CN102747699B - Pile-splicing construction method and pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects - Google Patents

Pile-splicing construction method and pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects Download PDF

Info

Publication number
CN102747699B
CN102747699B CN201210261160.2A CN201210261160A CN102747699B CN 102747699 B CN102747699 B CN 102747699B CN 201210261160 A CN201210261160 A CN 201210261160A CN 102747699 B CN102747699 B CN 102747699B
Authority
CN
China
Prior art keywords
pile
former
column
pile extension
splicing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210261160.2A
Other languages
Chinese (zh)
Other versions
CN102747699A (en
Inventor
张春秋
董丽艳
张明伟
周景新
马长青
张利忠
王金发
苏红英
张永祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Beilong Traffic Engineering Co.,Ltd.
Jiangsu Shengshitong Transportation Construction Engineering Co., Ltd
Original Assignee
Qiqihar Beiluda Traffic Facilities Manufacturing Co Ltd
HEILONGJIANG BEILONG TRADDIC ENGIEERING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qiqihar Beiluda Traffic Facilities Manufacturing Co Ltd, HEILONGJIANG BEILONG TRADDIC ENGIEERING CO Ltd filed Critical Qiqihar Beiluda Traffic Facilities Manufacturing Co Ltd
Priority to CN201210261160.2A priority Critical patent/CN102747699B/en
Publication of CN102747699A publication Critical patent/CN102747699A/en
Application granted granted Critical
Publication of CN102747699B publication Critical patent/CN102747699B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a pile-splicing construction method and a pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects. At present, potential safety hazard is caused to traffic on road rebuilding and expansion projects. The method provided by the invention comprises: welding or cold-processing steel tubes with the strength not lower than that of the original road upright posts according to the pipe diameter dimension of original road guiderail upright posts to be a pile-splicing component (1) with a variable cross-section pipe diameter; using the variable cross-section steel tube as a connector, fixedly locking the pile-splicing component and bolt holes of the original upright post (2) by using high-strength bolts, so that the original upright post and the pile-splicing part are integrated to reach stress strength; using a hydraulic pile driver after pile-splicing, carrying out pile-sinking according to the designed construction dimension, controlling elevation and vertical degree in the pile-sinking process by a levelling instrument and a vertical degree tester until satisfying the design requirements; installing an anti-blocking block or a bracket (3) and installing barrier plates (4) by the high-strength bolts. The pile-splicing component is used for pile-splicing construction of guiderails in expressway rebuilding and expansion and major maintenance projects.

