CN102720357B - 高支模体系 - Google Patents

高支模体系 Download PDF

Info

Publication number
CN102720357B
CN102720357B CN201210198885.1A CN201210198885A CN102720357B CN 102720357 B CN102720357 B CN 102720357B CN 201210198885 A CN201210198885 A CN 201210198885A CN 102720357 B CN102720357 B CN 102720357B
Authority
CN
China
Prior art keywords
loop bar
vertical rod
tie assembly
bar
high form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210198885.1A
Other languages
English (en)
Other versions
CN102720357A (zh
Inventor
沈海晏
王新鹏
金小龙
刘静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Techen Technology Co Ltd
Original Assignee
Shenzhen Techen Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Techen Technology Co Ltd filed Critical Shenzhen Techen Technology Co Ltd
Priority to CN201210198885.1A priority Critical patent/CN102720357B/zh
Publication of CN102720357A publication Critical patent/CN102720357A/zh
Application granted granted Critical
Publication of CN102720357B publication Critical patent/CN102720357B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明涉及一种高支模体系,包括多根立杆(1)、套杆(2)和连接杆(3),所述立杆(1)与所述套杆(2)滑套配合并固定连接,所述连接杆(3)连接在相邻的立杆(1)或套杆(2)之间。本发明的高支模体系通用性强、高度易调节,同时结构简单、安装方便、安全性高。

Description

高支模体系
技术领域
本发明涉及建筑施工支模结构体系,更具体地说,涉及一种高支模体系。
背景技术
在建筑工程、公共建筑的共享空间等高大厅堂楼盖现浇混凝土结构施工中,需要应用高支模体系。现有的高支模体系的常规施工方法为采用钢管扣件、门式架或碗扣架搭设的满堂架。但这些方法不仅难以标准化,搭设人工费用高,搭设过程繁琐,更为重要的是这些支撑体系是建筑施工事故的高发区,安全隐患较多,是建筑施工头痛和重点监管的分项工作。
发明内容
本发明要解决的技术问题在于,针对现有技术中的高支模体系结构复杂、搭设繁琐、难以标准化,安全监管难度大的缺陷,提供一种结构简单、安装方便的高支模体系。
本发明解决其技术问题所采用的技术方案是:构造一种高支模体系,包括多根立杆、套杆和连接杆,所述立杆与所述套杆滑套配合并固定连接,所述连接杆连接在相邻的立杆或套杆之间。
在本发明所述的高支模体系中,所述立杆中部为筒体,所述筒体四周设有肋板,所述肋板上设有第一连接孔。
在本发明所述的高支模体系中,所述肋板设有多个,多个所述肋板呈辐射状分布。
在本发明所述的高支模体系中,所述套杆具有与所述立杆的筒体和肋板滑套配合的中空结构,所述套杆包裹在所述立杆外,所述套杆在对应第一连接孔的位置设有第二连接孔。
在本发明所述的高支模体系中,所述立杆和所述套杆通过第一连接孔和第二连接孔利用插销或螺栓固定连接。
在本发明所述的高支模体系中,所述套杆具有与所述筒体和肋板滑套配合的中空结构。
在本发明所述的高支模体系中,所述立杆和所述套杆通过插销8或螺栓连接。
在本发明所述的高支模体系中,所述立杆由钢或铝合金或玻璃钢或复合材料制得。
在本发明所述的高支模体系中,所述套杆由钢或铝合金或玻璃钢或复合材料制得。
在本发明所述的高支模体系中,所述连接杆、所述立杆和所述套杆组成桁架结构。
在本发明所述的高支模体系中,所述套杆或立杆上设有可调顶撑。
实施本发明的高支模体系,具有以下有益效果:立杆和套杆插接配合后,可以通过移动立杆或套杆来改变整个高支模体系的高度,调节方便。同时,连接杆、立杆和套杆可以组成可靠的空间桁架结构,能保证安全性。本发明的高支模体系结构简单、安装方便、安全性高。
附图说明
下面将结合附图及实施例对本发明作进一步说明,附图中:
图1是本发明高支模体系的结构示意图;
图2是立杆的结构示意图;
图3是立杆的俯视图;
图4是套杆的结构示意图;
图5a是套杆的俯视图;
图5b是套杆另一实施例的俯视图;
图6是立杆与套杆连接处的结构示意图。
具体实施方式
为了对本发明的技术特征、目的和效果有更加清楚的理解,现对照附图详细说明本发明的具体实施方式。
如图1-图6所示,本发明的高支模体系包括立杆1、套杆2和连接杆3。其中,立杆1和套杆2滑套配合,可以将立杆1插接在套杆2内,也可以将套杆2插接在立杆1内。立杆1和套杆2完成滑套配合后,再将两者固定连接。调节整个高支模体系的高度时,只需取消固定,然后滑动立杆1或套杆2即可,简单方便。立杆1和套杆2都设置有多根,连接杆3连接在两根相邻的立杆1之间,两根相邻的套杆2之间也设有连接杆3。连接杆3可以是横向设置的,也可以是斜向设置的,可以与立杆1和套杆2组成桁架结构,强度高,安全性高。在套杆2上设有可调顶撑4,用于提供支撑预紧力,并且可以进行微调。具体的,可以设置在套杆2或立杆1上,可调顶撑4的具体结构是现有技术,在此不再赘述。
如图2-图5b所示,进一步的,本实施例中的立杆1中部是筒体,在筒体的四周设有肋板5,肋板5上设有第一连接孔6。套杆2具有与筒体和肋板5滑套配合的中空结构,套杆2包裹在立杆1外侧,套杆上的在包裹肋板5的位置设有第二连接孔7,第二连接孔7与第一连接孔6对应。通过第一连接孔6和第二连接孔7可以实现立杆1和套杆2的连接,也可以实现连接杆3和立杆1的连接或者连接杆3和套杆2的连接。肋板5可以设置多个,可以增加强度,也方便连接。多个肋板5辐向分布,本实施例中的肋板5有四个,呈“十”字形分布。
如图6所示,进一步的,立杆1和套杆2的固定方式有多种,为了方便拆装可以采用插销8或螺栓连接等可拆卸连接的方式固定,插销8可以是楔式的插销8。
进一步的,立杆1和套杆2可以采用钢或铝合金或玻璃钢或复合材料制得,复合材料可以由铝合金、玻璃钢或塑胶等材料复合而成。肋板5可以和立杆1或套杆2一体成型,容易制造,并且用铝合金制造的立杆1和套杆2重量轻,方便安装。套杆2可以是个单独的部件,如图5a所示,也可以是由两个部件拼合而成的,如图5b所示,可根据实际需要选择。
上面结合附图对本发明的实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,而不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可做出很多形式,这些均属于本发明的保护之内。

Claims (5)

1.一种高支模体系,其特征在于,包括多根立杆(1)、套杆(2)和连接杆(3),所述立杆(1)与所述套杆(2)滑套配合并固定连接,所述连接杆(3)连接在相邻的立杆(1)和相邻的套杆(2)之间;
所述立杆(1)中部为筒体,所述筒体四周设有肋板(5),所述肋板(5)上设有第一连接孔(6);所述套杆(2)具有与所述立杆(1)的筒体和肋板(5)滑套配合的中空结构,所述套杆(2)包裹在所述立杆(1)外,所述套杆(2)上的在包裹所述肋板(5)的位置设有第二连接孔(7),所述第二连接孔(7)与所述第一连接孔(6)对应;所述立杆(1)和所述套杆(2)通过第一连接孔(6)和第二连接孔(7)利用插销(8)或螺栓固定连接;所述连接杆(3)、所述立杆(1)和所述套杆(2)组成桁架结构,其中通过第一连接孔(6)和第二连接孔(7)实现所述立杆(1)和套杆(2)的连接以及实现所述连接杆(3)和立杆(1)的连接或者所述连接杆(3)和套杆(2)的连接。
2.根据权利要求1所述的高支模体系,其特征在于,所述肋板(5)设有多个,多个所述肋板(5)呈辐射状分布。
3.根据权利要求1所述的高支模体系,其特征在于,所述立杆(1)由钢或铝合金或玻璃钢制得。
4.根据权利要求1所述的高支模体系,其特征在于,所述套杆(2)由钢或铝合金或玻璃钢制得。
5.根据权利要求1所述的高支模体系,其特征在于,所述套杆(2)或立杆(1)上设有可调顶撑(4)。
CN201210198885.1A 2012-06-15 2012-06-15 高支模体系 Expired - Fee Related CN102720357B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210198885.1A CN102720357B (zh) 2012-06-15 2012-06-15 高支模体系

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210198885.1A CN102720357B (zh) 2012-06-15 2012-06-15 高支模体系

Publications (2)

Publication Number Publication Date
CN102720357A CN102720357A (zh) 2012-10-10
CN102720357B true CN102720357B (zh) 2016-08-24

Family

ID=46946209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210198885.1A Expired - Fee Related CN102720357B (zh) 2012-06-15 2012-06-15 高支模体系

Country Status (1)

Country Link
CN (1) CN102720357B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196234A (zh) * 2014-08-27 2014-12-10 广东浩和绿色建筑研究有限公司 一种建筑模板顶撑结构
CN107268998B (zh) * 2017-08-11 2019-05-07 中国化学工程第六建设有限公司 高支模
CN110409807B (zh) * 2019-08-09 2021-05-07 天津建工城市建设发展有限公司 一种屋顶的高支模体系

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1423835A (en) * 1972-05-24 1976-02-04 Rapid Metal Developments Ltd Lattice structure
EP1384837A1 (en) * 2001-04-03 2004-01-28 ULMA C y E, S. COOP. Floor and roof formwork system
US6814184B1 (en) * 2001-02-27 2004-11-09 Lawrence Blinn, Jr. High rigidity vertical column member and structure and hoist platform system
CN2697208Y (zh) * 2004-03-22 2005-05-04 吴铁海 支撑架
CN101368445A (zh) * 2007-08-16 2009-02-18 施龙井 支柱
CN102330495A (zh) * 2010-07-14 2012-01-25 无锡圣泰建筑模板有限公司 建筑用支承结构

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7823347B1 (en) * 2001-02-27 2010-11-02 Lawrence Blinn Structural member and structural systems using structural member
CN201003287Y (zh) * 2007-01-09 2008-01-09 中建八局第一建设有限公司 一种模板支撑架
CN201794317U (zh) * 2010-09-27 2011-04-13 南京道广建筑模板有限公司 一种建筑塔式支撑架

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1423835A (en) * 1972-05-24 1976-02-04 Rapid Metal Developments Ltd Lattice structure
US6814184B1 (en) * 2001-02-27 2004-11-09 Lawrence Blinn, Jr. High rigidity vertical column member and structure and hoist platform system
EP1384837A1 (en) * 2001-04-03 2004-01-28 ULMA C y E, S. COOP. Floor and roof formwork system
CN2697208Y (zh) * 2004-03-22 2005-05-04 吴铁海 支撑架
CN101368445A (zh) * 2007-08-16 2009-02-18 施龙井 支柱
CN102330495A (zh) * 2010-07-14 2012-01-25 无锡圣泰建筑模板有限公司 建筑用支承结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
独立钢支撑式水平模板早拆体系在住宅工程施工中的应用研究;姜超;《住宅产业》;20081120(第11期);第2页第3部分 *

Also Published As

Publication number Publication date
CN102720357A (zh) 2012-10-10

Similar Documents

Publication Publication Date Title
CN104453197B (zh) 高空大悬挑砼结构型钢支撑平台
CN106801510B (zh) 塑料模板早拆体系
CN108033367B (zh) 一种钢柱筒架交替支撑式钢平台与塔吊同步提升装置及其提升方法
CN201738583U (zh) 斜向剪力墙模板的组合支撑加固系统
CN102337782B (zh) 一种高大空间顶部施工桁架平台提升系统
CN102720357B (zh) 高支模体系
CN104895193A (zh) 预制外墙板连接盒及连接节点
CN106351445A (zh) 一种劲性混凝土斜墙模板组合支撑加固系统及安装施工方法
CN104153495B (zh) 一种多功能轻质混凝土幕墙的连接结构
CN103485574B (zh) 一种造粒塔塔顶钢筋混凝土结构施工方法
CN204001650U (zh) 建筑用悬挑式脚手架
CN103122691A (zh) 塔吊标准节支承高空支模钢平台结构及施工方法
CN206581593U (zh) 模板脚手架体系
CN103552911B (zh) 一种活动式起吊装置及其使用的施工安装方法
CN106320699B (zh) 桁架式模板支架体系的快速拆装方法
CN205875740U (zh) 一种大悬挑结构施工模架标准化桁架斜撑体系
CN204252083U (zh) 拱坝牛腿全倒悬模板装置
CN110230414A (zh) 一种装配式站台雨棚及其安装方法
CN204173804U (zh) 一种结构梁承载式的内爬塔吊安装及顶升结构
CN207999079U (zh) 悬挑大模板支撑装置
CN103112766A (zh) 悬置于房屋建筑地下室顶板上方的施工电梯及其施工方法
CN107327307B (zh) 一种内模钢管支架整体滑移方法及结构
CN206053370U (zh) 一种预制装配式建筑构件吊装支撑角码工具
CN204715720U (zh) 附着式升降脚手架在建筑物外墙内收段的附着支承装置
CN109812072A (zh) 一种现场工地可组装式钢筋加工棚

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

CF01 Termination of patent right due to non-payment of annual fee