CN102774740A - Arc balancing beam - Google Patents

Arc balancing beam Download PDF

Info

Publication number
CN102774740A
CN102774740A CN201210291870XA CN201210291870A CN102774740A CN 102774740 A CN102774740 A CN 102774740A CN 201210291870X A CN201210291870X A CN 201210291870XA CN 201210291870 A CN201210291870 A CN 201210291870A CN 102774740 A CN102774740 A CN 102774740A
Authority
CN
China
Prior art keywords
arc
equalizing bar
pulley
hoist
hoist cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210291870XA
Other languages
Chinese (zh)
Other versions
CN102774740B (en
Inventor
王海波
徐明贤
屈振江
张金钟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Heavy Industry Shenzhen Co Ltd
Original Assignee
China Merchants Heavy Industry Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Heavy Industry Shenzhen Co Ltd filed Critical China Merchants Heavy Industry Shenzhen Co Ltd
Priority to CN201210291870.XA priority Critical patent/CN102774740B/en
Publication of CN102774740A publication Critical patent/CN102774740A/en
Application granted granted Critical
Publication of CN102774740B publication Critical patent/CN102774740B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses an arc balancing beam, which is characterized in that a beam body of the arc balancing beam is arc-shaped along the horizontal direction, a plurality of lifting points of the arc balancing beam are distributed into an arc shape consistent with the shape of a lifted arc barrel consisting of a plurality of devices, the number of the lifting points can be the same as that of the devices, and the positions of the lifting points are consistent with those of the devices. The balancing beam disclosed by the invention can conveniently lift an arc barrel consisting of a plurality of plate-type assembling structures which are distributed in an arc shape, and the lifting operation is high in efficiency, and is safe and reliable.

Description

A kind of arc equalizing bar
Technical field
The present invention relates to lifting construction equipment, particularly relate to a kind of arc equalizing bar.
Background technology
Equalizing bar is the important component part of hoisting machine tool, in the lifting engineering, is widely used.Equalizing bar is claimed fringed iris herb again, can be used for keeping the balance of the equipment that hung, and avoids the hoist cable damage equipment; Shorten the height of hoist cable, reduce the sling height of movable pulley; The horizontal pressure that is born during the lifting of minimizing equipment is avoided damage equipment.Yet general equalizing bar can't be efficiently and is solved the lifting problem of the arc cylindrical shell spare of the board-like assembly unit of large-scale arc safely and reliably.
In addition, general equalizing bar upper end is connected with the loop wheel machine pulley through suspension hook, steel rope, shackle, from the suspension hook to the equalizing bar, need take big working space; And; In the equalizing bar lower end, be to hang over through shackle on the otic placode of equalizing bar bottom with steel rope to realize lifting, it is longer to connect distance.This causes existing equalizing bar can't satisfy has the specific workyard (like near operation place the airport etc.) of operation height requirement for restriction to preparation of construction lifting operation.
Summary of the invention
Main purpose of the present invention is exactly the deficiency to prior art, and a kind of arc equalizing bar is provided, and can lift many arc cylindrical shells that board-like splicing structure is formed that arc distributes easily, and efficient is high, and is safe and reliable.
For realizing above-mentioned purpose, the present invention adopts following technical scheme:
A kind of arc equalizing bar, the beam body along continuous straight runs of said arc equalizing bar is curved, and the quilt that a plurality of suspension centres of said arc equalizing bar are arranged to form with many members hangs the consistent arc of arc cylindrical shell.
Preferably, the suspension centre of said arc equalizing bar has the quantity identical with member and position and the corresponding unanimity of each member.Yet, satisfying under the situation of safety, several members of not getting rid of linking together adopt a suspension centre.
Preferably, the beam body of said arc equalizing bar comprises the box-like body and a series of horizontal inboard gussets that are connected two arcuate flanks with two arcuate flanks.Thus, can conveniently increase or reduce suspension centre to actual needs.
Preferably; The top, horizontal of said arc equalizing bar is provided with the main otic placode of two subtend upper process symmetrically; The plate body is vertical with the beam body of said arc equalizing bar; Offer the hole for hoist that is used to install the lifting main shaft on the said main otic placode, the hole for hoist on the hole for hoist on the every pair of main otic placode and the corresponding loop wheel machine pulley of executing loop wheel machine is all through a lifting main shaft, to be used for separately being connected fixing with two loop wheel machine pulleys two pairs of main otic placodes.
Preferably, said arc equalizing bar is provided with the pulley pallet that supplies location, leading sheave to use.
Preferably; Said pulley pallet comprises the part that extends upward the formation groove perpendicular to the horizontal component of beam body with from the horizontal component both sides; Said loop wheel machine pulley bottom is provided with the pulley base; Hole for hoist on the said loop wheel machine pulley is opened on the said pulley base, and said groove is used to locate, leading is positioned over said pulley base wherein, and the bottom and the both sides of said groove and said pulley base are the arc that cooperatively interacts on cross-sectional plane.
Preferably; Each suspension centre comprises the some paired small ear plate that is positioned at said arc equalizing bar top; Said arc equalizing bar is provided with the hoist cable passage that runs through the beam body up and down; Said some paired small ear plates are arranged on the hoist cable channel exit both sides at arc equalizing bar top in opposite directions, offer little axle mounting hole on the said small ear plate, and the little axle across said hoist cable channel outlet is installed on the little axle mounting hole of every pair of small ear plate; Hoist cable is fixed on said little axle and goes up and pass the below that said hoist cable passage extends to said arc equalizing bar, and the lower end of hoist cable is hung member through shackle with quilt and is connected.
Preferably, said hoist cable passage is vertically offered along said arc equalizing bar horizontal surface midway location.
Beneficial technical effects of the present invention is:
The present invention is directed to by the assembled large-scale arc cylindrical shell lifting demand of the lath of some quantity; The curved arc equalizing bar of beam body along continuous straight runs has been proposed; Its suspension centre is arranged to and is hung the consistent arc of arc cylindrical shell; Thereby can lift the arc cylindrical shell that comprises many board-like splicing structures easily, efficient is high, and is safe and reliable.The present invention is specially adapted to the lifting construction of the large-scale workpieces such as thin-walled arc body that the strip type framing member is assembled into.
Description of drawings
Fig. 1 is the arc equalizing bar birds-eye view of one embodiment of the invention;
Fig. 2 is the lifting scheme drawing of one embodiment of the invention;
Fig. 3 is the stage casing enlarged diagram of arc equalizing bar shown in Figure 1;
Fig. 4 is the left-half enlarged diagram of arc equalizing bar shown in Figure 1;
Fig. 5 be an embodiment suspension centre and pulley be connected scheme drawing (H-H cross section);
Fig. 6 is the main otic placode structural representation (C-C cross section) of an embodiment;
Fig. 7 is the beam body schematic cross-section (Q-Q cross section) of an embodiment;
Fig. 8 is the structural representation of the hoist cable passage of an embodiment;
