CN102733378A - Construction method of concrete pile - Google Patents

Construction method of concrete pile Download PDF

Info

Publication number
CN102733378A
CN102733378A CN201210123357XA CN201210123357A CN102733378A CN 102733378 A CN102733378 A CN 102733378A CN 201210123357X A CN201210123357X A CN 201210123357XA CN 201210123357 A CN201210123357 A CN 201210123357A CN 102733378 A CN102733378 A CN 102733378A
Authority
CN
China
Prior art keywords
outer tube
concrete
interior
mentioned
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210123357XA
Other languages
Chinese (zh)
Other versions
CN102733378B (en
Inventor
王继忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING PUISSANT GEOTECHNICAL ENGINEERING CO., LTD.
Original Assignee
王继忠
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王继忠 filed Critical 王继忠
Priority to CN201210123357XA priority Critical patent/CN102733378B/en
Publication of CN102733378A publication Critical patent/CN102733378A/en
Application granted granted Critical
Publication of CN102733378B publication Critical patent/CN102733378B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention aims to provide a construction method a concrete pile. According to the invention, a protection layer is arranged around the pipe body and then a pile body is constructed, so that the corrosion caused by water or slurry is avoided, a soil body around the pile can be reinforced, and the quality and the friction of the pile body can be improved. The construction method comprises the following steps: 1) sinking an outer tube to a design depth; 2) pouring concrete to the top of the pile; 3) lifting out the outer tube; 4) sinking the outer tube again at the position of the concrete pile body; 5) placing an inner tube inside the outer tube, and placing an inner tamping hammer in the inner tube; 6) filling a filling material in the outer tube, and tamping and densely squeezing the inner tube by hitting through the hammer; 7) repeatedly filling and tamping until a requirement of a density is met; 8) filling harsh concrete and densely squeezing for multiple times; 9) constructing the pile body; and 10) lifting out the outer pipe in a vibration manner. When a sand layer exists underground, a hole is formed in spiral hole guiding manner, and then the construction of the pile body is carried out, so that the construction efficiency is improved.

Description

The job practices of concrete pile
Technical field
The present invention relates to field of civil engineering, particularly relate to the construction technology of stake.
Background technology
The coastal area of China is the zone that comparatively concentrate in flourishing city, the enormous amount of construction work.And there are identical characteristics in the geological conditions major part of coastal area, and promptly phreatic content is than horn of plenty, have or even silt soil strata.This characteristics are handled to foundation and are caused very big difficulty, and as adopting in situ concrete pile, the concrete of pile body receives the erosion of water or mud very easily to produce undergauge or broken pile, has a strong impact on bearing capacity of pile foundation.
Foundation also often runs into the underground geological condition that layer of sand is arranged in handling; All great changes have taken place for the compactness of layer of sand and thickness, in this geological conditions, and pore-forming modes such as vibration sinking tube commonly used at present or the following pipe of hammering; Be difficult to pore-forming to projected depth, cause very big difficulty to construction.
In patent No. ZL98101041.5 patent documentation, a kind of construction technology of concrete pile is disclosed, this stake comprises complex carrier and concrete pile body; The characteristics of this technology are the variation of stake itself not to be studied; But emphasis is compacted to the reinforcing of the maximum optimum of the soil body under the stake end, through forming complex carrier, makes upper load pass through a stake and the following complex carrier of stake; Be delivered on the better bearing stratum, thereby improved the bearing capacity of stake.But this job practices finds that in quality examination the settling amount of stake is excessive sometimes, and complex carrier also reaches the degree of destruction far away, and its reason is that the quality of pile body and stake end joint portion is prone to problem; Particularly in the higher soil layer of mucky soil or water content, construct; Though taked the measure of cylinder-wall protecting, in the process of concrete perfusion and proposition casing, mud or water are prone to get into the joint portion of pile body or pile body and carrier; Produce undergauge or broken pile, influenced pile foundation quality.
Summary of the invention
The present invention proposes in order to solve the above problems; Purpose is to provide a kind of job practices of concrete pile, before carrying out the carrier construction, topping is set around pile body; Carry out the construction of pile body again; Avoided the erosion of water or mud, and the pile body surrounding soil has been carried out reinforcing to a certain degree, improved the pile body friction the joint portion of pile body or pile body and carrier.When running into the geological conditions of layer of sand, at first draw the mode pore-forming in hole simultaneously, after pile body is provided with topping on every side, carry out the construction of pile body then again, improve construction efficiency, increase the supporting capacity of stake with spiral.
To achieve these goals, the job practices of concrete pile of the present invention comprises the steps:
1) place, predetermined stake position in ground is sink to projected depth with outer tube;
2) concrete perfusion to stake top is located in outer tube;
3) before concrete initial set, outer tube is proposed;
4) at the pile body place that concrete forms, the outer tube that will have precast pile tip once more is sink to projected depth;
5) in outer tube, put into pipe, put into hammer ram in the interior pipe, interior pipe is connected through rope with interior hammer ram, the movement of falling object through interior hammer ram hits outer tube 10~50cm with interior pipe bottom;
6) promote interior hammer ram and interior the pipe to outer tube feeding port place simultaneously, in outer tube, insert the prose style free from parallelism inserts of some, through the movement of falling object of interior hammer ram, pipe is tamped compacted to prose style free from parallelism inserts in the hammering;
7) carry out above-mentioned filling and compacting operation repeatedly, the outer tube bottom, promptly the certain depth of stake end below and the foundation soil body of scope carry out continuous ground extruding, until the requirement of satisfying compactness to reach design bearing capacity;
8) promote interior hammer ram and interior the pipe to outer tube feeding port place simultaneously, to the harsh concrete of outer tube bottom gradation filling scheduled volume, through the movement of falling object of interior hammer ram, pipe is tamped compacted in the hammering to harsh concrete;
9) propose interior hammer ram and interior pipe simultaneously, in outer tube, place reinforcing cage, concrete perfusion;
