Combination structure of cable dome structure and cantilever structure and combining method thereof Download PDFInfo
- Publication number
- CN102704607A CN102704607A CN2012100957358A CN201210095735A CN102704607A CN 102704607 A CN102704607 A CN 102704607A CN 2012100957358 A CN2012100957358 A CN 2012100957358A CN 201210095735 A CN201210095735 A CN 201210095735A CN 102704607 A CN102704607 A CN 102704607A
- Authority
- CN
- China
- Prior art keywords
- ring
- rigid
- combining
- cable dome
- ring beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a combination structure of a tension structure and a cantilever structure and a combining method thereof. The combination structure comprises a tension structure, rigid cantilever structures, a rigid constraint component and a support structure, wherein the tension structure is connected with the rigid cantilever components to form a combination through the rigid constraint component, and the combination is connected to the support structure. The combining method of the combination structure includes: arranging a ring truss or a ring beam inside the rigid cantilever structure to serve as the rigid constraint component, connecting the outer ends of outer-ring ridge cables or outer-ring stay cables of a cable dome structure to the ring truss or the ring beam, providing temporary supports for the rigid cantilever structures during construction, removing the temporary supports after completion of prestress tension of the cable dome structure, and finally forming the stress-balanced combination structure of the cable dome structure and the cantilever structures. The combination structure has the advantages that internal stress balance of the structure system is realized, stress to the ring truss is lowered, and a large space without columns is reserved.
Description
Technical field
The present invention relates to a kind of architectural structure system, particularly relate to the combined structure system and the combined method thereof of stretching-drawing structure and rigid structures.
Background technology
Cable dome structure has built up many abroad at present.Cable dome structure is as a kind of large span spatial structure of flexibility, and is different with the general spatial structure, and it mainly provides rigidity by prestressing force.Cable dome structure must be formed a closed-loop path with the pressurized ring beam of periphery, is a kind of self equilibrium systems, and structure has adaptive ability.Therefore existing cable dome structure must be provided with special confining part all for the balance internal tension, and such as compression ring truss or ring beam, and confining part such as outside ring beam is often bigger, ability tail rope dome pulling force.
The stretching-drawing structure that the present invention proposes and the combined structure system of rigid structures can inwardly be drawn stretching-drawing structures such as rope dome, cantilevered structure inside outwards receives drawknot altogether receives force self-balancedly inside and outside the realization, reduce the stressed of compression ring truss and ring beam greatly.
Summary of the invention
Technical problem
Span bigger structure in the middle of encorbelmenting all around is because the part of encorbelmenting makes the inside configuration upper edge produce radially outer pulling force, so internal construction often will be made and receives the draw ring beam or encircle truss for bearing this pulling force.
Cable dome structure is as a kind of stretching-drawing structure; Peripheral notochord and oblique cord outer end need be connected fixed end; Generally be the radially inside pulling force that employing pressurized ring beam or the mode of encircling truss are born the inner cable dome, often cause ring truss and ring beam huge, just to bearing rope dome external pull;
Technical scheme
The present invention proposes the combined structure system of a kind of stretching-drawing structure and rigid structures, it is characterized in that comprising stretching-drawing structure and rigidity cantilevered structure, and both connect through encircling truss or ring beam or other rigid constraint member, and above assembly is connected on the braced structures.
Stretching-drawing structure is preferentially selected cable dome structure for use, also can be the double-deck rope web frame of rung formula, suspended-cable structure, monolayer cable net structure etc.,
Rigid structures can be overhanging steel structure, also can be concrete structure or the combining structure of encorbelmenting.Rigid structures can for one deck or two-layer and more than.Simultaneously, rigid structures also can be the suspended structure system.
The member that connects stretching-drawing structure and rigid structures is ring truss or ring beam or other rigid constraint members.
Cantilevered structure and cable dome structure link to each other through hoop truss or ring beam or other confining parts.
Beneficial effect
Through the new combining structure that the present invention proposes, the cantilevered structure part is because radially outer pulling force produces the hoop tension effect to ring truss or ring beam; After cable dome structure prestressed stretch-draw and the carrying, radially notochord and oblique cord are radially drawn, and ring truss or ring beam are produced the circumferential pressure effect.Therefore the part of encorbelmenting and rope dome are at ring truss or ring beam place internal force balance, and implementation structure system inside receives force self-balanced, significantly reduce that to encircle truss stressed.Inside can realize not having the post large space simultaneously.
Description of drawings
Fig. 1 is the structure sectional view;
Fig. 2 is the structure vertical view;
Fig. 3 is that the rope dome is connected sketch map with ring truss (or ring beam);
Fig. 4 is rope dome and ring truss (or ring beam) the node sketch map that is articulated and connected.
Among each figure, 1-cantilevered structure superstructure, 2-hoop truss (or ring beam), the 3-substructure of encorbelmenting, 4-cable dome structure or other stretching-drawing structures, the 5-braced structures, 6-rope link, the 7-rope connects otic placode.
The specific embodiment
With certain rope dome and cantilevered structure combining structure engineering drawing 2 is example; Cantilevered structure set inside hoop truss or ring beam 2 link to each other the outer end of cable dome structure 4 outer ring notochords or outer ring oblique cord 6, during construction with hoop truss or ring beam 2; Outside cantilevered structure is provided with interim support; Cable dome structure 4 prestressed stretch-draws support unloading after accomplishing temporarily, form rope dome and cantilevered structure and receive force self-balanced combining structure.
Cable dome structure and preferential employing of being connected of hoop truss or the ring beam mode that is articulated and connected as shown in Figure 4: the outer ring rope 6 of rope dome is connected with the ring truss (or ring beam) 2 of cantilevered structure through connecting otic placode 7.
Claims (10)
1. the combining structure of stretching-drawing structure and rigid structures; It is characterized in that said combining structure comprises stretching-drawing structure, rigidity cantilevered structure, rigid constraint member and braced structures; Said stretching-drawing structure is connected to form assembly through said rigid constraint member and said rigidity overhanging component, and this assembly is connected on the said braced structures.
2. combining structure as claimed in claim 1 is characterized in that said stretching-drawing structure is a cable dome structure.
3. combining structure as claimed in claim 1 is characterized in that said stretching-drawing structure is the double-deck rope web frame of rung formula or suspended-cable structure or monolayer cable net structure.
4. combining structure as claimed in claim 1 is characterized in that rigid structures is a suspended structure.
5. like the described combining structure of arbitrary claim in the claim 1 to 4, it is characterized in that said rigidity cantilevered structure is the overhanging steel structure or the concrete structure of encorbelmenting.
6. like the described combining structure of arbitrary claim in the claim 1 to 5, it is characterized in that said rigidity cantilevered structure is one deck or two layers or more.
7. like the described combining structure of arbitrary claim in the claim 1 to 6, it is characterized in that said rigid constraint member is hoop truss or ring beam.
8. like the combined method of the said combining structure of claim 2; It is characterized in that said rigidity cantilevered structure set inside hoop truss or ring beam are as the rigid constraint member; The outer ring notochord of said cable dome structure (4) or the outer end (6) of outer ring oblique cord are linked to each other with said hoop truss or ring beam; Said rigidity cantilevered structure is provided with interim support during construction; After the prestressed stretch-draw of said cable dome structure (4) is accomplished, support unloading temporarily, finally form the combining structure of rope dome and cantilevered structure stress balance.
9. combined method as claimed in claim 8 is characterized in that said cable dome structure (4) and said hoop truss or ring beam (2) adopt the mode that is articulated and connected.
10. combined method as claimed in claim 9 is characterized in that the said mode of being articulated and connected is that the outer end (6) of the outer ring rope of said cable dome structure is connected with said hoop truss or ring beam (2) through connecting otic placode (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201210095735 CN102704607B (en) | 2012-04-04 | 2012-04-04 | Combination structure of cable dome structure and cantilever structure and combining method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201210095735 CN102704607B (en) | 2012-04-04 | 2012-04-04 | Combination structure of cable dome structure and cantilever structure and combining method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102704607A true CN102704607A (en) | 2012-10-03 |
CN102704607B CN102704607B (en) | 2013-08-28 |
Family
ID=46897636
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201210095735 Active CN102704607B (en) | 2012-04-04 | 2012-04-04 | Combination structure of cable dome structure and cantilever structure and combining method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102704607B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103615064A (en) * | 2013-11-27 | 2014-03-05 | 浙江精工钢结构集团有限公司 | Cable dome and mounting method thereof |
CN105178434A (en) * | 2015-06-08 | 2015-12-23 | 天津住宅集团建设工程总承包有限公司 | Overhanging suspended building structure and building and circular large building |
CN105625623A (en) * | 2016-02-05 | 2016-06-01 | 中国航空规划设计研究总院有限公司 | Circular awning with cable dome and spatial steel truss being combined and construction method of circular awning |
CN110016972A (en) * | 2019-04-28 | 2019-07-16 | 江南大学 | A kind of overhanging type two layer of space intelligence cantilevered structure system of stability |
CN111088851A (en) * | 2020-01-13 | 2020-05-01 | 东南大学 | Construction method of annular cable bearing grid structure with upper grid participating in balancing pre-tensioning force of inhaul cable |
CN113175093A (en) * | 2021-04-27 | 2021-07-27 | 上海建工四建集团有限公司 | Large-span spatial structure roof truss construction device and construction method |
CN113250491A (en) * | 2021-04-29 | 2021-08-13 | 无锡周博建筑设计有限公司 | Backdrop structure for commercial block |
CN113802751A (en) * | 2021-09-03 | 2021-12-17 | 中国航空规划设计研究总院有限公司 | Spoke type prestress string-stretching dome structure and construction method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003003517A1 (en) * | 2001-06-12 | 2003-01-09 | Elguja Medzmariashvili | Deployable space reflector antenna |
JP2004339854A (en) * | 2003-05-19 | 2004-12-02 | Tomoe Corp | Building method for cable dome roof |
JP2008261181A (en) * | 2007-04-13 | 2008-10-30 | Mamoru Kawaguchi | Dome roof frame construction method |
CN101864806A (en) * | 2010-06-04 | 2010-10-20 | 北京工业大学 | Stiffness-supported dome structure |
-
2012
- 2012-04-04 CN CN 201210095735 patent/CN102704607B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003003517A1 (en) * | 2001-06-12 | 2003-01-09 | Elguja Medzmariashvili | Deployable space reflector antenna |
JP2004339854A (en) * | 2003-05-19 | 2004-12-02 | Tomoe Corp | Building method for cable dome roof |
JP2008261181A (en) * | 2007-04-13 | 2008-10-30 | Mamoru Kawaguchi | Dome roof frame construction method |
CN101864806A (en) * | 2010-06-04 | 2010-10-20 | 北京工业大学 | Stiffness-supported dome structure |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103615064A (en) * | 2013-11-27 | 2014-03-05 | 浙江精工钢结构集团有限公司 | Cable dome and mounting method thereof |
CN103615064B (en) * | 2013-11-27 | 2016-09-07 | 浙江精工钢结构集团有限公司 | A kind of Cable dome and installation method thereof |
CN105178434A (en) * | 2015-06-08 | 2015-12-23 | 天津住宅集团建设工程总承包有限公司 | Overhanging suspended building structure and building and circular large building |
CN105178434B (en) * | 2015-06-08 | 2017-09-29 | 天津住宅集团建设工程总承包有限公司 | One kind chooses hovering and hangs building structure, building and annular building mansion |
CN105625623A (en) * | 2016-02-05 | 2016-06-01 | 中国航空规划设计研究总院有限公司 | Circular awning with cable dome and spatial steel truss being combined and construction method of circular awning |
CN105625623B (en) * | 2016-02-05 | 2018-09-18 | 中国航空规划设计研究总院有限公司 | A kind of round awning that Cable dome is combined with Steel Space Truss and its engineering method |
CN110016972A (en) * | 2019-04-28 | 2019-07-16 | 江南大学 | A kind of overhanging type two layer of space intelligence cantilevered structure system of stability |
CN111088851A (en) * | 2020-01-13 | 2020-05-01 | 东南大学 | Construction method of annular cable bearing grid structure with upper grid participating in balancing pre-tensioning force of inhaul cable |
CN113175093A (en) * | 2021-04-27 | 2021-07-27 | 上海建工四建集团有限公司 | Large-span spatial structure roof truss construction device and construction method |
CN113250491A (en) * | 2021-04-29 | 2021-08-13 | 无锡周博建筑设计有限公司 | Backdrop structure for commercial block |
CN113802751A (en) * | 2021-09-03 | 2021-12-17 | 中国航空规划设计研究总院有限公司 | Spoke type prestress string-stretching dome structure and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN102704607B (en) | 2013-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102704607B (en) | Combination structure of cable dome structure and cantilever structure and combining method thereof | |
CN105625623B (en) | A kind of round awning that Cable dome is combined with Steel Space Truss and its engineering method | |
CN100532750C (en) | Cord string branch dome | |
CN112482577B (en) | Large-span space chord supporting wheel spoke type truss structure system and construction method | |
CN112982669B (en) | Eccentric annular large-cantilever prestressed steel structural system and construction method thereof | |
CN113719139B (en) | Construction method for hoisting irregular space net rack of stadium | |
CN101864806B (en) | Stiffness-supported dome structure | |
CN104110086A (en) | Suspended dome and plane prestress combined structure, tensioning tool and construction method | |
CN107034992B (en) | A kind of band winds up the Geiger dome structure and construction forming method of stiffening ring bar | |
CN202882185U (en) | Ribbed-type rigid grid cable dome | |
CN101967887A (en) | Large-span light steel structure roof girder hoisting method | |
CN105888065A (en) | Straining beam cable rod dome structure and construction method thereof | |
CN101100876A (en) | Net-shell net-rack overhanging high altitude bulk construction method for bolt sphere node | |
CN107268791A (en) | A kind of combined tension force dome structure of rigid roofing | |
CN107268792A (en) | A kind of rigid roofing cable dome structure supported with ring | |
CN102199931B (en) | Annular cable chord supported grid beam structure and method for applying prestressing force to same | |
CN112267709A (en) | Segmented demolition construction method for large-span beam string structure | |
CN105926850A (en) | Circular cross cable truss structure | |
CN206928431U (en) | A kind of rigid roofing cable dome structure with ring support | |
CN102330470B (en) | Single-layer prestressing frame structure | |
CN102733524B (en) | Combined structural system of tension structure and rigid structure as well as combining method thereof | |
CN205907812U (en) | Take steel frame structure that encorbelments greatly of pull rod | |
CN104358328B (en) | All-steel four-steel pipe multistage mountable overlong buckling-restrained brace | |
CN201024561Y (en) | Cable rod cord supported dome | |
KR20150025643A (en) | Precast segment assembly and precast segment structure by using of it) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100120 Beijing Desheng street, No. 12, Xicheng District Patentee after: CHINA AVIATION PLANNING AND DESIGN INSTITUTE (GROUP) CO., LTD. Address before: 100120 Beijing Desheng street, No. 12, Xicheng District Patentee before: China Aviation Planning and Construction Development Co., Ltd. |