沿海人防工程防水抗渗施工方法 Download PDFInfo
- Publication number
- CN102733427A CN102733427A CN2012102347084A CN201210234708A CN102733427A CN 102733427 A CN102733427 A CN 102733427A CN 2012102347084 A CN2012102347084 A CN 2012102347084A CN 201210234708 A CN201210234708 A CN 201210234708A CN 102733427 A CN102733427 A CN 102733427A
- Authority
- CN
- China
- Prior art keywords
- construction
- concrete
- water
- seepage
- agent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
本发明公开了一种沿海人防工程防水抗渗施工方法,包括整体性防水抗渗施工、构体防腐抗渗施工、室内除湿降渍施工等步骤。本发明施工方便,防水抗渗效果好。
Description
技术领域
本发明涉及一种沿海人防工程防水抗渗施工方法。
背景技术
当前,国际形势瞬夕万变,仍然处在不安定环境之中,而我国沿海区域既是我国经济发达地区,也是敌对国家的瞄准目标,又处于邻国边境,是国防前沿,需要构建地下人防工程。然而近海区域地下土层复杂。一般为软砂淤离土,砂性土质,抗惨性差,又且近海区域地下水位高,海水渗透力强,因而地下人防工程施工的难点是防水抗渗。
发明内容
本发明的目的在于提供一种施工方便、防水抗渗效果好的沿海人防工程防水抗渗施工方法。
本发明的技术解决方案是:
一种沿海人防工程防水抗渗施工方法,其特征是:包括:
(一)整体性防水抗渗施工:
(1)基础性金属防水抗渗底板敷设:主体基础第一层基础面浇筑后保养期满,在混凝土基面上,刷一层防腐防水涂料,然后按底面面积将金属板平铺在混凝土基础面上,并进行拼缝焊接,焊接后,涂刷一层防腐防水涂料,厚度在2mm,待涂料干后进入下道工序;
(2)主体防水抗渗混凝土配置、施工:水泥用硅酸盐水泥,其二氧化硫含量≥85%,选用的石子粒径≥40mm,砂选用中粗砂,灰砂比为1:1.5,水胶比≤0.45;三相比中固相为73%-84%,液相为15%-22%,气相为1%-5%;同时在混凝土中加入减水剂、膨胀剂、防水剂、密实剂及引水剂,且减水剂、膨胀剂、防水剂、密实剂及引水剂的用量均为固相重量的加0.5%,在混凝土中还加入相当于固相重量2%的纤维2%,并通过搅拌均匀配置;在此基础上进行混凝土工程施工;
(3)防水抗渗砂浆找平抹面:当主体工程完成后,保养期满后,用防水抗渗砂浆对凹处进行找平,然后抹面,抹面分两次进行,厚度为18-20mm;
(4)铺贴防水卷材:地下人防工程采用自粘性聚合物改性沥青防水卷材,并在基面涂刷胶浆;所述胶浆重量配比为325水泥:水:901胶=1:0.3:0.2,涂刷厚度为2-4mm,铺贴时搭接缝≥10cm,铺贴后压实,并涂刷密封防腐胶;
(二)构体防腐抗渗施工:
采用防腐性封闭涂料进行构体表体防护,自防腐性封闭涂料是由ZS-711聚合物防腐涂料、凹凸棒粉、环氧树脂漆按重量比:ZS-711聚合物防腐涂料:凹凸棒粉:环氧树脂漆=5:15:70进行搅拌均匀配置而成;均匀涂刷在构体内外两侧,厚度在10mm-15mm之间;
(三)室内除湿降渍施工:
(1)除湿降渍地面施工:除湿降渍地面材料采用混凝土材料浇筑地面,在混凝土中含有2%的体积的发泡沫及2%体积的凹凸棒烯土粉,浇筑厚度为2cm;
(2)安装吸湿抽风机进行排湿、吸湿抽风机安装在屋顶上部。
在进防水抗渗砂浆找平抹面施工时,当主体工程完成后,保养期满后,先进行细部施工,再进行找平抹面施工;所述细部施工包括:(1)变型缝处理施工:采用U锚热硫橡胶止水带施工技术,首先清理断面,将需要做接头部位切掉约5mm,用二甲苯将断面及上下表面清洗干净,将模具放在接头位置垫平,模具位于接头中心,将橡胶止水带嵌入模具中,中间空12-15mm缝;从两侧将止水带扶平,将生胶片截成12-15mm宽,与止水带宽度等长的两条重叠后嵌入止水带接缝中,其中间空中衬橡胶,大小与空洞相匹配,然后进行合模,将另一块模具盖上;通电加热,达到130℃时,切断电位、拆模、使按头接牢,再用卡具安装固定;
(2)后浇带处理施工:后浇带两侧采用阶梯缝结构,后浇带浇筑采用挎膨胀剂的补偿收缩混凝土、水中养护140天后的限制膨胀率≥0.015%,浇筑时应一次性浇筑,不留施工缝进行养护,养护时间应≥28天,然后嵌贴止水带。
(3)穿墙管处理施工,穿墙管在主体混凝土浇筑前进行预埋,穿墙管安装前在穿强管穿墙段中的管外侧套入止水环,同时在管壁周围涂一层密封胶,密封胶厚度为3mm,然后浇筑混凝土;
(4)埋设件处理施工:地下人防工程中的埋件采用预埋方法,埋件端部的混凝土厚度≥250mm;
(5)桩头处理施工:将桩顶剔凿至基面混凝土密实处,对桩顶周围进行清洗干净,在桩头用防水套材包围起来,并与基面连接,再涂水泥基渗透结晶型防水涂料,并涂刷均匀,施工后进行养护。
本发明施工方便,防水抗渗效果好。
下面结合实施例对本发明作进一步说明。
具体实施方式
一种沿海人防工程防水抗渗施工方法,包括:
(一)整体性防水抗渗施工:
(1)基础性金属防水抗渗底板敷设:主体基础第一层基础面浇筑后保养期满,在混凝土基面上,刷一层防腐防水涂料,然后按底面面积将金属板平铺在混凝土基础面上,并进行拼缝焊接,焊接后,涂刷一层防腐防水涂料,厚度在2mm,待涂料干后进入下道工序;
(2)主体防水抗渗混凝土配置、施工:水泥用硅酸盐水泥,其二氧化硫含量≥85%,选用的石子粒径≥40mm,砂选用中粗砂,灰砂比为1:1.5,水胶比≤0.45;三相比中固相为73%-84%,液相为15%-22%,气相为1%-5%;同时在混凝土中加入减水剂、膨胀剂、防水剂、密实剂及引水剂,且减水剂、膨胀剂、防水剂、密实剂及引水剂的用量均为固相重量的加0.5%,在混凝土中还加入相当于固相重量2%的纤维2%,并通过搅拌均匀配置;在此基础上进行混凝土工程施工;
(3)防水抗渗砂浆找平抹面:当主体工程完成后,保养期满后,用防水抗渗砂浆对凹处进行找平,然后抹面,抹面分两次进行,厚度为18-20mm;
(4)铺贴防水卷材:地下人防工程采用自粘性聚合物改性沥青防水卷材,并在基面涂刷胶浆;所述胶浆重量配比为325水泥:水:901胶=1:0.3:0.2,涂刷厚度为2-4mm,铺贴时搭接缝≥10cm,铺贴后压实,并涂刷密封防腐胶;
(二)构体防腐抗渗施工:
采用防腐性封闭涂料进行构体表体防护,自防腐性封闭涂料是由ZS-711聚合物防腐涂料、凹凸棒粉、环氧树脂漆按重量比:ZS-711聚合物防腐涂料:凹凸棒粉:环氧树脂漆=5:15:70进行搅拌均匀配置而成;均匀涂刷在构体内外两侧,厚度在10mm-15mm之间;
(三)室内除湿降渍施工:
(1)除湿降渍地面施工:除湿降渍地面材料采用混凝土材料浇筑地面,在混凝土中含有2%的体积的发泡沫及2%体积的凹凸棒烯土粉,浇筑厚度为2cm;
(2)安装吸湿抽风机进行排湿、吸湿抽风机安装在屋顶上部。
在进防水抗渗砂浆找平抹面施工时,当主体工程完成后,保养期满后,先进行细部施工,再进行找平抹面施工;所述细部施工包括:(1)变型缝处理施工:采用U锚热硫橡胶止水带施工技术,首先清理断面,将需要做接头部位切掉约5mm,用二甲苯将断面及上下表面清洗干净,将模具放在接头位置垫平,模具位于接头中心,将橡胶止水带嵌入模具中,中间空12-15mm缝;从两侧将止水带扶平,将生胶片截成12-15mm宽,与止水带宽度等长的两条重叠后嵌入止水带接缝中,其中间空中衬橡胶,大小与空洞相匹配,然后进行合模,将另一块模具盖上;通电加热,达到130℃时,切断电位、拆模、使按头接牢,再用卡具安装固定;
(2)后浇带处理施工:后浇带两侧采用阶梯缝结构,后浇带浇筑采用挎膨胀剂的补偿收缩混凝土、水中养护140天后的限制膨胀率≥0.015%,浇筑时应一次性浇筑,不留施工缝进行养护,养护时间应≥28天,然后嵌贴止水带。
(3)穿墙管处理施工,穿墙管在主体混凝土浇筑前进行预埋,穿墙管安装前在穿强管穿墙段中的管外侧套入止水环,同时在管壁周围涂一层密封胶,密封胶厚度为3mm,然后浇筑混凝土;
(4)埋设件处理施工:地下人防工程中的埋件采用预埋方法,埋件端部的混凝土厚度≥250mm;
(5)桩头处理施工:将桩顶剔凿至基面混凝土密实处,对桩顶周围进行清洗干净,在桩头用防水套材包围起来,并与基面连接,再涂水泥基渗透结晶型防水涂料,并涂刷均匀,施工后进行养护。
Claims (2)
1.一种沿海人防工程防水抗渗施工方法,其特征是:包括:
(一)整体性防水抗渗施工:
(1)基础性金属防水抗渗底板敷设:主体基础第一层基础面浇筑后保养期满,在混凝土基面上,刷一层防腐防水涂料,然后按底面面积将金属板平铺在混凝土基础面上,并进行拼缝焊接,焊接后,涂刷一层防腐防水涂料,厚度在2mm,待涂料干后进入下道工序;
(2)主体防水抗渗混凝土配置、施工:水泥用硅酸盐水泥,其二氧化硫含量≥85%,选用的石子粒径≥40mm,砂选用中粗砂,灰砂比为1:1.5,水胶比≤0.45;三相比中固相为73%-84%,液相为15%-22%,气相为1%-5%;同时在混凝土中加入减水剂、膨胀剂、防水剂、密实剂及引水剂,且减水剂、膨胀剂、防水剂、密实剂及引水剂的用量均为固相重量的加0.5%,在混凝土中还加入相当于固相重量2%的纤维2%,并通过搅拌均匀配置;在此基础上进行混凝土工程施工;
(3)防水抗渗砂浆找平抹面:当主体工程完成后,保养期满后,用防水抗渗砂浆对凹处进行找平,然后抹面,抹面分两次进行,厚度为18-20mm;
(4)铺贴防水卷材:地下人防工程采用自粘性聚合物改性沥青防水卷材,并在基面涂刷胶浆;所述胶浆重量配比为325水泥:水:901胶=1:0.3:0.2,涂刷厚度为2-4mm,铺贴时搭接缝≥10cm,铺贴后压实,并涂刷密封防腐胶;
(二)构体防腐抗渗施工:
采用防腐性封闭涂料进行构体表体防护,自防腐性封闭涂料是由ZS-711聚合物防腐涂料、凹凸棒粉、环氧树脂漆按重量比:ZS-711聚合物防腐涂料:凹凸棒粉:环氧树脂漆=5:15:70进行搅拌均匀配置而成;均匀涂刷在构体内外两侧,厚度在10mm-15mm之间;
(三)室内除湿降渍施工:
(1)除湿降渍地面施工:除湿降渍地面材料采用混凝土材料浇筑地面,在混凝土中含有2%的体积的发泡沫及2%体积的凹凸棒烯土粉,浇筑厚度为2cm;
(2)安装吸湿抽风机进行排湿、吸湿抽风机安装在屋顶上部。
2.根据权利要求1所述的沿海人防工程防水抗渗施工方法,其特征是:在进防水抗渗砂浆找平抹面施工时,当主体工程完成后,保养期满后,先进行细部施工,再进行找平抹面施工;所述细部施工包括:(1)变型缝处理施工:采用U锚热硫橡胶止水带施工技术,首先清理断面,将需要做接头部位切掉约5mm,用二甲苯将断面及上下表面清洗干净,将模具放在接头位置垫平,模具位于接头中心,将橡胶止水带嵌入模具中,中间空12-15mm缝;从两侧将止水带扶平,将生胶片截成12-15mm宽,与止水带宽度等长的两条重叠后嵌入止水带接缝中,其中间空中衬橡胶,大小与空洞相匹配,然后进行合模,将另一块模具盖上;通电加热,达到130℃时,切断电位、拆模、使按头接牢,再用卡具安装固定;
(2)后浇带处理施工:后浇带两侧采用阶梯缝结构,后浇带浇筑采用挎膨胀剂的补偿收缩混凝土、水中养护140天后的限制膨胀率≥0.015%,浇筑时应一次性浇筑,不留施工缝进行养护,养护时间应≥28天,然后嵌贴止水带。
(3)穿墙管处理施工,穿墙管在主体混凝土浇筑前进行预埋,穿墙管安装前在穿强管穿墙段中的管外侧套入止水环,同时在管壁周围涂一层密封胶,密封胶厚度为3mm,然后浇筑混凝土;
(4)埋设件处理施工:地下人防工程中的埋件采用预埋方法,埋件端部的混凝土厚度≥250mm;
(5)桩头处理施工:将桩顶剔凿至基面混凝土密实处,对桩顶周围进行清洗干净,在桩头用防水套材包围起来,并与基面连接,再涂水泥基渗透结晶型防水涂料,并涂刷均匀,施工后进行养护。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210234708.4A CN102733427B (zh) | 2012-07-09 | 2012-07-09 | 沿海人防工程防水抗渗施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210234708.4A CN102733427B (zh) | 2012-07-09 | 2012-07-09 | 沿海人防工程防水抗渗施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102733427A true CN102733427A (zh) | 2012-10-17 |
CN102733427B CN102733427B (zh) | 2014-03-26 |
Family
ID=46989683
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210234708.4A Active CN102733427B (zh) | 2012-07-09 | 2012-07-09 | 沿海人防工程防水抗渗施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102733427B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106978886A (zh) * | 2016-11-30 | 2017-07-25 | 北京东方雨虹防水工程有限公司 | 护砼防水系统及其施工方法 |
CN111535324A (zh) * | 2020-05-14 | 2020-08-14 | 陈文斌 | 一种地下现浇灌混凝土的同步防水防腐施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0539620A (ja) * | 1991-08-07 | 1993-02-19 | Takenaka Komuten Co Ltd | 空気圧を用いた地下構築物の止水方法および止水構造 |
KR20010026954A (ko) * | 1999-09-09 | 2001-04-06 | 김창호 | 방수·단열용 복합패널 및 방수/단열시공방법 |
CN1335435A (zh) * | 2001-08-29 | 2002-02-13 | 蒋学志 | 地下建筑卷材融合防水施工方法 |
CN101775817A (zh) * | 2010-02-04 | 2010-07-14 | 魏勇 | 一种防止临海建筑物地下室底板透寒、结露的结构及其施工方法 |
CN201665923U (zh) * | 2010-02-10 | 2010-12-08 | 广西金雨伞防水装饰有限公司 | 二合一反应型高分子复合防水卷材 |
-
2012
- 2012-07-09 CN CN201210234708.4A patent/CN102733427B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0539620A (ja) * | 1991-08-07 | 1993-02-19 | Takenaka Komuten Co Ltd | 空気圧を用いた地下構築物の止水方法および止水構造 |
KR20010026954A (ko) * | 1999-09-09 | 2001-04-06 | 김창호 | 방수·단열용 복합패널 및 방수/단열시공방법 |
CN1335435A (zh) * | 2001-08-29 | 2002-02-13 | 蒋学志 | 地下建筑卷材融合防水施工方法 |
CN101775817A (zh) * | 2010-02-04 | 2010-07-14 | 魏勇 | 一种防止临海建筑物地下室底板透寒、结露的结构及其施工方法 |
CN201665923U (zh) * | 2010-02-10 | 2010-12-08 | 广西金雨伞防水装饰有限公司 | 二合一反应型高分子复合防水卷材 |
Non-Patent Citations (6)
Title |
---|
何炳泉: "广州海心沙亚运会场馆大型人防地下空间工程防水施工技术", 《广东土木与建筑》, no. 08, 31 August 2011 (2011-08-31), pages 37 - 39 * |
刘国庆等: "上海某地块地下工程防水施工技术", 《中国建筑防水》, no. 05, 31 March 2012 (2012-03-31), pages 28 - 31 * |
宁佐利等: "天津滨海新区于家堡金融区起步区地下工程防水设计", 《中国建筑防水》, no. 09, 31 May 2011 (2011-05-31), pages 22 - 25 * |
张龙等: "浅谈地下防水工程施工的技术要求和方法", 《价值工程》, no. 06, 28 February 2011 (2011-02-28), pages 139 * |
江岳华等: "湖南郴州五岭广场地下人防工程防水设计与施工技术", 《中国建筑防水》, no. 01, 31 January 2012 (2012-01-31), pages 28 - 32 * |
