CN102733314A CN2012102540645A CN201210254064A CN102733314A CN 102733314 A CN102733314 A CN 102733314A CN 2012102540645 A CN2012102540645 A CN 2012102540645A CN 201210254064 A CN201210254064 A CN 201210254064A CN 102733314 A CN102733314 A CN 102733314A
Authority
CN
China
Prior art keywords
blue
walking mechanism
fulcrum
draw
stretch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102540645A
Other languages
English (en)
Other versions
CN102733314B (zh
Inventor
辛自洋
张运书
曹永操
胡继栋
张广阔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Rail Transit Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
Rail Transit Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical Rail Transit Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority to CN201210254064.5A priority Critical patent/CN102733314B/zh
Publication of CN102733314A publication Critical patent/CN102733314A/zh
Application granted granted Critical
Publication of CN102733314B publication Critical patent/CN102733314B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种用前卡式千斤顶移动挂蓝的行走机构及其施工方法,行走机构包括挂蓝(4)、枕梁(12)和轨道梁(1),所述挂蓝(4)通过支点安装在轨道梁(1)上;在轨道梁(1)的前端设有拉力座(7)和张拉前垫梁(8);在挂蓝(4)的前支点(5)处设有前卡式千斤顶(13)和张拉后垫梁(14);拉力座(7)和前支点(5)之间设有钢绞线(6),钢绞线(6)的一端安装有挤压套(9),穿过拉力座(7)和张拉前垫梁(8),另一端穿过前支点(5)、张拉后垫梁(14)和前卡式千斤顶(13),通过前卡式千斤顶(13)提供动力使挂蓝(4)整体前移。该行走机构的安装成本低,简单实用,而且在施工时,挂蓝移动平稳。

Description

一种用前卡式千斤顶移动挂蓝的行走机构及其施工方法
技术领域
本发明属于桥梁施工浇筑领域,具体涉及了一种用前卡式千斤顶移动挂蓝的行走机构及其施工方法。
背景技术
目前,现有和曾有的关于挂蓝移动施工的方式方法很多,有卷扬机拖的,还有手拉葫芦拉的,有液压杆推的,形式多种多样。但总体来说,挂蓝的移动方式,主要是控制几个方面,一是挂蓝在移动过程中的稳定性、二是移动是否省工省力,三是移动设备的成本如何。但是上述的各种移动方式就这几个方面来说还存有不足。因此,在目前的桥梁浇筑施工中急需挂蓝移动平稳、省工省力、而且使用的设备成本低廉的挂蓝移动施工的方式、方法。
发明内容
本发明的目的在于针对现有技术的不足,提供了一种蓝移动平稳、省工省力、而且使用的设备成本低廉的用前卡式千斤顶移动挂蓝的行走机构及其施工方法。
本发明是这样实现的:
一种用前卡式千斤顶移动挂蓝的行走机构,包括挂蓝、枕梁和安装在枕梁上的轨道梁,所述挂蓝设有前支点和后支点,并通过前支点和后支点安装在轨道梁上;在轨道梁的前端设有拉力座和张拉前垫梁,张拉前垫梁安装在拉力座前端;在挂蓝的前支点处设有前卡式千斤顶,前卡式千斤顶与前支点之间设有张拉后垫梁;拉力座和前支点之间设有钢绞线,钢绞线的一端安装有挤压套,穿过拉力座和张拉前垫梁;钢绞线的另一端穿过前支点、张拉后垫梁和前卡式千斤顶,通过前卡式千斤顶提供动力使挂蓝整体前移。
所述挂蓝的后支点上设有后锚梁。
所述前卡式千斤顶是QYC型前卡式千斤顶。QYC型前卡式千斤顶是一种多用途的预应力张拉设备,操作方便,主要用于单孔张拉;又可用于多孔预紧、张拉和排障,并能适用于多种规格尺寸的高强钢丝束及钢绞线。
所述轨道梁通过钢垫梁和竖向预应力筋固定安装在施工地面上。
一种使用上述行走机构移动挂蓝的施工方法,依次包括以下步骤:
①松开后锚梁及挂蓝各部位的吊点、吊带,使挂蓝与所浇注梁体处于一种脱离状态,在挂蓝的重力作用下,后支点倒扣在轨道梁上,拆除轨道梁上除前支点、后支点外的所有约束;
②在前支点处用两台机械千斤顶(如50T的机械千斤顶)支起主桁架,拖动轨道梁到达指定位置,支垫好钢枕梁,将轨道梁通到竖向预应力筋和钢垫梁锚固安装好;
③松开前支点的机械千斤顶,安装钢绞线和前卡式千斤顶,完全拆除后锚梁的约束,通过前卡式千斤顶张拉钢绞线推动前支点在轨道梁上行走,从而带动整个主桁和挂蓝前行,直至达到指定位置;
④安装后锚梁的锚杆,使后锚梁和轨道梁牢固的锚在一起,将轨道梁和竖向预应力筋的联系加密,张拉安装各部位的吊杆、吊带,达到挂蓝施工状态。
本发明的优点:
1.挂蓝移动稳定。在轨道梁上焊接拉力座,用钢铰线作为牵引绳,采用现场预应力施工用的穿心式千斤顶作为动力,代替了传统的手拉葫芦倒链牵引或液压杆顶推的移动方式,由于本发明QYC型前卡式千斤顶提供的动力和挂蓝走行所需的力在一条轴线上,因此受力很合理;而且采用的是液压动力滑移,施工人员只用操作机械,因此移动十分平稳,也大大降低了劳动强度。
2.省时省工,设备成本低。本发明的行走机构的设备有QYC型前卡式千斤顶、钢绞线、轨道梁、拉力座、张拉垫梁、枕梁、钢垫枕等,机械千斤顶和油泵均是现场施工需要的机械,其他材料均是现场加工而成。因此这些设备或材料均可施工现场获取,无需特别的准备,大大降低了劳动成本和设备成本。
附图说明
图1是本发明一实施例中挂蓝在行走前的示意图。
图2是本发明一实施例中挂蓝在行走时的示意图。
图3是本发明一实施例中挂蓝在行走到位、处于浇筑状态下的示意图。
图4是本发明一实施例中前支点与拉力座之间的部分结构示意图。
附图标记:
轨道梁1,钢垫梁2,后锚梁3,挂蓝4,前支点5,钢绞线6,拉力座7,张拉前垫梁8,挤压套9,竖向预应力筋10,后支点11,枕梁12,前卡式千斤顶13,张拉后垫梁14。
具体实施方式
下面结合附图对本发明进一步说明,但不限制本发明的保护范围。
实施例:
一种用前卡式千斤顶移动挂蓝的行走机构,包括挂蓝4、枕梁12和安装在枕梁12上的轨道梁1,所述挂蓝4的主桁架设有前支点5和后支点11,并通过前支点5和后支点11安装在轨道梁1上;在轨道梁1的前端设有拉力座7和张拉前垫梁8,张拉前垫梁8安装在拉力座7前端;在挂蓝4的前支点5处设有QYC型前卡式千斤顶13,QYC型前卡式千斤顶13与前支点5之间设有张拉后垫梁14;挂蓝4的后支点11上设有后锚梁3;拉力座7和前支点5之间设有钢绞线6,钢绞线6的一端安装有挤压套9,穿过拉力座7和张拉前垫梁8;钢绞线6的另一端穿过前支点5、张拉后垫梁14和QYC型前卡式千斤顶13,通过QYC型前卡式千斤顶13提供动力使挂蓝4整体前移;所述轨道梁1通过钢垫梁2和竖向预应力筋10固定安装在施工地面上。
使用该行走机构的施工方法,包括以下步骤:
①松开挂蓝4的吊杆、吊带,使之离开混凝土面5~8厘米,再松开后锚梁3的锚杆,使后支点11倒扣在轨道梁1上;
②用两台50T的机械千斤顶顶起前支点5,使其离开轨道梁1两厘米左右,再收紧后锚梁3的锚杆,使后支点11脱离轨道梁;安放好轨道梁1下的枕梁12;用倒链或卷扬机拖动轨道梁1前行至指定位置,将轨道梁1通过竖向预应力筋10和钢垫梁2初步锚定在已浇完的梁体上;
③松开前支点5的机械千斤顶,将前支点5坐在轨道梁1上,在钢绞线6一端安装挤压套9,将钢绞线6穿过张拉前垫梁8、拉力座7、前支点5、张拉后垫梁14、QYC型前卡式13,开动油泵,使钢绞线6处于绷紧状态;拆除后锚梁3上的锚杆,使后支点11完全倒扣在轨道梁1上;检查各部份的部件,确保能达到安全行走要求;开动油泵,推动挂蓝4缓慢同步前移,直至到达指定位置。
④松开千斤顶,上好后锚梁3的锚杆,锚固好后锚梁3;加密轨道梁1上的竖向预应力筋10和钢垫梁12,使轨道梁1和施工梁体联系更加牢固;上好各部位的吊杆、吊带,和已浇梁体紧密锚合,达到施工条件。

Claims (5)

1. 一种用前卡式千斤顶移动挂蓝的行走机构,包括挂蓝(4)、枕梁(12)和安装在枕梁(12)上的轨道梁(1),所述挂蓝(4)的主桁架设有前支点(5)和后支点(11),并通过前支点(5)和后支点(11)安装在轨道梁(1)上;其特征在于:在轨道梁(1)的前端设有拉力座(7)和张拉前垫梁(8),张拉前垫梁(8)安装在拉力座(7)前端;在挂蓝(4)的前支点(5)处设有前卡式千斤顶(13),前卡式千斤顶(13)与前支点(5)之间设有张拉后垫梁(14);拉力座(7)和前支点(5)之间设有钢绞线(6),钢绞线(6)的一端安装有挤压套(9),穿过拉力座(7)和张拉前垫梁(8);钢绞线(6)的另一端穿过前支点(5)、张拉后垫梁(14)和前卡式千斤顶(13),通过前卡式千斤顶(13)提供动力使挂蓝(4)整体前移。
2. 根据权利要求1所述的用前卡式千斤顶移动挂蓝的行走机构,其特征在于:所述挂蓝(4)的后支点(11)上设有后锚梁(3)。
3. 根据权利要求1或2所述的用前卡式千斤顶移动挂蓝的行走机构,其特征在于:所述前卡式千斤顶(13)是QYC型前卡式千斤顶。
4. 根据权利要求3所述的用前卡式千斤顶移动挂蓝的行走机构,其特征在于:所述轨道梁(1)通过钢垫梁(2)和竖向预应力筋(10)固定安装在施工地面上。
5. 一种使用如权利要求1-4任一所述的行走机构移动挂蓝的施工方法,其特征在于:该施工方法依次包括以下步骤:
①松开后锚梁(3)及挂蓝(4)各部位的吊杆、吊带,使挂蓝(4)与所浇注梁体处于一种脱离状态,在挂蓝(4)的重力作用下,后支点(11)倒扣在轨道梁(1)上,拆除轨道梁(1)上除前支点(5)、后支点(11)外的所有约束;
②在前支点(5)处用两台机械千斤顶支起主桁架,拖动轨道梁(1)到达指定位置,支垫好钢枕梁(12),将轨道梁(1)通到竖向预应力筋(10)和钢垫梁(2)锚固安装好;
③松开前支点(5)的机械千斤顶,安装钢绞线(6)和前卡式千斤顶(13),完全拆除后锚梁(3)的约束,通过前卡式千斤顶(13)张拉钢绞线(6)推动前支点(5)在轨道梁(1)上行走,从而带动整个主桁和挂蓝(4)前行,直至达到指定位置;
④安装后锚梁(3)的锚杆,使后锚梁(3)和轨道梁(1)牢固的锚在一起,将轨道梁(1)和竖向预应力筋(10)的联系加密,张拉安装各部位的吊杆、吊带,达到挂蓝(4)施工状态。
CN201210254064.5A 2012-07-21 2012-07-21 一种用前卡式千斤顶移动挂蓝的行走机构及其施工方法 Active CN102733314B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210254064.5A CN102733314B (zh) 2012-07-21 2012-07-21 一种用前卡式千斤顶移动挂蓝的行走机构及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210254064.5A CN102733314B (zh) 2012-07-21 2012-07-21 一种用前卡式千斤顶移动挂蓝的行走机构及其施工方法

Publications (2)

Publication Number Publication Date
CN102733314A true CN102733314A (zh) 2012-10-17
CN102733314B CN102733314B (zh) 2014-06-25

Family

ID=46989571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210254064.5A Active CN102733314B (zh) 2012-07-21 2012-07-21 一种用前卡式千斤顶移动挂蓝的行走机构及其施工方法

Country Status (1)

Country Link
CN (1) CN102733314B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103614971A (zh) * 2013-12-11 2014-03-05 山东省路桥集团有限公司 门式吊装施工挂篮设备与配置方法
CN103669217A (zh) * 2013-11-21 2014-03-26 中建三局建设工程股份有限公司 一种后支点挂篮及其整体换幅横移方法
CN106149568A (zh) * 2016-08-24 2016-11-23 中国铁建大桥工程局集团有限公司 一种用于箱梁箱室外部施工的装置及施工方法
CN107447683A (zh) * 2017-09-19 2017-12-08 安徽水利开发股份有限公司 挂篮行走装置
CN114000439A (zh) * 2021-11-23 2022-02-01 江苏省交通工程集团有限公司 一种自锚式挂篮吊带装置
CN114908883A (zh) * 2022-07-04 2022-08-16 中国建筑第四工程局有限公司 用于体育场馆钢罩棚竖转安装的提升装置及其操作方法
WO2023193827A1 (en) * 2022-03-30 2023-10-12 Overseas Engineering Company Of China Railway No.5 Engineering Group Co., Ltd. Intelligent control of electric hoist mobile hanging basket walking device and construction method
CN117945293A (zh) * 2024-03-21 2024-04-30 天津泰达数智科技发展有限公司 一种适用于城市轨道桥梁双u箱组合连续梁的吊装设备

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000248511A (ja) * 1999-03-03 2000-09-12 Ps Corp 支柱を用いた構造物の構築方法及び支柱構造
KR20020074130A (ko) * 2002-09-03 2002-09-28 최병렬 푸쉬-풀 및 리프팅 시스템을 이용한프리패브리캐션(Prefabrication) 교량상부구조의 일체화설치공법
KR100808212B1 (ko) * 2007-06-29 2008-02-29 노윤근 기능유지가 가능한 교량 상부구조물 인상용 가설벤트와이를 이용한 교량 상부구조물 인상방법
CN101649604A (zh) * 2009-08-28 2010-02-17 中铁八局集团第一工程有限公司 一种斜拉桥1#块施工支架及其搭建方法
CN201473889U (zh) * 2009-06-12 2010-05-19 中铁二十二局集团第一工程有限公司 斜拉三角挂篮
CN202688889U (zh) * 2012-07-21 2013-01-23 中铁十八局集团轨道交通工程有限公司 一种用前卡式千斤顶移动挂蓝的行走机构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000248511A (ja) * 1999-03-03 2000-09-12 Ps Corp 支柱を用いた構造物の構築方法及び支柱構造
KR20020074130A (ko) * 2002-09-03 2002-09-28 최병렬 푸쉬-풀 및 리프팅 시스템을 이용한프리패브리캐션(Prefabrication) 교량상부구조의 일체화설치공법
KR100808212B1 (ko) * 2007-06-29 2008-02-29 노윤근 기능유지가 가능한 교량 상부구조물 인상용 가설벤트와이를 이용한 교량 상부구조물 인상방법
CN201473889U (zh) * 2009-06-12 2010-05-19 中铁二十二局集团第一工程有限公司 斜拉三角挂篮
CN101649604A (zh) * 2009-08-28 2010-02-17 中铁八局集团第一工程有限公司 一种斜拉桥1#块施工支架及其搭建方法
CN202688889U (zh) * 2012-07-21 2013-01-23 中铁十八局集团轨道交通工程有限公司 一种用前卡式千斤顶移动挂蓝的行走机构

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669217A (zh) * 2013-11-21 2014-03-26 中建三局建设工程股份有限公司 一种后支点挂篮及其整体换幅横移方法
CN103669217B (zh) * 2013-11-21 2017-12-05 中建三局建设工程股份有限公司 一种后支点挂篮及其整体换幅横移方法
CN103614971A (zh) * 2013-12-11 2014-03-05 山东省路桥集团有限公司 门式吊装施工挂篮设备与配置方法
CN103614971B (zh) * 2013-12-11 2016-01-06 山东省路桥集团有限公司 门式吊装施工挂篮设备与配置方法
CN106149568A (zh) * 2016-08-24 2016-11-23 中国铁建大桥工程局集团有限公司 一种用于箱梁箱室外部施工的装置及施工方法
CN107447683A (zh) * 2017-09-19 2017-12-08 安徽水利开发股份有限公司 挂篮行走装置
CN114000439A (zh) * 2021-11-23 2022-02-01 江苏省交通工程集团有限公司 一种自锚式挂篮吊带装置
CN114000439B (zh) * 2021-11-23 2022-08-05 江苏省交通工程集团有限公司 一种自锚式挂篮吊带装置
WO2023193827A1 (en) * 2022-03-30 2023-10-12 Overseas Engineering Company Of China Railway No.5 Engineering Group Co., Ltd. Intelligent control of electric hoist mobile hanging basket walking device and construction method
CN114908883A (zh) * 2022-07-04 2022-08-16 中国建筑第四工程局有限公司 用于体育场馆钢罩棚竖转安装的提升装置及其操作方法
CN114908883B (zh) * 2022-07-04 2024-04-26 中国建筑第四工程局有限公司 用于体育场馆钢罩棚竖转安装的提升装置及其操作方法
CN117945293A (zh) * 2024-03-21 2024-04-30 天津泰达数智科技发展有限公司 一种适用于城市轨道桥梁双u箱组合连续梁的吊装设备
CN117945293B (zh) * 2024-03-21 2024-05-24 天津泰达数智科技发展有限公司 一种适用于城市轨道桥梁双u箱组合连续梁的吊装设备

Also Published As

Publication number Publication date
CN102733314B (zh) 2014-06-25

Similar Documents

Publication Publication Date Title
CN102733314B (zh) 一种用前卡式千斤顶移动挂蓝的行走机构及其施工方法
CN100543235C (zh) 斜拉索辅助全悬臂架设钢桁梁的方法及系统
CN201635020U (zh) 用于大中型混凝土桥梁的拆除桥面吊机
CN107747282B (zh) 上跨既有线旧桥梁体整体拆除方法
CN101446066B (zh) 一种悬索桥加劲梁架设方法及装置
CN102797227A (zh) 倒挂式三角斜爬挂篮的施工方法
CN109339458A (zh) 一种现浇梁钢筋笼绑扎安装多功能台车
CN102587284B (zh) 独立扒杆梁板安装施工工法
CN102373673A (zh) 跨铁路既有线桥梁施工滚轴挂蓝及其使用方法
CN203393639U (zh) 一种用于路桥施工的菱形自锚式挂篮
CN101818479B (zh) 移动模架空中退行解体拆除施工工艺
CN106592446B (zh) 一种带边跨湿接缝的预制节段平衡悬臂拼装施工方法
CN104120659B (zh) 下行式挂篮
CN104074145B (zh) 一种合拢段挂篮改装施工方法
CN202688889U (zh) 一种用前卡式千斤顶移动挂蓝的行走机构
CN205421022U (zh) 一种悬索桥加劲梁滑移架设装置
CN207987749U (zh) 骑索式桥面吊机
CN102494861B (zh) 桥梁下部结构冲击振动试验重锤操作装置
CN201288308Y (zh) 一种悬索桥加劲梁架设装置
CN101314937B (zh) 向下竖转拱箱的施工设备
CN202116985U (zh) 一种挂篮自动走行系统
CN205171374U (zh) 一种用于钢管桁架混凝土拱桥吊杆更换的牵引式工具吊杆装置
CN102225580B (zh) 箱梁内模纵移方法
CN201132941Y (zh) 移动模架自浮式下扁担梁
CN211664572U (zh) 一种快速行走的缆载起重机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: THE EIGHTEENTH BUREAU OF CHINA S RAILROAD GROUP CO

Effective date: 20130117

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130117

Address after: 530031, the Guangxi Zhuang Autonomous Region City, Nanning Jinzhou Road, 31 City masterpiece, 2 floor

Applicant after: Rail Transit Engineering Co., Ltd. of China Railway 18 Bureau Group Co., Ltd.

Applicant after: the Eighteenth Bureau of China's Railroad Group Co., Ltd.

Address before: 530031, the Guangxi Zhuang Autonomous Region City, Nanning Jinzhou Road, 31 City masterpiece, 2 floor

Applicant before: Rail Transit Engineering Co., Ltd. of China Railway 18 Bureau Group Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant