CN102677881A - Method for improving bearing capacity of support frame by reducing length of top layer cantilever of support frame - Google Patents

Method for improving bearing capacity of support frame by reducing length of top layer cantilever of support frame Download PDF

Info

Publication number
CN102677881A
CN102677881A CN2012101856890A CN201210185689A CN102677881A CN 102677881 A CN102677881 A CN 102677881A CN 2012101856890 A CN2012101856890 A CN 2012101856890A CN 201210185689 A CN201210185689 A CN 201210185689A CN 102677881 A CN102677881 A CN 102677881A
Authority
CN
China
Prior art keywords
bracing frame
length
bar
support frame
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101856890A
Other languages
Chinese (zh)
Inventor
刘群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012101856890A priority Critical patent/CN102677881A/en
Publication of CN102677881A publication Critical patent/CN102677881A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a method for improving and determining a bearing capacity of a support frame by reducing a length of vertical rods of the support frame that protrudes a top layer horizontal rod cantilever. The support frame has four vertical strides and four transverse strides and is loaded in a range of four-stride X four-stride. The support frame is 5.48 m high, a step pitch of the vertical rods is 1.49 m, the vertical distance of the vertical rods is 1.25 m, the transverse distance of the vertical rods is 1.21 m, the vertical rods are lapped by steel pipes of phi48 X 3.2, and nodes are connected by fasteners. The upper part of a support is taken as a bearing main beam by supporting two steel pipes of phi48 X 3.2 through an adjustable bracket, the bottom of the adjustable bracket is inserted and fixed in the vertical rods of the support, and the vertical rods protrude the top layer horizontal rod cantilever for 0.81 m. The length of the vertical rods of the support frame that protrudes the top layer horizontal rod cantilever is reduced to 0.52 m, the support frame is 5.19 m high, and a critical load of the support frame is improved for 15%. According to the method provided by the invention, the method for improving and determining the bearing capacity of the support frame by reducing the length of vertical rods of the support frame is provided, so that a scaffold is safely and economically used in building engineering.

