CN211690084U - Pavement additional paving structure using existing waveform guard bar - Google Patents
Pavement additional paving structure using existing waveform guard bar Download PDFInfo
- Publication number
- CN211690084U CN211690084U CN202020125888.2U CN202020125888U CN211690084U CN 211690084 U CN211690084 U CN 211690084U CN 202020125888 U CN202020125888 U CN 202020125888U CN 211690084 U CN211690084 U CN 211690084U
- Authority
- CN
- China
- Prior art keywords
- existing
- pavement
- upright post
- newly
- guardrail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004575 stone Substances 0.000 claims description 2
- 230000007480 spreading Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 13
- 210000000481 breast Anatomy 0.000 description 10
- 238000012423 maintenance Methods 0.000 description 8
- 238000000034 method Methods 0.000 description 7
- 230000008901 benefit Effects 0.000 description 3
- 230000009467 reduction Effects 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 206010039203 Road traffic accident Diseases 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000010415 tidying Methods 0.000 description 1
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a pavement additional paving structure utilizing an existing waveform guardrail, which comprises an existing upright post, wherein the bottom end of the existing upright post is embedded in the existing pavement, and the pavement additional paving structure also comprises a new pavement paved above the existing pavement and an additional upright post with the bottom end embedded in the new pavement, wherein the top end of the additional upright post is higher than the top end of the existing upright post, and the additional upright post is connected with the existing upright post; the guardrail plate is arranged on the newly-added upright post. An object of the utility model is to provide an utilize existing waveform guardrail's road surface to add and spread the structure to need rebuild waveform guardrail again after rebuilding among the solution prior art, big well road surface of repairing and spreading, lead to the problem of the resource and the cost a large amount of wastes, realize the existing resource of make full use of, subtract short project duration, reduce engineering cost's purpose.
Description
Technical Field
The utility model relates to a road anticollision barrier field, concretely relates to utilize road surface of existing wave form guardrail to add shop's structure.
Background
The waveform guardrail is used as an important safety accessory facility of a road, can effectively prevent vehicles from rushing out of the road due to faults or uncontrolled driving, and can effectively reduce traffic accidents and property loss, thereby being widely applied.
At present, in practical engineering, the waveform guardrail is widely utilized. Along with the construction of a large amount of highway infrastructure in China, more and more highway major repair and intermediate repair projects are continuously developed, wherein a great part of the projects are additionally paved on the original road, so that the road surface elevation is higher and higher, and the road surface is raised after the major parts of the waveform guardrail foundations, the upright posts and the waveform breast boards are completely paved, so that the height of the existing waveform guardrail is insufficient, the safety standard is not met, and the existing waveform guardrail cannot be used continuously. In the prior art, when a road is paved, a common method is to dismantle and rebuild the waveform guardrail which comprises a foundation, an upright post and a waveform sideboard, so that a great deal of social resources are wasted, and the maintenance fund which is originally caught and sees elbows is frosted on snow.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an utilize existing waveform guardrail's road surface to add and spread the structure to need rebuild waveform guardrail again after rebuilding among the solution prior art, big well road surface of repairing and spreading, lead to the problem of the resource and the cost a large amount of wastes, realize the existing resource of make full use of, subtract short project duration, reduce engineering cost's purpose.
The utility model discloses a following technical scheme realizes:
the pavement additional paving structure utilizing the existing waveform guardrail comprises an existing upright post, a new pavement paved above the existing pavement and an additional upright post, wherein the bottom end of the existing upright post is embedded in the existing pavement, the additional upright post is embedded in the new pavement, the top end of the additional upright post is higher than the top end of the existing upright post, and the additional upright post is connected with the existing upright post; the guardrail plate is arranged on the newly-added upright post.