Description

Highway extension project and overhaul engineering guardrail pile connection construction method and pile extension component
Technical field:
The present invention relates to a kind of highway extension project and overhaul engineering guardrail pile connection construction technical method and pile extension component.
Background technology:
Along with deepening continuously of National Macroscopic economic adjustment, the expressway construction market of China is flourish, and at the end of cut-off 2011, speedway total kilometrage has reached 8.5 ten thousand kilometers, is sure to occupy the second in the world.According to the actual conditions of each department, in expressway construction process, adopt the multiple construction modes such as newly-built, renovating and enlarging, overhaul.At present in reorganization and expansion road event, particularly in major repair project construction, after roadbed, heavy resurfacing, grade elevation is caused to promote, the relative altitude on original guardrail and road surface is caused to reduce, cause larger potential safety hazard to traffic flow, the current safety of vehicle and traffic safety facilities technical specification and national standard cannot be ensured, removed again that construction cost is high, operation is numerous and diverse, loss due to spoiled work in the past.
Summary of the invention:
The object of this invention is to provide a kind of highway extension project and overhaul engineering guardrail pile connection construction method and pile extension component, cost of manufacture reduces, and improves efficiency of construction.
Above-mentioned object is realized by following technical scheme:
A kind of highway extension project and overhaul engineering guardrail pile connection construction method, the method comprises the steps: the column caliber size according to original highway barrier, the steel-pipe welding or cold working that are not less than former column strength are formed the pile extension component that caliber is variable cross-section, variable-section steel pipe is utilized to be connected with former column as pile extension component, with hydraulic pile driver after pile extension, pressure pile sinking is carried out according to design and construction size, in pile driving process, elevation and vertical bury pipe is controlled well, until meet design requirement by level gauge and vertical bury pipe tester, after pile sinking, pile extension component and former upstanding studs hole high-strength bolt are fixed locked, make former column and pile extension part become overall, reach design by force intensity, finally obstruction block or bracket are installed, by high-strength bolt, guardrail board are installed, the described diameter of pile extension component and the determination of wall thickness: the former material as pile extension component should be identical with described former column material, its thickness and diameter are tried one's best equal or are not less than, to ensure its intensity, the determination of the former material length of described pile extension component, be connected for guaranteeing the former leghole position reached described in utilization, and realize guardrail board hang after meet steel guard rail acceptance criteria, former material length should >=road surface increase height+pile extension press down stroke+former leghole distance+pitch-row edge length, after confirmed standard size, intercept corresponding steel pipe length, by mold lathe and special-purpose machinery, be placed between hydraulic pressure utensil and fetal membrane, carry out in variable cross-section cold working process, balanced, slowly afterburning, prevent from causing plastic failure, the pile extension component of described variable cross-section cold working made carries out punching press pore-forming according to the design attitude of drawing, and carries out preservative treatment, the stake bit plane of described pile sinking arranges revision, utilizes transit to carry out linear setting-out demarcation, and level gauge controls elevation, vertical bury pipe tester controls the vertical bury pipe of pile extension, meter ruler controls stake column pitch, is partially worth demarcation, to control in the process of pile sinking in former stake position, described pressure pile sinking is according to direction, position, the hole principle consistent with former column by described pile extension component, small bore stands on concentric position on described former column down, stake machine tup evenly exerts a force by a small margin from heavy in section and presses down, pile extension component is slowly moved down along former column inwall until become large locked by frictional force because of cross section, tup increases pressure, operating personnel are according to the plan-position of setting-out and vertical bury pipe, regulate and control in stake sinking watching, ensure that plan-position and vertical bury pipe meet the demands, according to altitude data, slowing down stroke close to during design altitude 50 ㎜, until design altitude stops piling, tup is mentioned, carry out the pile sinking of next fence upright.
Described highway extension project and overhaul engineering guardrail pile connection construction method, according to the size of design drawing, after pile sinking, the hole that former rail pile column hangs obstruction block just in time overlaps with the lower marginal pore of described pile extension component, be fastenedly connected with standard high-strength bolt, make the pile extension part of pile extension component and described former column become overall.
Beneficial effect:
Make full use of original guardrail facility and engineering material, saved the expense occurred because of old guardrail facility dismounting, transport and storage, particularly saved the significant investment occurred because traffic environment requirement again lays guardrail.
Utilize adapter technology that column entire length is increased, under the effect of hydraulic pile driver, make the corresponding increase of the following buried depth in fence upright road surface, add resistance to overturning and the safety in utilization of guardrail.
Construct simple and practical, be easy to operation, little, the unified batch production of pile extension material profile, safer under the environment be open to traffic; Squeeze into stroke short, save the engineering time; Be easy in construction control elevation and straight degree, what ensure that after construction is linearly attractive in appearance.
The enforcement of guardrail pile connection construction technology and utilization, be embodied directly in every root post saving steel weight.Relatively again construct, pile extension consumes the long 45cm(of steel and raises 11cm calculating by road surface), the long 2150cm(design standard of construction stake again), when caliber wall thickness is identical, every pile saving steel is 80%, and direct cost will reduce by 80%; From indirect angle, same pile column, more than pile pulling expense piling expense, by the equal calculating of expense, is equivalent to piling twice.Pile connection construction takes saving more than 90%.Because pile extension operation is simple, guardrail board can shipped off-site after removing, and cross construction is installed, and saves a large amount of transports and has bad luck expense; From economically total, because the duration is short, blocked for road construction time is short, reduce the probability had an accident in construction, improves road operation ability simultaneously, shortens the haulage time of public vehicles, improve the economic benefit of society greatly.
Accompanying drawing illustrates:
Accompanying drawing 1 is the scheme of installation of pile extension component.
Accompanying drawing 2 is structural representations of pile extension component.
Accompanying drawing 3 is top views of accompanying drawing 2.
Detailed description of the invention:
Embodiment 1:
A kind of highway extension project and overhaul engineering guardrail pile connection construction method, the method comprises the steps: according to the origin road fence upright caliber size, the steel pipe being not less than former road upright column intensity is processed to form the pile extension component 1 that caliber is variable cross-section, utilize variable-section steel pipe as connector, with hydraulic pile driver after pile extension, pressure pile sinking is carried out according to design and construction size, in pile driving process, elevation and vertical bury pipe is controlled well, until meet design requirement by level gauge and vertical bury pipe tester; Fix locked by described pile extension component and former column 2 bolt hole high-strength bolt, make former column and pile extension part become overall, reach design by force intensity; Then obstruction block or bracket 3 are installed, by high-strength bolt, guardrail board 4 are installed.
Embodiment 2:
Above-mentioned highway extension project and overhaul engineering guardrail pile connection construction method, the described diameter of pile extension component and the determination of wall thickness, former material as pile extension material should be identical with former column material or slightly high, and its thickness and diameter are tried one's best equal or be not less than, to ensure its intensity and aesthetic property; The determination of the described former material length of pile extension component pile extension, original leghole position is utilized to be connected for guaranteeing to reach, and realize guardrail board hang after meet steel guard rail acceptance criteria, former material length should >=road surface increase height+pile extension press down stroke+former leghole distance+pitch-row edge length; After confirmed standard size, intercept corresponding steel pipe length, by mold lathe and special-purpose machinery, be placed between hydraulic pressure utensil and fetal membrane, carry out variable cross-section cold working.In process, balanced slowly afterburning, prevent from causing plastic failure; Variable cross-section pile extension component cold working made carries out punching press pore-forming according to the design attitude of drawing, and carries out preservative treatment.
Embodiment 3:
Above-mentioned highway extension project and overhaul engineering guardrail pile connection construction method, the stake bit plane of described pile sinking arranges revision, transit is utilized to carry out linear setting-out demarcation, level gauge controls elevation, vertical bury pipe tester controls the vertical bury pipe of pile extension, a column pitch controlled well by meter ruler, is partially worth demarcation, to control in the process of pile sinking in former stake position.
Embodiment 4:
Above-mentioned highway extension project and overhaul engineering guardrail pile connection construction method, by described pile extension component according to direction, position, the hole principle consistent with former column, small bore stands on concentric position on former column down, stake machine tup evenly exerts a force by a small margin from heavy in section and presses down, pile extension component is slowly moved down along former stake column inwall until become large locked by frictional force because of cross section, tup increases pressure, operating personnel are according to the plan-position of setting-out and vertical bury pipe, regulate and control in stake sinking watching, ensure that plan-position and vertical bury pipe meet the demands, according to altitude data, going into close to slowing down during design altitude 50 ㎜, until design altitude stops piling, tup is mentioned, carry out the pile sinking of next fence upright.
Embodiment 5:
Above-mentioned highway extension project and overhaul engineering guardrail pile connection construction method, according to the size of design drawing, after pile sinking, former rail pile column hangs the hole of obstruction block and just in time overlaps with the lower marginal pore of pile extension component, be fastenedly connected with standard high-strength bolt, make its pile extension part and former stake column become overall.
Embodiment 6:
A kind of pile extension component, its composition comprises: through welding or cold worked variable-section steel pipe 5, the small bore place of described variable-section steel pipe and heavy in section place have two groups of through holes 6 respectively.

