the second time and fire.
Base substrate of the present invention is made and is fired base substrate and includes twice; And they hocket, and when firing for the first time, earlier the chain base substrate are fired completion; When firing for the second time; Just avoided all being carried on the annulus at connecting device two places because of the weight of whole chain, the situation that causes the annulus at this two place very easily to rupture takes place, and has improved yield rate greatly.
Further the such scheme said first time of blank forming can comprise the steps,
1) making of chain link base substrate: the annulus with the blank kneading one-tenth band fracture for preparing, again the annulus more than 2 or 2 is socketed into one group of chain link base substrate successively, interface is mediated handled at last, accomplish the making of chain link base substrate;
2) drying of chain link base substrate: the chain link base substrate is carried out drying treatment, the moisture of base substrate is discharged;
3) repaired biscuit of chain link base substrate: dried chain link base substrate is repaired, to reach design requirements;
4) making of chain base substrate: with the chain link base substrate behind repaired biscuit water spray reach softening after; With the annulus fracture of cutter, its terminal fracture is socketed on the annulus at second group of chain link base substrate top again that second group of chain link base substrate is terminal annulus fracture with first group of chain link base substrate two ends; Be socketed in successively on the annulus at next group chain link base substrate top; Said belled chain link base substrate is the N+2 group, and interface is mediated processing, accomplishes the making of chain base substrate; Its two ends annulus fracture of the chain base substrate that completes, wherein N is a positive integer;
Fire the said first time base substrate can for,
Dried chain base substrate is put in the kiln, temperature is increased to 1100~1200 ℃ gradually, under this temperature, fired 8~12 hours, after cooling, the chain base substrate is taken out, accomplish the first time of chain base substrate and fire;
Said second time, blank forming can comprise the steps,
1) making of device base substrate is processed the device base substrate with the blank for preparing;
2) making of chain device base substrate is socketed in the chain base substrate of firing completion for the first time on the device base substrate, and interface is mediated processing, accomplishes the making of chain device base substrate;
Fire the said second time base substrate can for,
Dried chain device base substrate is put in the kiln, temperature is increased to 1100~1200 ℃ gradually, under this temperature, fired 8~12 hours, after cooling, chain device base substrate is taken out, accomplish the second time of chain device base substrate and fire; After cooling, taking-up obtains finished product.
In order further to improve the rate of burning till of chain base substrate, when firing base substrate for the first time, can dried chain base substrate be lain in a horizontal plane in the kiln and fire.Can the weight of chain base substrate be evenly distributed on the whole piece chain sagging the tearing each other and chain being broken off of causing of having avoided chain like this.
The drying of the said chain link base substrate of such scheme can be used existing drying means and time; Because the chain link base substrate is thin shape object, can reduce the exsiccant time, enhances productivity; The drying of said chain link base substrate can be for being positioned over shady and cool environment with the chain link base substrate, and be 6~8 hours time of drying.
The span of the said N of such scheme can be 1≤N≤50.
In the making of chain base substrate, the socket group number of said chain link base substrate can confirm as required, except can socket N+2 group; Said belled chain link base substrate can also be 2 groups; Be chain link base substrate water spray behind the repaired biscuit reach softening after, with the annulus fracture of cutter, its terminal fracture is socketed on the annulus at second group of chain link base substrate top first group of chain link base substrate two ends; Again that second group of chain link base substrate is terminal annulus fracture is accomplished the making of the chain base substrate that has only 2 groups of chain link base substrates.