Description

A kind of bracing frame top layer jib-length that reduces improves bracing frame bearing capacity method
Technical field
The present invention relates to the fastener type steel pipe bracing frame used a kind of building site, its vertical rod is stretched out top layer horizon bar jib-length and is reduced to 0.52m by 0.81m, the method that fastener type steel pipe bracing frame bearing capacity is improved.
Background technology
The fastener type steel pipe bracing frame is being used in the building site at present, does not have the vertical rod of support body series to stretch out top layer horizon bar jib-length and changes critical load requirement one to one, does not have the bracing frame vertical rod to stretch out top layer horizon bar jib-length and changes the fastener type bracing frame bearing capacity method of confirming; Set up by rule of thumb at the scene, on the one hand, causes the waste of material cost to increase; On the other hand; Cause potential safety hazard, what have causes support body top local buckling, finally causes taking place serious accident.
Summary of the invention
The object of the present invention is to provide a kind of fastener type steel pipe bracing frame, its vertical rod is stretched out top layer horizon bar jib-length and is reduced to 0.52m by 0.81m, the method that fastener type steel pipe bracing frame bearing capacity is improved.Make the use bracing frame that construction work can be safe, economic.
The present invention realizes above-mentioned purpose like this:
The fastener type bracing frame of top layer horizon bar jib-length 0.81m is stretched out in a kind of vertical rod, comprises pole steel tube, vertical equity bar and transverse horizontal bar; Node connects with the malleable cast iron fastener; Bracing frame vertical 4 is striden, and horizontal 4 stride, and loading zone is 4 to stride * 4 scopes of striding; The vertical rod step pitch is 1.49m, adjacent pole steel tube longitudinal pitch 1.25m, adjacent pole steel tube horizontal spacing 1.21m; The bar height of sweeping the floor is 0.2m, and frame structure is set up by 3 step pitches, and the frame structure height is 5.48m; Bracing frame top is by the two steel pipe girders of adjustable bracket jacking; The upper lateral tube epithelium of adjustable bracket upper surface to bracing frame is apart from 0.81m, and the length that adjustable bracket stretches out pole steel tube is not more than 0.35m; Pole steel tube, vertical equity bar, transverse horizontal bar and two steel pipe girder all adopt Φ 48 * 3.2 steel pipes.
The fastener type bracing frame of top layer horizon bar jib-length 0.52m is stretched out in a kind of vertical rod, comprises pole steel tube, vertical equity bar and transverse horizontal bar; Node connects with the malleable cast iron fastener; Bracing frame vertical 4 is striden, and horizontal 4 stride, and loading zone is 4 to stride * 4 scopes of striding; The vertical rod step pitch is 1.49m, adjacent pole steel tube longitudinal pitch 1.25m, adjacent pole steel tube horizontal spacing 1.21m; The bar height of sweeping the floor is 0.2m, and frame structure is set up by 3 step pitches, and the frame structure height is 5.18m; Bracing frame top is by the two steel pipe girders of adjustable bracket jacking; The upper lateral tube epithelium of adjustable bracket upper surface to bracing frame is apart from 0.52m, and the length that adjustable bracket stretches out pole steel tube is not more than 0.35m; Pole steel tube, vertical equity bar, transverse horizontal bar and two steel pipe girder all adopt Φ 48 * 3.2 steel pipes.Stretch out the fastener type bracing frame of top layer horizon bar jib-length 0.81m with vertical rod and compare, critical load improves 15%.
The present invention has confirmed the fastener type steel pipe bracing frame, and its vertical rod is stretched out top layer horizon bar jib-length and is reduced to 0.52m by 0.81m, the method that fastener type steel pipe bracing frame bearing capacity is improved.Make the use bracing frame that construction work can be safe, economic.
Description of drawings
Fig. 1 is a top jib-length 0.81m fastener type steel pipe bracing frame front view;
Fig. 2 is a top jib-length 0.81m fastener type steel pipe bracing frame vertical view;
Fig. 3 is a top jib-length 0.81m fastener type steel pipe bracing frame lateral view;
Fig. 4 is a top jib-length 0.81m fastener type steel pipe bracing frame load test assembling front view;
Fig. 5 is a top jib-length 0.81m fastener type steel pipe bracing frame loading zone vertical view;
Fig. 6 is a top jib-length 0.81m fastener type steel pipe bracing frame load test assembling side elevation;
Fig. 7 is a top jib-length 0.52m fastener type steel pipe bracing frame front view;
Fig. 8 is a top jib-length 0.52m fastener type steel pipe bracing frame lateral view;
Fig. 9 is a top jib-length 0.52m fastener type steel pipe bracing frame lateral view;
Figure 10 is a top jib-length 0.52m fastener type steel pipe bracing frame load test assembling front view;
Figure 11 is a top jib-length 0.52m fastener type steel pipe bracing frame loading zone vertical view;
Figure 12 is a top jib-length 0.52m fastener type steel pipe bracing frame load test assembling side elevation;
Among the figure: 1, adjustable bracket; 2, two steel pipe girders; 3, vertical equity bar; 4, pole steel tube; 5, transverse horizontal bar; 6, malleable cast iron fastener; 7, reaction frame; 8, fixing reaction frame steel pipe; 9, distribution beam; 10, i iron; 11, jack.
The specific embodiment
Shown in Fig. 1-6, the fastener type bracing frame of top layer horizon bar jib-length 0.81m is stretched out in a kind of vertical rod, comprises pole steel tube 4, vertical equity bar 3 and transverse horizontal bar 5; Node connects with malleable cast iron fastener 6; Bracing frame vertical 4 is striden, and horizontal 4 stride, and loading zone is 4 to stride * 4 scopes of striding; Vertical rod step pitch E is 1.49m, and adjacent pole steel tube longitudinal pitch A is 1.25m, and adjacent pole steel tube horizontal spacing B is 1.21m; The bar height D that sweeps the floor is 0.2m, and frame structure is set up by 3 step pitches, and frame structure height C is 5.48m; Bracing frame top is by the two steel pipe girders 2 of adjustable bracket 1 jacking; The upper lateral tube epithelium of adjustable bracket 1 upper surface to bracing frame is 0.81m apart from F, and the length G that adjustable bracket 1 stretches out pole steel tube is not more than and is 0.35m; Pole steel tube 4, vertical equity bar 3, transverse horizontal bar 5 and two steel pipe girder 2 all adopt Φ 48 * 3.2 steel pipes.Test is shown in Fig. 4~6, and this fastener type steel pipe bracing frame is through jack 11 loadings, top reaction frame 7 girders; Reaction frame returns back to top load is reached distribution beam 9; Distribution beam 9 reaches i iron 10 with load, and i iron 10 reaches the two steel pipes 2 of support with load, realizes the bracing frame loading test.Confirm average single vertical rod critical load 16.6kN through loading test.
Shown in Fig. 7-12, the fastener type bracing frame of top layer horizon bar jib-length 0.52m is stretched out in a kind of vertical rod, comprises pole steel tube 4, vertical equity bar 3 and transverse horizontal bar 5; Node connects with malleable cast iron fastener 6: bracing frame vertical 4 is striden, and horizontal 4 stride, and loading zone is 4 to stride * 4 scopes of striding; Vertical rod step pitch E is 1.49m, and adjacent pole steel tube longitudinal pitch A is 1.25m, and adjacent pole steel tube horizontal spacing B is 1.21m; The bar height D that sweeps the floor is 0.2m, and frame structure is set up by 3 step pitches, and frame structure height C is 5.19m; Bracing frame top is by the two steel pipe girders 2 of adjustable bracket jacking; The upper lateral tube epithelium distance L of adjustable bracket 1 upper surface to bracing frame is 0.52m, and the length G that adjustable bracket stretches out pole steel tube is not more than 0.35m; Vertical rod steel test is shown in Figure 10~12, and this fastener type steel pipe bracing frame is through jack 11 loadings, top reaction frame 7 girders; Reaction frame returns back to top load is reached distribution beam 9; Distribution beam 9 reaches i iron 10 with load, and i iron 10 reaches the two steel pipes 2 of support with load, realizes the bracing frame loading test.
Confirm average single vertical rod critical load 19.1kN through loading test.Stretch out the fastener type bracing frame of top layer horizon bar jib-length 0.81m with vertical rod and compare, critical load improves 15%.