Claims (1)

1. a highway extension project and overhaul engineering guardrail pile connection construction method, it is characterized in that: the method comprises the steps: the column caliber size according to original highway barrier, the steel-pipe welding or cold working that are not less than former column strength are formed the pile extension component that caliber is variable cross-section, variable-section steel pipe is utilized to be connected with former column as pile extension component, with hydraulic pile driver after pile extension, pressure pile sinking is carried out according to design and construction size, in pile driving process, elevation and vertical bury pipe is controlled well, until meet design requirement by level gauge and vertical bury pipe tester, after pile sinking, pile extension component and former upstanding studs hole high-strength bolt are fixed locked, make former column and pile extension part become overall, reach design by force intensity, finally obstruction block or bracket are installed, by high-strength bolt, guardrail board are installed, the described diameter of pile extension component and the determination of wall thickness: the former material as pile extension component should be identical with described former column material, its thickness and diameter are tried one's best equal or are not less than, to ensure its intensity, the determination of the former material length of described pile extension component, be connected for guaranteeing the former leghole position reached described in utilization, and realize guardrail board hang after meet steel guard rail acceptance criteria, former material length should >=road surface increase height+pile extension press down stroke+former leghole distance+pitch-row edge length, after confirmed standard size, intercept corresponding steel pipe length, by mold lathe and special-purpose machinery, be placed between hydraulic pressure utensil and fetal membrane, carry out in variable cross-section cold working process, balanced, slowly afterburning, prevent from causing plastic failure, the pile extension component of described variable cross-section cold working made carries out punching press pore-forming according to the design attitude of drawing, and carries out preservative treatment, the stake bit plane of described pile sinking arranges revision, utilizes transit to carry out linear setting-out demarcation, and level gauge controls elevation, vertical bury pipe tester controls the vertical bury pipe of pile extension, meter ruler controls stake column pitch, is partially worth demarcation, to control in the process of pile sinking in former stake position, described pressure pile sinking is according to direction, position, the hole principle consistent with former column by described pile extension component, small bore stands on concentric position on described former column down, stake machine tup evenly exerts a force by a small margin from heavy in section and presses down, pile extension component is slowly moved down along former column inwall until become large locked by frictional force because of cross section, tup increases pressure, operating personnel are according to the plan-position of setting-out and vertical bury pipe, regulate and control in stake sinking watching, ensure that plan-position and vertical bury pipe meet the demands, according to altitude data, slowing down stroke close to during design altitude 50 ㎜, until design altitude stops piling, tup is mentioned, carry out the pile sinking of next fence upright.
2. highway extension project according to claim 1 and overhaul engineering guardrail pile connection construction method, it is characterized in that: according to the size of design drawing, after pile sinking, the hole that former rail pile column hangs obstruction block just in time overlaps with the lower marginal pore of described pile extension component, be fastenedly connected with standard high-strength bolt, make the pile extension part of pile extension component and described former column become overall.
CN201210261160.2A 2012-07-26 2012-07-26 Pile-splicing construction method and pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects Active CN102747699B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210261160.2A CN102747699B (en) 2012-07-26 2012-07-26 Pile-splicing construction method and pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210261160.2A CN102747699B (en) 2012-07-26 2012-07-26 Pile-splicing construction method and pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects

Publications (2)

Publication Number Publication Date
CN102747699A CN102747699A (en) 2012-10-24
CN102747699B true CN102747699B (en) 2015-06-03

Family

ID=47028164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210261160.2A Active CN102747699B (en) 2012-07-26 2012-07-26 Pile-splicing construction method and pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects

Country Status (1)

Country Link
CN (1) CN102747699B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2407035Y (en) * 1999-12-30 2000-11-22 栾永军 Pile driver for highway guardrail
JP3381045B2 (en) * 1994-04-27 2003-02-24 清水建設株式会社 New structure and new construction method using new steel pipe pile using existing steel pipe pile
CN1465819A (en) * 2002-07-05 2004-01-07 刘克家 Construction method for heightening collision-resistant barrier
CN2890158Y (en) * 2006-03-17 2007-04-18 龚绪东 Highroad steel guardrail upright-post heightening device
CN201099845Y (en) * 2007-12-27 2008-08-13 翟岷 Anti-collision guard rail jointing device for roads traffic safety facilities road pavement
CN201574366U (en) * 2010-01-07 2010-09-08 山东省交通厅公路局 Highway eccentric obstruct-proof block waveform girder guard rail heightening apparatus
CN202090310U (en) * 2011-05-05 2011-12-28 北京道从交通科技有限公司 Reinforced and reformed structure of W-shaped beam guardrail
CN202688923U (en) * 2012-07-26 2013-01-23 黑龙江省北龙交通工程有限公司 Steel guardrail construction pile splicing component

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3381045B2 (en) * 1994-04-27 2003-02-24 清水建設株式会社 New structure and new construction method using new steel pipe pile using existing steel pipe pile
CN2407035Y (en) * 1999-12-30 2000-11-22 栾永军 Pile driver for highway guardrail
CN1465819A (en) * 2002-07-05 2004-01-07 刘克家 Construction method for heightening collision-resistant barrier
CN2890158Y (en) * 2006-03-17 2007-04-18 龚绪东 Highroad steel guardrail upright-post heightening device
CN201099845Y (en) * 2007-12-27 2008-08-13 翟岷 Anti-collision guard rail jointing device for roads traffic safety facilities road pavement
CN201574366U (en) * 2010-01-07 2010-09-08 山东省交通厅公路局 Highway eccentric obstruct-proof block waveform girder guard rail heightening apparatus
CN202090310U (en) * 2011-05-05 2011-12-28 北京道从交通科技有限公司 Reinforced and reformed structure of W-shaped beam guardrail
CN202688923U (en) * 2012-07-26 2013-01-23 黑龙江省北龙交通工程有限公司 Steel guardrail construction pile splicing component

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
液压打桩机锤头重量计算;谢立扬;《西安公路交通大学学报》;19981230;第18卷(第4期);全文 *
高速公路波形梁护栏再利用技术研究;邰永刚;《广东公路交通》;20091230(第4期);全文 *

Also Published As

Publication number Publication date
CN102747699A (en) 2012-10-24

Similar Documents

Publication Publication Date Title
CN109403456B (en) Steel corbel embedded structure and construction method thereof
CN102644244B (en) Antidumping reinforcing reinforce device for bridge and construction method thereof
CN103243621A (en) Method for mounting integrated steel rail supporting frame for adjustment of groove type steel rails of tramcar
CN204125872U (en) A kind of highway barrier bracing means
CN104153311A (en) Road guardrail reinforcing device and reinforcing method thereof
CN202148503U (en) Saddle type combined guardrail structure
CN102747699B (en) Pile-splicing construction method and pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects
CN204703923U (en) A kind of jacking is increased system and is comprised the lining trolley of this system
CN201756799U (en) Large mold plate for rollover construction of hollow thin-wall high piers
CN202945554U (en) Sliding crash barrier
CN202688923U (en) Steel guardrail construction pile splicing component
CN104372757A (en) Waveform beam guard bar heightening device and method
CN110374030B (en) Reinforced anti-collision guardrail structure for highway bend, construction machine and process
CN108517795A (en) Railroad bridge protecting canopy frame structure and its construction method
CN201099845Y (en) Anti-collision guard rail jointing device for roads traffic safety facilities road pavement
CN211689924U (en) High mound bracket supports bracket anchor structure
CN211498508U (en) Assembled pocket bottom protection device
CN211690084U (en) Pavement additional paving structure using existing waveform guard bar
CN204212262U (en) A kind of frame construction of pin-connected panel multi-storied garage
CN201990950U (en) Lifting-type water-dripping slot-forming system
CN103147460B (en) Integrated prefabricated pier and foundation structure
CN202390850U (en) Quick mounting structure for foundation of machine tool
CN104695981A (en) Jacking heightening system and lining trolley including system
CN203160160U (en) Road guardrail
CN110761225A (en) Road guardrail and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: QIQIHAR BEILUDA TRAFFIC FACILITIES MANUFACTURING C

Effective date: 20131223

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Chunqiu

Inventor after: Dong Liyan

Inventor after: Zhang Mingwei

Inventor after: Zhou Jingxin

Inventor after: Ma Changqing

Inventor after: Zhang Lizhong

Inventor after: Wang Jinfa

Inventor after: Su Hongying

Inventor after: Zhang Yongxiang

Inventor before: Zhang Chunqiu

Inventor before: Dong Liyan

Inventor before: Zhou Jingxin

Inventor before: Ma Changqing

Inventor before: Zhang Lizhong

Inventor before: Wang Jinfa

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG CHUNQIU DONG LIYAN ZHOU JINGXIN MA CHANGQING ZHANG LIZHONG WANG JINFA TO: ZHANG CHUNQIU DONG LIYAN ZHANG MINGWEI ZHOU JINGXIN MA CHANGQING ZHANG LIZHONG WANG JINFA SU HONGYING ZHANG YONGXIANG

TA01 Transfer of patent application right

Effective date of registration: 20131223

Address after: 150076 Heilongjiang city of Harbin province in the area of Heluo Street No. 10

Applicant after: Heilongjiang Beilong Traddic Engieering Co., Ltd.

Applicant after: Qiqihar Beiluda Traffic Facilities Manufacturing Co., Ltd.

Address before: 150076 Heilongjiang city of Harbin province in the area of Heluo Street No. 10

Applicant before: Heilongjiang Beilong Traddic Engieering Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211224

Address after: No.10, Heluo street, Daoli District, Harbin City, Heilongjiang Province

Patentee after: Heilongjiang Beilong Traffic Engineering Co.,Ltd.

Patentee after: Jiangsu Shengshitong Transportation Construction Engineering Co., Ltd

Address before: No.10, Heluo street, Daoli District, Harbin City, Heilongjiang Province

Patentee before: Heilongjiang Beilong Traffic Engineering Co.,Ltd.

Patentee before: Qiqihar beiluda transportation facilities manufacturing Co., Ltd

TR01 Transfer of patent right