Compared with prior art; The present invention carries out 2 times to the chain base substrate and fires, and earlier the chain base substrate is fired separately, and the chain after will firing again is socketed on the device; Fire again once with device; Avoided once firing in the middle of existing that the weight because of whole chain all is carried on the mud ring that plays connecting device two places in the completion, the situation that causes the annulus at this two place very easily to rupture takes place, and has improved yield rate greatly; And the making of chain base substrate be earlier by the less chain link base substrate of annulus number after super-dry; Break off that the annulus socket at its two ends gets up, solved existing in the middle of the chain base substrate when making, once accomplish the making of rectangular chain base substrate; Very easily the problem of fracture has further improved yield rate.
Embodiment
With embodiment the present invention is described further below, but the present invention is not limited to these embodiment.
Embodiment 1: make the chain teapot
Get 60 parts in eastern mud, western mud is processed blank for 40 parts, carries out blank forming again, said blank forming comprises twice, for the first time blank forming comprises the steps,
1) making of chain link base substrate: the annulus with the blank kneading one-tenth band fracture for preparing, again 2 annulus are socketed into one group of chain link base substrate successively, interface is mediated handled at last, accomplish the making of chain link base substrate;
2) drying of chain link base substrate: the drying of said chain link base substrate is for to be positioned over shady and cool environment with the chain link base substrate, and be 6 hours time of drying;
3) repaired biscuit of chain link base substrate: dried chain link base substrate is repaired, to reach design requirements;
4) making of chain base substrate: with the chain link base substrate behind repaired biscuit water spray reach softening after; With cutter with 2 annulus fractures of first group of chain link base substrate; One of them fracture is socketed on the annulus of second group of chain link base substrate,, is socketed in successively on the annulus at next group chain link base substrate top again with another annulus fracture of second group of chain link base substrate; Said belled chain link base substrate is 50 groups; And, accomplish the making of chain base substrate, its two ends annulus fracture of the chain base substrate that completes with 100 annulus with interface kneading processing;
The said base substrate of firing comprises twice, and firing base substrate for the first time is that dried chain base substrate is put in the kiln; Temperature is increased to 1100 ℃ gradually, under this temperature, fired 11 hours, after cooling; The chain base substrate is taken out, accomplish the first time of chain base substrate and fire;
Blank forming comprises the steps for the second time,
1) making of teapot base substrate is processed the teapot base substrate with the blank for preparing;
2) making of chain teapot base substrate is socketed in the chain base substrate of firing completion for the first time on the teapot base substrate, and interface is mediated processing, accomplishes the making of chain teapot base substrate;
For the second time firing base substrate does, dried chain teapot base substrate is put in the kiln, and temperature is increased to 1110 ℃ gradually, under this temperature, fires 12 hours, after cooling, chain teapot base substrate is taken out, and accomplishes the second time of chain teapot and fires; After cooling, take out and obtain finished product chain teapot, yield rate is 98%.
Embodiment 2: make the chain goods of furniture for display rather than for use
Get 50 parts in eastern mud, western mud is processed blank for 50 parts, carries out blank forming again, said blank forming comprises twice, for the first time blank forming comprises the steps,
1) making of chain link base substrate: the annulus with the blank kneading one-tenth band fracture for preparing, again 6 annulus are socketed into one group of chain link base substrate successively, also 3 annulus are socketed into one group of chain link base substrate successively, interface is mediated handled at last, accomplish the making of chain link base substrate;
2) drying of chain link base substrate: the drying of said chain link base substrate is for to be positioned over shady and cool environment with the chain link base substrate, and be 8 hours time of drying;
3) repaired biscuit of chain link base substrate: dried chain link base substrate is repaired, to reach design requirements;
4) making of chain base substrate: with the chain link base substrate behind repaired biscuit water spray reach softening after, with the annulus fracture of cutter, the fracture of terminal annulus is socketed on the annulus of second group of chain link base substrate first group of chain link base substrate two ends; Again with another annulus fracture of second group of chain link base substrate; Be socketed in successively on the annulus at next group chain link base substrate top, said belled chain link base substrate is 3 groups, and interface is mediated processing; Accomplish the making of chain base substrate; Its two ends annulus fracture of the chain base substrate that completes, chain link base substrate wherein can be 6 annulus, also can be 3 annulus;
The said base substrate of firing comprises twice, and firing base substrate for the first time is that dried chain base substrate is put in the kiln; Temperature is increased to 1200 ℃ gradually, under this temperature, fired 8 hours, after cooling; The chain base substrate is taken out, accomplish the first time of chain base substrate and fire;
Blank forming comprises the steps for the second time,
1) making of goods of furniture for display rather than for use base substrate is processed the goods of furniture for display rather than for use base substrate with the blank for preparing;
2) making of chain goods of furniture for display rather than for use base substrate is socketed in the chain base substrate of firing completion for the first time on the goods of furniture for display rather than for use base substrate, and interface is mediated processing, accomplishes the making of chain goods of furniture for display rather than for use base substrate;
For the second time firing base substrate does, dried chain goods of furniture for display rather than for use base substrate is put in the kiln, and temperature is increased to 1120 ℃ gradually, under this temperature, fires 11 hours, after cooling, chain goods of furniture for display rather than for use base substrate is taken out, and accomplishes the second time of chain goods of furniture for display rather than for use and fires; After cooling, take out and obtain finished product chain goods of furniture for display rather than for use, yield rate is 95%.
Embodiment 3: make the chain vase
Get 60 parts in eastern mud, western mud is processed blank for 40 parts, carries out blank forming again, said blank forming comprises twice, for the first time blank forming comprises the steps,
1) making of chain link base substrate: the annulus with the blank kneading one-tenth band fracture for preparing, again 8 annulus are socketed into one group of chain link base substrate successively, interface is mediated handled at last, accomplish the making of chain link base substrate;
2) drying of chain link base substrate: the drying of said chain link base substrate is for to be positioned over shady and cool environment with the chain link base substrate, and be 7 hours time of drying;
3) repaired biscuit of chain link base substrate: dried chain link base substrate is repaired, to reach design requirements;
4) making of chain base substrate: with the chain link base substrate behind repaired biscuit water spray reach softening after; With the annulus fracture of cutter, the fracture of terminal annulus is socketed on the annulus of second group of chain link base substrate again that second group of chain link base substrate is terminal annulus fracture with first group of chain link base substrate two ends; Said belled chain link base substrate is 2 groups; And, accomplish the making of chain base substrate, its two ends annulus fracture of the chain base substrate that completes with interface kneading processing;
The said base substrate of firing comprises twice, and firing base substrate for the first time is that dried chain base substrate is put in the kiln; Temperature is increased to 1150 ℃ gradually, under this temperature, fired 11 hours, after cooling; The chain base substrate is taken out, accomplish the first time of chain base substrate and fire;
Blank forming comprises the steps for the second time,
1) making of vase base substrate is processed the vase base substrate with the blank for preparing;
2) making of chain vase base substrate is socketed in the chain base substrate of firing completion for the first time on the vase base substrate, and interface is mediated processing, accomplishes the making of chain vase base substrate;
For the second time firing base substrate does, dried chain vase base substrate is put in the kiln, and temperature is increased to 1170 ℃ gradually, under this temperature, fires 11 hours, after cooling, chain vase base substrate is taken out, and accomplishes the second time of chain vase and fires; After cooling, take out and obtain finished product chain vase, yield rate is 94%.