Claims (3)

1. fastener type bracing frame, top layer horizon bar jib-length 0.81m is stretched out in vertical rod, and bracing frame comprises pole steel tube, vertical equity bar and transverse horizontal bar; Node connects with the malleable cast iron fastener; It is characterized in that: bracing frame vertical 4 is striden, and horizontal 4 stride, and loading zone is 4 to stride * 4 scopes of striding; The vertical rod step pitch is 1.49m, adjacent pole steel tube longitudinal pitch 1.25m, adjacent pole steel tube horizontal spacing 1.21m; The bar height of sweeping the floor is 0.2m, and frame structure is set up by 3 step pitches, and the frame structure height is 5.48m; Bracing frame top is by the two steel pipe girders of adjustable bracket jacking; The upper lateral tube epithelium of adjustable bracket upper surface to bracing frame is apart from 0.81m, and the length that adjustable bracket stretches out pole steel tube is not more than 0.35m; Pole steel tube, vertical equity bar, transverse horizontal bar and two steel pipe girder all adopt Φ 48 * 3.2 steel pipes.
2. fastener type bracing frame, top layer horizon bar jib-length 0.52m is stretched out in vertical rod, and bracing frame comprises pole steel tube, vertical equity bar and transverse horizontal bar; Node connects with the malleable cast iron fastener; It is characterized in that: bracing frame vertical 4 is striden, and horizontal 4 stride, and loading zone is 4 to stride * 4 scopes of striding; The vertical rod step pitch is 1.49m, adjacent pole steel tube longitudinal pitch 1.25m, adjacent pole steel tube horizontal spacing 1.21m; The bar height of sweeping the floor is 0.2m, and frame structure is set up by 3 step pitches, and the frame structure height is 5.19m; Bracing frame top is by the two steel pipe girders of adjustable bracket jacking; The upper lateral tube epithelium of adjustable bracket upper surface to bracing frame is apart from 0.52m, and the length that adjustable bracket stretches out pole steel tube is not more than 0.35m; Pole steel tube, vertical equity bar, transverse horizontal bar and two steel pipe girder all adopt Φ 48 * 3.2 steel pipes.
3. one kind reduces bracing frame top layer jib-length raising bracing frame bearing capacity method; Bracing frame adopts the described vertical rod of claim 2 to stretch out top layer horizon bar jib-length 0.52m; It is characterized in that: the fastener type bracing frame that stretches out top layer horizon bar jib-length 0.81m with vertical rod in the claim 1 is compared, and critical load improves 15%.
CN2012101856890A 2012-06-07 2012-06-07 Method for improving bearing capacity of support frame by reducing length of top layer cantilever of support frame Pending CN102677881A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101856890A CN102677881A (en) 2012-06-07 2012-06-07 Method for improving bearing capacity of support frame by reducing length of top layer cantilever of support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101856890A CN102677881A (en) 2012-06-07 2012-06-07 Method for improving bearing capacity of support frame by reducing length of top layer cantilever of support frame

Publications (1)

Publication Number Publication Date
CN102677881A true CN102677881A (en) 2012-09-19

Family

ID=46810398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101856890A Pending CN102677881A (en) 2012-06-07 2012-06-07 Method for improving bearing capacity of support frame by reducing length of top layer cantilever of support frame

Country Status (1)

Country Link
CN (1) CN102677881A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110793769A (en) * 2019-12-16 2020-02-14 兰州理工大学 Civil engineering frame construction's test device
CN110792269A (en) * 2019-10-31 2020-02-14 中冶天工集团有限公司 Discharging platform for multi-storey building construction and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007309029A (en) * 2006-05-22 2007-11-29 Alinco Inc Single-pipe scaffold
JP2009161934A (en) * 2007-12-28 2009-07-23 Alinco Inc Support for tube and coupler scaffolding, and tube and coupler scaffolding structure using the same
CN101892738A (en) * 2010-08-20 2010-11-24 中太建设集团股份有限公司 Embedded scaffold connecting tube and construction method thereof
CN102322134A (en) * 2011-06-14 2012-01-18 刘群 Method for determining difference in bearing capacities of fastener-type full space support frame and full space scaffold

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007309029A (en) * 2006-05-22 2007-11-29 Alinco Inc Single-pipe scaffold
JP2009161934A (en) * 2007-12-28 2009-07-23 Alinco Inc Support for tube and coupler scaffolding, and tube and coupler scaffolding structure using the same
CN101892738A (en) * 2010-08-20 2010-11-24 中太建设集团股份有限公司 Embedded scaffold connecting tube and construction method thereof
CN102322134A (en) * 2011-06-14 2012-01-18 刘群 Method for determining difference in bearing capacities of fastener-type full space support frame and full space scaffold

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792269A (en) * 2019-10-31 2020-02-14 中冶天工集团有限公司 Discharging platform for multi-storey building construction and construction method thereof
CN110793769A (en) * 2019-12-16 2020-02-14 兰州理工大学 Civil engineering frame construction's test device
CN110793769B (en) * 2019-12-16 2021-07-13 兰州理工大学 Civil engineering frame construction's test device

Similar Documents

Publication Publication Date Title
CN203867159U (en) Sleeve type cantilever scaffold structure
CN102322134B (en) Method for determining difference in bearing capacities of fastener-type full space support frame and full space scaffold
CN203383221U (en) Foundation pit support structure formed by armoured concrete and steel structure
CN102182300B (en) Method for increasing horizontal cross braces and improving and determining bearing capacity of support frame
CN102733599A (en) Fastener type steel pipe scaffold framework support applicable to steel reinforced concrete beam
CN201381637Y (en) Fastener type steel pipe scaffold template bracket
CN100554629C (en) A kind of buckled type steel pipe scaffold formwork support
CN102677881A (en) Method for improving bearing capacity of support frame by reducing length of top layer cantilever of support frame
CN202745353U (en) Tool-type overhanging scaffold
CN201284559Y (en) Fastener type steel pipe scaffold template stand
CN101560829B (en) Buckled type steel pipe scaffold formwork support with large height-width ratio
CN102677882A (en) Method for increasing support frame bearing capacity by reducing support frame height-width ratio
CN201284550Y (en) Fastener type steel pipe full scaffold
CN102182311B (en) Method for increasing wall connecting piece and improving and determining bearing capacity of support frame
CN203867164U (en) Cantilever type scaffold structure with positioning steel pipe
CN204059589U (en) A kind of shaped steel combination formula supporting and the cantilevered structure of going along with sb. to guard him
CN102182310B (en) Method for increasing horizontal restraint and improving and determining bearing capacity of supporting frame
CN103276889B (en) Full hall fastener type steel pipe scaffold anti-side shifting method
CN201381638Y (en) Fastener type steel pipe scaffold template bracket
CN201310191Y (en) Template support of steel-tube scaffold of fastener type
CN105649317A (en) Fixing mechanism for cantilever I-beam
CN100540826C (en) A kind of buckled type steel pipe scaffold formwork support
CN105926915B (en) Grow the construction method for workbench of encorbelmenting in Bailey beam high-altitude
CN104695694A (en) Worm and gear lead screw lifting type attached scaffold
CN201284556Y (en) Fastener type steel pipe scaffold template support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Liu Qun

Document name: Notification that Application Deemed to be Withdrawn

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120919