CN102758538B - One is drawn and is built component building assembled wallboard mould car - Google Patents
One is drawn and is built component building assembled wallboard mould car Download PDFInfo
- Publication number
- CN102758538B CN102758538B CN201210202123.4A CN201210202123A CN102758538B CN 102758538 B CN102758538 B CN 102758538B CN 201210202123 A CN201210202123 A CN 201210202123A CN 102758538 B CN102758538 B CN 102758538B
- Authority
- CN
- China
- Prior art keywords
- wallboard
- rotating shaft
- mounting plate
- wheel
- running gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
One draws block component building assembled wallboard mould car to be made up of wallboard mounting plate, two dimension prestressing system, running gear; Described running gear comprises support platform, dynamical system, heading control loop, rotating shaft system with wheel.Beneficial effect of the present invention is: realize masonry dry operation, and the mass effect of the metope that can realize exempting from plastering; Masonry project sets up scaffold without high-altitude, greatly saves the artificial also reduction of erection time, improves operating environment; Pintle hook lock building block repeats to install at ground special operating platform, stretch-draw, and precision is high, safe and reliable; The high and low cost of turnover rate, environmental protection and economy, maintenance cost are cheap.
Description
Technical field
The present invention relates to building field, being specifically related to a kind of for drawing the mould car building component building assembled wallboard.
Background technology
The interior wall that building interior space is separated on demand is especially the indispensable part of building by the body of wall of building.Known wall structure technology is initially fragment of brick and piles up, not only heaviness but also take a lot of work, time-consuming.Occur subsequently using pre-cast concrete wallboard, produce by factory is unified in advance, be then transported to building-site assembling, which is conducive to rapid construction and batch production is produced in a large number.
Current technology is all installed by manual one piece of block, at the construction field (site) during installation exercise, still there is certain triviality, when particularly prestressing force rope being added for needs, install combination comparatively take a lot of work, time-consuming.
Summary of the invention
The present invention is exactly the deficiency for technology, proposes
oneplant to draw and build component building assembled wallboard mould car, be applicable to use the fixing prefabricated cement board of prestressing force rope strengthening or the prefabricated mode laying bricks to be formed wallboard, described mould car can effectively improve construction operation operating efficiency, reduction cost per unit.
One draws block component building assembled wallboard mould car to be made up of wallboard mounting plate, two dimension prestressing system, running gear; Described running gear comprises support platform, dynamical system, heading control loop, rotating shaft system with wheel; Described dynamical system, hydraulic system, heading control loop, be fixed in support platform with the rotating shaft system of wheel, described heading control loop is connected with the rotating shaft system with wheel, for controlling direction of travel, described dynamical system provides power for the rotating shaft system with wheel; One end of described wallboard mounting plate is flexibly connected by rotating shaft with one end of described running gear support platform; Described two dimension prestressing system is arranged on wallboard mounting plate; One end of the hydraulic stem of described hydraulic system is fixed on wallboard mounting plate.
Beneficial effect of the present invention is: realize masonry dry operation, and the mass effect of the metope that can realize exempting from plastering; Masonry project sets up scaffold without high-altitude, greatly saves the artificial also reduction of erection time, improves operating environment; Pintle hook lock building block repeats to install at ground special operating platform, stretch-draw, and precision is high, safe and reliable; The high and low cost of turnover rate, environmental protection and economy, maintenance cost are cheap.
accompanying drawing
Fig. 1 one is drawn and is built component building assembled wallboard mould bassinet structure schematic diagram;
In figure: 1, wallboard mounting plate, 2, two dimension prestressing system, 3, hydraulic stem, 4, support platform, 5, dynamical system, 6, heading control loop, 7, rotating shaft system with wheel, 8, movable rotation-shaft, 9, hydraulic system.
Detailed description of the invention
As shown in Figure 1, one draws block component building assembled wallboard mould car to be made up of wallboard mounting plate 1, two dimension prestressing system 2, running gear; Described running gear comprises support platform 4, dynamical system 5, heading control loop 6, rotating shaft system 7 with wheel; Described dynamical system 5, hydraulic system 9, heading control loop 6, be fixed in support platform 4 with the rotating shaft system 7 of wheel, described heading control loop 6 is connected with the rotating shaft system 7 with wheel, for controlling direction of travel, described dynamical system 5 provides power for the rotating shaft system 7 with wheel; One end of described wallboard mounting plate 1 is connected by movable rotation-shaft 8 with one end of the support platform 4 of described running gear; Described two dimension prestressing system 2 is arranged on wallboard mounting plate 1; One end of the hydraulic stem 3 of described hydraulic system 9 is fixed on wallboard mounting plate 1.
Utilize one of the present invention to draw and build component building assembled wallboard mould car, the process implementing body of wall assembling is: be placed on wallboard mounting plate by prefabricated cement board or prefabricated body of wall size order on demand of laying bricks, then by prestressing force rope successively through prefabricated cement board or prefabricatedly to lay bricks, utilize a kind of two dimension prestressing system of building component building assembled wallboard mould car of drawing of the present invention to carry out fastening process to the wallboard Shi Hanzhang of splicing; Then utilize running gear that finished product wallboard is transported to construction point, utilize the hydraulic system of mould garage walking system to be erect by finished product wallboard, by crane, wallboard is arranged on precalculated position.