After the road surface is reconstructed and paved on a large and medium-sized road surface in the prior art, the road surface is lifted, the height of the existing waveform guardrail is insufficient, the safety standard is not met, and the road surface cannot be used continuously; and rebuild the wave form guardrail and lead to resource and cost a large amount of extravagant again, for this reason, the utility model provides an utilize the road surface of existing wave form guardrail to add the shop structure, among the existing wave form guardrail, two parts including the breast board of existing stand and guardrail, this structure keeps existing stand to continue to bury underground and keeps unchangeable in existing road surface, pulls down the guardrail breast board, directly pours new shop face on existing road surface. In order to guarantee the road surface and increase the mounting height of back guardrail, the utility model discloses set up newly-increased stand next door, newly-increased stand links to each other with existing stand, and makes the top of newly-increased stand be higher than the top of existing stand. The concrete height of the newly-added stand columns is adapted according to the designed height of the heightened pavement, and the requirements for the height of the guardrail in relevant safety specifications are met. The utility model discloses the new pavement surface of pouring does not have the bottom of newly-increased stand to can bury the bottom of newly-increased stand underground in the new pavement, ensure the stability of newly-increased stand. After the newly-added upright posts are fixed and the newly-paved road surface is laid, the fence plates are installed on the newly-added upright posts. The breast board is preferably detached from the existing upright post, so that the breast board can be recycled. The utility model discloses make full use of the stand and the breast board structure of existing waveform guardrail, need not demolish existing stand, also need not pore-creating again, the construction is convenient fast, and it is cheaper than former tradition demolishment newly-built guardrail to make the price moreover. And, because the utility model discloses need not to rebuild the guardrail stand basis again, consequently can also show reduction maintenance cost, improve the efficiency of construction. Therefore, the utility model discloses can the existing resource of make full use of, reduce the maintenance cost, realize quick construction, subtract short engineering time limit for a project greatly, reduce engineering cost, can extensively utilize in reconstruction, the major transit highway engineering of repairing.
Furthermore, the existing pavement and/or the new pavement are formed by pouring flat kerbs. The flat kerbstone refers to a kerbstone with a top surface flush with the road surface, and has the functions of calibrating the range of the road surface, tidying the road capacity and protecting the edge of the road surface.
Furthermore, the bottom end of the newly-added stand column is positioned on the top surface of the existing pavement. When installing newly-increased stand, just with its bottom directly place on existing road surface can, both can make things convenient for the connection installation between newly-increased stand and the existing stand, can make again more pre-buried in new pavement of newly-increased stand, and then improve stability.
Furthermore, the newly-added upright post is detachably connected with the existing upright post through a connecting piece.
Further, the connecting piece is a single-hole double-pipe clamp.
Furthermore, the newly-added upright columns and the existing upright columns are arranged along the direction of the center line of the road. For a straight road, the newly added upright posts and the existing upright posts are distributed along the axis direction of the road; but to the crooked section of road, then arrange according to the central line direction to make newly-increased stand, existing stand keep equal to the distance at road center, make the distance of guardrail to road center through this application setting, keep unchangeable with the distance of original guardrail to road center.
Furthermore, the existing upright post is of a hollow structure, and expansion concrete is poured inside the existing upright post. Improve the structural strength and the hardness of existing stand, make its atress basic unit spare as newly-increased stand, when the vehicle was out of control to collide the guardrail, the vehicle keeps forward power under inertial action, leads to the stand to take place the deformation of horizontal direction easily, in case out of control deformation then easily dashes out the road, and through the reinforcement to the existing stand of newly-increased stand in the same horizontal plane in this scheme, the anti horizontal deformation ability of newly-increased stand has effectively been improved, thereby improved the utility model discloses an overall safety nature.
The pavement paving method by using the existing waveform guardrail comprises the following steps:
(a) disassembling the existing corrugated guardrail, taking down the guardrail plate and keeping the existing upright post;
(b) installing a newly-added upright column beside the existing upright column, so that the top end of the newly-added upright column is higher than that of the existing upright column; fixing the newly added upright post;
(c) pouring a new pavement on the existing pavement, so that the bottom end of the newly added stand column is positioned in the poured new pavement;
(d) and installing the taken-down breast board on the newly-added upright post.
The method makes full use of the upright post and the breast board structure of the existing waveform guardrail, does not need to dismantle the existing upright post and re-form holes, has quick and convenient construction, and has lower construction cost than the original traditional method of dismantling and then building the guardrail. In addition, the method does not need to rebuild the guardrail column foundation, so that the maintenance cost can be obviously reduced, and the construction efficiency can be improved. Therefore, the method can fully utilize the existing resources, reduce the maintenance cost, realize quick construction, greatly shorten the construction period, reduce the construction cost and be widely used in road engineering reconstruction and major and middle maintenance.
And (c) further, in the step (b), the newly-added stand columns are fixedly connected with the existing stand columns through a plurality of connecting pieces, and the height of each connecting piece is higher than the height of the newly-paved road.
Further, step (d) further comprises: and pouring the expansive concrete into the existing upright columns.
Compared with the prior art, the utility model, following advantage and beneficial effect have:
the utility model discloses utilize the road surface of existing waveform guardrail to add and spread the structure, make full use of the stand and the breast board structure of existing waveform guardrail, need not demolish existing stand, also need not pore-creating again, the construction is convenient fast, makes the price ratio original tradition demolish newly-built guardrail cheap moreover. And, because the utility model discloses need not to rebuild the guardrail stand basis again, consequently can also show reduction maintenance cost, improve the efficiency of construction. Therefore, the utility model discloses can the existing resource of make full use of, reduce the maintenance cost, realize quick construction, subtract short engineering time limit for a project greatly, reduce engineering cost, can extensively utilize in reconstruction, the major transit highway engineering of repairing.
Drawings
The accompanying drawings, which are included to provide a further understanding of the embodiments of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the principles of the invention. In the drawings:
FIG. 1 is an elevation view of an embodiment of the present invention;
FIG. 2 is a plan view of an embodiment of the present invention;
fig. 3 is a side view of an embodiment of the present invention.
Reference numbers and corresponding part names in the drawings:
1-existing upright posts, 2-newly-added upright posts, 3-connecting pieces, 4-baffle plates, 5-original pavement elevation, 6-newly-paved pavement and 7-newly-paved pavement elevation.
Detailed Description
To make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail below with reference to the following examples and drawings, and the exemplary embodiments and descriptions thereof of the present invention are only used for explaining the present invention, and are not intended as limitations of the present invention.
Example 1:
the pavement additional paving structure using the existing waveform guardrail as shown in fig. 1 to 3 comprises an existing upright post 1, a new pavement 6 paved above the existing pavement, and a new upright post 2 with the bottom embedded in the new pavement 6, wherein the top end of the new upright post 2 is higher than the top end of the existing upright post 1, and the new upright post 2 is connected with the existing upright post 1; and the fence plate 4 is arranged on the newly added upright post 2.
Preferably, the balustrade 4 in this embodiment is a corrugated balustrade.
Example 2:
as shown in fig. 1 to 3, in the pavement additional paving structure using the existing corrugated guard rail, on the basis of embodiment 1, the existing pavement and the new pavement 6 are cast by flat stones. The bottom end of the newly-added upright post 2 is positioned on the top surface of the existing pavement. The newly-added upright post 2 is detachably connected with the existing upright post 1 through a connecting piece 3. The connecting piece 3 is a single-hole double-pipe clamp. The newly added upright columns 2 and the existing upright columns 1 are arranged along the central line direction of the road. The existing upright post 1 is of a hollow structure, and expansion concrete is poured inside the existing upright post.
Example 3:
the pavement paving method by using the existing waveform guardrail comprises the following steps:
the existing corrugated guardrail is disassembled, the guardrail plate 4 is taken down, and the existing upright post 1 is reserved;
installing a new upright post 2 beside the existing upright post 1, and enabling the top end of the new upright post 2 to be higher than the top end of the existing upright post 1; fixing the newly added upright post 2;
pouring a new pavement 6 on the existing pavement, and enabling the bottom end of the newly added upright post 2 to be positioned in the poured new pavement 6;
pouring expanded concrete into the existing upright post 1; and installing the removed breast board 4 on the newly added upright post 2.
Preferably, in the step b, the newly added upright post 2 is fixedly connected with the existing upright post 1 through a plurality of connecting pieces 3, and the height of the connecting pieces 3 is higher than the height 7 of the newly paved surface.
The connecting piece 3 in the embodiment adopts a single-hole double-pipe clamp, and the single-hole double-pipe clamp is customized according to the diameter and strength requirements of the existing stand column and the newly added stand column; the height of the newly added upright post is determined according to the current specification, and the height of the newly added upright post can be adjusted according to the field condition; the connection strength between the newly-added upright post and the existing upright post is required to meet the current standard.
In addition, when the road surface is heightened again, the newly-added upright post can be directly used as a stress component, and the guardrail can be heightened again in the same way in the embodiment.
The above-mentioned embodiments, further detailed description of the objects, technical solutions and advantages of the present invention, it should be understood that the above description is only the embodiments of the present invention, and is not intended to limit the scope of the present invention, and any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the scope of the present invention.
Claims (7)
1. The pavement additional paving structure utilizing the existing waveform guardrail comprises an existing upright post (1), wherein the bottom end of the existing upright post (1) is embedded in the existing pavement, and the pavement additional paving structure is characterized by further comprising a new pavement (6) paved above the existing pavement and a newly-added upright post (2) with the bottom end embedded in the new pavement (6), wherein the top end of the newly-added upright post (2) is higher than the top end of the existing upright post (1), and the newly-added upright post (2) is connected with the existing upright post (1); and the guardrail plate (4) is arranged on the newly added upright post (2).
2. A pavement overlaying structure using existing waveform guard rail according to claim 1, wherein said existing pavement and/or new pavement (6) is poured by flat stone.
3. A pavement overlaying structure using an existing corrugated guardrail according to claim 1, wherein a bottom end of said new post (2) is located on a top surface of an existing pavement.
4. The pavement structure using the existing corrugated guard rail according to claim 1, wherein the newly added upright post (2) is detachably connected with the existing upright post (1) through a connecting piece (3).
5. A roadway paving structure using an existing waveform guard rail according to claim 4, characterized in that the connecting member (3) is a single-hole double pipe clamp.
6. The pavement paving structure using the existing corrugated guardrail according to claim 1, wherein the new columns (2) and the existing columns (1) are arranged along the center line direction of the road.
7. A roadway-paving structure using an existing corrugated guardrail as claimed in claim 1, wherein the existing upright (1) is a hollow structure, and the interior of the hollow structure is poured with expansive concrete.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020125888.2U CN211690084U (en) | 2020-01-19 | 2020-01-19 | Pavement additional paving structure using existing waveform guard bar |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020125888.2U CN211690084U (en) | 2020-01-19 | 2020-01-19 | Pavement additional paving structure using existing waveform guard bar |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211690084U true CN211690084U (en) | 2020-10-16 |
Family
ID=72773646
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020125888.2U Active CN211690084U (en) | 2020-01-19 | 2020-01-19 | Pavement additional paving structure using existing waveform guard bar |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211690084U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111155465A (en) * | 2020-01-19 | 2020-05-15 | 四川省交通勘察设计研究院有限公司 | Pavement additional paving structure and additional paving method by utilizing existing waveform guardrail |
-
2020
- 2020-01-19 CN CN202020125888.2U patent/CN211690084U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111155465A (en) * | 2020-01-19 | 2020-05-15 | 四川省交通勘察设计研究院有限公司 | Pavement additional paving structure and additional paving method by utilizing existing waveform guardrail |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105803925B (en) | Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam | |
| CN103243640B (en) | Cap beam efficient, convenient and quick to construct and construction method thereof | |
| KR101090400B1 (en) | Construction method of extended footbridge installed on side of road | |
| CN210288214U (en) | Wave form roof beam combination formula guardrail and concrete guardrail transition structure | |
| CN104313993B (en) | A kind of highway bridge and construction method thereof | |
| CN206768675U (en) | A kind of ripple joist steel guardrail raised type obstruction block of highway three | |
| CN109339087A (en) | A low-rise building infrastructure system | |
| CN107313628A (en) | A kind of basic digging-free assembled tower-type space garage and its construction method | |
| CN214005536U (en) | Concrete guardrail reforms transform structure | |
| CN207211869U (en) | A kind of basic digging-free assembled tower-type space garage | |
| CN202466338U (en) | Construction device for rapidly recovering metro station road | |
| CN105507160A (en) | Method of operation platform for movable-type bailey beams for construction of cast-in-place box beams | |
| CN104372757A (en) | Waveform beam guard bar heightening device and method | |
| CN210238373U (en) | Guardrail stand rising structure | |
| CN201574367U (en) | W-beam guardrail device for highway road surface maintenance | |
| CN206512585U (en) | A kind of adjustable box-structure viaduct of the gradient | |
| CN218597026U (en) | Anti-collision guardrail structure | |
| CN207121922U (en) | A kind of foundation structure in digging-free assembled stereoscopic garage | |
| CN202559264U (en) | Steel-structure assembled-type framework for erecting traffic signal devices | |
| CN204282259U (en) | The device that a kind of corrugated beam barrier is increased | |
| CN111155465A (en) | Pavement additional paving structure and additional paving method by utilizing existing waveform guardrail | |
| CN104988852B (en) | Presetting system is adjustable, and attachment strap processes the jacking apparatus of bumping at bridge-head | |
| CN105507159B (en) | A kind of temporary support device suitable for large-span prestressed bent cap system transform | |
| CN222796227U (en) | A structure for adding anti-collision guardrail to existing bridge sidewalks | |
| CN211113138U (en) | Hollow pier capping support with PB L shear keys at periphery of embedded I-steel |