10) vibration proposes outer tube.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 1) in, have precast pile tip when sinking to outer tube.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 2) in, concrete is formed by cement, sand, stone and water mix.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 2) in, concrete can substitute with plain concrete or mortar.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 4) in, the diameter of precast pile tip should be a bit larger tham the diameter of outer tube, makes concrete can not get into outer tube inside.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 5) in; The length of interior pipe is greater than outer length of tube, and the bottom of pipe is sealed in being somebody's turn to do, and the bottom is flat; The inner bottom of interior pipe is filled with the loose material of some, and steel plate is placed in the loose material top, steel plate top placement rubber cushion.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 6) in, prose style free from parallelism inserts is meant brickbat or broken watt or rubble or dregs or cobble or slag or cement-soil or dirt or harsh concrete, or the compound of above-mentioned material.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 7) in, the requirement of compactness is meant that under situation about not feeding intake, with the empty continuously injection amount of hitting of counting of beating of predetermined energy test inner tamping tube, total injection amount should be less than design load; Like unmet injection amount design load, then proceed the compacted operation of filler, until reaching above-mentioned injection amount design load.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 8) in, when the harsh concrete of scheduled volume was filled compacted end, interior pipe bottom and outer tube bottom maintained an equal level.
To achieve these goals, the job practices of concrete pile of the present invention also comprises the steps:
1) the predetermined stake position place in ground, with the mode pore-forming of auger boring to projected depth;
When 2) proposing auger stem, guncreting is to place, stake top in the stake hole;
3) before concrete initial set, at the pile body place that concrete forms, the outer tube that will have precast pile tip is sink to projected depth with the mode of vibrating;
4) in outer tube, put into pipe, put into hammer ram in the interior pipe, interior pipe is connected through rope with interior hammer ram, the movement of falling object through interior hammer ram hits outer tube 10~50cm with interior pipe bottom;
5) promote interior hammer ram and interior the pipe to outer tube feeding port place simultaneously, in outer tube, insert the prose style free from parallelism inserts of some, through the movement of falling object of interior hammer ram, pipe is tamped compacted to prose style free from parallelism inserts in the hammering;
6) carry out above-mentioned filling and compacting operation repeatedly, the outer tube bottom, promptly the certain depth of stake end below and the foundation soil body of scope carry out continuous ground extruding, until the requirement of satisfying compactness to reach design bearing capacity;
7) promote interior hammer ram and interior the pipe to outer tube feeding port place simultaneously, to the harsh concrete of outer tube bottom gradation filling scheduled volume, through the movement of falling object of interior hammer ram, pipe is tamped compacted in the hammering to harsh concrete;
8) propose interior hammer ram and interior pipe simultaneously, in outer tube, place reinforcing cage, concrete perfusion;
9) vibration proposes outer tube.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 2) in, concrete is formed by cement, sand, stone and water mix.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 2) in, concrete can substitute with plain concrete or mortar.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 3) in, the diameter of precast pile tip should be a bit larger tham the diameter of outer tube, makes concrete can not get into outer tube inside.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 4) in; The length of interior pipe is greater than outer length of tube, and the bottom of pipe is sealed in being somebody's turn to do, and the bottom is flat; The inner bottom of interior pipe is filled with the loose material of some, and steel plate is placed in the loose material top, steel plate top placement rubber cushion.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 5) in, prose style free from parallelism inserts is meant brickbat or broken watt or rubble or dregs or cobble or slag or cement-soil or dirt or harsh concrete, or the compound of above-mentioned material.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 6) in, the requirement of compactness is meant that under situation about not feeding intake, with the empty continuously injection amount of hitting of counting of beating of predetermined energy test inner tamping tube, total injection amount should be less than design load; Like unmet injection amount design load, then proceed the compacted operation of filler, until reaching above-mentioned injection amount design load.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 7) in, when the harsh concrete of scheduled volume was filled compacted end, interior pipe bottom and outer tube bottom maintained an equal level.
The characteristics and the advantage of the concrete pile that forms through above method are:
1. guarantee pile body and stake end joint portion quality.At first behind pore-forming the stake hole in concrete perfusion; Concrete has played the effect of pile body topping; When after this carrying out the pile body construction again and proposing outer tube; Outside pipe is surrounded by plain concrete all the time, has avoided the erosion to the joint portion of pile body or pile body and carrier of water or mud, has effectively improved the quality of pile body with stake end joint portion.
2. improve the pile body friction.Owing to poured into plain concrete in the stake hole behind the pore-forming; When outer tube and interior pipe together when being lowered into, compacted behind the concrete compression, and carry out filler when reinforcing when interior pipe to the pile body surrounding soil; Receive the vibration effect concrete further compacted the pile body surrounding soil; Therefore when enlarging pile body diameter, increase the compactness of pile body surrounding soil, significantly improved the pile body friction.
3. improve work efficiency and bearing capacity.When running into the geological conditions of layer of sand, at first draw the mode pore-forming in hole with spiral, compare with the mode of vibration or hammering; But the satisfactory stake of the formation of simple and fast hole is provided with topping then around pile body, carry out the construction of pile body again; Improve construction efficiency, increase the supporting capacity of stake.
Description of drawings
Fig. 1 is the process chart as the job practices of the concrete pile of one embodiment of the present of invention.
Fig. 2 is the process chart as the job practices of the concrete pile of an alternative embodiment of the invention.
The specific embodiment
As the job practices of the concrete pile of one embodiment of the present of invention, it comprises the steps, at first, shown in Fig. 1 a, the place, predetermined stake position in ground is sink to projected depth with outer tube 1 with the mode of vibration; Then, shown in Fig. 1 b, concrete perfusion to stake top mark eminence in outer tube 1; Then, shown in Fig. 1 c, before concrete initial set, vibration proposes outer tube 1; Then, shown in Fig. 1 d, at the pile body place that has been formed by concrete, the outer tube 1 that will have precast pile tip once more is sink to projected depth; Then, shown in Fig. 1 e, in outer tube 1, put into pipe 3, interior pipe 3 upper ends are provided with fixing ramming and coil 4, put into hammer ram 2 again in the interior pipe 3; Then, shown in Fig. 1 f, the movement of falling object through interior hammer ram 2 hits outer tube 10~50cm with interior pipe 3 bottoms; Then, shown in Fig. 1 g, promote interior hammer ram 2 and inner tamping tube 3 to outer tube 1 feeding port place simultaneously, in outer tube 1, insert the prose style free from parallelism inserts 5 of some, through the movement of falling object of interior hammer ram 2,3 pairs of prose style free from parallelism inserts 5 of pipe are tamped compacted in the hammering; Then, shown in Fig. 1 h, carry out above-mentioned filling and compacting operation repeatedly, outer tube 1 bottom, promptly the certain depth of stake end below and the foundation soil body of scope carry out continuous ground extruding, until the requirement of satisfying compactness to reach design bearing capacity; Then, shown in Fig. 1 i, hammer ram 2 and interior pipe 3 to outer tube 1 feeding port place in promoting simultaneously, to the harsh concrete 6 of outer tube 1 bottom gradation filling scheduled volume, through the movement of falling object of interior hammer ram 2,3 pairs of harsh concretes 6 of pipe are tamped compacted in the hammering; Then, shown in Fig. 1 j, hammer ram 2 and interior pipe 3 in proposing are simultaneously placed reinforcing cage 8, concrete perfusion 7 in outer tube 1; At last, shown in Fig. 1 k, vibration proposes outer tube 1.
As the job practices of the concrete pile of an alternative embodiment of the invention, it comprises the steps that at first, shown in Fig. 2 a, the place, predetermined stake position in ground holes to projected depth with auger stem 9; Then, shown in Fig. 2 b, when proposing auger stem 9, guncreting is to place, stake top in the stake hole; Then, shown in Fig. 2 c, before concrete initial set, at the pile body place that concrete forms, the outer tube 1 that will have precast pile tip is sink to projected depth with the mode of vibrating; Then, shown in Fig. 2 d, in outer tube 1, put into pipe 3, interior pipe 3 upper ends are provided with fixing ramming and coil 4, put into hammer ram 2 again in the interior pipe 3; Then, shown in Fig. 2 e, the movement of falling object through interior hammer ram 2 hits outer tube 10~50cm with interior pipe 3 bottoms; Then, shown in Fig. 2 f, promote interior hammer ram 2 and interior pipe 3 to outer tube 1 feeding port place simultaneously, in outer tube 1, insert the prose style free from parallelism inserts 5 of some, through the movement of falling object of interior hammer ram 2,3 pairs of prose style free from parallelism inserts 5 of pipe are tamped compacted in the hammering; Then, shown in Fig. 2 g, carry out above-mentioned filling and compacting operation repeatedly, outer tube 1 bottom, promptly the certain depth of stake end below and the foundation soil body of scope carry out continuous ground extruding, until the requirement of satisfying compactness to reach design bearing capacity; Then, shown in Fig. 2 h, hammer ram 2 and interior pipe 3 are to outer tube feeding port place in promoting simultaneously, and to the harsh concrete 6 of outer tube bottom gradation filling scheduled volume, through the movement of falling object of interior hammer ram 2,3 pairs of harsh concretes 6 of pipe are tamped compacted in the hammering; Then, shown in Fig. 2 i, hammer ram 2 and interior pipe 3 in proposing are simultaneously placed reinforcing cage 8, concrete perfusion 7 in outer tube 1; At last, shown in Fig. 2 j, vibration proposes outer tube 1.

Claims (17)

1. the job practices of a concrete pile, this method comprises the steps:
1) place, predetermined stake position in ground is sink to projected depth with outer tube;
2) concrete perfusion to stake top is located in outer tube;
3) before concrete initial set, outer tube is proposed;
4) at the pile body place that concrete forms, the outer tube that will have precast pile tip once more is sink to projected depth;
5) in outer tube, put into pipe, put into hammer ram in the interior pipe, interior pipe is connected through rope with interior hammer ram, the movement of falling object through interior hammer ram hits outer tube 10~50cm with interior pipe bottom;
6) promote interior hammer ram and interior the pipe to outer tube feeding port place simultaneously, in outer tube, insert the prose style free from parallelism inserts of some, through the movement of falling object of interior hammer ram, pipe is tamped compacted to prose style free from parallelism inserts in the hammering;
7) carry out above-mentioned filling and compacting operation repeatedly, the outer tube bottom, promptly the certain depth of stake end below and the foundation soil body of scope carry out continuous ground extruding, until the requirement of satisfying compactness to reach design bearing capacity;
8) promote interior hammer ram and interior the pipe to outer tube feeding port place simultaneously, to the harsh concrete of outer tube bottom gradation filling scheduled volume, through the movement of falling object of interior hammer ram, pipe is tamped compacted in the hammering to harsh concrete;
9) propose interior hammer ram and interior pipe simultaneously, in outer tube, place reinforcing cage, concrete perfusion;
10) vibration proposes outer tube.
2. the job practices of concrete pile according to claim 1 is characterized in that above-mentioned steps 1) in, the above-mentioned precast pile tip that has when sinking to outer tube.
3. the job practices of concrete pile according to claim 1 is characterized in that above-mentioned steps 2) in, above-mentioned concrete is formed by cement, sand, stone and water mix.
4. the job practices of concrete pile according to claim 1 is characterized in that above-mentioned steps 2) in, above-mentioned concrete can substitute with plain concrete or mortar.
5. the job practices of concrete pile according to claim 1 is characterized in that above-mentioned steps 4) in, the diameter of above-mentioned precast pile tip should be a bit larger tham the diameter of outer tube, makes concrete can not get into outer tube inside.
6. the job practices of concrete pile according to claim 1; It is characterized in that above-mentioned steps 5) in, the length of above-mentioned interior pipe is greater than outer length of tube, and the bottom of pipe is sealed in being somebody's turn to do; The bottom is flat; The inner bottom of interior pipe is filled with the loose material of some, and steel plate is placed in the loose material top, steel plate top placement rubber cushion.
7. the job practices of concrete pile according to claim 1; It is characterized in that above-mentioned steps 6) in; Above-mentioned prose style free from parallelism inserts is meant brickbat or broken watt or rubble or dregs or cobble or slag or cement-soil or dirt or harsh concrete, or the compound of above-mentioned material.
8. the job practices of concrete pile according to claim 1; It is characterized in that above-mentioned steps 7) in, the requirement of above-mentioned compactness is meant, under situation about not feeding intake; With the empty continuously injection amount of hitting of counting of beating of predetermined energy test inner tamping tube, total injection amount should be less than design load; Like unmet injection amount design load, then proceed the compacted operation of filler, until reaching above-mentioned injection amount design load.
9. job practices according to claim 1 is characterized in that above-mentioned steps 8) in, when the harsh concrete of scheduled volume was filled compacted end, interior pipe bottom and outer tube bottom maintained an equal level.
10. to achieve these goals, the job practices of concrete pile of the present invention also comprises the steps:
1) the predetermined stake position place in ground, with the mode pore-forming of auger boring to projected depth;
When 2) proposing auger stem, guncreting is to place, stake top in the stake hole;
3) before concrete initial set, at the pile body place that concrete forms, the outer tube that will have precast pile tip is sink to projected depth with the mode of vibrating;
4) in outer tube, put into pipe, put into hammer ram in the interior pipe, interior pipe is connected through rope with interior hammer ram, the movement of falling object through interior hammer ram hits outer tube 10~50cm with interior pipe bottom;
5) promote interior hammer ram and interior the pipe to outer tube feeding port place simultaneously, in outer tube, insert the prose style free from parallelism inserts of some, through the movement of falling object of interior hammer ram, pipe is tamped compacted to prose style free from parallelism inserts in the hammering;
6) carry out above-mentioned filling and compacting operation repeatedly, the outer tube bottom, promptly the certain depth of stake end below and the foundation soil body of scope carry out continuous ground extruding, until the requirement of satisfying compactness to reach design bearing capacity;
7) promote interior hammer ram and interior the pipe to outer tube feeding port place simultaneously, to the harsh concrete of outer tube bottom gradation filling scheduled volume, through the movement of falling object of interior hammer ram, pipe is tamped compacted in the hammering to harsh concrete;
8) propose interior hammer ram and interior pipe simultaneously, in outer tube, place reinforcing cage, concrete perfusion;
9) vibration proposes outer tube.
11. the job practices of concrete pile according to claim 10 is characterized in that above-mentioned steps 2) in, above-mentioned concrete is formed by cement, sand, stone and water mix.
12. the job practices of concrete pile according to claim 10 is characterized in that above-mentioned steps 2) in, above-mentioned concrete can substitute with plain concrete or mortar.
13. the job practices of concrete pile according to claim 10 is characterized in that above-mentioned steps 3) in, the diameter of above-mentioned precast pile tip should be a bit larger tham the diameter of outer tube, makes concrete can not get into outer tube inside.
14. the job practices of concrete pile according to claim 10; It is characterized in that above-mentioned steps 4) in, the length of above-mentioned interior pipe is greater than outer length of tube, and the bottom of pipe is sealed in being somebody's turn to do; The bottom is flat; The inner bottom of interior pipe is filled with the loose material of some, and steel plate is placed in the loose material top, steel plate top placement rubber cushion.
15. the job practices of concrete pile according to claim 1; It is characterized in that above-mentioned steps 5) in; Above-mentioned prose style free from parallelism inserts is meant brickbat or broken watt or rubble or dregs or cobble or slag or cement-soil or dirt or harsh concrete, or the compound of above-mentioned material.
16. the job practices of concrete pile according to claim 1; It is characterized in that above-mentioned steps 6) in, the requirement of above-mentioned compactness is meant, under situation about not feeding intake; With the empty continuously injection amount of hitting of counting of beating of predetermined energy test inner tamping tube, total injection amount should be less than design load; Like unmet injection amount design load, then proceed the compacted operation of filler, until reaching above-mentioned injection amount design load.
17. job practices according to claim 1 is characterized in that above-mentioned steps 7) in, when the harsh concrete of scheduled volume was filled compacted end, interior pipe bottom and outer tube bottom maintained an equal level.
CN201210123357XA 2012-04-25 2012-04-25 Construction method of concrete pile Active CN102733378B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210123357XA CN102733378B (en) 2012-04-25 2012-04-25 Construction method of concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210123357XA CN102733378B (en) 2012-04-25 2012-04-25 Construction method of concrete pile

Publications (2)

Publication Number Publication Date
CN102733378A true CN102733378A (en) 2012-10-17
CN102733378B CN102733378B (en) 2013-12-04

Family

ID=46989635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210123357XA Active CN102733378B (en) 2012-04-25 2012-04-25 Construction method of concrete pile

Country Status (1)

Country Link
CN (1) CN102733378B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103911986A (en) * 2014-03-31 2014-07-09 福建工程学院 Method for constructing composite repeatedly driven steel pipe piles
CN104295234A (en) * 2014-09-19 2015-01-21 刘守进 Long spiral extrusion bottom ramming pile machine and pile foundation pouring pile forming method
CN104895124A (en) * 2015-05-27 2015-09-09 王春龙 Method and device for monitoring finished plates of squeezed and expanded branch and plate cast-in-place pile
CN104988913A (en) * 2015-05-29 2015-10-21 王继忠 Construction method for carrier pile of major diameter long pile
CN105040692A (en) * 2015-06-27 2015-11-11 王继忠 Construction method of precast concrete pile body carrier pile
CN105064332A (en) * 2015-07-14 2015-11-18 王继忠 Construction method for bearing base piles of square pile bodies
CN105714773A (en) * 2016-03-01 2016-06-29 江苏东合南岩土科技股份有限公司 Foundation treatment method
CN107060648A (en) * 2017-05-17 2017-08-18 福建岩土工程勘察研究院 Soft soil foundation exciting drilling device and its construction method
CN109853534A (en) * 2019-01-02 2019-06-07 邱晓光 A kind of strength core pedestal pile constructing process
CN112144516A (en) * 2020-10-16 2020-12-29 王继忠 Construction method of concrete pile
CN112281841A (en) * 2020-10-22 2021-01-29 陈远 Construction method of assembled deep foundation pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1191257A (en) * 1998-03-20 1998-08-26 王继忠 Method for construction of concrete pile
CN1215776A (en) * 1998-11-23 1999-05-05 王继忠 Method for construction of cast-in-place concrete anchor pile
CN1831251A (en) * 2005-03-08 2006-09-13 曹兴明 Construction method of cord cast-in-place concrete bored concrete pile
JP2008068796A (en) * 2006-09-15 2008-03-27 Ihi Marine United Inc Propulsion method and device for marine vessel
WO2011125710A1 (en) * 2010-04-01 2011-10-13 新日本製鐵株式会社 Steel pile driving method involving degassing process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1191257A (en) * 1998-03-20 1998-08-26 王继忠 Method for construction of concrete pile
CN1215776A (en) * 1998-11-23 1999-05-05 王继忠 Method for construction of cast-in-place concrete anchor pile
CN1831251A (en) * 2005-03-08 2006-09-13 曹兴明 Construction method of cord cast-in-place concrete bored concrete pile
JP2008068796A (en) * 2006-09-15 2008-03-27 Ihi Marine United Inc Propulsion method and device for marine vessel
WO2011125710A1 (en) * 2010-04-01 2011-10-13 新日本製鐵株式会社 Steel pile driving method involving degassing process

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103911986B (en) * 2014-03-31 2016-01-20 福建工程学院 A kind of construction method combining strike-on steel pipe pile
CN103911986A (en) * 2014-03-31 2014-07-09 福建工程学院 Method for constructing composite repeatedly driven steel pipe piles
CN104295234A (en) * 2014-09-19 2015-01-21 刘守进 Long spiral extrusion bottom ramming pile machine and pile foundation pouring pile forming method
CN104895124A (en) * 2015-05-27 2015-09-09 王春龙 Method and device for monitoring finished plates of squeezed and expanded branch and plate cast-in-place pile
CN104895124B (en) * 2015-05-27 2016-09-21 王春龙 The one-tenth dish monitoring method and device of expanding branch grouting pile
CN104988913A (en) * 2015-05-29 2015-10-21 王继忠 Construction method for carrier pile of major diameter long pile
CN105040692A (en) * 2015-06-27 2015-11-11 王继忠 Construction method of precast concrete pile body carrier pile
CN105064332A (en) * 2015-07-14 2015-11-18 王继忠 Construction method for bearing base piles of square pile bodies
CN105714773A (en) * 2016-03-01 2016-06-29 江苏东合南岩土科技股份有限公司 Foundation treatment method
CN107060648A (en) * 2017-05-17 2017-08-18 福建岩土工程勘察研究院 Soft soil foundation exciting drilling device and its construction method
CN109853534A (en) * 2019-01-02 2019-06-07 邱晓光 A kind of strength core pedestal pile constructing process
CN112144516A (en) * 2020-10-16 2020-12-29 王继忠 Construction method of concrete pile
CN112281841A (en) * 2020-10-22 2021-01-29 陈远 Construction method of assembled deep foundation pile

Also Published As

Publication number Publication date
CN102733378B (en) 2013-12-04

Similar Documents

Publication Publication Date Title
CN102733378B (en) Construction method of concrete pile
CN104074186B (en) The casing device of pore-forming and construction method thereof in a kind of building lot
CN110318393B (en) Construction method of composite pile
CN105821836B (en) A kind of construction method of carrier pile
CN102733377B (en) Method for constructing concrete pile
CN103821139B (en) A kind of rammer expands carrier strength core multiple elements design stake and reinforced soft soil ground construction method
CN110387879B (en) Concrete cast-in-place pile construction method for hydraulically vibrating and hammering immersed tube
KR100762991B1 (en) Precast piling method injected with high-strength mortar
CN104294818B (en) The construction method of concrete-pile
CN105040692B (en) A kind of construction method of precast concrete pile body carrier pile
CN104314078A (en) Concrete pile construction equipment and construction method thereof
CN103510510A (en) Reinforced long spiral drilling concrete grouting pile and construction method thereof
CN103074882A (en) Construction method for reinforcing island-type perennial frozen-soil foundation by adopting gravel piles
CN114517472B (en) Construction method of carrier pile
CN105714773A (en) Foundation treatment method
CN104099925A (en) Construction device for concrete pile and construction method thereof
CN100375820C (en) Construction method for concrete pile
CN107100160B (en) A kind of construction technology for lower storage reservoir check dam vibro-replacement stone column
CN102635110B (en) Construction method for concrete pile
CN104762956B (en) Method for forming pile based on construction waste recycled aggregate
CN104988913B (en) A kind of construction method of the carrier pile of long large-diameter pile
CN105064332A (en) Construction method for bearing base piles of square pile bodies
CN105926621B (en) A kind of construction method of static pressure carrier pile
CN104895078B (en) A kind of to hold the construction method of the prefabricated pile of holding capacity
CN203594023U (en) Enhanced type long auger drilling pressure-grouting concrete pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING PUISSANT GEOTECHNICAL ENGINEERING CO., LTD

Free format text: FORMER OWNER: WANG JIZHONG

Effective date: 20140715

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140715

Address after: 102218, Beijing, Changping District East small town Taiping homes, building 31

Patentee after: BEIJING PUISSANT GEOTECHNICAL ENGINEERING CO., LTD.

Address before: 102218 Beijing city Changping District East Town Taiping home building No. 31 Beijing possente Geotechnical Engineering Co. Ltd.

Patentee before: Wang Jizhong