CN1465819A - Construction method for heightening collision-resistant barrier - Google Patents

Construction method for heightening collision-resistant barrier Download PDF

Info

Publication number
CN1465819A
CN1465819A CNA021387621A CN02138762A CN1465819A CN 1465819 A CN1465819 A CN 1465819A CN A021387621 A CNA021387621 A CN A021387621A CN 02138762 A CN02138762 A CN 02138762A CN 1465819 A CN1465819 A CN 1465819A
Authority
CN
China
Prior art keywords
collision
anticollision barrier
construction method
sleeve pipe
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA021387621A
Other languages
Chinese (zh)
Other versions
CN1211536C (en
Inventor
刘克家
王银虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 02138762 priority Critical patent/CN1211536C/en
Publication of CN1465819A publication Critical patent/CN1465819A/en
Application granted granted Critical
Publication of CN1211536C publication Critical patent/CN1211536C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The present invention discloses a road anti-collision protecting fence height-increasing construction method, and said method is characterized by that in the condition of no moving original length-fixed anti-collision protecting fence post a lengthened sleeve can be added and mounted on the top of the original length-fixed anti-collision protecting fence post, then on the lengthened sleeve the anti-collision fence can be fixed so as to implement said invention.

Description

The highway anti-collision guardrail heightening construction method
Technical field
The present invention relates to a kind of construction of the highway method, relate in particular to a kind of highway anti-collision guardrail heightening construction method.
Background technology
The highway both sides generally will install anticollision barrier additional, in case motor vehicles are gone out the road surface when meeting accident and caused pernicious traffic accident, therefore, anticollision barrier has certain requirement apart from the height on road surface.But every time through about 10 years of highway pavement repairs always and about bed hedgehopping 10cm, makes anticollision barrier constantly reduce apart from pavement-height, thereby does not reach the requirement of relevant specification.For this reason, existing solution is that original anticollision barrier column is completely extracted roadbed, unified moves certain position, punches on roadbed again, plants to adorn new lengthening column or original column shallow embedding is solved, and the while must the original old Kong of landfill.Make time-consuming in this way taking a lot of work, also damage roadbed, the application life of having reduced highway easily simultaneously.
Summary of the invention
The object of the present invention is to provide a kind of highway anti-collision guardrail heightening construction method.
In order to achieve the above object, technical program of the present invention lies in adopting a kind of highway anti-collision guardrail heightening construction method, this method is by under the situation of not moving original fixed length anticollision barrier column, install the lengthening sleeve pipe additional at original fixed length anticollision barrier column top, and then on the lengthening sleeve pipe fixedly the step of anticollision barrier realize.
Because the method applied in the present invention is: under the situation of not moving original fixed length anticollision barrier column, install the lengthening sleeve pipe additional at original fixed length anticollision barrier column top, and then on the lengthening sleeve pipe fixedly the step of anticollision barrier realize.This just makes anticollision barrier to be increased on the basis of not moving original column, has saved opening old hole on roadbed, filling old hole and plant again the dress column process, can save a large amount of operating expenses; Do not destroy simultaneously the original structure of roadbed, improved the efficiency of construction of increasing guardrail the application life that helps to improve highway yet, have important social benefit and economic benefit.
Description of drawings
Fig. 1 is the highway anti-collision guardrail assembling schematic diagram before increasing;
Fig. 2 is the highway anti-collision guardrail assembling schematic diagram after increasing.
The specific embodiment
As shown in Figure 1 and Figure 2.Among Fig. 1, anticollision barrier 3 is by in the fixing hole 2 that is bolted to column 1 top.During construction, earlier the anticollision barrier on the column shown in Fig. 113 is pulled down, the sleeve pipe 4 that will extend then is sleeved on the top (as shown in Figure 2) of column 1, and by bolt lengthening sleeve pipe 4 and column 1 is tightened together, at last again anticollision barrier 3 by be bolted to the lengthening sleeve pipe 4 on.Lengthening sleeve pipe 4 is provided with two mutual parallel radial direction through hole 5,6 one on the other, and both are at a distance of about 110cm.During installation, fixing hole original on lengthening lower through-hole 6 of sleeve pipe 4 and the column 12 is aimed at, penetrated will extend sleeve pipe 4 and column 1 of bolt again and be fixed together.At last, anticollision barrier 3 is fixed by bolts in the last through hole 5 of lengthening sleeve pipe 4.

Claims (1)

1, a kind of highway anti-collision guardrail heightening construction method, it is characterized in that: this method is by under the situation of not moving original fixed length anticollision barrier column, install the lengthening sleeve pipe additional at original fixed length anticollision barrier column top, and then on the lengthening sleeve pipe fixedly the step of anticollision barrier realize.
CN 02138762 2002-07-05 2002-07-05 Construction method for heightening collision-resistant barrier Expired - Fee Related CN1211536C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02138762 CN1211536C (en) 2002-07-05 2002-07-05 Construction method for heightening collision-resistant barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02138762 CN1211536C (en) 2002-07-05 2002-07-05 Construction method for heightening collision-resistant barrier

Publications (2)

Publication Number Publication Date
CN1465819A true CN1465819A (en) 2004-01-07
CN1211536C CN1211536C (en) 2005-07-20

Family

ID=34147268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02138762 Expired - Fee Related CN1211536C (en) 2002-07-05 2002-07-05 Construction method for heightening collision-resistant barrier

Country Status (1)

Country Link
CN (1) CN1211536C (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101440610B (en) * 2007-11-19 2010-12-08 魏志新 Unbroken rapid heightening construction method for highway wall type guard rail
CN102747699A (en) * 2012-07-26 2012-10-24 黑龙江省北龙交通工程有限公司 Pile-splicing construction method and pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects
CN108301273A (en) * 2018-01-30 2018-07-20 福建省地质工程勘察院 The fore-telling shaped pile anchor structure and its construction method of guardrail reinforcing integrated with roadbed
CN110205958A (en) * 2019-07-01 2019-09-06 四川省交通勘察设计研究院有限公司 A kind of fence upright elevated structure and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101440610B (en) * 2007-11-19 2010-12-08 魏志新 Unbroken rapid heightening construction method for highway wall type guard rail
CN102747699A (en) * 2012-07-26 2012-10-24 黑龙江省北龙交通工程有限公司 Pile-splicing construction method and pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects
CN102747699B (en) * 2012-07-26 2015-06-03 黑龙江省北龙交通工程有限公司 Pile-splicing construction method and pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects
CN108301273A (en) * 2018-01-30 2018-07-20 福建省地质工程勘察院 The fore-telling shaped pile anchor structure and its construction method of guardrail reinforcing integrated with roadbed
CN110205958A (en) * 2019-07-01 2019-09-06 四川省交通勘察设计研究院有限公司 A kind of fence upright elevated structure and method

Also Published As

Publication number Publication date
CN1211536C (en) 2005-07-20

Similar Documents

Publication Publication Date Title
CN201737062U (en) Automobile wing mounting structure lessening hurt to passers-by caused by collision
CN205295921U (en) Gyro wheel mound combination formula collision avoidance pier device
CN1211536C (en) Construction method for heightening collision-resistant barrier
CN202688916U (en) Lifting column type vehicle intercepting device
CN104947622A (en) Guardrail height increasing device and method
CN204691396U (en) A kind of road construction fence
CN2555285Y (en) Elevated column for anticollision barrier of highway
CN208167614U (en) A kind of intelligent flexible anticollision guardrail structure
CN206143675U (en) Limit for height frame warning pendulum
CN205676805U (en) Band greening grooved chain type flexible guardrail base
CN2383879Y (en) Road elastic safety anti-collision guard fence
CN2839369Y (en) Safety traffic gates
CN204455923U (en) A kind of buffer road rail
CN204608656U (en) A kind of novel isolation strip opening movable guard rail
CN207484345U (en) A kind of integral and intelligent parking banister
CN205742032U (en) A kind of novel concrete guardrail
CN201235351Y (en) Protection fence cleaning machine
CN200965199Y (en) Driving cabin external lamp protecting device
CN204703063U (en) A kind of Bridge guardrail
CN219653603U (en) Self-luminous road isolation anti-collision facility made of waste tires
CN205711871U (en) A kind of crashproof road guard of split-mounting type flexible buffer
CN216663795U (en) Self-luminous bridge rail guard that falls is used to bridge
CN205369089U (en) Built -in highway profile mark reflector
CN204701573U (en) Turnover automobile-used side guard rail and engineering truck
CN213952053U (en) Town road guardrail

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050720