CN102605938A - Building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs - Google Patents
Building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs Download PDFInfo
- Publication number
- CN102605938A CN102605938A CN2012101042479A CN201210104247A CN102605938A CN 102605938 A CN102605938 A CN 102605938A CN 2012101042479 A CN2012101042479 A CN 2012101042479A CN 201210104247 A CN201210104247 A CN 201210104247A CN 102605938 A CN102605938 A CN 102605938A
- Authority
- CN
- China
- Prior art keywords
- leveling
- bar
- floating screed
- guiding ruler
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention relates to a building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs. The guiding rule comprises a tubular section with a notch on one side, a supporting tube is mounted in the tubular section, a magnet is mounted above the supporting tube, a lever is mounted below the supporting tube and extends out of the tubular section via a strip-shaped hole arranged at the bottom of the tubular section, and a fracture is arranged on the magnet and corresponds to the notch. The guiding rule is a tool for realizing quick and effective leveling for a wall plastering procedure in current building construction, by the aid of a laser perpendicular and horizontal cast instrument which can realize rapid cast positioning and is widely used in the current decoration industry, the finished assorted punched ribs are rapidly adhered on a wall via cement mortar, so that ribs with high flatness and low friction are formed and bring great convenience for downstream construction, construction skills of workers can be improved integrally, and construction efficiency is increased by multiple times as compared with the original construction efficiency. The building wall-whitewashing, plastering and leveling or ground leveling guiding rule and the assorted punched ribs can effectively reduce labor intensity of the workers, improve work efficiency, enhance construction quality and are quite simple and convenient in operation.
Description
Technical field
The present invention relates to the building engineering construction apparatus field, particularly a kind of building white washed wall plaster leveling or floor leveling are with guiding ruler and supporting floating screed bar.
Background technology
Usually building operations is built by laying bricks or stones or is built will postorder to plaster wall after accomplishing at metope and plasters, and the metope state in this time is that little fluctuating is arranged, and wall facade planeness is on duty mutually, and 1~2 centimeter error even higher is all arranged usually.This just need plaster with just high the whole smooth of the low process of making up a deficiency realization metope of mending through white washed wall.The wall plastering levelling is normally earlier after metope is measured the line of face,mounting of plastering by vertical line and horizon in traditional building construction process; On former basic metope, do reference through pulling nylon wire, smear pat of cement piece or cement strip muscle make plaster high point several, then whole metope is scraped the stop-off slurry; The workman scrapes with the chi bar and swings; Through relying on the cement rib, progressively make up a deficiency, be able to floating one metope at last.The method was continued to use a lot of years; Its shortcoming is that labour intensity is big, and the quality technology control method is rough simple, relies on bigger to workman personal experience technical level; The skilled worker of varying level often; Construction quality is uneven, and efficiency of construction is also very low simultaneously, can not guarantee comprehensively that construction quality reaches the unified standard requirement.
Summary of the invention
The object of the invention just is to overcome the defective of above-mentioned prior art, and a kind of effective reduction labour intensity is provided, and efficient is high, reliable in quality, and building white washed wall plaster leveling or floor leveling easy and simple to handle are used guiding ruler;
Another object of the present invention provides above-mentioned and the matching used floating screed bar of guiding ruler.
The objective of the invention is to be achieved through following technical scheme:
A kind of building white washed wall plaster leveling or floor leveling guiding ruler; It is characterized in that said guiding ruler comprises a tubulose section bar of trough of belt mouth on one side; In this tubulose section bar, support tubing is installed; The top of supporting tubing is equipped with magnet piece; The below is equipped with spanner; Spanner stretches out outside the tubulose section bar by the set bar hole in tubulose section bar bottom, has disconnected joint mouth at the corresponding notch place of magnet piece;
Above-mentioned tubulose section bar and support pipe material by adopting non iron square pipe;
Said support tubing below is installed with the cylinder ball through spring leaf and axle;
The side of said tubulose section bar is provided with graduation mark;
The floating screed bar that a kind of supporting guiding ruler uses, it is characterized in that: said floating screed bar main body section is the T type, accompanies the long-tail folder on it during use;
Said long-tail is clipped on the end face of floating screed bar vertical plane
Have several holes on the horizontal plane of said floating screed bar.
The present invention is the instrument that solves the fast effective levelling of wall plastering operation in the current building operations; Through producing a kind of guiding ruler and matching used finished product floating screed bar with special construction; And utilize instantly the horizontal level of the widely used laser vertical of repairs profession to throw the line location rapidly; On metope, paste finished product PVC floating screed bar fast, form the rib of high-flatness, low friction, bring great convenience for back operation construction with cement mortar; Workman's construction technical ability there is the lifting of an integral body, and makes efficiency of construction improve several times than in the past.
