CN102699382A - 数控钻床工作台t型槽结构 - Google Patents

数控钻床工作台t型槽结构 Download PDF

Info

Publication number
CN102699382A
CN102699382A CN201210202820XA CN201210202820A CN102699382A CN 102699382 A CN102699382 A CN 102699382A CN 201210202820X A CN201210202820X A CN 201210202820XA CN 201210202820 A CN201210202820 A CN 201210202820A CN 102699382 A CN102699382 A CN 102699382A
Authority
CN
China
Prior art keywords
groove structure
workbench
shaped groove
numerical control
drilling machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210202820XA
Other languages
English (en)
Inventor
陆松茂
周敏铨
薛静清
邵燕瑛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Hualian Science and Technology Group Co Ltd
Wuxi Hualian Precision Machinery Co Ltd
Original Assignee
Wuxi Hualian Precision Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Hualian Precision Machinery Co Ltd filed Critical Wuxi Hualian Precision Machinery Co Ltd
Priority to CN201210202820XA priority Critical patent/CN102699382A/zh
Publication of CN102699382A publication Critical patent/CN102699382A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Machine Tool Units (AREA)

Abstract

本发明涉及一种数控钻床工作台T型槽结构包括床身、压板、连接架、凹槽板,所述凹槽板上设置有凹槽,凹槽板焊接在床身上,压板通过螺栓装在凹槽板上,连接架与床身通过螺栓连接组成工作台T型槽整体结构。本发明与已有技术相比具有以下优点:本发明通过凹槽板直接焊在床身,整体加工压板表面与内侧面,可以降低加工难度,减少加工时间并保证工件安放平面度。

Description

数控钻床工作台T型槽结构
技术领域
本发明涉及机械加工设备领域,尤其是一种数控钻床工作台T型槽结构。
背景技术
    常规数控钻结构中,T型槽为整体结构,T型槽加工完成后再通过螺栓与床身连接。这样产生的问题是床身上表面全部要精加工,T型槽沟槽部位加工难度大,所需要的加工时间长,后期拼接也会有平面度误差,使工件安放不平整,孔加工产生位置误差。
发明内容
本发明针对上述现有T型槽结构加工难度大、时间长,容易产生位置度误差的缺点,提供一种数控钻床工作台T型槽结构,该结构T型槽结构可以降低加工难度,减少加工时间,消除位置度误差,使孔加工位置更精确。
按照本发明提供的技术方案,数控钻床工作台T型槽结构包括床身、压板、连接架、凹槽板,所述凹槽板上设置有凹槽,凹槽板焊接在床身上,压板通过螺栓装在凹槽板上,连接架与床身通过螺栓连接组成工作台T型槽整体结构。
本发明与已有技术相比具有以下优点:本发明通过凹槽板直接焊在床身,整体加工压板表面与内侧面,可以降低加工难度,减少加工时间并保证工件安放平面度。
附图说明
图1为本发明的结构主视图。
图2为图1的剖视图。
具体实施方式:
下面本发明将结合附图中的实施例作进一步描述。
如图1~图2所示,包括床身1、压板2、连接架3、凹槽板4。
本发明T型槽分为凹槽板4与压板2两部分。凹槽板4内设置有凹槽,凹槽板4加工后直接焊在床身1上,只需要加工凹槽板4上表面,压板2与凹槽板4通过螺栓连接后,安装后整体精加工压板2上表面与内侧面,连接架3与床身1通过螺栓连接组成工作台T型槽整体结构。
这种整体加工方式既能降低加工难度,减少加工时间,又能保证工件安放平整,减少孔加工位置度误差。

Claims (1)

1. 一种数控钻床工作台T型槽结构,包括床身(1);其特征是:还包括压板(2)、连接架(3)、凹槽板(4),所述凹槽板(4)上设置有凹槽,所述凹槽板(4)焊接在床身(1)上,压板(2)通过螺栓装在凹槽板(4)上,连接架(3)与床身(1)通过螺栓连接组成工作台T型槽整体。
CN201210202820XA 2012-06-19 2012-06-19 数控钻床工作台t型槽结构 Pending CN102699382A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210202820XA CN102699382A (zh) 2012-06-19 2012-06-19 数控钻床工作台t型槽结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210202820XA CN102699382A (zh) 2012-06-19 2012-06-19 数控钻床工作台t型槽结构

Publications (1)

Publication Number Publication Date
CN102699382A true CN102699382A (zh) 2012-10-03

Family

ID=46892595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210202820XA Pending CN102699382A (zh) 2012-06-19 2012-06-19 数控钻床工作台t型槽结构

Country Status (1)

Country Link
CN (1) CN102699382A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103707093A (zh) * 2013-12-06 2014-04-09 常州金安冶金设备有限公司 钻床固定工装
CN104117982A (zh) * 2014-07-10 2014-10-29 洛阳利维科技有限公司 一种用于大中型装备加工及装配的带t型槽复合平台

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5354383A (en) * 1976-10-28 1978-05-17 Nippon Kokan Kk <Nkk> Method for processing metal using a plurality of kinds of machine tool
JPS5997825A (ja) * 1982-11-24 1984-06-05 Aioi Seiki Kk 工作機械のワ−ク固定盤
CN2063459U (zh) * 1989-11-27 1990-10-10 山东莱州市台钳厂 导向板钻用平口钳
JP3495791B2 (ja) * 1994-08-23 2004-02-09 東芝機械株式会社 工作機械用テーブル
CN2912870Y (zh) * 2006-01-10 2007-06-20 上海精密机械制造有限公司 阵列轴数控龙门钻床
CN202070914U (zh) * 2011-05-20 2011-12-14 上海三一精机有限公司 立柱移动式立式加工中心
CN202667730U (zh) * 2012-06-19 2013-01-16 无锡华联精工机械有限公司 数控钻床工作台t型槽结构

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5354383A (en) * 1976-10-28 1978-05-17 Nippon Kokan Kk <Nkk> Method for processing metal using a plurality of kinds of machine tool
JPS5997825A (ja) * 1982-11-24 1984-06-05 Aioi Seiki Kk 工作機械のワ−ク固定盤
CN2063459U (zh) * 1989-11-27 1990-10-10 山东莱州市台钳厂 导向板钻用平口钳
JP3495791B2 (ja) * 1994-08-23 2004-02-09 東芝機械株式会社 工作機械用テーブル
CN2912870Y (zh) * 2006-01-10 2007-06-20 上海精密机械制造有限公司 阵列轴数控龙门钻床
CN202070914U (zh) * 2011-05-20 2011-12-14 上海三一精机有限公司 立柱移动式立式加工中心
CN202667730U (zh) * 2012-06-19 2013-01-16 无锡华联精工机械有限公司 数控钻床工作台t型槽结构

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103707093A (zh) * 2013-12-06 2014-04-09 常州金安冶金设备有限公司 钻床固定工装
CN104117982A (zh) * 2014-07-10 2014-10-29 洛阳利维科技有限公司 一种用于大中型装备加工及装配的带t型槽复合平台
CN104117982B (zh) * 2014-07-10 2017-05-03 洛阳利维科技有限公司 一种用于大中型装备加工及装配的带t型槽复合平台

Similar Documents

Publication Publication Date Title
CN104259903A (zh) 一种液压铣用夹具
CN210731713U (zh) 滑动式快速换型工装
CN204449420U (zh) 一种铁路货车用心盘磨耗盘导电柱孔的钻孔定位装置
CN201815701U (zh) 立卧三面主减速器壳精镗孔组合机床
CN204195300U (zh) 车体盖辅助钻孔工装
CN102699382A (zh) 数控钻床工作台t型槽结构
CN103658760A (zh) 弧形板钻孔定位装置
CN202591675U (zh) 平衡悬架支架钻模
CN102825287A (zh) 粗精镗专机
CN202667730U (zh) 数控钻床工作台t型槽结构
CN203875657U (zh) 燕尾夹具
CN206415670U (zh) 用于钻轴承座螺纹孔的夹具
CN107414557B (zh) 一种加工双臂行星架的液压工装及加工方法
CN204108698U (zh) 用于数控铣床的板料制孔快速定位装夹系统
CN204504278U (zh) 一种单头数控钻床
CN103170867A (zh) 一种数控设备加工工件的装置及其工作方法
CN203649407U (zh) 一种长插销车床
CN203611017U (zh) 刨床手动夹紧机构
CN203437963U (zh) 主机筒内孔镗孔工装
CN103331634B (zh) 砻谷机齿轮箱镗孔方法
CN203210049U (zh) 一种钻孔定位夹具
CN201768933U (zh) 一种六轴镗孔机床
CN104985233A (zh) 一种钻孔工装
CN207971453U (zh) 用于车床后托架钻孔的夹具
CN105729186A (zh) 一种汽车转向横拉杆臂钻铣夹具

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121003