Claims (6)

1. the manufacture craft that has the emerging pottery of mud of chain comprises preparation blank, blank forming, dry base substrate and fires base substrate, it is characterized in that:
Said blank forming comprises twice,
For the first time blank forming is socketed into one group of chain base substrate with a plurality of annulus more successively for become the annulus of band fracture with the blank kneading for preparing, and with the annulus fracture at chain base substrate two ends, accomplishes the making of chain base substrate;
The said base substrate of firing comprises twice,
Fire to dried chain base substrate is put into kiln for the first time and fire;
Blank forming is socketed in the chain base substrate of firing completion for the first time on the device base substrate for processing the device base substrate with the blank for preparing for the second time, accomplishes the making of chain device base substrate;
Fire for the second time and dried chain device base substrate is put into kiln fire.
2. the manufacture craft with emerging pottery of mud of chain according to claim 1 is characterized in that:
Blank forming comprises the steps for the first time,
1) making of chain link base substrate: the annulus with the blank kneading one-tenth band fracture for preparing, again the annulus more than 2 or 2 is socketed into one group of chain link base substrate successively, interface is mediated handled at last, accomplish the making of chain link base substrate;
2) drying of chain link base substrate: the chain link base substrate is carried out drying treatment, the moisture of base substrate is discharged;
3) repaired biscuit of chain link base substrate: dried chain link base substrate is repaired, to reach design requirements;
4) making of chain base substrate: with the chain link base substrate behind repaired biscuit water spray reach softening after; With the annulus fracture of cutter, its terminal fracture is socketed on the annulus at second group of chain link base substrate top again that second group of chain link base substrate is terminal annulus fracture with first group of chain link base substrate two ends; Be socketed in successively on the annulus at next group chain link base substrate top; Said belled chain link base substrate is the N+2 group, and interface is mediated processing, accomplishes the making of chain base substrate; Its two ends annulus fracture of the chain base substrate that completes, wherein N is a positive integer;
For the first time firing base substrate does,
Dried chain base substrate is put in the kiln, temperature is increased to 1100~1200 ℃ gradually, under this temperature, fired 8~12 hours, after cooling, the chain base substrate is taken out, accomplish the first time of chain base substrate and fire;
Blank forming comprises the steps for the second time,
1) making of device base substrate is processed the device base substrate with the blank for preparing;
2) making of chain device base substrate is socketed in the chain base substrate of firing completion for the first time on the device base substrate, and interface is mediated processing, accomplishes the making of chain device base substrate;
For the second time firing base substrate does,
Dried chain device base substrate is put in the kiln, temperature is increased to 1100~1200 ℃ gradually, under this temperature, fired 8~12 hours, after cooling, chain device base substrate is taken out, accomplish the second time of chain device base substrate and fire; After cooling, taking-up obtains finished product.
3. the manufacture craft with emerging pottery of mud of chain according to claim 2 is characterized in that: when for the first time firing base substrate, dried chain base substrate lain in a horizontal plane in the kiln fire.
4. the manufacture craft with emerging pottery of mud of chain according to claim 2 is characterized in that: the drying of said chain link base substrate is for to be positioned over shady and cool environment with the chain link base substrate, and be 6~8 hours time of drying.
5. the manufacture craft with emerging pottery of mud of chain according to claim 2 is characterized in that: the span of said N is 1≤N≤50.
6. the manufacture craft with emerging pottery of mud of chain according to claim 2; It is characterized in that: in the making of chain base substrate, said belled chain link base substrate is 2 groups, after promptly the water spray of the chain link base substrate behind the repaired biscuit reaches and softens; With the annulus fracture of cutter with first group of chain link base substrate two ends; Its terminal fracture is socketed on the annulus at second group of chain link base substrate top, again that second group of chain link base substrate is terminal annulus fracture is accomplished the making of the chain base substrate that has only 2 groups of chain link base substrates.
CN201210294339.8A 2012-08-17 2012-08-17 Fabrication process of nixing pottery with chain Expired - Fee Related CN102786292B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210294339.8A CN102786292B (en) 2012-08-17 2012-08-17 Fabrication process of nixing pottery with chain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210294339.8A CN102786292B (en) 2012-08-17 2012-08-17 Fabrication process of nixing pottery with chain