Fig. 9 is the small ear plate structural representation of an embodiment.
The specific embodiment
Below combine accompanying drawing that the present invention is further specified through embodiment.
See also Fig. 1 and Fig. 2, in some embodiment, the beam body along continuous straight runs of arc equalizing bar is curved, and the suspension centre of said arc equalizing bar arranges that the quilt of forming with many members hangs the arc consistent (arc among this paper all refers to non-full circle) of arc cylindrical shell.
In an embodiment, the suspension centre of said arc equalizing bar is consistent with the member that is hung the arc cylindrical shell on quantity and installation site.That is, in this embodiment, each member that is hung the arc cylindrical shell is to should there being a suspension centre, and the mutual alignment relation is one to one.
Yet, satisfying under the situation of safety, do not get rid of the arc equalizing bar and a plurality of members that link together are executed with a suspension centre hung.
Like Fig. 1, Fig. 3 and shown in Figure 4, in preferred embodiment, the beam body of said arc equalizing bar is joined successively by a series of box-like body with arcuate flanks and inboard gusset and forms.Benefit of this design-calculated is that it is big or small conveniently to change the beam body to actual needs, comprises increasing or reduce suspension centre.
Like Fig. 2, Fig. 4-shown in Figure 6; At two places separated by a distance, arc equalizing bar top; Every place is provided with a pair of main otic placode 6 to upper process, and lifting main shaft 1 passes the hole for hoist of main otic placode 6 and the hole for hoist of loop wheel machine pulley 3, directly main otic placode 6 is connected with loop wheel machine pulley 3; Thereby loop wheel machine pulley 3 is connected with arc equalizing bar 5, and through the nut fixation on it.As shown in Figure 5, preferably, arc equalizing bar upper end is provided with pulley pallet 2, and location, guiding are used when supplying the pulley lifting.Loop wheel machine pulley 3 matches with loop wheel machine steel rope 4.
Equalizing bar in the past all passes through suspension hook, steel rope, shackle and is connected with loop wheel machine pulley (general pulley is made as one with suspension hook); Present embodiment has been cancelled the suspension hook and the shackle on equalizing bar top; Pulley directly is connected with equalizing bar master otic placode through the lifting main shaft; Reduced top and connected distance, can save suspension hook, steel rope, shackle like this and be connected needed space with equalizing bar.
In an embodiment, as the hanger of suspension below hoist cable, arc equalizing bar top is distributed with the paired small ear plate 12 with the member equivalent amount by arc, and makes that the layout of small ear plate is consistent with the radian of arc cylindrical shell member 11 distributions.
Like Fig. 5-shown in Figure 8; This arc equalizing bar set inside has the wire rope sling passage 8 that runs through equalizing bar up and down; Respectively there is a small ear plate 12 the hoist cable channel exit both sides on plane on the arc equalizing bar; As the hanger of the wire rope sling 9 of suspension element, little axle 7 cross-ties are installed in each little axle mounting hole to small ear plate 12.Lifting wire rope sling 9 passes through the hoist cable passage, is fixed on the little axle 7.Can hoist cable be hung member 11 with quilt through shackle 10 under the equalizing bar is connected.Shackle can be general lockset.This design; Lifting wire rope sling 9 passes through equalizing bar in-to-in hoist cable passage 8, the length of hoist cable 9 is hidden in the middle of the arc equalizing bar to greatest extent, for the lifting space has been saved in the lifting of member 11; Shorten hoisting height, therefore can reduce the operating altitude of loop wheel machine.Suspension centre is located at the equalizing bar top, also is convenient to unload steel rope.
Like Fig. 1, Fig. 3 and shown in Figure 4, the wire rope sling passage preferably is arranged on the line of centers of equalizing bar vertical (being horizontal direction).
In preferred embodiment, adopt aforementioned arrangements that the upper and lower lifting of equalizing bar is reduced the distance simultaneously, can more effectively solve and hang high limited problem, the while has also solved and has made things convenient for the discharged problem of rope.
In a practical application example, loop wheel machine, arc equalizing bar and to be hung the concrete installation process of arc cylindrical shell following:
(1) will be the arc cylindrical shell that forms of the good some laths of assembly unit member (the arc cylindrical shell usually by the very long lath splicing on specific frock in advance of many single-pieces of for example about 20 ~ 30m, close up form) be connected with cable wire end 9 accordingly through shackle 10 one by one, as treating hanging piece 11;
(2) arc equalizing bar 5 is placed the frock top of assembly unit arc cylindrical shell;
(3) the little axle 7 on each cable wire end 9 passes the middle hoist cable passage 8 of corresponding arc equalizing bar and is installed in small ear plate 12 is connected;
(4) loop wheel machine pulley 3 places on the arc equalizing bar 5 through pulley pallet 2 guiding;
(5) lifting main shaft 1 passes the hole for hoist of arc equalizing bar master otic placode 6 and the hole for hoist of pulley 3 successively, loop wheel machine pulley 3 is connected with arc equalizing bar 5, and the nut screwing clamping on it is firm to install.
After above-mentioned steps is accomplished, check and just can implement to lift after errorless.
Above content is to combine concrete preferred implementation to the further explain that the present invention did, and can not assert that practical implementation of the present invention is confined to these explanations.For the those of ordinary skill of technical field under the present invention, under the prerequisite that does not break away from the present invention's design, can also make some simple deduction or replace, all should be regarded as belonging to protection scope of the present invention.

