CN102677703A - 抗落石冲击明洞、棚洞洞顶垫层结构及其施工方法 - Google Patents
抗落石冲击明洞、棚洞洞顶垫层结构及其施工方法 Download PDFInfo
- Publication number
- CN102677703A CN102677703A CN2011103748010A CN201110374801A CN102677703A CN 102677703 A CN102677703 A CN 102677703A CN 2011103748010 A CN2011103748010 A CN 2011103748010A CN 201110374801 A CN201110374801 A CN 201110374801A CN 102677703 A CN102677703 A CN 102677703A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- impact
- open cut
- shock resistance
- course
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
本发明涉及一种抗落石冲击明洞、棚洞洞顶垫层结构及其施工方法,属于隧道工程、地质灾害防治工程领域。一种抗落石冲击明洞、棚洞洞顶垫层结构,其自下而上依次包括防水层、抗冲击垫层、粘土隔水层和种植土层,防水层与明洞或棚洞洞顶的拱圈层相邻,抗冲击垫层是由回填土层和抗冲击板材间隔铺设而成,抗冲击板材至少设置一层,抗冲击垫层的上下表面均为回填土层。抗冲击板材为一般的聚苯乙烯土工泡沫板。本发明在回填土层中增设聚苯乙烯土工泡沫板(抗冲击板材),充分利用该种材料在冲击作用下的缓冲、变形、消能作用,从而大大延长冲击历时,也就是说能够有效降低冲击力,从而保证了明洞、棚洞结构在落石冲击荷载作用下的安全。
Description
技术领域
本发明涉及一种抗落石冲击明洞、棚洞洞顶垫层结构及其施工方法,属于隧道工程、地质灾害防治工程领域。
背景技术
目前国内外隧道进出口明洞、棚洞顶部多为素填土垫层,如我国公路、铁路行业标准均推荐采用不小于1.5m以上的土垫层以抵抗落石冲击,实际工程中应用效果欠佳,西部地区明洞被落石所毁的案例每年均有数起发生。出于抵抗落石冲击的目的,也有一些隧道尝试在顶部回填时加入土工格栅等加筋材料,但由于落石冲击是一种短时脉冲行为,仅通过加筋提高垫层的抗冲击能力效果有限。
发明内容
本发明的目的在于提供一种抗落石冲击明洞、棚洞洞顶垫层结构,解决了现有明洞、棚洞洞顶用素填土垫层抗冲击能力不佳,无法抵抗落石冲击的技术问题。
本发明还提供一种上述垫层结构的施工方法。
本发明解决其技术问题所采用的技术方案是:
一种抗落石冲击明洞、棚洞洞顶垫层结构,其自下而上依次包括防水层、抗冲击垫层、粘土隔水层和种植土层,防水层与明洞或棚洞洞顶的拱圈层相邻,抗冲击垫层是由回填土层和抗冲击板材间隔铺设而成,抗冲击板材至少设置一层,抗冲击垫层的上下表面均为回填土层。抗冲击板材为一般的聚苯乙烯土工泡沫板。
本发明在回填土层中增设聚苯乙烯土工泡沫板(抗冲击板材),充分利用该种材料在冲击作用下的缓冲、变形、消能作用,从而大大延长冲击历时,也就是说能够有效降低冲击力,从而保证了明洞、棚洞结构在落石冲击荷载作用下的安全,减小垫层厚度,降低垫层自重,从而带来良好的经济、环保、减灾效益。
作为优选,防水层由防水板和土工布组成。进一步优选的是,所述的土工布与明洞或棚洞洞顶的拱圈层通过沥青层粘结固定。
作为优选,回填土层厚度为25~30cm。
作为优选,粘土隔水层厚度为8~10cm。
作为优选,抗冲击板材为2~3层,板材厚度为10cm~15cm。
一种抗落石冲击明洞、棚洞洞顶垫层结构的施工方法,该方法具体包括如下步骤:
1)在隧道明洞或棚洞洞顶上表面铺设防水层:防水层由防水板和土工布组成,明洞或棚洞洞顶上表面先铺设一层沥青,再铺设一层土工布,土工布通过沥青固定在明洞或棚洞洞顶上表面,土工布上方最后铺设防水板;