Claims (1)
1. draw and build a component building assembled wallboard mould car, it is characterized in that:
Described formwall car is made up of wallboard mounting plate, two dimension prestressing system, running gear;
Described running gear comprises support platform, dynamical system, hydraulic system, heading control loop, rotating shaft system with wheel; Described dynamical system, hydraulic system, heading control loop, be fixed in support platform with the rotating shaft system of wheel;
Described heading control loop is connected with the rotating shaft system with wheel, and for controlling direction of travel, described dynamical system provides power for the rotating shaft system with wheel;
One end of the hydraulic stem of described hydraulic system is fixed on wallboard mounting plate;
One end of described wallboard mounting plate is flexibly connected by rotating shaft with one end of described running gear support platform;
Described two dimension prestressing system is arranged on wallboard mounting plate; The prestressing force rope of described two dimension prestressing system is successively through prefabricated wallboard, and described two dimension prestressing system carries out fastening process to the wallboard Shi Hanzhang of splicing;
Described wallboard is cement board or prefabricatedly lays bricks.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210202123.4A CN102758538B (en) | 2012-06-19 | 2012-06-19 | One is drawn and is built component building assembled wallboard mould car |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210202123.4A CN102758538B (en) | 2012-06-19 | 2012-06-19 | One is drawn and is built component building assembled wallboard mould car |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102758538A CN102758538A (en) | 2012-10-31 |
CN102758538B true CN102758538B (en) | 2016-01-06 |
Family
ID=47053168
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210202123.4A Active CN102758538B (en) | 2012-06-19 | 2012-06-19 | One is drawn and is built component building assembled wallboard mould car |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102758538B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104631846B (en) * | 2014-12-29 | 2017-02-22 | 芜湖赛特施工设备有限公司 | Air brick correcting and flatly laying device |
CN105064700A (en) * | 2015-07-09 | 2015-11-18 | 河南万道轻钢实业有限公司 | Simple wall board installing vehicle |
CN110424755B (en) * | 2019-08-05 | 2022-03-01 | 福建省优泥墙体工程服务有限公司 | Prefabricated brickwork rigging equipment |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11324331A (en) * | 1998-05-14 | 1999-11-26 | Hazama Gumi Ltd | Conveying truck |
CN2361743Y (en) * | 1998-05-29 | 2000-02-02 | 湖北省节能公司 | Machine-made wallboard conveyer |
CN1718970A (en) * | 2005-07-27 | 2006-01-11 | 同济大学 | Intelligent prestress system |
CN101245667A (en) * | 2008-03-14 | 2008-08-20 | 司从军 | Semi-automatic hydraulic wall board conveying upending vehicle |
CN101328722A (en) * | 2008-06-27 | 2008-12-24 | 温习旺 | Chain building |
CN201756833U (en) * | 2010-06-22 | 2011-03-09 | 三门峡富达水泥制品有限责任公司 | Assembling type fence in concrete |
CN202755672U (en) * | 2012-06-19 | 2013-02-27 | 北京航天万源建筑工程有限责任公司 | Pull-lay combination building fabricated wall plate mold vehicle |
-
2012
- 2012-06-19 CN CN201210202123.4A patent/CN102758538B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11324331A (en) * | 1998-05-14 | 1999-11-26 | Hazama Gumi Ltd | Conveying truck |
CN2361743Y (en) * | 1998-05-29 | 2000-02-02 | 湖北省节能公司 | Machine-made wallboard conveyer |
CN1718970A (en) * | 2005-07-27 | 2006-01-11 | 同济大学 | Intelligent prestress system |
CN101245667A (en) * | 2008-03-14 | 2008-08-20 | 司从军 | Semi-automatic hydraulic wall board conveying upending vehicle |
CN101328722A (en) * | 2008-06-27 | 2008-12-24 | 温习旺 | Chain building |
CN201756833U (en) * | 2010-06-22 | 2011-03-09 | 三门峡富达水泥制品有限责任公司 | Assembling type fence in concrete |
CN202755672U (en) * | 2012-06-19 | 2013-02-27 | 北京航天万源建筑工程有限责任公司 | Pull-lay combination building fabricated wall plate mold vehicle |
Also Published As
Publication number | Publication date |
---|---|
CN102758538A (en) | 2012-10-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103015565B (en) | Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method | |
CN202380609U (en) | Pre-split-joint light wall plate capable of realizing industrial production | |
CN107558626A (en) | A kind of prefabricated assembled wall structure and the method using this structure building house | |
CN104975716A (en) | Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete | |
CN102261189A (en) | Assembly-cast-in-situ type close column structure used in residential building with shear wall system | |
CN203924471U (en) | Precast concrete external wall panel | |
CN102758538B (en) | One is drawn and is built component building assembled wallboard mould car | |
MD4161C1 (en) | Process for erection of cast-in-situ building, complex of cast-in-situ buildings and production tooling for realization thereof | |
CN102708934A (en) | Nuclear power plant reactor cavity structure and reactor cavity constructing method | |
CN202755672U (en) | Pull-lay combination building fabricated wall plate mold vehicle | |
CN102094525A (en) | Method for constructing reinforced concrete lintel | |
CN103669872B (en) | A kind of walling method and walling equipment | |
CN102644375B (en) | Construction method for multi-ribbed composite wall | |
CN111648555A (en) | Laminated precast concrete elevator shaft way | |
CN202899440U (en) | Prefabricated structural column | |
CN202596025U (en) | Preformed frame light big wall plate | |
CN203238839U (en) | Prefabricated concrete composite wallboard of fabricated house building | |
CN106150191A (en) | A kind of full ground form assembled light bounding wall system and construction method | |
CN102926463A (en) | Plane external connection structure of cast-in-situ shear wall and prefabricated beam of assembly type concrete frame core tube structure | |
CN204282528U (en) | A kind of prefabricated balcony structure | |
CN204252155U (en) | The single footing that green construction assembling can be recycled | |
CN107542223A (en) | A kind of T-shaped lowly reinforced external wrapping concrete shaped steel Special-Shaped Column | |
CN107856177A (en) | A kind of assembly concrete post mold | |
CN203320691U (en) | Light steel and concrete house building system | |
CN204252337U (en) | Assembled architecture wall body construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |