CN100375820C - Concrete pile construction method - Google Patents

Concrete pile construction method Download PDF

Info

Publication number
CN100375820C
CN100375820C CNB2004101027116A CN200410102711A CN100375820C CN 100375820 C CN100375820 C CN 100375820C CN B2004101027116 A CNB2004101027116 A CN B2004101027116A CN 200410102711 A CN200410102711 A CN 200410102711A CN 100375820 C CN100375820 C CN 100375820C
Authority
CN
China
Prior art keywords
pile
mentioned
concrete
pipe
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNB2004101027116A
Other languages
Chinese (zh)
Other versions
CN1621626A (en
Inventor
王继忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2004101027116A priority Critical patent/CN100375820C/en
Publication of CN1621626A publication Critical patent/CN1621626A/en
Application granted granted Critical
Publication of CN100375820C publication Critical patent/CN100375820C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The present invention provides a construction method of a concrete pile, which is characterized in that a prestressed pipe pile is used as a pile body, and the operations of filling materials, squeezing materials, filling concrete, etc. are carried out in a central hole of the pipe pile. The present invention effectively forms a composite carrier, positively ensures the quality of a connecting part at the pile end, enhances the qualified rate of piles and decrease the amount of precipitation of the piles. The construction method comprises the following steps: 1) selecting favorable foundation soil as a bearing layer at the pile end; 2) sinking the prestressed pipe pile to a designed depth through a power device at a preset pile position; 3) filling loose filling materials into the central hole of the prestressed pipe pile, tamping the filling materials, and repeating the operations of material filling and tamping until forming the optimum squeezed soil mass which meets the desired requirement; 4) filling preset amount of concrete at low flow state to the bottom end of a pile pipe, and expanding the bottom end of the pile pipe at little energy and low falling distance; 5) putting a steel reinforcement cage downward into the pile pipe; 6) filling concrete into the pile pipe and vibrating the concrete compactly to finish forming the pile body.

Description

混凝土桩的施工方法 Concrete pile construction method

技术领域 technical field

本发明涉及土木工程领域,特别是涉及桩的施工技术。The invention relates to the field of civil engineering, in particular to the construction technology of piles.

背景技术 Background technique

在专利号ZL98101041.5专利文献中,公开了一种混凝土桩的施工技术——复合载体夯扩桩,该桩包括复合载体和混凝土桩身,该工艺的特点在于不对桩本身的变化进行研究,而是注重对桩端下土体最大最优的加固挤密,并通过三击贯入度标准有效地形成复合载体,让上部荷载有效地通过桩和桩下面的复合载体,传递到较好持力层上,从而大大提高了桩的承载力,因此具有单桩承载力高、造价经济等优点。但是这种施工方法在质量检测中发现有时桩的沉降量过大,而复合载体还远未达到破坏的程度,其原因是桩身和桩端结合部的质量易出现问题,特别是在淤泥质土或含水量较高的土层中施工,虽然采取了护筒护壁等措施,但在灌注混凝土和提出护筒的过程中,淤泥或水易进入桩身与复合载体的结合部,影响桩端结合部质量,造成桩的沉降量过大。In the Patent No. ZL98101041.5 patent document, a construction technology of concrete piles - composite carrier rammed and expanded piles is disclosed. This pile includes composite carriers and concrete pile bodies. The characteristic of this process is that it does not study the changes of the pile itself. Instead, it focuses on the maximum and optimal reinforcement and compaction of the soil under the pile tip, and effectively forms a composite carrier through the three-strike penetration standard, so that the upper load can be effectively transmitted through the pile and the composite carrier below the pile to a better holding The bearing capacity of the pile is greatly improved, so it has the advantages of high bearing capacity of a single pile and low cost. However, in the quality inspection of this construction method, it is found that sometimes the settlement of the pile is too large, and the composite carrier is far from being destroyed. For construction in soil or soil with high water content, although measures such as casing and wall protection have been taken, during the process of pouring concrete and raising the casing, silt or water easily enters the joint between the pile body and the composite carrier, affecting the pile end. The quality of the joint will cause the settlement of the pile to be too large.

发明内容 Contents of the invention

本发明是为了解决上述的问题而提出的,目的在于提供一种混凝土桩的施工方法,桩身采用预应力管桩,在管桩的中孔内直接进行填料挤密、灌注混凝土等操作,在有效形成复合载体的同时可确实地保证桩端结合部质量,提高桩的合格率,减小桩的沉降量。The present invention is proposed in order to solve the above-mentioned problems, and the purpose is to provide a construction method for concrete piles. The pile body adopts prestressed pipe piles, and operations such as packing compaction and pouring concrete are directly carried out in the middle holes of the pipe piles. While effectively forming the composite carrier, the quality of the joint at the pile end can be reliably guaranteed, the qualified rate of the pile can be improved, and the settlement of the pile can be reduced.

为了实现上述目的,本发明的混凝土桩的施工方法包括下述步骤:In order to achieve the above object, the construction method of the concrete pile of the present invention comprises the following steps:

1)根据地质勘探报告和建筑物上部荷载,选择较好地基土作为桩端持力层;1) According to the geological exploration report and the load on the upper part of the building, select a better foundation soil as the bearing layer at the pile tip;

2)在地基中的预定桩位处,通过动力装置将预应力管桩沉至设计标高处;2) At the predetermined pile position in the foundation, sink the prestressed pipe pile to the design elevation through the power device;

3)通过上述预应力管桩的中孔,一边向桩管底端填入散体填充料,一边通过夯锤,对上述填入的散体填充料进行夯实,反复进行该填充和夯实操作,对上述桩管底端,即桩端下方的一定深度和范围的地基土体进行密实加固,直至形成满足所需要求的最优的挤密土体;3) Through the middle hole of the above-mentioned prestressed pipe pile, while filling the bulk filler into the bottom of the pile pipe, the above-mentioned filled bulk filler is compacted by a rammer, and the filling and compaction operations are repeated, The bottom of the above-mentioned pile tube, that is, the foundation soil of a certain depth and range below the pile end, is compacted and reinforced until an optimal compacted soil that meets the required requirements is formed;

4)通过上述预应力管桩的中孔,向桩管底端填充预定量的低流态混凝土,通过上述夯锤,以小能量,低落距轻轻将上述低流态混凝土挤扩出桩管底端;4) Through the middle hole of the above-mentioned prestressed pipe pile, fill a predetermined amount of low-flow concrete into the bottom of the pile pipe, and use the above-mentioned rammer to gently squeeze the above-mentioned low-flow concrete out of the pile pipe with small energy and low drop distance bottom;

5)通过上述预应力管桩的中孔,向桩管内下钢筋笼;5) Through the middle hole of the above-mentioned prestressed pipe pile, lower the reinforcement cage into the pile pipe;

6)通过上述预应力管桩的中孔,向桩管内灌注混凝土,对混凝土进行振捣密实,完成桩身施工。6) Through the middle hole of the above-mentioned prestressed pipe pile, pour concrete into the pile pipe, vibrate and compact the concrete, and complete the construction of the pile body.

最好,在上述的混凝土桩的施工方法中,上述步骤1)中较好地基土是指能够满足上部荷载的强度和变形要求,同时能够进行加固挤密的土层。Preferably, in the above concrete pile construction method, the better foundation soil in the above step 1) refers to the soil layer that can meet the strength and deformation requirements of the upper load and can be reinforced and compacted at the same time.

最好,在上述的混凝土桩的施工方法中,上述步骤2)中预应力管桩的沉入方式是通过静压、锤击和振动的方式实现的。Preferably, in the construction method of the above-mentioned concrete pile, the sinking mode of the prestressed pipe pile in the above-mentioned step 2) is realized by means of static pressure, hammering and vibration.

最好,在上述的混凝土桩的施工方法中,上述步骤2)中在预应力管桩的底端设置预制桩尖。Preferably, in the construction method of the above-mentioned concrete pile, in the above-mentioned step 2), a prefabricated pile point is arranged at the bottom of the prestressed pipe pile.

最好,在上述的混凝土桩的施工方法中,上述步骤3)中满足所需要求的最优的挤密土体是指符合下述条件a),同时要求符合地基表面没有隆起,即不对相邻桩已形成的挤密土体造成影响,从而在桩端形成由夯实的散体填充料,挤密土体和影响土体构成的复合载体,由此获得桩端的最大扩散面积Ae,以获得最大的承载能力;该条件a)指上述填充料的最终填充夯实程度由三击总贯入量控制,即在不投料的情况下,以预定的锤重和落距,测试夯锤连续空打三击的贯入量,其中前一次的贯入量大于后一次的贯入量,即第二击空打贯入量小于第一击空打贯入量,第三击空打贯入量小于第二击空打贯入量,并且上述三击总贯入量应小于三击贯入量的设计值。Preferably, in the construction method of the above-mentioned concrete pile, the optimal compacted soil that meets the required requirements in the above-mentioned step 3) refers to the following condition a), and at the same time, it is required to meet the foundation surface without uplift, that is, no relative The impact of the compacted soil formed by the adjacent pile, thus forming a composite carrier composed of compacted bulk filler, compacted soil and impacted soil at the pile end, thus obtaining the maximum diffusion area Ae of the pile end, to obtain The maximum bearing capacity; the condition a) means that the final filling and compaction degree of the above-mentioned filling materials is controlled by the total penetration of the three strikes, that is, in the case of no feeding, with the predetermined hammer weight and drop distance, the test hammer is continuously empty The penetration volume of three strikes, the previous penetration volume is greater than the subsequent penetration volume, that is, the second air strike penetration volume is less than the first air strike penetration volume, and the third air strike penetration volume is less than The amount of air strike penetration in the second blow, and the total penetration amount of the above three strikes should be less than the design value of the penetration amount of the three strikes.

最好,在上述的混凝土桩的施工方法中,上述步骤3)中反复进行该填充和夯实操作是在预应力管桩的中孔内进行的。Preferably, in the construction method of the above-mentioned concrete pile, the repeated filling and compacting operations in the above-mentioned step 3) are carried out in the middle hole of the prestressed pipe pile.

最好,在上述的混凝土桩的施工方法中,上述步骤3)中散体填充料指碎砖烂瓦,干硬性混凝土,各种废弃骨料,卵石,钢渣,或上述成分的混合料。Preferably, in the construction method of the above-mentioned concrete pile, the bulk filler in the above-mentioned step 3) refers to broken bricks and rotten tiles, dry hard concrete, various waste aggregates, pebbles, steel slag, or a mixture of the above-mentioned components.

通过以上方法形成的混凝土桩的特点和优势在于:The characteristics and advantages of concrete piles formed by the above methods are:

①桩身质量可靠。由于采用了预应力管桩作桩身,又在桩身内设钢筋笼和灌注混凝土,其桩身质量比一般现浇混凝土桩身大大提高。① The quality of the pile body is reliable. Because the prestressed pipe pile is used as the pile body, and the steel cage and poured concrete are arranged in the pile body, the quality of the pile body is greatly improved compared with the general cast-in-place concrete pile body.

②桩端结合部质量提高。由于在预应力管桩的中孔内直接进行填料夯扩挤密和下钢筋笼、灌注桩身混凝土等操作,避免了淤泥或水进入桩身与复合载体的结合部的可能,大大提高桩端结合部质量,上部荷载更有效地直接传递到复合载体,显著减小桩的沉降量。②The quality of pile end joints is improved. Since the filler ramming, expanding and compacting, lowering the reinforcement cage, pouring pile concrete and other operations are directly carried out in the middle hole of the prestressed pipe pile, the possibility of silt or water entering the joint between the pile body and the composite carrier is avoided, and the pile end is greatly improved. Combined with the quality of the part, the upper load is more effectively transmitted directly to the composite carrier, significantly reducing the settlement of the pile.

③桩的承载力高。相对一般的预应力管桩、沉管灌注桩、静压桩等桩形,由于在桩端形成有效的复合载体,显著提高桩的承载力,同时桩端复合载体可设在粉质粘土、粉土、砂土等相对较好的土层,因此可缩短桩的长度。③ The bearing capacity of the pile is high. Compared with common pile shapes such as prestressed pipe piles, sinking pipe piles, and static pressure piles, the effective composite carrier is formed at the pile end, which can significantly improve the bearing capacity of the pile. Soil, sand and other relatively good soil layers, so the length of the pile can be shortened.

附图说明 Description of drawings

图1作为本发明的一个实施例的混凝土桩的施工方法的工序图。Fig. 1 is a process diagram of a construction method of a concrete pile as an embodiment of the present invention.

具体实施方式 Detailed ways

作为本发明的一个实施例的混凝土桩的施工方法,其包括下述步骤,首先,如图1a所示,在地基中的预定桩位处,在预应力管桩1的底端设置预制桩尖,通过动力装置将预应力管桩1沉至设计标高处;接着,如图1b所示,通过夯锤2将预制桩尖击出预应力管桩1一定距离;然后,如图1c所示,一边向上述预应力管桩1的中孔内填入散体填充料3,一边通过夯锤2,对填入的散体填充料3进行夯实,反复进行该填充和夯实操作,对上述预应力管桩1底端,即桩端下一定深度、范围和体积的地基土体进行密实加固,直至形成满足所需要求的承载体;该承载体由夯实的散体填充料3,挤密土体4和影响土体5构成,如图1d所示;然后,如图1e所示,通过上述预应力管桩1的中孔,向桩管底端填充预定量的低流态混凝土6,通过上述夯锤,以小能量,低落距轻轻将上述低流态混凝土6挤扩出桩管底端;然后,如图1f所示,通过上述预应力管桩1的中孔,向桩管内下钢筋笼7,之后,如图1g所示,通过上述预应力管桩的中孔,向桩管内灌注混凝土8,对混凝土8进行振捣密实,完成桩身施工。As the construction method of the concrete pile of an embodiment of the present invention, it comprises the following steps, at first, as shown in Figure 1a, at the predetermined pile position place in the foundation, prefabricated pile tip is set at the bottom of prestressed pipe pile 1 , sink the prestressed pipe pile 1 to the design elevation through the power device; then, as shown in Fig. While filling the bulk filling material 3 into the middle hole of the above-mentioned prestressed pipe pile 1, the filled bulk filling material 3 is compacted by the rammer 2, and the filling and compacting operations are repeated, and the above-mentioned prestressed The bottom of the pipe pile 1, that is, the foundation soil of a certain depth, range and volume under the pile end is compacted and reinforced until a bearing body that meets the required requirements is formed; 4 and affected soil 5, as shown in Figure 1d; then, as shown in Figure 1e, through the middle hole of the above-mentioned prestressed pipe pile 1, fill the bottom of the pile pipe with a predetermined amount of low-flow concrete 6, through the above-mentioned The rammer gently extrudes the above-mentioned low-flow concrete 6 out of the bottom of the pile pipe with a small energy and a low drop distance; then, as shown in Figure 1f, through the middle hole of the above-mentioned prestressed pipe pile 1, lower the steel bar into the pile pipe Cage 7, and then, as shown in Figure 1g, concrete 8 is poured into the pile pipe through the middle hole of the above-mentioned prestressed pipe pile, and the concrete 8 is vibrated and compacted to complete the construction of the pile body.