Guiding ruler of the present invention and supporting use floating screed bar can effectively reduce working strength of workers, increase work efficiency, and promote construction quality, operate also very easy.
Leveling unit of the present invention is equally applicable to floor leveling.
Description of drawings
Fig. 1 is the upward view of floating screed bar among the present invention;
Fig. 2 is the sectional view of floating screed bar among the present invention;
Fig. 3 is the cooperate figure of floating screed bar among the present invention with the long-tail folder;
Fig. 4 is guiding ruler sectional drawing among the present invention;
Fig. 5 is guiding ruler sectional view among the present invention;
Fig. 6 is guiding ruler among the present invention and floating screed bar absorption cooperation sketch map.
The specific embodiment
Below by embodiment technical scheme of the present invention is made further description:
A kind of building white washed wall plaster leveling of the present invention or floor leveling guiding ruler and supporting use floating screed bar are realized function by the horizontal level of the laser vertical of generally using on the market at present.
Guiding ruler of the present invention comprises a tubulose section bar 3 of trough of belt mouth on one side; In this tubulose section bar 3, be equipped with and support tubing 5; The top of supporting tubing 5 is equipped with magnet piece 4; Magnet piece 4 corresponding notch places have the joint mouth 10 that breaks, and this disconnected joint mouth 10 can hold the bottom surface entering of long-tail folder 2 just and adsorbed by magnet piece.In order to guarantee construction, tubulose section bar 3 all adopts the non iron square pipe with support tubing 5.
Below support tubing 5, spanner 8 is installed also, this spanner 8 stretches out outside the tubulose section bar 3 through the set bar hole 9 in tubulose section bar 3 bottoms, and this is provided with mainly is to be convenient to separating of floating screed bar and guiding ruler.For more convenient moving magnet piece 4, realize floating screed bar convenient with guiding ruler, effective separation, support tubing 5 below also through spring leaf 6 with spool be installed with cylinder ball 7.
The side of above-mentioned tubulose section bar 3 also is provided with graduation mark 11.
Matching used floating screed bar 1 main body section of the present invention and guiding ruler is the T type, and its vertical plane is shorter than horizontal plane.On its horizontal plane, have several holes 12, purpose is more firm when guaranteeing to stick on the metope.Long-tail folder 2 is clipped on the end face of floating screed bar 1 vertical plane.
Be the concrete use of this device below:
Metope is being plastered wall when plastering, testing the situation of institute's degree of plainness for wall surface of will plastering with laser level earlier, holding whole wall plastering thickness, regulating laser level then and locate behind the vertical line motionlessly on the wall limit, beginning to paste floating screed bar 1 with this.Pressing several irony long-tail folders 2 on the certain intervals folder on the floating screed bar 1 earlier; The floating screed bar 1 that will accompany long-tail folder 2 then suffers in floating screed bar guiding ruler trough of belt mouth one side; Long-tail presss from both sides just in time disconnected joint mouthful 10 places on the aligned notches, 2 bottom surfaces; Because disconnected joint mouthful 10 places are provided with magnet piece 4, at this moment the pvc floating screed bar 1 of gentle matter just is adsorbed onto rapidly on the straight guiding ruler.Be coated with scrape one strip concrete grey aspect at metope with spatula with plain cement mortar then, local blade coating also can, the one side with the floating screed bar on the floating screed bar guiding ruler with holes 1 is pressed on the concrete grey aspect then; Be radiated on the floating screed bar guiding ruler outer tube wall by the good vertical line of laser level adjustment; After pushing the vertical line that guiding ruler sends the corresponding level of graduation mark 11 adjustment on the tube wall, keep motionless, the other end that pull bar hole 9 with the spanner on the guiding ruler 8 this moment, at this moment the magnet piece in the guiding ruler 4 and long-tail folder 2 are just wrong position; Lost suction to long-tail folder 2; Floating screed bar 1 has broken away from floating screed bar guiding ruler naturally, and floating screed bar 1 just has been bonded on the metope by the position of adjusting at this moment, takes away 1 guiding ruler then; And taking off long-tail folder 2, it is 2 reusable that long-tail presss from both sides.After one wall located vertical line with level; Level no longer moves, thus the graduation mark of assert on the corresponding guiding ruler of laser rays through level, to having pasted several floating screed bars on the metope; These floating screed bars are all on a vertical elevation; So just guaranteed the higher unified planeness of these floating screed bars, just can carry out subsequent processing then, metope has been carried out the mortar knife filling.Owing to had the very high floating screed row culture of planeness to lean on muscle, and this kind is smoothly fluent by muscle, swings the light leicht fallen D/A of white washed wall mortar so the utilization floating rule is scraped.If the utilization Mortar spraying machine sprays knife filling, work efficiency can improve more than three times than the old law construction, has really realized the construction of high-efficiency high-quality.