2)在防水层表面铺设第一层回填土:利用就地开挖的原土,并清除掺入的有机杂质和过大的颗粒;分层填筑并进行夯实,洞身左右两侧同步回填,高度差不大于50cm,洞顶以上1m厚度范围内采用人工夯填,虚铺厚度不超过200mm,每层压实遍数3~4次,压实度不小于90%,第一层填土填筑至拱顶厚度30cm,然后压实整平,准备铺设抗冲击板材;
3)抗冲击板材的铺设:铺设前依据明洞顶部宽度、明洞长度的特点分割制作成长4.5~5m,宽2m~3m的板材备用,抗冲击板材采用人工满铺,形成抗冲击板材层;
4) “三明治”抗冲击垫层结构的形成:铺设抗冲击板材后,进行一层回填土一层抗冲击板材间隔铺设,形成“三明治”抗冲击垫层结构,回填土层每层填筑厚度不超过30cm;
5) 最上一层的回填土层表面依次铺设粘土隔水层、种植土层:回填土层上的粘土隔水层厚度不小于10cm。
本发明的施工顺序是对明洞、棚洞洞顶上部进行先期处理,做防水层,然后一层素土(回填土层)、一层抗冲击材料分层施工,最上层的种植土层采用素土,以满足绿化要求。素填土层要求达到一定的密实度,抗冲击板材的铺设范围覆盖整个拱顶、拱腰等可能受落石冲击的范围。
作为优选,抗冲击板材选择密度为15kg/m3~30kg/m3的聚苯乙烯土工泡沫板材,抗压强度≥100kPa,板材厚度10cm~15cm,压缩强度≥100Kpa;尺寸稳定性≤3%;吸水率(V/V)≤4%。
作为优选,土工布采用≥350g/m2的无纺土工布,防水板采用1.2~1.5mm的ECB防水板。乙烯乙酸乙烯改性沥青共混(ECB)防水板是一种合成树脂高分子防水板,是以乙烯乙酸乙烯共聚物为主要原料,加入一定量的改性沥青共混,经过二段挤出三辊压延冷却分卷等工序制成的一种高档土工防水防渗材,ECB防水板为现有产品,可购得。
本发明的关键技术为在隧道明洞、棚洞顶部回填土层中加设数层的抗冲击材料,形成一种回填土和抗冲击材料组成的类似于“三明治”的结构,适用于崩塌落石灾害威胁地区的隧道进出口工程,应用部位为隧洞进出口明洞,棚洞结构顶部的缓冲垫层。
本发明的有益效果是:与现有技术相比,成型后垫层自重较同厚度素填土垫层减少20%~40%,垫层自重的减小为抵抗落石冲击留出了受载空间。增设的抗冲击材料为一种多孔、弹塑性介质,在冲击荷载作用下,可通过弹性、塑性变形吸收冲击动能,延长整个冲击过程的历时,可提高垫层抗冲击能力2倍以上。该材料为工厂化生产、订做的板材,可于土层填筑过程中直接铺设;运输、铺设无需大型机械设备,同等厚度回填土垫层相比,由于无需碾压、夯实,工期还略有缩短。尽管增设了缓冲材料,但考虑土方工程量以及抗冲击能力增强导致的明洞结构工程量的节约,综合造价可降低5%~15%。
附图说明
图1是本发明的结构示意图;
图2是本发明与普通回填土垫层抗冲击原理比较图,A为普通回填土垫层,B为本发明垫层结构。
图中:1、拱圈层,2、防水层,3、回填土层,4、抗冲击板材,5、粘土隔水层,6、种植土层。
具体实施方式
下面通过具体实施例,并结合附图,对本发明的技术方案作进一步的具体说明。
实施例:
如图1所示的一种抗落石冲击明洞、棚洞洞顶垫层结构,其自下而上依次包括防水层2、抗冲击垫层、粘土隔水层5和种植土层6,防水层2与明洞或棚洞洞顶的拱圈层1相邻,抗冲击垫层是由回填土层3和抗冲击板材4间隔铺设而成,抗冲击垫层的上下表面均为回填土层。防水层2由防水板和土工布组成,所述的土工布与明洞或棚洞洞顶的拱圈层通过沥青层粘结固定。本实施例中的抗冲击板材为2层,板材厚度为15cm。
施工时,回填土层厚度控制在25~30cm范围内,小于等于30cm比较适宜。粘土隔水层厚度为8~10cm。抗冲击垫层中冲击板材的铺设层数以抗冲击能力需要所确定。回填土层和种植土层采用素土。
上述抗落石冲击明洞、棚洞洞顶垫层结构的施工方法,该方法具体包括如下步骤:
1)在隧道明洞或棚洞洞顶上表面铺设防水层:为防止洞内渗漏水,在明洞或棚洞洞顶铺设防水层,防水层由防水板和土工布组成,明洞或棚洞洞顶上表面先涂一层热沥青或乳化沥青。再铺设一层土工布,土工布通过沥青粘结在明洞或棚洞洞顶上表面,土工布上方最后铺设防水板。土工布采用≥350g/m2的无纺土工布,防水板采用1.2~1.5mm的ECB防水板。
防水层用于防止土里的水进入隧道里,相当于房顶上的防水处理。防水板和土工布两种材料通过沥青粘在明洞顶。