Publications (2)

Publication Number Publication Date
CN102786292A true CN102786292A (en) 2012-11-21
CN102786292B CN102786292B (en) 2014-02-26

Family

ID=47151902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210294339.8A Expired - Fee Related CN102786292B (en) 2012-08-17 2012-08-17 Fabrication process of nixing pottery with chain

Country Status (1)

Country Link
CN (1) CN102786292B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109592965A (en) * 2018-12-29 2019-04-09 钦州学院 A kind of preparation process of luminous Nixing pottery pug and its moulded products

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0416544A (en) * 1990-05-10 1992-01-21 Shin Nippon Kagaku Kogyo Co Ltd Body composition for large-sized porcelain and production of large-sized porcelain
CN1253124A (en) * 1998-10-29 2000-05-17 淄博通博高档骨质瓷有限责任公司 Green porcelain glaze and process for preparing products of green porcelain glaze
CN1393303A (en) * 2001-06-29 2003-01-29 宣碧华 Method for manufacturing chain
KR100969267B1 (en) * 2009-07-23 2010-07-09 김복한 A ceramic ware manufacture method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4016544B2 (en) * 1999-09-29 2007-12-05 株式会社デンソー Radiator for supercritical vapor compression refrigeration cycle

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0416544A (en) * 1990-05-10 1992-01-21 Shin Nippon Kagaku Kogyo Co Ltd Body composition for large-sized porcelain and production of large-sized porcelain
CN1253124A (en) * 1998-10-29 2000-05-17 淄博通博高档骨质瓷有限责任公司 Green porcelain glaze and process for preparing products of green porcelain glaze
CN1393303A (en) * 2001-06-29 2003-01-29 宣碧华 Method for manufacturing chain
KR100969267B1 (en) * 2009-07-23 2010-07-09 김복한 A ceramic ware manufacture method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109592965A (en) * 2018-12-29 2019-04-09 钦州学院 A kind of preparation process of luminous Nixing pottery pug and its moulded products
CN109592965B (en) * 2018-12-29 2021-08-27 钦州学院 Luminous nixing pottery clay material and preparation process of formed product thereof

Also Published As

Publication number Publication date
CN102786292B (en) 2014-02-26

Similar Documents

Publication Publication Date Title
CN102417355B (en) Characteristic kiln change technology of Nixing ceramics
CN101722788A (en) Antique finished porcelain with twisted body and manufacturing method thereof
CN102786292B (en) Fabrication process of nixing pottery with chain
CN105399329A (en) Preparation method and glaze material of celadon secret color glaze
CN101168489A (en) Method for producing crack under glaze at low-temperature
CN106083200B (en) Dragon's fountain Song Dynasty brother's kiln celadon glaze and the method for making dragon's fountain Song Dynasty brother's kiln celadon product with the glaze
CN111848129A (en) Firing process of Yinhao Jianzhan
CN104261803B (en) The manufacture method of porcelain insulator
CN103121369B (en) Manufacturing method of woven decorative patterns of artistic porcelain with twisted clay body
CN101851120B (en) Fabrication method for handicraft texture
CN105819706A (en) Decoration firing technology of milky-white crystal porcelain tableware
CN103057333B (en) Method for manufacturing twistable glaze artistic porcelain chrysanthemum ornamentation
CN108395207A (en) The preparation method of Nixing pottery modelled after an antique
CN103057343A (en) Method for producing natural ornamentation of twisted colored body decorative china
CN105384451A (en) Manufacturing process for ice crackle glaze fine ceramic jewelry
CN102503565A (en) Manufacturing method of ceramic product with crack glaze
CN101514115A (en) Technique for manufacturing crack glaze ceramic bottle
CN104529539A (en) Peacock blue glaze and preparation method thereof
CN104072104A (en) Process for processing spherical anti-fouling pin type insulator
CN104402406B (en) A kind of preparation method of transparent artistic porcelain
CN104072105A (en) Processing process for fuse porcelain bushing
CN108383497A (en) The preparation method of large-scale Nixing pottery plate
CN103121366A (en) Manufacturing method of V-shaped decorative patterns of artistic porcelain with twisted clay body
CN105565903A (en) Glaze material of condensed dew glaze and process for preparing porcelain by using same
CN112341156A (en) Preparation method of Jun porcelain with plant specimen on outer surface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211231

Address after: 535002 room 1101, unit 2, building 3, Lijing Tianxia, No. 191, Wuma Road, Qinzhou City, Guangxi Zhuang Autonomous Region

Patentee after: Qinzhou Qidian nixing Ceramics Co.,Ltd.

Address before: 535000 No. 89, West Ring Road, Qinnan District, Qinzhou, the Guangxi Zhuang Autonomous Region.

Patentee before: Yang Jianjun

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140226

CF01 Termination of patent right due to non-payment of annual fee