Claims (8)

1. an arc equalizing bar is characterized in that, the beam body along continuous straight runs of said arc equalizing bar is curved, and the quilt that a plurality of suspension centres of said arc equalizing bar are arranged to form with many members hangs the consistent arc of arc cylindrical shell.
2. arc equalizing bar as claimed in claim 1 is characterized in that, the suspension centre of said arc equalizing bar has the quantity identical with member and the position is corresponding consistent with each member.
3. arc equalizing bar as claimed in claim 1 is characterized in that, the beam body of said arc equalizing bar comprises the box-like body and a series of horizontal inboard gussets that are connected two arcuate flanks with two arcuate flanks.
4. arc equalizing bar as claimed in claim 1; It is characterized in that; The top, horizontal of said arc equalizing bar is provided with the main otic placode of two subtend upper process symmetrically, and the plate body is vertical with the beam body of said arc equalizing bar, offers the hole for hoist that is used to install the lifting main shaft on the said main otic placode; Hole for hoist on hole for hoist on the every pair of main otic placode and the corresponding loop wheel machine pulley of executing loop wheel machine is all through a lifting main shaft, to be used for separately being connected fixing with two loop wheel machine pulleys two pairs of main otic placodes.
5. arc equalizing bar as claimed in claim 3 is characterized in that, said arc equalizing bar is provided with the pulley pallet that supplies location, guiding loop wheel machine pulley to use.
6. arc equalizing bar as claimed in claim 5; It is characterized in that; Said pulley pallet comprises the part that extends upward the formation groove perpendicular to the horizontal component of beam body with from the horizontal component both sides, and said loop wheel machine pulley bottom is provided with the pulley base, and the hole for hoist on the said loop wheel machine pulley is opened on the said pulley base; Said groove is used to locate, leading is positioned over said pulley base wherein, and the bottom and the both sides of said groove and said pulley base are the arc that cooperatively interacts on cross-sectional plane.
7. like each described arc equalizing bar of claim 1 to 6; It is characterized in that; Each suspension centre comprises the some paired small ear plate that is positioned at said arc equalizing bar top, and said arc equalizing bar is provided with the some hoist cable passages that run through the beam body up and down, and said some paired small ear plates are arranged on the hoist cable channel exit both sides at arc equalizing bar top in opposite directions; Offer little axle mounting hole on the said small ear plate; Little axle across said hoist cable channel outlet is installed on the little axle mounting hole of every pair of small ear plate, and hoist cable is fixed on said little axle and goes up and pass the below that said hoist cable passage extends to said arc equalizing bar, and the lower end of hoist cable is hung member through shackle with quilt and is connected.
8. arc equalizing bar as claimed in claim 7 is characterized in that, said hoist cable passage is vertically offered along said arc equalizing bar horizontal surface midway location.
CN201210291870.XA 2012-08-16 2012-08-16 Arc balancing beam Expired - Fee Related CN102774740B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210291870.XA CN102774740B (en) 2012-08-16 2012-08-16 Arc balancing beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210291870.XA CN102774740B (en) 2012-08-16 2012-08-16 Arc balancing beam

Publications (2)

Publication Number Publication Date
CN102774740A true CN102774740A (en) 2012-11-14
CN102774740B CN102774740B (en) 2014-10-29

Family

ID=47119885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210291870.XA Expired - Fee Related CN102774740B (en) 2012-08-16 2012-08-16 Arc balancing beam

Country Status (1)

Country Link
CN (1) CN102774740B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107601257A (en) * 2017-10-26 2018-01-19 上海市安装工程集团有限公司 Large scale arc special hoisting bar and its application method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1785987C (en) * 1990-11-22 1993-01-07 Черноморское Отделение Морских Берегозащитных Сооружений Им.А.М.Жданова Всесоюзного Научно-Исследовательского Института Транспортного Строительства Load gripper
CN200951923Y (en) * 2006-09-19 2007-09-26 张宏生 Transverse hanging bean for railway hoister
CN201268549Y (en) * 2008-06-06 2009-07-08 中国海洋石油总公司 Hoisting appliance for offshore wind power generation tower frame
CN201330136Y (en) * 2009-01-12 2009-10-21 陈炯 Arc crane boom
CN201362570Y (en) * 2008-12-26 2009-12-16 佑图物理应用科技发展(武汉)有限公司 Rotary moving pulley for stage crane
CN201439475U (en) * 2009-08-11 2010-04-21 渤海船舶重工有限责任公司 Multifunctional balance hanging beam
CN201923769U (en) * 2011-02-22 2011-08-10 抚顺隆基电磁科技有限公司 Bridge type hanging beam for permanent magnet jack
CN201980837U (en) * 2010-12-24 2011-09-21 本钢板材股份有限公司 Lifting appliance for replacing furnace top roller of annealing furnace

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1785987C (en) * 1990-11-22 1993-01-07 Черноморское Отделение Морских Берегозащитных Сооружений Им.А.М.Жданова Всесоюзного Научно-Исследовательского Института Транспортного Строительства Load gripper
CN200951923Y (en) * 2006-09-19 2007-09-26 张宏生 Transverse hanging bean for railway hoister
CN201268549Y (en) * 2008-06-06 2009-07-08 中国海洋石油总公司 Hoisting appliance for offshore wind power generation tower frame
CN201362570Y (en) * 2008-12-26 2009-12-16 佑图物理应用科技发展(武汉)有限公司 Rotary moving pulley for stage crane
CN201330136Y (en) * 2009-01-12 2009-10-21 陈炯 Arc crane boom
CN201439475U (en) * 2009-08-11 2010-04-21 渤海船舶重工有限责任公司 Multifunctional balance hanging beam
CN201980837U (en) * 2010-12-24 2011-09-21 本钢板材股份有限公司 Lifting appliance for replacing furnace top roller of annealing furnace
CN201923769U (en) * 2011-02-22 2011-08-10 抚顺隆基电磁科技有限公司 Bridge type hanging beam for permanent magnet jack

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107601257A (en) * 2017-10-26 2018-01-19 上海市安装工程集团有限公司 Large scale arc special hoisting bar and its application method

Also Published As

Publication number Publication date
CN102774740B (en) 2014-10-29

Similar Documents

Publication Publication Date Title
CN105401714B (en) A kind of attachment type raise scaffold and elevating method
CN103935882B (en) A kind of pocket of large thin-wall dryer hangs method
CN103758042B (en) A kind of tight cable machine
CN102491186A (en) Tower crane
CN206466885U (en) A kind of milling train inner structural member dismounts special hanger
CN204096894U (en) A kind of aircraft hoisting rig
CN104609281A (en) Domestic lift
CN206172852U (en) Neighbouring railway business line sound barrier sound insulation board installation device
CN210048319U (en) Traction type construction elevator with foldable top beam
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN201713229U (en) Steel box girder cable-loaded crane for suspension bridge construction
CN101863423B (en) Steel box beam cable carrying lifter for construction of suspension bridge
CN204624958U (en) The row of hanging
CN102774740A (en) Arc balancing beam
CN205603125U (en) Special hoist device that horizontal water tube cooler heat exchange tube was changed
CN102285582B (en) T-beam hoisting method
CN204371545U (en) A kind of power station impeller apparatus for examination and repair
CN204624959U (en) Building berth main frame installation hoisting structure
CN205662215U (en) Main hoisting rope adjusting device of vertical shaft hoisting system
CN204355947U (en) Large-scale without eye plate lifting beam device
CN104709846B (en) A kind of light combined lifting equipment and its application method
CN206637572U (en) High-Pole Lamp bar top transmission mechanism
CN208948679U (en) Assembled hanger
CN108928729B (en) Lifting appliance and lifting device using same
CN106284961A (en) Small-sized attachment type raise scaffold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141029

Termination date: 20200816