CN102776957A - 建筑抗震节点及其制造工艺 - Google Patents

建筑抗震节点及其制造工艺 Download PDF

Info

Publication number
CN102776957A
CN102776957A CN2012102969222A CN201210296922A CN102776957A CN 102776957 A CN102776957 A CN 102776957A CN 2012102969222 A CN2012102969222 A CN 2012102969222A CN 201210296922 A CN201210296922 A CN 201210296922A CN 102776957 A CN102776957 A CN 102776957A
Authority
CN
China
Prior art keywords
reinforcing plate
plate
millet
node
fine strain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102969222A
Other languages
English (en)
Inventor
朱若兰
毕辉
杨凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI GENERAL METAL STRUCTURE ENGINEERING CO LTD
Original Assignee
SHANGHAI GENERAL METAL STRUCTURE ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI GENERAL METAL STRUCTURE ENGINEERING CO LTD filed Critical SHANGHAI GENERAL METAL STRUCTURE ENGINEERING CO LTD
Priority to CN2012102969222A priority Critical patent/CN102776957A/zh
Publication of CN102776957A publication Critical patent/CN102776957A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明揭示了一种建筑抗震节点,用于建筑梁柱连接节点,包括上加强板和下加强板。上加强板呈L型,两个侧边分别焊接至柱的侧边和梁的顶部。下加强板包括斜向板和垂直于斜向板的肋板,斜向板的两端分别焊接至柱的侧边和梁的底部,肋板的两个侧边分别焊接至柱的侧边和梁的底部。还揭示了一种建筑抗震节点的制造工艺,包括:铸造上加强板和下加强板,上加强板呈L型,下加强板包括斜向板和垂直于斜向板的肋板;在建筑梁柱连接节点焊接上加强板,将上加强板的两个侧边分别焊接至柱的侧边和梁的顶部;在建筑梁柱连接节点焊接下加强板,将斜向板的两端分别焊接至柱的侧边和梁的底部,将肋板的两个侧边分别焊接至柱的侧边和梁的底部。

Description

建筑抗震节点及其制造工艺
技术领域
本发明涉及建筑结构领域,尤其涉及一种建筑抗震节点及其制造工艺。
背景技术
随着社会的发展,对建筑结构抗震设计的安全性和适用性也提出了更为严格的要求,既要确保结构的有效抗震、减震效果,又要降低建筑工程成本。在发生强震的情况下,最容易出现断裂和被破坏的结构是建筑梁柱的刚性连接节点,梁柱的刚性连接节点通常是发生脆性破坏。加强梁柱连接节点的方式一般是对梁柱的焊接缝周围进行加强,使得连接区域的面积扩大,提高节点延性,达到加强节点强度的目的。进行加强的方式有两种:使用螺栓连接支撑板件或者使用焊接方式连接支撑板件。螺栓连接方式受力好,但安装施工成本高。焊接方式施工操作简单,但安装质量难以保证。
发明内容
本发明旨在提出一种建筑抗震节点及其制造工艺,通过重新设计支撑板件的形状结构来实现以焊接方式达到高质量节点的目的。
根据本发明的一实施例,提出一种建筑抗震节点,用于建筑粱柱连接节点,包括上加强板和下加强板。上加强板呈L型,两个侧边分别焊接至柱的侧边和粱的顶部。下加强板包括斜向板和垂直于斜向板的肋板,斜向板的两端分别焊接至柱的侧边和粱的底部,肋板的两个侧边分别焊接至柱的侧边和粱的底部。
在一个实施例中,上加强板为钢制,具有短边和长边,短边焊接在柱的侧边,长边焊接在粱的顶部。
在一个实施例中,肋板呈梯形。下加强板为钢制。
根据本发明的一实施例,提出一种建筑抗震节点的制造工艺,包括:铸造上加强板和下加强板,上加强板呈L型,下加强板包括斜向板和垂直于斜向板的肋板;在建筑粱柱连接节点焊接上加强板,将上加强板的两个侧边分别焊接至柱的侧边和粱的顶部;在建筑粱柱连接节点焊接下加强板,将斜向板的两端分别焊接至柱的侧边和粱的底部,将肋板的两个侧边分别焊接至柱的侧边和粱的底部。
在一个实施例中,上加强板为钢制,具有短边和长边,短边焊接在柱的侧边,长边焊接在粱的顶部。
在一个实施例中,肋板呈梯形。下加强板为钢制。
本发明的建筑抗震节点及其制造工艺通过合理的上加强板和下加强板的结构设计,使得通过焊接方式形成的抗震节点具有高质量和高强度,在满足建筑要求的情况下降低了成本。
附图说明
图1揭示了根据本发明的一实施例的建筑抗震节点的结构图。
图2揭示了根据本发明的一实施例的建筑抗震节点中上加强板的结构。
图3揭示了根据本发明的一实施例的建筑抗震节点中下加强板的结构。
具体实施方式
参考图1~图3所示,本发明揭示了一种建筑抗震节点,用于建筑粱柱连接节点,即柱202和梁204的连接处,对于钢结构建筑来说,就是柱202和梁204焊接处。该建筑抗震节点包括上加强板102和下加强板104。参考图1和图2所示,图2揭示了上加强板的立体图。上加强板102呈L型,两个侧边分别焊接至柱202的侧边和粱204的顶部。在图示的实施例中,上加强板102为钢制,具有短边121和长边122,短边121焊接在柱202的侧边,长边122焊接在粱204的顶部。上加强板102与柱202的侧边的焊接处位于梁204的上方。参考图1和图3所示,图3揭示了下加强板的立体图。下加强板104包括斜向板141和垂直于斜向板141的肋板142,斜向板141的两端分别焊接至柱202的侧边和粱204的底部,肋板142的两个侧边分别焊接至柱202的侧边和粱204的底部。下加强板104与柱202的侧边的焊接处位于梁204的下方。肋板142呈梯形,在斜向板141的中部垂直向上延伸。下加强板104为钢制。
本发明还解释了一种建筑抗震节点的制造工艺,包括如下的步骤:
铸造上加强板和下加强板,上加强板呈L型,下加强板包括斜向板和垂直于斜向板的肋板,肋板呈梯形。上加强板和下加强板均为钢制,上加强板具有短边和长边。上加强板和下加强板的结构可以参考图2和图3所示。
在建筑粱柱连接节点焊接上加强板,将上加强板的两个侧边分别焊接至柱的侧边和粱的顶部。其中短边焊接在柱的侧边,长边焊接在粱的顶部。上加强板与柱的侧边的焊接处位于梁的上方。
在建筑粱柱连接节点焊接下加强板,将斜向板的两端分别焊接至柱的侧边和粱的底部,将肋板的两个侧边分别焊接至柱的侧边和粱的底部。下加强板与柱的侧边的焊接处位于梁的下方。
本发明的建筑抗震节点及其制造工艺通过合理的上加强板和下加强板的结构设计,使得通过焊接方式形成的抗震节点具有高质量和高强度,在满足建筑要求的情况下降低了成本。

Claims (8)

1.一种建筑抗震节点,其特征在于,用于建筑粱柱连接节点,包括:
上加强板,上加强板呈L型,两个侧边分别焊接至柱的侧边和粱的顶部;
下加强板,下加强板包括斜向板和垂直于斜向板的肋板,斜向板的两端分别焊接至柱的侧边和粱的底部,肋板的两个侧边分别焊接至柱的侧边和粱的底部。
2.如权利要求1所述的建筑抗震节点,其特征在于,所述上加强板为钢制,具有短边和长边,短边焊接在柱的侧边,长边焊接在粱的顶部。
3.如权利要求1所述的建筑抗震节点,其特征在于,所述肋板呈梯形。
4.如权利要求3所述的建筑抗震节点,其特征在于,所述下加强板为钢制。
5.一种建筑抗震节点的制造工艺,其特征在于,包括:
铸造上加强板和下加强板,上加强板呈L型,下加强板包括斜向板和垂直于斜向板的肋板;
在建筑粱柱连接节点焊接上加强板,将上加强板的两个侧边分别焊接至柱的侧边和粱的顶部;
在建筑粱柱连接节点焊接下加强板,将斜向板的两端分别焊接至柱的侧边和粱的底部,将肋板的两个侧边分别焊接至柱的侧边和粱的底部。
6.如权利要求5所述的建筑抗震节点的制造工艺,其特征在于,所述上加强板为钢制,具有短边和长边,短边焊接在柱的侧边,长边焊接在粱的顶部。
7.如权利要求5所述的建筑抗震节点的制造工艺,其特征在于,所述肋板呈梯形。
8.如权利要求7所述的建筑抗震节点的制造工艺,其特征在于,所述下加强板为钢制。
CN2012102969222A 2012-08-20 2012-08-20 建筑抗震节点及其制造工艺 Pending CN102776957A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102969222A CN102776957A (zh) 2012-08-20 2012-08-20 建筑抗震节点及其制造工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102969222A CN102776957A (zh) 2012-08-20 2012-08-20 建筑抗震节点及其制造工艺

Publications (1)

Publication Number Publication Date
CN102776957A true CN102776957A (zh) 2012-11-14

Family

ID=47122053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102969222A Pending CN102776957A (zh) 2012-08-20 2012-08-20 建筑抗震节点及其制造工艺

Country Status (1)

Country Link
CN (1) CN102776957A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103290930A (zh) * 2013-04-03 2013-09-11 青岛理工大学 一种l型加强板螺栓连接装置
CN103306380A (zh) * 2013-04-03 2013-09-18 青岛理工大学 一种对称加强腋板螺栓连接装置
CN104912199A (zh) * 2015-06-17 2015-09-16 北京清华同衡规划设计研究院有限公司 钢梁柱铰接节点的加固结构
CN106703184A (zh) * 2016-12-30 2017-05-24 北京工业大学 一种方钢管混凝土柱与矩形截面钢梁的连接节点构造

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1710222A (zh) * 2004-06-18 2005-12-21 上海市建筑科学研究院有限公司 粘贴纤维布加固空间混凝土梁柱节点的方法
JP2006063787A (ja) * 2004-07-26 2006-03-09 Sotofumi Oshima 柱と梁の結合構造
CN102251584A (zh) * 2011-05-04 2011-11-23 南京工业大学 一种l型角钢加固的木结构榫卯节点
CN102287008A (zh) * 2011-07-01 2011-12-21 青岛理工大学 钢结构梁翼缘非对称加腋型抗震节点
CN102409764A (zh) * 2011-08-15 2012-04-11 长安大学 一种钢筋混凝土框架变梁异型节点结构及加固方法
CN202347664U (zh) * 2011-11-15 2012-07-25 福州大学 一种通过角钢连接的高延性钢结构梁柱节点

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1710222A (zh) * 2004-06-18 2005-12-21 上海市建筑科学研究院有限公司 粘贴纤维布加固空间混凝土梁柱节点的方法
JP2006063787A (ja) * 2004-07-26 2006-03-09 Sotofumi Oshima 柱と梁の結合構造
CN102251584A (zh) * 2011-05-04 2011-11-23 南京工业大学 一种l型角钢加固的木结构榫卯节点
CN102287008A (zh) * 2011-07-01 2011-12-21 青岛理工大学 钢结构梁翼缘非对称加腋型抗震节点
CN102409764A (zh) * 2011-08-15 2012-04-11 长安大学 一种钢筋混凝土框架变梁异型节点结构及加固方法
CN202347664U (zh) * 2011-11-15 2012-07-25 福州大学 一种通过角钢连接的高延性钢结构梁柱节点

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103290930A (zh) * 2013-04-03 2013-09-11 青岛理工大学 一种l型加强板螺栓连接装置
CN103306380A (zh) * 2013-04-03 2013-09-18 青岛理工大学 一种对称加强腋板螺栓连接装置
CN104912199A (zh) * 2015-06-17 2015-09-16 北京清华同衡规划设计研究院有限公司 钢梁柱铰接节点的加固结构
CN104912199B (zh) * 2015-06-17 2017-10-10 北京清华同衡规划设计研究院有限公司 钢梁柱铰接节点的加固结构
CN106703184A (zh) * 2016-12-30 2017-05-24 北京工业大学 一种方钢管混凝土柱与矩形截面钢梁的连接节点构造

Similar Documents

Publication Publication Date Title
CN106638943A (zh) 钢管约束型钢再生混凝土柱与钢梁连接节点及其施工方法
CN102776957A (zh) 建筑抗震节点及其制造工艺
CN105735541A (zh) 钢结构无梁楼盖板柱结构
KR101750177B1 (ko) 절단 브리지형 펀칭전단 보강재 및 이를 이용한 기초판의 시공방법
CN201433509Y (zh) 一种预应力钢梁
CN113684929B (zh) 隔震支座上支墩节点型钢劲性柱架空固定结构及施工方法
CN105863048A (zh) 一种预制框撑结构梁柱节点的连接构造
CN204139335U (zh) 分层阶梯式牛腿节点结构
CN201972310U (zh) 钢筋马凳
CN203924115U (zh) 一种地铁双柱高架车站型钢混凝土转换结构钢骨
JP2015068005A (ja) 溶接接合連続小梁構造
JP6466196B2 (ja) 既存柱の補強構造および補強方法
CN103015533B (zh) 一种抗剪抗压抗震的角节点装置和边节点装置
CN202745208U (zh) 重组竹框架结构节点连接
CN202627212U (zh) 一种钢结构节点组件
JP6802675B2 (ja) 柱梁接合方法、及び仕口部材
KR101590065B1 (ko) 조립형 합성 트러스거더 및 그 시공방법
CN209941512U (zh) 一种斜拉桥斜塔下横梁支撑剪力件
CN202788024U (zh) 一种高刚度混凝土梁结构
CN203613643U (zh) 一种超高层建筑的多塔楼高位转换结构
CN202017257U (zh) 一种高层建筑的大跨度转换结构
CN203867059U (zh) 带肋h型钢和带肋h型钢混凝土结构
KR20160053668A (ko) 방음벽의 매입형 지주 및 기초연결 시스템
CN209260968U (zh) 槽钢剪力墙结构及其与基础的连接结构
CN106013620A (zh) 主筋与箍筋的连接结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121114