CN102704498A - Technology for processing soil filled slope by combining geogrids and concrete panels - Google Patents

Technology for processing soil filled slope by combining geogrids and concrete panels Download PDF

Info

Publication number
CN102704498A
CN102704498A CN2012101748735A CN201210174873A CN102704498A CN 102704498 A CN102704498 A CN 102704498A CN 2012101748735 A CN2012101748735 A CN 2012101748735A CN 201210174873 A CN201210174873 A CN 201210174873A CN 102704498 A CN102704498 A CN 102704498A
Authority
CN
China
Prior art keywords
concrete
gsz
geogrids
ground
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101748735A
Other languages
Chinese (zh)
Inventor
郭培玺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Original Assignee
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC filed Critical Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority to CN2012101748735A priority Critical patent/CN102704498A/en
Publication of CN102704498A publication Critical patent/CN102704498A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a technology for processing a soil filled slope by combining geogrids and concrete panels. The technology comprises the following steps of: flattening to a foundation design elevation, paving a layer of broken stone hardcore on ground, and manufacturing a concrete ground beam, wherein the height of the ground beam is required to be greater than that of a first layer of grinds; after the age of the pouring of the ground beam is reached, paving the geogrids inside the ground beam, and laminating on different layers; placing embedded bars on the top of each layer of the geogrids, and manufacturing bent hooks at the front ends of the steel bars; after the geogrids are paved for certain height, starting to manufacture the concrete panels on the ground beam; and connecting the steel bars which are placed in advance and the steel bars of the panels, wherein the step of connecting the steel bars which are placed in advance and the steel bars of the panels is used as fixing measures of a concrete formwork.

Description

GSZ combines the concrete panel to handle the side slope technology of banketing
Technical field
The present invention relates to the geotechnical engineering technical field, is that a kind of GSZ that utilizes combines the concrete cast-in-situ panel to handle the technology of the side slope of banketing.
Background technology
The processing side slope of banketing generally adopts common form such as gravity retaining wall, grappling plate type retaining wall, anchor retaining wall, steel concrete cantilever retaining wall and reinforced earth retaining wall.Gravity retaining wall dependence wall body deadweight support soil pressure is kept it and is stablized.General how building with sheet (piece) barnacle, form is simple, can gather materials on the spot.But soil pressure and moment of flexure that the stable dependence concrete wall opposing of its whole body of wall is banketed and produced, the general section size is big.
To the side slope of banketing, the construction of GSZ is comparatively simple, less demanding to the place, and used machinery is also less relatively.Lower to the ground requirement for bearing capacity.Speed of application is fast, reduces investment outlay.Domaticly can plant grass, relatively environmental protection.
Weak point: be used for the fixedly woven bag easy ageing of GSZ of anti-package, and cause the soil body to run off, domatic uneven.As do not carry out slope greening, domatic relatively more dull.
Summary of the invention
The objective of the invention is to adopt GSZ to combine the concrete cast-in-situ panel to reinforce to the side slope of banketing.
GSZ of the present invention combines the concrete panel to handle the side slope technology of banketing, and comprising:
(1) lays one deck GSZ+graded broken stone mattress layer at first on the ground; Make concrete ground beam then, (28d) was at inboard GSZ, the layered rolling laid of grade beam after grade beam had certain length of time; Embedded bar is placed at the top of every layer of GSZ, and the reinforcing bar front end is made into crotch.
After GSZ was partly laid completion, concrete slab was made in beginning on grade beam, and slab reinforcement is connected with prepositioned reinforcing bar, and embedded bar is used for the fixing of concrete slab, guaranteed the stable of concrete slab; And template fixing when can be used for concreting.
(2) finally form the banket form of side slope of GSZ and concrete slab joint reinforcement.
Concrete slab is connected with the soil body through embedded bar, and is more stable; In addition, concrete slab can prevent that the soil body runs off, and guarantees domatic attractive in appearance.
GSZ of the present invention combines the concrete panel to handle to banket the advantage of side slope technology to be: the GSZ barricade is lower to the ground requirement for bearing capacity, and concrete slab can guarantee domatic smooth, prevents simultaneously because the aging loss that causes charges of geotextile; Concrete slab is connected with the soil body through embedded bar, and is more stable; Embedded bar can be used as the fixation of concrete slab template, accelerates construction.
Description of drawings
Fig. 1 combines the concrete slab sketch map for GSZ.
Fig. 2 is the embedded bar connection layout.
1, cast-in-place panel; 2, tension rib; 3, embedded bar; 4, cast-in-place grade beam;
5, C15 plain concrete cushion layer; 6, GSZ+graded broken stone mattress layer.
The specific embodiment
Root a tree name accompanying drawing 1. (1) shown in Figure 2 does not at first meet the demands like ground superficial part bearing capacity, changes earlier and fills out, and is smooth then to design altitude; Lay one deck GSZ+graded broken stone mattress layer on the ground 6., and build C15 concrete bed course 5., begin then to make concrete ground beam 4.; The grade beam requirement for height is slightly higher than first floor grid, reaches certain length of time after grade beam is built, at the inboard GSZ of laying of grade beam; Layered rolling; Every layer of GSZ rubble that is packed in bag is fixed, and embedded bar is placed in its top 3., and the reinforcing bar front end is made into crotch; (2) after GSZ was laid and accomplished certain altitude, 1. beginning made concrete slab on grade beam, and prepositioned reinforcing bar and slab reinforcement (main muscle, tension rib are 2.) connect, simultaneously as the concrete blinding fixation.

Claims (1)

1. a GSZ combines concrete slab to handle the method for the side slope of banketing; It is characterized in that: (1) is smooth to the basic engineering elevation; Lay one deck GSZ+graded broken stone mattress layer on the ground 6., build C15 concrete bed course 5., make concrete ground beam then 4..The grade beam requirement for height is slightly higher than first floor grid.After grade beam is built and is reached the length of time, at inboard GSZ, the layered rolling laid of grade beam.Embedded bar is placed in the top of every layer of GSZ 3., and the reinforcing bar front end is made into crotch; (2) after GSZ was laid and accomplished certain altitude, 1. beginning made concrete slab on grade beam.Prepositioned reinforcing bar is connected with slab reinforcement (main muscle, tension rib are 2.), simultaneously as the concrete blinding fixation.
CN2012101748735A 2012-05-31 2012-05-31 Technology for processing soil filled slope by combining geogrids and concrete panels Pending CN102704498A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101748735A CN102704498A (en) 2012-05-31 2012-05-31 Technology for processing soil filled slope by combining geogrids and concrete panels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101748735A CN102704498A (en) 2012-05-31 2012-05-31 Technology for processing soil filled slope by combining geogrids and concrete panels

Publications (1)

Publication Number Publication Date
CN102704498A true CN102704498A (en) 2012-10-03

Family

ID=46897530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101748735A Pending CN102704498A (en) 2012-05-31 2012-05-31 Technology for processing soil filled slope by combining geogrids and concrete panels

Country Status (1)

Country Link
CN (1) CN102704498A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652181A (en) * 2015-02-25 2015-05-27 中铁第四勘察设计院集团有限公司 Light supporting structure for existing railway station roadbed on filling roadbed
CN109537603A (en) * 2018-12-07 2019-03-29 天津大学 A kind of novel backfill reinforcement means
CN115217088A (en) * 2022-07-28 2022-10-21 石家庄铁道大学 Grid tensioning connecting piece, grid installation method and abutment-roadbed structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201158826Y (en) * 2008-02-25 2008-12-03 山东玮丰达建筑工程有限公司 Earth work grille reinforced retaining wall
CN101851894A (en) * 2010-07-01 2010-10-06 中国科学院地质与地球物理研究所 Protection method for improving salt expansion or dissolution sink of salty soil
CN201883440U (en) * 2010-11-29 2011-06-29 昆明理工大学 Separate reinforced retaining structures
CN202202339U (en) * 2011-08-25 2012-04-25 中国电力工程顾问集团西南电力设计院 Geogrid reinforced soil retaining wall of concrete module
CN102454171A (en) * 2010-11-02 2012-05-16 同济大学 Reinforced earth retaining wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201158826Y (en) * 2008-02-25 2008-12-03 山东玮丰达建筑工程有限公司 Earth work grille reinforced retaining wall
CN101851894A (en) * 2010-07-01 2010-10-06 中国科学院地质与地球物理研究所 Protection method for improving salt expansion or dissolution sink of salty soil
CN102454171A (en) * 2010-11-02 2012-05-16 同济大学 Reinforced earth retaining wall
CN201883440U (en) * 2010-11-29 2011-06-29 昆明理工大学 Separate reinforced retaining structures
CN202202339U (en) * 2011-08-25 2012-04-25 中国电力工程顾问集团西南电力设计院 Geogrid reinforced soil retaining wall of concrete module

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652181A (en) * 2015-02-25 2015-05-27 中铁第四勘察设计院集团有限公司 Light supporting structure for existing railway station roadbed on filling roadbed
CN104652181B (en) * 2015-02-25 2017-02-01 中铁第四勘察设计院集团有限公司 Light supporting structure for existing railway station roadbed on filling roadbed
CN109537603A (en) * 2018-12-07 2019-03-29 天津大学 A kind of novel backfill reinforcement means
CN115217088A (en) * 2022-07-28 2022-10-21 石家庄铁道大学 Grid tensioning connecting piece, grid installation method and abutment-roadbed structure
CN115217088B (en) * 2022-07-28 2023-03-14 石家庄铁道大学 Grid tensioning connecting piece, grid installation method and abutment-roadbed structure

Similar Documents

Publication Publication Date Title
CN102677695B (en) Mutually-embedded ecological building block retaining wall and construction method thereof
CN106988178A (en) A kind of subgrade in soft soil zone widened structure and its construction method
CN205152982U (en) Barricade and structure of filling suitable for height is filled
CN201158826Y (en) Earth work grille reinforced retaining wall
CN104818732A (en) Embedded type ecological block retaining wall and construction method thereof
CN103952986A (en) Load-shedding type rigid culvert structure
CN202559377U (en) Mutually-embedded ecological building block
JP2007530833A (en) Reinforced soil retaining wall system and construction method
CN205116214U (en) Composite foundation check guest retaining wall structure
CN202865855U (en) Stabilizing plate type anchoring pile retaining structure
CN103088833A (en) Assembly-type ecological net face geogrid pulling-opposite-type supporting structure
CN203924075U (en) The high embankment edge slope structure of anti-package formula Fill Reinforced With Geogrids Green ecological flexible
KR101591812B1 (en) Block-type reinforced earth retaining wall construction method and steel rod grid reinforcing material is installed
CN202809501U (en) Reinforced load reducing structure of motorway high filling culvert in mountainous area
CN101781897B (en) Anchor plate reinforced gabion retaining wall and construction method thereof
CN108035378A (en) The compound reinforcing rib Ecological Retaining Wall of geotechnical grid and its construction method
CN101418574B (en) Construction method for reinforcing grade beam
CN102704498A (en) Technology for processing soil filled slope by combining geogrids and concrete panels
CN202323922U (en) Tilted stratum soft foundation reinforcing structure of high-speed railway
CN107503370B (en) The high barricade of one seed sand well combined type reinforced earth and production method
CN203284795U (en) Buttressed retaining wall with anchor board
CN206902734U (en) A kind of earth construction of soft foundation zone
CN111005278B (en) Rapid repairing and reinforcing method for locally-reinforced embankment
CN102146680A (en) Packaged-type reinforced gabion retaining wall and construction method thereof
CN202672186U (en) Column type reinforced gabion retaining wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121003