Claims (7)

1.一种混凝土桩的施工方法,该方法包括下述步骤:1. A construction method of concrete pile, the method may further comprise the steps: 1)根据地质勘探报告和建筑物上部荷载,选择较好地基土作为桩端持力层;1) According to the geological exploration report and the load on the upper part of the building, select a better foundation soil as the bearing layer at the pile tip; 2)在地基中的预定桩位处,通过动力装置将预应力管桩沉至设计标高处;2) At the predetermined pile position in the foundation, sink the prestressed pipe pile to the design elevation through the power device; 3)通过上述预应力管桩的中孔,一边向桩管底端填入散体填充料,一边通过夯锤,对上述填入的散体填充料进行夯实,反复进行该填充和夯实操作,对上述桩管底端,即桩端下方的一定深度和范围的地基土体进行密实加固,直至形成满足所需要求的最优的挤密土体;3) Through the middle hole of the above-mentioned prestressed pipe pile, while filling the bulk filler into the bottom of the pile pipe, the above-mentioned filled bulk filler is compacted by a rammer, and the filling and compaction operations are repeated, The bottom of the above-mentioned pile tube, that is, the foundation soil of a certain depth and range below the pile end, is compacted and reinforced until an optimal compacted soil that meets the required requirements is formed; 4)通过上述预应力管桩的中孔,向桩管底端填充预定量的低流态混凝土,通过上述夯锤,以小能量,低落距轻轻将上述低流态混凝土挤扩出桩管底端;4) Through the middle hole of the above-mentioned prestressed pipe pile, fill a predetermined amount of low-flow concrete into the bottom of the pile pipe, and use the above-mentioned rammer to gently squeeze the above-mentioned low-flow concrete out of the pile pipe with small energy and low drop distance bottom; 5)通过上述预应力管桩的中孔,向桩管内下钢筋笼;5) Through the middle hole of the above-mentioned prestressed pipe pile, lower the reinforcement cage into the pile pipe; 6)通过上述预应力管桩的中孔,向桩管内灌注混凝土,对混凝土进行振捣密实,完成桩身施工。6) Through the middle hole of the above-mentioned prestressed pipe pile, pour concrete into the pile pipe, vibrate and compact the concrete, and complete the construction of the pile body. 2.根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤1)中,较好地基土是指能够满足上部荷载的强度和变形要求,同时能够进行加固挤密的土层。2. the construction method of concrete pile according to claim 1 is characterized in that in above-mentioned steps 1), better foundation soil refers to the strength and deformation requirements that can meet the upper load, and can carry out the soil layer of reinforcement compaction simultaneously. 3.根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤2)中,上述预应力管桩的沉入方式是通过静压、锤击和振动的方式实现的。3. The construction method of the concrete pile according to claim 1, characterized in that in the above-mentioned step 2), the sinking mode of the above-mentioned prestressed pipe pile is realized by means of static pressure, hammering and vibration. 4.根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤2)中,在上述预应力管桩的底端设置预制桩尖。4. The construction method of concrete piles according to claim 1, characterized in that in the above step 2), a prefabricated pile tip is set at the bottom of the above-mentioned prestressed pipe pile. 5.根据权利要求1所述的施工方法,其特征在于上述步骤3)中,上述满足所需要求的最优的挤密土体是指符合下述条件a),同时要求符合地基表面没有隆起,即不对相邻桩已形成的挤密土体造成影响,从而在桩端形成由夯实的散体填充料,挤密土体和影响土体构成的复合载体,由此获得桩端的最大扩散面积Ae,以获得最大的承载能力;该条件a)指上述填充料的最终填充夯实程度由三击总贯入量控制,即在不投料的情况下,以预定的锤重和落距,测试夯锤连续空打三击的贯入量,其中前一次的贯入量大于后一次的贯入量,即第二击空打贯入量小于第一击空打贯入量,第三击空打贯入量小于第二击空打贯入量,并且上述三击总贯入量应小于三击贯入量的设计值。5. The construction method according to claim 1, characterized in that in above-mentioned step 3), the above-mentioned optimal compacted soil body meeting the required requirements refers to meeting the following conditions a), while requiring that the surface of the foundation is not uplifted , that is, it does not affect the compacted soil formed by adjacent piles, so that a composite carrier composed of compacted bulk filler, compacted soil and impacted soil is formed at the pile tip, thereby obtaining the maximum diffusion area of the pile tip Ae, to obtain the maximum bearing capacity; this condition a) means that the final filling compaction degree of the above-mentioned filling material is controlled by the total penetration amount of three strikes, that is, the test tamping is performed with a predetermined hammer weight and drop distance without feeding. The penetration amount of three consecutive blows of the hammer, wherein the penetration amount of the previous time is greater than that of the next time, that is, the penetration amount of the second blow is smaller than the penetration amount of the first blow, and the penetration amount of the third blow is smaller than that of the first blow. The penetration amount is less than the second-strike empty-strike penetration amount, and the above-mentioned three-strike total penetration amount should be less than the design value of the three-strike penetration amount. 6.根据权利要求1所述的施工方法,其特征在于上述步骤3)中,上述反复进行该填充和夯实操作是在预应力管桩的中孔内进行的。6. The construction method according to claim 1, characterized in that in the above-mentioned step 3), the above-mentioned repeated filling and compacting operations are carried out in the middle hole of the prestressed pipe pile. 7.根据权利要求1所述的施工方法,其特征在于上述步骤3)中,上述散体填充料指碎砖烂瓦,干硬性混凝土,各种废弃骨料,卵石,钢渣,或上述成分的混合料。7. The construction method according to claim 1, characterized in that in the above step 3), the above-mentioned bulk filler refers to broken bricks and rotten tiles, dry hard concrete, various waste aggregates, pebbles, steel slag, or the above-mentioned ingredients Mixture.
CNB2004101027116A 2004-12-28 2004-12-28 Concrete pile construction method Expired - Lifetime CN100375820C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004101027116A CN100375820C (en) 2004-12-28 2004-12-28 Concrete pile construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004101027116A CN100375820C (en) 2004-12-28 2004-12-28 Concrete pile construction method

Publications (2)

Publication Number Publication Date
CN1621626A CN1621626A (en) 2005-06-01
CN100375820C true CN100375820C (en) 2008-03-19

Family

ID=34766834

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004101027116A Expired - Lifetime CN100375820C (en) 2004-12-28 2004-12-28 Concrete pile construction method

Country Status (1)

Country Link
CN (1) CN100375820C (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046529A (en) * 2012-12-31 2013-04-17 中国建筑西南勘察设计研究院有限公司 Rammed hard plain concrete pile composite foundation
CN104404958A (en) * 2014-11-20 2015-03-11 上海智岛建筑科技有限公司 Construction method for precast hollow pedestal piles
CN104727309A (en) * 2015-02-02 2015-06-24 中国电力工程顾问集团中南电力设计院有限公司 Construction technology of squeeze-in expanded-base pipe pile
CN104988896B (en) * 2015-05-13 2017-01-25 刘闯 Minitype friction short tubular pile composite foundation structure and constructing method thereof
CN105040692B (en) * 2015-06-27 2018-01-19 王继忠 A kind of construction method of precast concrete pile body carrier pile
CN105821836B (en) * 2016-02-18 2017-08-04 王继忠 A kind of construction method of carrier pile
CN105714773B (en) * 2016-03-01 2017-11-28 江苏东合南岩土科技股份有限公司 A kind of method for processing foundation
CN105926595A (en) * 2016-04-21 2016-09-07 化学工业岩土工程有限公司 Construction method for rammed and reamed pre-stressed hollow pipe pile
CN106812149A (en) * 2017-03-03 2017-06-09 王继忠 A kind of construction method of pile foundation
CN106884429B (en) * 2017-04-10 2019-12-17 浙江省现代建筑设计研究院有限公司 Precast pile construction method
CN111549767A (en) * 2020-05-27 2020-08-18 刘清洁 Construction method for improving bearing capacity of concrete cast-in-place pile
CN112144522A (en) * 2020-10-20 2020-12-29 王继忠 Construction method of prestressed pipe pile and special prestressed pipe pile thereof
CN112854177A (en) * 2021-01-14 2021-05-28 中国铁建港航局集团有限公司 Sea-facies mud layer reinforcing treatment method
CN113083129A (en) * 2021-05-07 2021-07-09 马鞍山市北益环保科技有限责任公司 Filling device for producing multilayer composite rock wool board and filling method thereof
CN113235636A (en) * 2021-05-22 2021-08-10 宁波市明森建筑设计院有限公司 High-strength soft soil stratum pile foundation
CN115305912A (en) * 2022-02-14 2022-11-08 高云飞 A construction method for pipe pile grouting, ramming, vibration and bottom expansion
CN116220006B (en) * 2023-03-07 2024-09-17 广州市市政工程试验检测有限公司 A post-tensioned slow-bonding prestressed combined rammed-expanded pile and its construction method
CN119593390A (en) * 2025-01-13 2025-03-11 北京波森特岩土工程有限公司 A method for processing bottom sealing of prefabricated pipe piles

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2261456A (en) * 1991-11-12 1993-05-19 Bing Wing Choy A shoe for a concrete pile
CN1104280A (en) * 1993-10-19 1995-06-28 俞晓 Pre-poured composite tube pile and pile-making technology and apparatus thereof
CN1191257A (en) * 1998-03-20 1998-08-26 王继忠 Concrete pile construction method
CN1354307A (en) * 2001-12-28 2002-06-19 王继忠 Construction method of concrete pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2261456A (en) * 1991-11-12 1993-05-19 Bing Wing Choy A shoe for a concrete pile
CN1104280A (en) * 1993-10-19 1995-06-28 俞晓 Pre-poured composite tube pile and pile-making technology and apparatus thereof
CN1191257A (en) * 1998-03-20 1998-08-26 王继忠 Concrete pile construction method
CN1354307A (en) * 2001-12-28 2002-06-19 王继忠 Construction method of concrete pile

Also Published As

Publication number Publication date
CN1621626A (en) 2005-06-01

Similar Documents

Publication Publication Date Title
US7201540B2 (en) Construction process for composite pile foundation
CN103821139B (en) A kind of rammer expands carrier strength core multiple elements design stake and reinforced soft soil ground construction method
CN102733378B (en) Construction method of concrete pile
CN104074186B (en) The casing device of pore-forming and construction method thereof in a kind of building lot
CN102733376B (en) Composite pile and its construction method
CN100564695C (en) The job practices of carrier pile
CN114517472B (en) Construction method of a carrier pile
CN101798809B (en) Non-borrow composite underreamed pile constructing method
CN101768970A (en) Construction method of concrete pile
CN102733377A (en) Method for constructing concrete pile
CN1621626A (en) Construction method for concrete pile
CN106192999A (en) The construction method of uplift pile
CN105714773A (en) Foundation treatment method
CN104947648A (en) Deep replacement dynamic compaction gravel pile foundation reinforcement method
CN104762956B (en) A pile-forming method based on recycled aggregate piles from construction waste
CN104404956A (en) Construction method for pedestal piles
CN103790148A (en) Combined treatment construction method for collapsible loess foundation
CN108797578A (en) Crushed stone grouting pile and its construction method with classification enlarged footing
CN209162869U (en) Pile End Construction Recycled Materials Compact and Expand Composite Pile Foundation
CN104988913B (en) A kind of construction method of the carrier pile of long large-diameter pile
CN105926621B (en) A kind of construction method of static pressure carrier pile
CN105064332A (en) Construction method for bearing base piles of square pile bodies
CN103615002B (en) A kind of expansion end broken stone pile pile steel pipe and construction method
CN203741824U (en) Rammed carrier strong core multi-component composite pile
CN100387789C (en) Concrete pile construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: BEIJING PUISSANT GEOTECHNICAL ENGINEERING Co.,Ltd.

Assignor: Wang Jizhong

Contract record no.: 2011110000108

Denomination of invention: Concrete pile construction method

Granted publication date: 20080319

License type: Exclusive License

Open date: 20050601

Record date: 20110718

CX01 Expiry of patent term

Granted publication date: 20080319

CX01 Expiry of patent term