2)在防水层表面铺设第一层回填土:利用就地开挖的原土,并清除掺入的有机杂质和过大的颗粒;分层填筑并进行夯实,洞身左右两侧同步回填,高度差不大于50cm,洞顶以上1m厚度范围内采用人工夯填,虚铺厚度不超过200mm,每层压实遍数3~4次,压实度不小于90%,第一层填土填筑至拱顶厚度30cm,然后压实整平,准备铺设抗冲击板材;
3)抗冲击板材的铺设:铺设前依据明洞顶部宽度、明洞长度的特点分割制作成长约5m,宽2m~3m的板材备用,抗冲击板材采用人工满铺,形成抗冲击板材层。抗冲击板材纵向、横向接头同一断面不超过50%为宜,接头间可用短钢筋做水平向连接处理,每延米设1处连接即可,仅起板材铺设、后续填土作业时的临时固定作用,非传力构件。
抗冲击板材选择密度为15kg/m3~30kg/m3的聚苯乙烯土工泡沫板材,抗压强度≥100kPa,板材厚度10cm~15cm,压缩强度≥100Kpa;尺寸稳定性≤3%;吸水率(V/V)≤4%。
4) “三明治”抗冲击垫层结构的形成:铺设抗冲击板材后,进行一层回填土一层抗冲击板材间隔铺设,形成“三明治”抗冲击垫层结构,回填土层每层填筑厚度不超过30cm。抗冲击垫层中冲击板材的铺设层数以抗冲击能力需要所确定。最上一层的回填土层施工同前述各层回填土层要求一致,控制顶标高为设计标高,范围应覆盖抗冲击板材,且包边宽度不小于30cm。
5) 最上一层的回填土层表面依次铺设粘土隔水层、种植土层:回填土层上的粘土隔水层厚度不小于10cm,粘土隔水层可按前述压实度标准控制。粘土隔水层即采用粘土作为铺筑原料,形成一层隔水层。
本发明与普通回填土垫层抗冲击原理比较图如图2所示。采用本发明的垫层结构,抗冲击板材的存在能够有效吸收落石冲击过程中的动能,增大冲击历时2倍以上,从而使作用在明、棚洞结构顶部的冲击力急剧减小,进而提高结构抗落石冲击能力。成型后的结构自重比同厚度的素填土垫层减少20~40%,结构自重的减小,为抵抗落石冲击留出了更多的承受荷载空间。以上两个方面的效应可以提高垫层结构抗落石冲击能力2倍以上。
以上所述的实施例只是本发明的一种较佳的方案,并非对本发明作任何形式上的限制,在不超出权利要求所记载的技术方案的前提下还有其它的变体及改型。
Claims (9)
1.一种抗落石冲击明洞、棚洞洞顶垫层结构,其特征在于:其自下而上依次包括防水层(2)、抗冲击垫层、粘土隔水层(5)和种植土层(6),防水层与明洞或棚洞洞顶的拱圈层(1)相邻,抗冲击垫层是由回填土层(3)和抗冲击板材(4)间隔铺设而成,抗冲击板材至少设置一层,抗冲击垫层的上下表面均为回填土层。
2.根据权利要求1所述的抗落石冲击明洞、棚洞洞顶垫层结构,其特征在于:防水层由防水板和土工布组成。
3.根据权利要求2所述的抗落石冲击明洞、棚洞洞顶垫层结构,其特征在于:所述的土工布与明洞或棚洞洞顶的拱圈层通过沥青层粘结固定。
4.根据权利要求1或2或3所述的抗落石冲击明洞、棚洞洞顶垫层结构,其特征在于:回填土层厚度为25~30cm。
5.根据权利要求1或2或3所述的抗落石冲击明洞、棚洞洞顶垫层结构,其特征在于:粘土隔水层厚度为8~10cm。
6.根据权利要求1或2或3所述的抗落石冲击明洞、棚洞洞顶垫层结构,其特征在于:抗冲击板材为2~3层,板材厚度为10cm~15cm。
7.一种抗落石冲击明洞、棚洞洞顶垫层结构的施工方法,其特征在于该方法具体包括如下步骤:
1)在隧道明洞或棚洞洞顶上表面铺设防水层:防水层由防水板和土工布组成,明洞或棚洞洞顶上表面先铺设一层沥青,再铺设一层土工布,土工布通过沥青固定在明洞或棚洞洞顶上表面,土工布上方最后铺设防水板;
2)在防水层表面铺设第一层回填土:利用就地开挖的原土,并清除掺入的有机杂质和过大的颗粒;分层填筑并进行夯实,洞身左右两侧同步回填,高度差不大于50cm,洞顶以上1m厚度范围内采用人工夯填,虚铺厚度不超过200mm,每层压实遍数3~4次,压实度不小于90%,第一层填土填筑至拱顶厚度30cm,然后压实整平,准备铺设抗冲击板材;
3)抗冲击板材的铺设:铺设前依据明洞顶部宽度、明洞长度的特点分割制作成长4.5~5m,宽2m~3m的板材备用,抗冲击板材采用人工满铺,形成抗冲击板材层;
4) “三明治”抗冲击垫层结构的形成:铺设抗冲击板材后,进行一层回填土一层抗冲击板材间隔铺设,形成“三明治”抗冲击垫层结构,回填土层每层填筑厚度不超过30cm;
5) 最上一层的回填土层表面依次铺设粘土隔水层、种植土层:回填土层上的粘土隔水层厚度不小于10cm。
8.根据权利要求7所述的施工方法,其特征在于:抗冲击板材选择密度为15kg/m3~30kg/m3的聚苯乙烯土工泡沫板材,抗压强度≥100kPa,板材厚度10cm~15cm,压缩强度≥100Kpa;尺寸稳定性≤3%;吸水率(V/V)≤4%。
9.根据权利要求7所述的施工方法,其特征在于:土工布采用≥350g/m2的无纺土工布,防水板采用1.2~1.5mm的ECB防水板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110374801.0A CN102677703B (zh) | 2011-11-23 | 2011-11-23 | 抗落石冲击明洞、棚洞洞顶垫层结构及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110374801.0A CN102677703B (zh) | 2011-11-23 | 2011-11-23 | 抗落石冲击明洞、棚洞洞顶垫层结构及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102677703A true CN102677703A (zh) | 2012-09-19 |
CN102677703B CN102677703B (zh) | 2014-07-02 |
Family
ID=46810222
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110374801.0A Expired - Fee Related CN102677703B (zh) | 2011-11-23 | 2011-11-23 | 抗落石冲击明洞、棚洞洞顶垫层结构及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102677703B (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106400709A (zh) * | 2016-12-20 | 2017-02-15 | 吉林大学 | 棚硐硐顶防崩塌落石装配式橡胶消能板防护结构 |
CN106836036A (zh) * | 2017-03-30 | 2017-06-13 | 中铁二院工程集团有限责任公司 | 一种弹性消能隧道棚洞结构及施工方法 |
CN107239645A (zh) * | 2017-08-10 | 2017-10-10 | 西南交通大学 | 落石冲击下无回填土拱形明洞结构概率可靠度设计方法 |
CN108797405A (zh) * | 2018-06-27 | 2018-11-13 | 重庆水利电力职业技术学院 | 一种桥隧相连防坠石的缓冲结构 |
CN109183639A (zh) * | 2018-09-29 | 2019-01-11 | 吴帆 | 一种柔性结构层的棚洞结构及其施工方法 |
CN109881547A (zh) * | 2019-01-29 | 2019-06-14 | 同济大学 | 高铁隧道下穿机场道面路基不均匀沉降控制结构及施工工艺 |
CN110158618A (zh) * | 2019-06-28 | 2019-08-23 | 四川省交通勘察设计研究院有限公司 | 一种应用于明洞洞顶的新型回填结构及回填方法 |
CN111335194A (zh) * | 2020-03-22 | 2020-06-26 | 南京正隆顺达高分子材料有限公司 | 一种三层发泡防抛垫 |
CN111335193A (zh) * | 2020-03-01 | 2020-06-26 | 西南交通大学 | 一种棚洞顶部箱式模块化分层复合防板结砂垫单元及施工方法 |
