CN102632375A - 风机机舱罩组装调整工装 - Google Patents

风机机舱罩组装调整工装 Download PDF

Info

Publication number
CN102632375A
CN102632375A CN2012101130056A CN201210113005A CN102632375A CN 102632375 A CN102632375 A CN 102632375A CN 2012101130056 A CN2012101130056 A CN 2012101130056A CN 201210113005 A CN201210113005 A CN 201210113005A CN 102632375 A CN102632375 A CN 102632375A
Authority
CN
China
Prior art keywords
engine room
room cover
blower fan
top board
type top
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101130056A
Other languages
English (en)
Other versions
CN102632375B (zh
Inventor
李广伟
马强
于炜东
李泽民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Wind Power Shandong Co Ltd
Original Assignee
CNR Wind Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNR Wind Power Co Ltd filed Critical CNR Wind Power Co Ltd
Priority to CN201210113005.6A priority Critical patent/CN102632375B/zh
Publication of CN102632375A publication Critical patent/CN102632375A/zh
Application granted granted Critical
Publication of CN102632375B publication Critical patent/CN102632375B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Wind Motors (AREA)

Abstract

本发明公开了一种风机机舱罩组装调整工装,包括顶置装置、L型顶板、活动小车,顶置装置与L型顶板连接,顶置装置的上部设有调整风机机舱罩水平移动的调整装置、底部设有小车导轨,活动小车与小车导轨配合,活动小车包括支座,支座上设有千斤顶,下部设有铁轮;所述铁轮轴向中间部位的外圆开设凹槽,小车导轨中间设凸起,导轨凸起与铁轮凹槽位置配合;所述调整装置包括为丝杠、螺母,螺母设在顶置装置的上端,丝杠一端与L型顶板联接;具有结构简单,操作方便,安全可靠,效率高的优点。

Description

风机机舱罩组装调整工装
技术领域
 本发明涉及一种风力发电设备技术领域,尤其涉及一种风机机舱罩组装调整工装。
背景技术
机舱罩是风力发电设备整机外壳,用来保护风力发电机组的内部机械和电气组件。机舱罩呈密闭长方体状,边角处均为圆角,材料为复合材料,有较强弹性。风力发电设备的整机通过偏航轴承支座竖立在圆柱塔筒顶部,前端通过主轴与中空球状轮毂连接,机舱罩与塔筒、轮毂相交位置均呈圆形开口状,通过密封刷环的毛刷密封、防尘。由于风机偏航、变桨的需要,必须调整机舱罩圆形开口分别与主轴、塔筒在一定的同轴度范围内,即使得机舱罩转子轴密封刷环与主轴,塔筒密封刷环与偏航轴承支座间的同轴度达到装配要求。以往机舱罩组装调整方式为通过天车悬吊、拉拽机舱罩起吊工装完成,起吊工装 为矩形框架结构,框架结构的下端设有四个吊环。工作时,天车悬吊起吊工装至机舱罩上端,四个吊环与机舱罩侧壁上法兰通过吊带连接,然后吊装机舱罩至整机,并通过天车拉拽完成组装调整。这种矩形框架结构的起吊工装存在的缺陷是:由于需要兼顾两处同轴度调整,这种方法操作费时费力,效率低下,用天车拉拽存在安全隐患。
发明内容
本发明的目的就是为了解决现有技术的起吊工装存在的操作费时费力、效率低下,存在安全隐患的问题;提供一种风机机舱罩组装调整工装;具有结构简单,操作方便,安全可靠,效率高的优点。
为了实现上述目的,本发明采用如下技术方案:
风机机舱罩组装调整工装,包括顶置装置 、L型顶板、活动小车,顶置装置与L型顶板连接,顶置装置的上部设有调整风机机舱罩水平移动的调整装置、底部设有小车导轨,活动小车与小车导轨配合,活动小车包括支座,支座上设有千斤顶,下部设有铁轮。
所述铁轮轴向中间部位的外圆开设凹槽,小车导轨中间设凸起,导轨凸起与铁轮凹槽位置配合。
所述调整装置包括相配合的丝杠、螺母,螺母设在顶置装置的上端,丝杠一端与L型顶板联接。
本发明的工作原理:风机机舱罩组装调整工装,包括顶置装置 、L型顶板、活动小车,顶置装置与L型顶板连接,顶置装置的上部设有调整风机机舱罩水平移动的调整装置、底部设有小车导轨,活动小车与小车导轨配合,活动小车包括支座,支座上设有千斤顶,下部设有铁轮。工作时将顶置装置 、L型顶板、活动小车三部分装配起来,顶置装置下端跨过整机运输机架,L型顶板起托住机舱罩,活动小车机械千斤顶顶在L型顶板下端,小车车轮嵌入顶置装置的导轨中。组装调整机舱罩时,机舱罩两侧各均匀分布若干这种工装。起升机械千斤顶,使机舱罩到合适的高度,然后根据实际所需调整情况,分别旋转各工装丝杠,机舱罩移动时各小车沿导轨方向转动,使得机舱罩不随意篡位,直到机舱罩转子轴密封刷环与主轴,塔筒密封刷环与偏航轴承支座间的同轴度达到装配要求。
    本发明的有益效果:
1)机舱罩组装调整效率高,操作方便、安全可靠;
2)实现微调整,保证了机舱罩转子轴密封刷环与主轴,以及塔筒密封刷环与偏航轴承支座间的同轴度要求。
附图说明
图1机舱罩组装调整工装示意图;
图2活动小车示意图;
图3机舱罩结构示意图;
图中,1、顶置装置,2、L型顶板,3、活动小车,4、小车导轨,5、丝杠,  6、铁轮,7、千斤顶 ,8、支座,9、整机运输机架,10、机舱罩,11、主轴端面。
具体实施方式
下面结合附图与实施例对本发明做进一步说明。
风机机舱罩组装调整工装,如图所示,包括顶置装置1 、L型顶板2、活动小车3,顶置装置与L型顶板连接,顶置装置1 的上部设有调整风机机舱罩水平移动的调整装置、底部设有小车导轨4,活动小车3与小车导轨4配合,活动小车3包括支座8,支座8上设有千斤顶7,下部设有铁轮6。所述铁轮的中间开槽,小车导轨4的截面为三角形,三角形导轨与铁轮开槽位置配合。所述调整装置包括相配合的丝杠5、螺母,螺母设在顶置装置1的上端,丝杠5一端与L型顶板2联接。工作时将顶置装置1、L型顶板2、活动小车3三部分装配起来,顶置装置1下端跨过整机运输机架9,L型顶板2起托住机舱罩10,调整丝杠5和千斤顶7直到机舱罩转子轴密封刷环与主轴端面11处的主轴,塔筒密封刷环与偏航轴承支座间的同轴度达到装配要求。
上述虽然结合附图对发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,所属领域技术人员应该明白,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。                   

Claims (3)

1.一种风机机舱罩组装调整工装,其特征是,包括顶置装置 、L型顶板、活动小车,顶置装置与L型顶板连接,顶置装置的上部设有调整风机机舱罩水平移动的调整装置、底部设有小车导轨,活动小车与小车导轨配合,活动小车包括支座,支座上设有千斤顶,下部设有铁轮。
2.如权利要求1所述的风机机舱罩组装调整工装,其特征是,所述铁轮轴向中间部位的外圆开设凹槽,小车导轨中间设凸起,导轨凸起与铁轮凹槽位置配合。
3.如权利要求1所述的风机机舱罩组装调整工装,其特征是,所述调整装置包括相配合的丝杠、螺母,螺母设在顶置装置的上端,丝杠一端与L型顶板联接。
CN201210113005.6A 2012-04-18 2012-04-18 风机机舱罩组装调整工装 Active CN102632375B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210113005.6A CN102632375B (zh) 2012-04-18 2012-04-18 风机机舱罩组装调整工装

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210113005.6A CN102632375B (zh) 2012-04-18 2012-04-18 风机机舱罩组装调整工装

Publications (2)

Publication Number Publication Date
CN102632375A true CN102632375A (zh) 2012-08-15
CN102632375B CN102632375B (zh) 2015-07-15

Family

ID=46617047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210113005.6A Active CN102632375B (zh) 2012-04-18 2012-04-18 风机机舱罩组装调整工装

Country Status (1)

Country Link
CN (1) CN102632375B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103056800A (zh) * 2012-12-14 2013-04-24 北车风电有限公司 大型风力发电机组机舱罩定位工装及调整同轴度的方法
CN103753176A (zh) * 2014-01-15 2014-04-30 西安电子科技大学 置于圆柱舱段对接装置内的手动微调机构
CN105406660A (zh) * 2015-12-10 2016-03-16 中船重工电机科技股份有限公司 塔上风机转子的舱内抽装机构
CN107009099A (zh) * 2017-05-05 2017-08-04 江苏振江新能源装备股份有限公司 金属机舱罩的制造方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2621150Y (zh) * 2003-07-01 2004-06-23 邯郸钢铁集团有限责任公司 线材打捆滚圆装置
CN101342657A (zh) * 2008-07-29 2009-01-14 四川成都成工工程机械股份有限公司 轴向对接装配机械调整装置
CN102079043A (zh) * 2010-12-10 2011-06-01 广汽本田汽车有限公司 一种车门拆装支承装置
CN201881138U (zh) * 2010-12-15 2011-06-29 北车风电有限公司 大型风力发电机主轴与齿轮箱对中装置
CN201988904U (zh) * 2011-02-22 2011-09-28 北车风电有限公司 风机底架调整装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2621150Y (zh) * 2003-07-01 2004-06-23 邯郸钢铁集团有限责任公司 线材打捆滚圆装置
CN101342657A (zh) * 2008-07-29 2009-01-14 四川成都成工工程机械股份有限公司 轴向对接装配机械调整装置
CN102079043A (zh) * 2010-12-10 2011-06-01 广汽本田汽车有限公司 一种车门拆装支承装置
CN201881138U (zh) * 2010-12-15 2011-06-29 北车风电有限公司 大型风力发电机主轴与齿轮箱对中装置
CN201988904U (zh) * 2011-02-22 2011-09-28 北车风电有限公司 风机底架调整装置

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103056800A (zh) * 2012-12-14 2013-04-24 北车风电有限公司 大型风力发电机组机舱罩定位工装及调整同轴度的方法
CN103056800B (zh) * 2012-12-14 2015-03-18 北车风电有限公司 大型风力发电机组机舱罩定位工装及调整同轴度的方法
CN103753176A (zh) * 2014-01-15 2014-04-30 西安电子科技大学 置于圆柱舱段对接装置内的手动微调机构
CN103753176B (zh) * 2014-01-15 2016-02-10 西安电子科技大学 置于圆柱舱段对接装置内的手动微调机构
CN105406660A (zh) * 2015-12-10 2016-03-16 中船重工电机科技股份有限公司 塔上风机转子的舱内抽装机构
CN107009099A (zh) * 2017-05-05 2017-08-04 江苏振江新能源装备股份有限公司 金属机舱罩的制造方法

Also Published As

Publication number Publication date
CN102632375B (zh) 2015-07-15

Similar Documents

Publication Publication Date Title
CN102632375B (zh) 风机机舱罩组装调整工装
CN102126689A (zh) 风力发电机塔筒自动爬升机
CN107416739A (zh) 电力检修平台及电力检修车
CN201990448U (zh) 风力发电机塔筒自动爬升机
CN101723272A (zh) 采用外转子永磁电机直驱绞车装置
CN203650467U (zh) 一种柜体框架翻转工作台
CN203827157U (zh) 一种变频器外壳
CN203982958U (zh) 一种通风降噪干式供电变压装置
CN204772354U (zh) 变径托举工装
CN204059994U (zh) 一种组对平台
CN103588131B (zh) 一种八点同步自升降维修平台
CN103501084A (zh) 用于永磁电机总装的导向装配方法
CN203537185U (zh) 用于永磁电机总装的导向装配工装
CN204376648U (zh) 一种伺服电机定转子装配工装
CN102826468A (zh) 一种电驱动防爆吊车
CN207378721U (zh) 一种高效追光太阳能路灯
CN205058652U (zh) 四线辐照牵引机
CN204897264U (zh) 用于输电线路铺设的提升机
CN110965818B (zh) 一种舞台用万向车台的驱动装置及控制系统
CN204493076U (zh) 风叶动态传动装置及应用其的水力发电机和风力发电机
CN204290518U (zh) 一种超薄电机
CN207698762U (zh) 聚合物锂电池板喷码机的旋转搬送机构
CN203848106U (zh) 电动升降投光灯
CN208063009U (zh) 一种拆装电机用工装平台
CN107313894A (zh) 一种小型风力发电系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant