CN102708519A - 一种基于自由搜索算法的变电站优化选址方法 - Google Patents
一种基于自由搜索算法的变电站优化选址方法 Download PDFInfo
- Publication number
- CN102708519A CN102708519A CN2012101421102A CN201210142110A CN102708519A CN 102708519 A CN102708519 A CN 102708519A CN 2012101421102 A CN2012101421102 A CN 2012101421102A CN 201210142110 A CN201210142110 A CN 201210142110A CN 102708519 A CN102708519 A CN 102708519A
- Authority
- CN
- China
- Prior art keywords
- transformer station
- target function
- search
- sensitivity
- individual
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210142110.2A CN102708519B (zh) | 2012-05-09 | 2012-05-09 | 一种基于自由搜索算法的变电站优化选址方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210142110.2A CN102708519B (zh) | 2012-05-09 | 2012-05-09 | 一种基于自由搜索算法的变电站优化选址方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102708519A true CN102708519A (zh) | 2012-10-03 |
CN102708519B CN102708519B (zh) | 2015-10-21 |
Family
ID=46901246
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210142110.2A Expired - Fee Related CN102708519B (zh) | 2012-05-09 | 2012-05-09 | 一种基于自由搜索算法的变电站优化选址方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102708519B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103116812A (zh) * | 2013-02-20 | 2013-05-22 | 重庆市电力公司电力科学研究院 | 一种新型的变电站布点方法 |
CN107977772A (zh) * | 2017-11-09 | 2018-05-01 | 国网山东省电力公司青岛供电公司 | 一种考虑分布式能源不确定性的配电网规划方法及系统 |
CN112839342A (zh) * | 2020-12-31 | 2021-05-25 | 国网吉林省电力有限公司长春供电公司 | 基于支持向量机的救灾移动应急基站选址方法 |
CN113133006A (zh) * | 2019-12-31 | 2021-07-16 | 华为技术服务有限公司 | 规划基站站址的方法和装置 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5818725A (en) * | 1993-08-11 | 1998-10-06 | First Pacific Networks | System for utility demand monitoring and control |
CN101561903A (zh) * | 2009-06-02 | 2009-10-21 | 天津大学 | 计及地理信息的变电站全自动选址定容方法 |
CN102254242A (zh) * | 2011-06-10 | 2011-11-23 | 华北电力大学 | 规划网络数据系统及其快速智能生成方法 |
-
2012
- 2012-05-09 CN CN201210142110.2A patent/CN102708519B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5818725A (en) * | 1993-08-11 | 1998-10-06 | First Pacific Networks | System for utility demand monitoring and control |
CN101561903A (zh) * | 2009-06-02 | 2009-10-21 | 天津大学 | 计及地理信息的变电站全自动选址定容方法 |
CN102254242A (zh) * | 2011-06-10 | 2011-11-23 | 华北电力大学 | 规划网络数据系统及其快速智能生成方法 |
Non-Patent Citations (3)
Title |
---|
KAI ZOU, ET AL.: "Multi-objective Optimisation for Distribution System Planning with Renewable Energy Resources", 《2010 IEEE INTERNATIONAL ENERGY CONFERENCE》 * |
周晖: "自由搜索算法及其在传感器网络中的应用", 《中国博士学位论文全文数据库信息科技辑》 * |
李鑫滨,等: "变电站选址定容新模型及其遗传算法优化", 《电力系统及其自动化学报》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103116812A (zh) * | 2013-02-20 | 2013-05-22 | 重庆市电力公司电力科学研究院 | 一种新型的变电站布点方法 |
CN107977772A (zh) * | 2017-11-09 | 2018-05-01 | 国网山东省电力公司青岛供电公司 | 一种考虑分布式能源不确定性的配电网规划方法及系统 |
CN113133006A (zh) * | 2019-12-31 | 2021-07-16 | 华为技术服务有限公司 | 规划基站站址的方法和装置 |
CN113133006B (zh) * | 2019-12-31 | 2023-09-12 | 华为技术服务有限公司 | 规划基站站址的方法和装置 |
CN112839342A (zh) * | 2020-12-31 | 2021-05-25 | 国网吉林省电力有限公司长春供电公司 | 基于支持向量机的救灾移动应急基站选址方法 |
CN112839342B (zh) * | 2020-12-31 | 2022-02-08 | 国网吉林省电力有限公司长春供电公司 | 基于支持向量机的救灾移动应急基站选址方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102708519B (zh) | 2015-10-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Cao et al. | A comprehensive review of Energy Internet: basic concept, operation and planning methods, and research prospects | |
CN101976842B (zh) | 基于电气分区的关键断面自动获取方法 | |
Ma et al. | Economic analysis of real-time large scale PEVs network power flow control algorithm with the consideration of V2G services | |
CN101252280B (zh) | 一种城市电网最大供电能力在线评估方法 | |
CN107104454A (zh) | 计及电动汽车功率可调控域的最优潮流节点电价计算方法 | |
CN106485417A (zh) | 基于动态自适应任务调度策略的光伏电站移动运维方法 | |
CN106228258A (zh) | 一种计及需求侧管理的家庭能源局域网能量优化控制方法 | |
CN102509173B (zh) | 一种基于马尔科夫链的电力系统负荷准确预测方法 | |
CN104866915A (zh) | 基于全寿命周期成本的电动汽车充电站优化规划方法 | |
CN106127377A (zh) | 一种智能电网多能源综合协调水平评价方法 | |
CN105449713A (zh) | 考虑分布式电源特性的有源配电网智能软开关规划方法 | |
CN103218690A (zh) | 基于碳排放流的主动配电网用户用电碳排放量的测量方法 | |
CN105375461B (zh) | 基于预测技术的主动配电网供电能力实时评估方法 | |
CN106786977B (zh) | 一种电动汽车充电站的充电调度方法 | |
CN105337310A (zh) | 一种串联结构光储型多微网经济运行系统及方法 | |
De Lima et al. | A specialized long-term distribution system expansion planning method with the integration of distributed energy resources | |
CN102254242A (zh) | 规划网络数据系统及其快速智能生成方法 | |
CN104462685A (zh) | 基于网格GIS和Floyd算法的输电线路设计方法 | |
CN109711706A (zh) | 考虑分布式电源和需求响应的主动配电网变电站规划方法 | |
CN107609712B (zh) | 一种基于分类预测的能量对齐方法和装置 | |
CN102708519A (zh) | 一种基于自由搜索算法的变电站优化选址方法 | |
CN105825295A (zh) | 一种计及元胞发展程度的空间负荷预测方法 | |
Yuan et al. | A SAFSA-and metabolism-based nonlinear grey Bernoulli model for annual water consumption prediction | |
Wang et al. | Stackelberg game-based optimal scheduling of integrated energy systems considering differences in heat demand across multi-functional areas | |
CN110414836A (zh) | 考虑综合能源站用电需求不确定性的变电站概率规划方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Zhiqiang Inventor after: Kang Ke Inventor after: Dai Tianze Inventor after: Xu Yiming Inventor after: Zhang Hongkui Inventor after: Liang Ying Inventor after: Xia Baoliang Inventor after: Dan Xiaodong Inventor after: Tian Xuefeng Inventor after: Tang Weilong Inventor before: Wang Zhiqiang Inventor before: Yang Yong Inventor before: Chen Jinshan Inventor before: Zhao Tianyang Inventor before: Gao Dandan Inventor before: Zhu Hanchao Inventor before: Liu Liu Inventor before: Jiang Hongyuan Inventor before: Li Yingzhi Inventor before: Xu Jikai |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: WANG ZHIQIANG CHEN JINSHAN ZHAO TIANYANG GAO DANDAN ZHU HANCHAO LIU LIU JIANG HONGYUAN LI YINGZHI XU JIKAI YANG YONG TO: WANG ZHIQIANG DAI TIANZE XU YIMING ZHANG HONGKUI LIANG YING XIA BAOLIANG DAN XIAODONG TIAN XUEFENG TANG WEILONG KANG KE |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Zhengzhou Inventor after: Xu Yiming Inventor after: Dan Xiaodong Inventor after: Xia Baoliang Inventor after: Guo Chenyang Inventor after: Tian Xuefeng Inventor after: Hou Yuxin Inventor after: Wang Zhiqiang Inventor before: Wang Zhiqiang Inventor before: Kang Ke Inventor before: Dai Tianze Inventor before: Xu Yiming Inventor before: Zhang Hongkui Inventor before: Liang Ying Inventor before: Xia Baoliang Inventor before: Dan Xiaodong Inventor before: Tian Xuefeng Inventor before: Tang Weilong |
|
COR | Change of bibliographic data | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151021 Termination date: 20170509 |