Claims (7)
1. building white washed wall plaster leveling or floor leveling are used guiding ruler; It is characterized in that said guiding ruler comprises a tubulose section bar (3) of trough of belt mouth on one side; In this tubulose section bar (3), be equipped with and support tubing (5), the top of supporting tubing (5) is equipped with magnet piece (4), and the below is equipped with spanner (8); Spanner (8) stretches out outside the tubulose section bar (3) through the set bar hole (9) in tubulose section bar (3) bottom, has disconnected joint mouthful (10) at the corresponding notch place of magnet piece (4).
2. plaster according to the described building of claim 1 white washed wall or floor leveling use guiding ruler, it is characterized in that: above-mentioned tubulose section bar (3) and support tubing (5) employing non iron square pipe.
3. according to claim 1 or 2 described buildings white washed wall is plastered or floor leveling use guiding ruler, it is characterized in that: said support tubing (5) below is installed with cylinder ball (7) through spring leaf (6) and spool (13).
4. according to claim 1 or 2 described buildings white washed wall is plastered or floor leveling is used guiding ruler, it is characterized in that: the side of said tubulose section bar (3) is provided with graduation mark (11).
5. the floating screed bar that uses of the said guiding ruler of a supporting claim 1, it is characterized in that: said floating screed bar (1) main body section is the T type, accompanies long-tail folder (2) on it during use.
6. according to the described floating screed bar of claim 5, it is characterized in that: said long-tail folder (2) is clipped on the end face of floating screed bar (1) vertical plane.
7. according to the described floating screed bar of claim 5, it is characterized in that: have several holes (12) on the horizontal plane of said floating screed bar (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210104247.9A CN102605938B (en) | 2012-04-11 | 2012-04-11 | Building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210104247.9A CN102605938B (en) | 2012-04-11 | 2012-04-11 | Building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102605938A true CN102605938A (en) | 2012-07-25 |
CN102605938B CN102605938B (en) | 2014-10-01 |
Family
ID=46523667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210104247.9A Expired - Fee Related CN102605938B (en) | 2012-04-11 | 2012-04-11 | Building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102605938B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104196214A (en) * | 2014-09-25 | 2014-12-10 | 张涛 | Screeding technology and screeding ruler for plaster work |
CN107288328A (en) * | 2017-07-19 | 2017-10-24 | 广东星艺装饰集团股份有限公司 | A kind of levelling method of ground floating screed and use instrument |
CN108801198A (en) * | 2018-04-18 | 2018-11-13 | 威创集团股份有限公司 | A kind of device and detection method of display big-wall flatness detection |
CN115380772A (en) * | 2020-10-30 | 2022-11-25 | 广州星卫草业股份有限公司 | Construction method for leveling natural lawn sports ground with high flatness |
CN116181024A (en) * | 2023-04-26 | 2023-05-30 | 山西建筑工程集团有限公司 | Wall surface punching rib leveling auxiliary device for building construction |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2117421U (en) * | 1992-03-07 | 1992-09-30 | 姚洪钧 | Telescopic template |
CN2245636Y (en) * | 1996-05-23 | 1997-01-22 | 匡彦博 | Building reinforcing bar |
CN2701969Y (en) * | 2004-05-21 | 2005-05-25 | 赵文学 | Spring running rule |
ES2267356A1 (en) * | 2004-08-19 | 2007-03-01 | Gualberto Dan. San Gil Medina | Guide ruler for mortar coatings applied on e.g. aluminum, PVC, wood, has spring, which connects between fixed short section and slidable long section, which biases long section into sliding motion relative to fixed section |
CN201068642Y (en) * | 2007-07-05 | 2008-06-04 | 赵景科 | Composite guiding rule for brick layer plastering |
CN201649572U (en) * | 2010-01-22 | 2010-11-24 | 深圳广田装饰集团股份有限公司 | Guiding rule for building plastering |
CN201714038U (en) * | 2010-07-07 | 2011-01-19 | 王汉猷 | Plastic hollow splayed plaster ground plate |
CN202530724U (en) * | 2012-04-11 | 2012-11-14 | 王建华 | Guiding rule for building wall whitewashing and plastering leveling or ground leveling and matched impact fillet |
-
2012
- 2012-04-11 CN CN201210104247.9A patent/CN102605938B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2117421U (en) * | 1992-03-07 | 1992-09-30 | 姚洪钧 | Telescopic template |
CN2245636Y (en) * | 1996-05-23 | 1997-01-22 | 匡彦博 | Building reinforcing bar |
CN2701969Y (en) * | 2004-05-21 | 2005-05-25 | 赵文学 | Spring running rule |
ES2267356A1 (en) * | 2004-08-19 | 2007-03-01 | Gualberto Dan. San Gil Medina | Guide ruler for mortar coatings applied on e.g. aluminum, PVC, wood, has spring, which connects between fixed short section and slidable long section, which biases long section into sliding motion relative to fixed section |
CN201068642Y (en) * | 2007-07-05 | 2008-06-04 | 赵景科 | Composite guiding rule for brick layer plastering |
CN201649572U (en) * | 2010-01-22 | 2010-11-24 | 深圳广田装饰集团股份有限公司 | Guiding rule for building plastering |
CN201714038U (en) * | 2010-07-07 | 2011-01-19 | 王汉猷 | Plastic hollow splayed plaster ground plate |
CN202530724U (en) * | 2012-04-11 | 2012-11-14 | 王建华 | Guiding rule for building wall whitewashing and plastering leveling or ground leveling and matched impact fillet |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104196214A (en) * | 2014-09-25 | 2014-12-10 | 张涛 | Screeding technology and screeding ruler for plaster work |
CN104196214B (en) * | 2014-09-25 | 2016-08-24 | 张涛 | The floating screed technique of a kind of plastering engineering and floating screed chi |
CN107288328A (en) * | 2017-07-19 | 2017-10-24 | 广东星艺装饰集团股份有限公司 | A kind of levelling method of ground floating screed and use instrument |
CN108801198A (en) * | 2018-04-18 | 2018-11-13 | 威创集团股份有限公司 | A kind of device and detection method of display big-wall flatness detection |
CN108801198B (en) * | 2018-04-18 | 2020-09-04 | 威创集团股份有限公司 | Device for displaying flatness detection of large wall and detection method |
CN115380772A (en) * | 2020-10-30 | 2022-11-25 | 广州星卫草业股份有限公司 | Construction method for leveling natural lawn sports ground with high flatness |
CN116181024A (en) * | 2023-04-26 | 2023-05-30 | 山西建筑工程集团有限公司 | Wall surface punching rib leveling auxiliary device for building construction |
Also Published As
Publication number | Publication date |
---|---|
CN102605938B (en) | 2014-10-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102605938B (en) | Building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs | |
CN201502164U (en) | Tool for paving floor tile | |
CN202530724U (en) | Guiding rule for building wall whitewashing and plastering leveling or ground leveling and matched impact fillet | |
CN203947743U (en) | Wall surface mortar strikes off trowelling machine exclusive guideway system | |
CN207032897U (en) | A kind of brick wall cement quickly lays instrument | |
CN103899072A (en) | Hanging member for wet hanging of stone or tiles and wet hanging method | |
CN105822048A (en) | Wall surface plastering robot | |
CN104018650B (en) | Wall plastering plane rushes muscle bar and using method thereof | |
CN206158117U (en) | Wall ground floating screed instrument of making level | |
CN203769273U (en) | Rapid floor tile laying leveling device | |
RU132826U1 (en) | BUILDING Trowel | |
CN103122695A (en) | Tool for controlling pouring thickness of concrete floor | |
CN204238529U (en) | Building site troweling machine | |
CN104963492A (en) | Paving tool and paving method for facing brick | |
CN205224547U (en) | Building white washed wall is plastered and is made level or ground guiding ruler of usefulness of making level | |
CN205822733U (en) | A kind of wall-surface screeding robot | |
CN104060807A (en) | Guide rail system special for wall mortar scraping and trowelling machine | |
CN208934358U (en) | One kind being used for the compound floating screed device of plastering on inner walls gypsum | |
CN102277954B (en) | Plastering device | |
JP5016147B1 (en) | Plasterer used for tile adhesive construction method | |
CN203947744U (en) | The special-purpose metope detent mechanism of a kind of wall surface mortar plastering machine guide rail | |
CN104775602A (en) | Brick paving method and special brick paving clamp | |
CN206189879U (en) | Plaster and get rid of thick liquid device | |
CN111910888A (en) | Method for making screeding of wall decoration gypsum plaster | |
CN211974219U (en) | Special plastering and scraping plate for mechanical sand-blasting mortar wall surface |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141001 Termination date: 20160411 |
|
CF01 | Termination of patent right due to non-payment of annual fee |