CN115075071A (zh) * | 2022-06-17 | 2022-09-20 | 四川省交通勘察设计研究院有限公司 | 一种隧间桥交通转换带及其设计方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060083740A (ko) * | 2005-01-18 | 2006-07-21 | 주식회사 하이콘엔지니어링 | 앵커 지보를 이용한 피암터널 시공방법 |
CN101922301A (zh) * | 2010-08-30 | 2010-12-22 | 中铁第四勘察设计院集团有限公司 | 一种穿越上高下深溶洞的隧道防护结构 |
CN101982612A (zh) * | 2010-10-29 | 2011-03-02 | 中国科学院地质与地球物理研究所 | 一种利用废旧轮胎制作滚石防护棚缓冲垫层的方法 |
CN201952746U (zh) * | 2010-12-16 | 2011-08-31 | 张俊德 | 新型棚洞 |
CN202324013U (zh) * | 2011-11-23 | 2012-07-11 | 浙江大地交通工程有限公司 | 抗落石冲击明洞、棚洞洞顶垫层结构 |
-
2011
- 2011-11-23 CN CN201110374801.0A patent/CN102677703B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060083740A (ko) * | 2005-01-18 | 2006-07-21 | 주식회사 하이콘엔지니어링 | 앵커 지보를 이용한 피암터널 시공방법 |
CN101922301A (zh) * | 2010-08-30 | 2010-12-22 | 中铁第四勘察设计院集团有限公司 | 一种穿越上高下深溶洞的隧道防护结构 |
CN101982612A (zh) * | 2010-10-29 | 2011-03-02 | 中国科学院地质与地球物理研究所 | 一种利用废旧轮胎制作滚石防护棚缓冲垫层的方法 |
CN201952746U (zh) * | 2010-12-16 | 2011-08-31 | 张俊德 | 新型棚洞 |
CN202324013U (zh) * | 2011-11-23 | 2012-07-11 | 浙江大地交通工程有限公司 | 抗落石冲击明洞、棚洞洞顶垫层结构 |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106400709B (zh) * | 2016-12-20 | 2018-09-07 | 吉林大学 | 棚硐硐顶防崩塌落石装配式橡胶消能板防护结构 |
CN106400709A (zh) * | 2016-12-20 | 2017-02-15 | 吉林大学 | 棚硐硐顶防崩塌落石装配式橡胶消能板防护结构 |
CN106836036A (zh) * | 2017-03-30 | 2017-06-13 | 中铁二院工程集团有限责任公司 | 一种弹性消能隧道棚洞结构及施工方法 |
CN107239645A (zh) * | 2017-08-10 | 2017-10-10 | 西南交通大学 | 落石冲击下无回填土拱形明洞结构概率可靠度设计方法 |
CN108797405B (zh) * | 2018-06-27 | 2020-06-19 | 重庆水利电力职业技术学院 | 一种桥隧相连防坠石的缓冲结构 |
CN108797405A (zh) * | 2018-06-27 | 2018-11-13 | 重庆水利电力职业技术学院 | 一种桥隧相连防坠石的缓冲结构 |
CN109183639A (zh) * | 2018-09-29 | 2019-01-11 | 吴帆 | 一种柔性结构层的棚洞结构及其施工方法 |
CN109881547A (zh) * | 2019-01-29 | 2019-06-14 | 同济大学 | 高铁隧道下穿机场道面路基不均匀沉降控制结构及施工工艺 |
CN109881547B (zh) * | 2019-01-29 | 2021-04-27 | 同济大学 | 高铁隧道下穿机场道面路基不均匀沉降控制结构及施工工艺 |
CN110158618A (zh) * | 2019-06-28 | 2019-08-23 | 四川省交通勘察设计研究院有限公司 | 一种应用于明洞洞顶的新型回填结构及回填方法 |
CN111335193A (zh) * | 2020-03-01 | 2020-06-26 | 西南交通大学 | 一种棚洞顶部箱式模块化分层复合防板结砂垫单元及施工方法 |
CN111335194A (zh) * | 2020-03-22 | 2020-06-26 | 南京正隆顺达高分子材料有限公司 | 一种三层发泡防抛垫 |
CN115075071A (zh) * | 2022-06-17 | 2022-09-20 | 四川省交通勘察设计研究院有限公司 | 一种隧间桥交通转换带及其设计方法 |
CN115075071B (zh) * | 2022-06-17 | 2024-03-26 | 四川省交通勘察设计研究院有限公司 | 一种隧间桥交通转换带及其设计方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102677703B (zh) | 2014-07-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102677703B (zh) | 抗落石冲击明洞、棚洞洞顶垫层结构及其施工方法 | |
CN104480963B (zh) | 一种预制模块式面板土工格栅加筋尾矿砂挡墙的施工方法 | |
CN103510441B (zh) | 防止寒区公路水损破坏的立体排水路基结构及施工方法 | |
CN104895089B (zh) | 地下室楼板与支护桩共同工作的永久支护体系的施工方法 | |
KR20160108299A (ko) | 지오셀 및 지오그리드를 갖는 포장도로 시스템 | |
CN104532712B (zh) | 一种防治公路软岩路基沉降变形病害的设计方法与结构 | |
CN105113354B (zh) | 适用于路面浅层的预埋管道 | |
CN110512637B (zh) | 一种新型隔震复合基础及其施工方法 | |
CN201158826Y (zh) | 土工格栅加筋挡土墙 | |
CN203049610U (zh) | 铁路富水地区路堑桩板式槽型挡土墙构造 | |
CN202969393U (zh) | 一种公路高填方涵洞的加筋减载结构 | |
CN107447597A (zh) | 一种无砟轨道铁路膨胀土路堑结构及施工方法 | |
CN108385716A (zh) | 一种预制装配式混凝土箱型重力式挡土墙结构及其施工方法 | |
CN107460790B (zh) | 一种无砟轨道铁路膨胀岩石路堑结构及施工方法 | |
CN205100053U (zh) | 多组式路面预埋防护管道 | |
CN109056789A (zh) | 一种挡土墙及其施工方法 | |
CN206346075U (zh) | 基于既有铁路路基的帮宽路基结构 | |
CN202324013U (zh) | 抗落石冲击明洞、棚洞洞顶垫层结构 | |
CN107780436B (zh) | 基于建筑渣土的土工格栅加筋土挡墙及施工方法 | |
US11821316B1 (en) | System and construction method of single-layer lining tunnel structure based on mine-tunnelling method | |
CN212077787U (zh) | 一种水利水电工程岸墙 | |
CN204875404U (zh) | 路面预埋式管道交叉结构 | |
CN104278683A (zh) | 一种地库顶板绿化堆坡的方法 | |
CN204343123U (zh) | 一种防治公路软岩路基沉降变形病害的结构 | |
CN215758302U (zh) | 一种高液限土路基结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140702 Termination date: 20161123 |
|
CF01 | Termination of patent right due to non-payment of annual fee |