玄立恒等: "齐齐哈尔中心广场地下人防工程防水施工技术", 《中国建筑防水》, no. 5, 31 March 2012 (2012-03-31), pages 24 - 27 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106978886A (zh) * | 2016-11-30 | 2017-07-25 | 北京东方雨虹防水工程有限公司 | 护砼防水系统及其施工方法 |
CN111535324A (zh) * | 2020-05-14 | 2020-08-14 | 陈文斌 | 一种地下现浇灌混凝土的同步防水防腐施工方法 |
CN111535324B (zh) * | 2020-05-14 | 2022-03-11 | 陈文斌 | 一种地下现浇灌混凝土的同步防水防腐施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102733427B (zh) | 2014-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104018598A (zh) | 一种外墙结构及施工安装方法 | |
CN102758456B (zh) | 地下室防水工程的施工方法 | |
CN204826464U (zh) | 女儿墙的防水结构 | |
CN102505663B (zh) | 一种浓缩池、水池渗漏修复方法 | |
CN104153401A (zh) | 抗浮锚杆防水施工方法 | |
CN102505762A (zh) | 一种砂加气混凝土保温块外墙外保温体系及其施工方法 | |
CN109184253A (zh) | 一种外墙渗漏的修补方法 | |
CN101545269B (zh) | 梁板式地下室刚性防水施工方法 | |
CN101761194B (zh) | 一种屋面防水结构及其制造方法 | |
CN105909122A (zh) | 一种塑钢门窗的安装方法 | |
CN101560777A (zh) | 一种带抗浮锚杆地下室底板防水施工方法 | |
CN110409633A (zh) | 一种环保防水建筑物外墙的施工方法 | |
CN207959289U (zh) | 一种用于地下室后浇带部位的漏水修补结构 | |
CN107574936B (zh) | 一种保温外墙施工工艺 | |
CN102733427B (zh) | 沿海人防工程防水抗渗施工方法 | |
CN205242457U (zh) | 一种地下室底板及外墙防水结构 | |
CN112408851A (zh) | 一种抗辐射半永久纳米渗透结晶密封致密剂及其使用方法 | |
CN102344278A (zh) | 渗透结晶型水泥基防水胶浆 | |
CN204492022U (zh) | 女儿墙高低跨变形缝的防水结构 | |
CN106869304A (zh) | 一种有限空间内地下室外墙防水结构及施工方法 | |
CN105133855A (zh) | 一种即有屋面的节能环保式防水保温施工方法 | |
CN102477798A (zh) | 一种外墙裂缝维修方法 | |
CN205663040U (zh) | 高层建筑瓷砖墙面现场浇筑式硬泡聚氨酯外墙外保温装置 | |
CN104234249A (zh) | 应用聚氨酯硬泡复合板块的外保温墙体工法 | |
CN204419202U (zh) | 一种隧道裂缝修复结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Waterproof and impermeable construction method of coastal civil air defense engineering Effective date of registration: 20220427 Granted publication date: 20140326 Pledgee: China Construction Bank Corporation Rudong sub branch Pledgor: JIANGSU SHUNTONG CONSTRUCTION GROUP Co.,Ltd. Registration number: Y2022980004919 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |