CN111910888A - Method for making screeding of wall decoration gypsum plaster - Google Patents
Method for making screeding of wall decoration gypsum plaster Download PDFInfo
- Publication number
- CN111910888A CN111910888A CN202010751832.2A CN202010751832A CN111910888A CN 111910888 A CN111910888 A CN 111910888A CN 202010751832 A CN202010751832 A CN 202010751832A CN 111910888 A CN111910888 A CN 111910888A
- Authority
- CN
- China
- Prior art keywords
- aluminum alloy
- square tube
- wall surface
- alloy square
- gypsum mortar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/02—Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
- E04F21/04—Patterns or templates; Jointing rulers
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Producing Shaped Articles From Materials (AREA)
Abstract
The invention discloses a method for manufacturing a screeding line of wall decoration gypsum plaster, which is used for manufacturing a plaster scraping and separating tool consisting of a Y-shaped rod piece, a connecting pipe and a fishing line, wherein the fishing line is connected with two top ends of the Y-shaped rod piece; determining a wall surface reinforcement positioning line, and measuring the elevation of the wall surface reinforcement according to the positioning line by using a horizontal laser instrument; after gypsum mortar is fully hung on the bottom surface of the aluminum alloy square tube, the aluminum alloy square tube is abutted to the position of a bead punching positioning line of the wall surface, and the aluminum alloy square tube is adjusted to the position of an elevation according to the elevation of the bead punching of the wall surface; and scraping the periphery of the bottom surface of the aluminum alloy square tube by adopting gypsum mortar, embedding a fish line at the top end of a Y-shaped rod piece of a paste scraping and separating tool between the bottom surface of the aluminum alloy square tube and the gypsum mortar after the gypsum mortar is initially set, and scraping along the bottom surface of the aluminum alloy square tube to separate the aluminum alloy square tube from the gypsum mortar, wherein the gypsum mortar forms a wall surface reinforcement. The method reduces the manufacturing process of the wall surface punching rib, improves the verticality and the flatness of the wall surface punching rib, reduces the construction period, improves the construction efficiency, is simple to operate, and reduces the cost of work materials.
Description
Technical Field
The invention relates to the technical field of constructional engineering, in particular to a method for manufacturing a screeding of wall decoration gypsum plastering.
Background
When the wall decoration and finishing engineering plastering construction is carried out, the base layer of most walls is plastered, the quality control of the wall decoration plastering construction is very strict, the perpendicularity and the flatness of the wall are not allowed to be larger than 3-4 mm, and therefore the bottom layer gypsum construction quality of the decoration plastering is very important. Generally, when a wall surface decoration surface layer is constructed, firstly, mortar cakes are manufactured on a wall surface according to the requirements of the perpendicularity and the flatness of the wall surface, and then wall surface reinforcement is carried out through the mortar cakes, wherein the wall surface reinforcement is a straight datum line from top to bottom which is manufactured by using mortar on the wall surface according to the mortar from top to bottom in advance before the cement mortar is plastered on the wall surface so as to improve the perpendicularity and the flatness of the plastered wall surface. However, if the space between the ash cakes is too large, or the ash cakes on the large-area wall surface are too many, the verticality and the flatness of the wall surface punched ribs and the subsequently painted wall surface are difficult to control, the quality of wall surface decoration construction is seriously influenced, the verticality of the wall surface punched ribs cannot be guaranteed, and the wall surface punched ribs manufactured according to the ash cakes are low in efficiency, long in period and labor-consuming and material-consuming.
Disclosure of Invention
The invention aims to solve the technical problem of providing a method for manufacturing the screeding of wall decoration gypsum plastering, which overcomes the defects of the traditional wall screeding operation, reduces the wall screeding manufacturing procedures, improves the verticality and the flatness of the wall screeding, reduces the construction period, improves the construction efficiency, has simple operation and reduces the material cost.
In order to solve the technical problem, the method for manufacturing the screeding of the wall decoration gypsum plaster comprises the following steps:
manufacturing a paste scraping and separating tool, wherein the paste scraping and separating tool comprises a Y-shaped rod piece, a connecting pipe and a fishing line, the bottom end of the Y-shaped rod piece is inserted into the top end of the connecting pipe, and the fishing line is connected with the two top ends of the Y-shaped rod piece;
determining a wall surface reinforcement punching positioning line through a wall surface design drawing, and measuring the elevation of the wall surface reinforcement punching according to the positioning line by using a horizontal laser instrument;
thirdly, hanging gypsum mortar on the bottom surface of the aluminum alloy square tube, enabling the aluminum alloy square tube full of gypsum mortar to lightly abut against the position of a bead punching positioning line of the wall surface, and adjusting the aluminum alloy square tube to an elevation position according to the wall surface bead punching elevation measured by a horizontal laser instrument;
and fourthly, scraping the periphery of the bottom surface of the aluminum alloy square tube by adopting gypsum mortar, embedding a fish line at the top end of a Y-shaped rod piece of a paste scraping and separating tool between the bottom surface of the aluminum alloy square tube and the gypsum mortar after the gypsum mortar is initially set, and scraping the bottom surface of the aluminum alloy square tube to separate the aluminum alloy square tube from the gypsum mortar, wherein the gypsum mortar forms a wall surface reinforcement.
Further, the length of the aluminum alloy square pipe is 2 meters.
Further, the Y-shaped rod piece of the paste scraping and separating tool is made of phi 6 steel bars, the connecting pipe is a PVC pipe, and the bottom end of the Y-shaped rod piece is tightly matched with an inner ring of the PVC pipe.
The invention adopts the technical scheme that the screeding manufacturing method of the wall decoration gypsum plaster adopts the method to manufacture the plaster scraping separation tool which consists of the Y-shaped rod piece, the connecting pipe and the fishing line, wherein the fishing line is connected with the two top ends of the Y-shaped rod piece; determining a wall surface reinforcement positioning line, and measuring the elevation of the wall surface reinforcement according to the positioning line by using a horizontal laser instrument; after gypsum mortar is fully hung on the bottom surface of the aluminum alloy square tube, the aluminum alloy square tube is abutted to the position of a bead punching positioning line of the wall surface, and the aluminum alloy square tube is adjusted to the position of an elevation according to the elevation of the bead punching of the wall surface; and scraping the periphery of the bottom surface of the aluminum alloy square tube by adopting gypsum mortar, embedding a fish line at the top end of a Y-shaped rod piece of a paste scraping and separating tool between the bottom surface of the aluminum alloy square tube and the gypsum mortar after the gypsum mortar is initially set, and scraping along the bottom surface of the aluminum alloy square tube to separate the aluminum alloy square tube from the gypsum mortar, wherein the gypsum mortar forms a wall surface reinforcement. The method overcomes the defects of the traditional wall surface rib punching operation, reduces the wall surface rib punching manufacturing process, improves the verticality and the flatness of the wall surface rib punching, reduces the construction period, improves the construction efficiency, is simple to operate, and reduces the material cost.
Drawings
The invention is described in further detail below with reference to the following figures and embodiments:
fig. 1 is a schematic structural view of a paste scraping and separating tool in the method for manufacturing the punching rib.
Detailed Description
Embodiment as shown in fig. 1, the method for making a screeding line of wall decoration gypsum plastering of the present invention comprises the following steps:
the method comprises the following steps of firstly, manufacturing a paste scraping and separating tool, wherein the paste scraping and separating tool comprises a Y-shaped rod piece 1, a connecting pipe 2 and a fishing line 3, the bottom end of the Y-shaped rod piece 1 is inserted into the top end of the connecting pipe 2, and the fishing line 3 is connected with the two top ends of the Y-shaped rod piece 1;
determining a wall surface reinforcement punching positioning line through a wall surface design drawing, and measuring the elevation of the wall surface reinforcement punching according to the positioning line by using a horizontal laser instrument;
thirdly, hanging gypsum mortar on the bottom surface of the aluminum alloy square tube, enabling the aluminum alloy square tube full of gypsum mortar to lightly abut against the position of a bead punching positioning line of the wall surface, and adjusting the aluminum alloy square tube to an elevation position according to the wall surface bead punching elevation measured by a horizontal laser instrument;
and fourthly, scraping the periphery of the bottom surface of the aluminum alloy square tube by adopting gypsum mortar, embedding a fish line at the top end of a Y-shaped rod piece of a paste scraping and separating tool between the bottom surface of the aluminum alloy square tube and the gypsum mortar after the gypsum mortar is initially set, and scraping the bottom surface of the aluminum alloy square tube to separate the aluminum alloy square tube from the gypsum mortar, wherein the gypsum mortar forms a wall surface reinforcement.
Preferably, the length of the aluminum alloy square tube is 2 meters. The 2 m aluminum alloy square tube can form the wall surface rib with the corresponding length, and the requirements of most of wall surface rib manufacturing are met.
Preferably, the Y-shaped rod piece 1 of the paste scraping and separating tool is made of phi 6 steel bars, the connecting pipe 2 is a PVC pipe, and the bottom end of the Y-shaped rod piece 1 is tightly matched with an inner ring of the PVC pipe.
The method can reduce the procedure of manufacturing the mortar cake during wall plastering construction, greatly improve the construction progress, and solve the technical problem of larger wall plastering deviation caused by more mortar cakes, overlarge space and the like during the wall plastering construction.
Claims (3)
1. A method for manufacturing a screeding for wall decoration gypsum plastering is characterized by comprising the following steps:
manufacturing a paste scraping and separating tool, wherein the paste scraping and separating tool comprises a Y-shaped rod piece, a connecting pipe and a fishing line, the bottom end of the Y-shaped rod piece is inserted into the top end of the connecting pipe, and the fishing line is connected with the two top ends of the Y-shaped rod piece;
determining a wall surface reinforcement punching positioning line through a wall surface design drawing, and measuring the elevation of the wall surface reinforcement punching according to the positioning line by using a horizontal laser instrument;
thirdly, hanging gypsum mortar on the bottom surface of the aluminum alloy square tube, enabling the aluminum alloy square tube full of gypsum mortar to lightly abut against the position of a bead punching positioning line of the wall surface, and adjusting the aluminum alloy square tube to an elevation position according to the wall surface bead punching elevation measured by a horizontal laser instrument;
and fourthly, scraping the periphery of the bottom surface of the aluminum alloy square tube by adopting gypsum mortar, embedding a fish line at the top end of a Y-shaped rod piece of a paste scraping and separating tool between the bottom surface of the aluminum alloy square tube and the gypsum mortar after the gypsum mortar is initially set, and scraping the bottom surface of the aluminum alloy square tube to separate the aluminum alloy square tube from the gypsum mortar, wherein the gypsum mortar forms a wall surface reinforcement.
2. The method for making the screeding of wall decorative gypsum plaster according to claim 1, characterized in that: the length of the aluminum alloy square tube is 2 meters.
3. The method for making the screeding of wall decorative gypsum plaster according to claim 1, characterized in that: the Y-shaped rod piece of the paste scraping and separating tool is made of phi 6 steel bars, the connecting pipe is a PVC pipe, and the bottom end of the Y-shaped rod piece is tightly matched with an inner ring of the PVC pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010751832.2A CN111910888A (en) | 2020-07-30 | 2020-07-30 | Method for making screeding of wall decoration gypsum plaster |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010751832.2A CN111910888A (en) | 2020-07-30 | 2020-07-30 | Method for making screeding of wall decoration gypsum plaster |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111910888A true CN111910888A (en) | 2020-11-10 |
Family
ID=73286401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010751832.2A Pending CN111910888A (en) | 2020-07-30 | 2020-07-30 | Method for making screeding of wall decoration gypsum plaster |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111910888A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114809492A (en) * | 2022-04-13 | 2022-07-29 | 安徽三建工程有限公司 | Gypsum mortar plastering wall surface screeding construction method |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102071792A (en) * | 2010-11-26 | 2011-05-25 | 中国建筑第四工程局有限公司 | Method for sticking cakes in plastering engineering by using laser |
CN103088994A (en) * | 2013-01-30 | 2013-05-08 | 深圳广田装饰集团股份有限公司 | Plastering fillet and constructional plastering method |
CN104018650A (en) * | 2014-06-19 | 2014-09-03 | 江苏嘉明合达工程机械有限公司 | Plane screeding rod for wall plastering and use method thereof |
CN104196214A (en) * | 2014-09-25 | 2014-12-10 | 张涛 | Screeding technology and screeding ruler for plaster work |
CN105926876A (en) * | 2016-06-21 | 2016-09-07 | 温州市华宁建筑机械有限公司 | Mechanized wall plastering construction method based on metal floating screed strips |
CN106677495A (en) * | 2016-11-02 | 2017-05-17 | 绿城装饰工程集团有限公司 | Multifunctional screeding machine with automatic perpendicularity correcting function |
CN106906987A (en) * | 2017-04-28 | 2017-06-30 | 中冶武汉冶金建筑研究院有限公司 | A kind of functional form floating screed does angle equipment and its installation method |
CN206829563U (en) * | 2017-06-14 | 2018-01-02 | 苏州鼎优美网络科技有限公司 | Flexible floating screed separator |
CN108708531A (en) * | 2018-06-06 | 2018-10-26 | 崔玉来 | A kind of big thick stick combination frame for line marking instrument floating screed method of aluminium alloy |
CN109779172A (en) * | 2019-03-10 | 2019-05-21 | 张春洋 | A kind of laser floating screed brushing gypsum plastering construction method |
-
2020
- 2020-07-30 CN CN202010751832.2A patent/CN111910888A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102071792A (en) * | 2010-11-26 | 2011-05-25 | 中国建筑第四工程局有限公司 | Method for sticking cakes in plastering engineering by using laser |
CN103088994A (en) * | 2013-01-30 | 2013-05-08 | 深圳广田装饰集团股份有限公司 | Plastering fillet and constructional plastering method |
CN104018650A (en) * | 2014-06-19 | 2014-09-03 | 江苏嘉明合达工程机械有限公司 | Plane screeding rod for wall plastering and use method thereof |
CN104196214A (en) * | 2014-09-25 | 2014-12-10 | 张涛 | Screeding technology and screeding ruler for plaster work |
CN105926876A (en) * | 2016-06-21 | 2016-09-07 | 温州市华宁建筑机械有限公司 | Mechanized wall plastering construction method based on metal floating screed strips |
CN106677495A (en) * | 2016-11-02 | 2017-05-17 | 绿城装饰工程集团有限公司 | Multifunctional screeding machine with automatic perpendicularity correcting function |
CN106906987A (en) * | 2017-04-28 | 2017-06-30 | 中冶武汉冶金建筑研究院有限公司 | A kind of functional form floating screed does angle equipment and its installation method |
CN206829563U (en) * | 2017-06-14 | 2018-01-02 | 苏州鼎优美网络科技有限公司 | Flexible floating screed separator |
CN108708531A (en) * | 2018-06-06 | 2018-10-26 | 崔玉来 | A kind of big thick stick combination frame for line marking instrument floating screed method of aluminium alloy |
CN109779172A (en) * | 2019-03-10 | 2019-05-21 | 张春洋 | A kind of laser floating screed brushing gypsum plastering construction method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114809492A (en) * | 2022-04-13 | 2022-07-29 | 安徽三建工程有限公司 | Gypsum mortar plastering wall surface screeding construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202090569U (en) | Plastering screed strip template | |
CN111910888A (en) | Method for making screeding of wall decoration gypsum plaster | |
CN107620449B (en) | Cylindrical surface annular screeding tool and cylindrical surface plastering method | |
CN102605938B (en) | Building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs | |
CN204662949U (en) | For concrete wall and masonry wall intersection aluminum alloy mould plate groove pressing device | |
CN208363632U (en) | A kind of concrete surface indent construction tool | |
CN104405115A (en) | Wall plastering flatness and perpendicularity control device and construction method | |
CN201588390U (en) | Screeding die plate for plastering | |
CN205369953U (en) | A ash cake preparation ware for engineering of plastering | |
CN204357080U (en) | Troweling machine for building | |
CN206158117U (en) | Wall ground floating screed instrument of making level | |
CN205846637U (en) | Distribution box, line box direct-burried device in inside and outside building block | |
CN103899075B (en) | Construction ruler and construction method for recycling mortar and calibrating plaster layer construction datum | |
CN205476491U (en) | Outer wall post template bottom consolidates uses pre -cast screw | |
CN104747798B (en) | The construction method of installation of kitchen and bath's drainpipe | |
CN205935589U (en) | Plaster dividing joint's joint -cutting mould of outer wall | |
CN106677495A (en) | Multifunctional screeding machine with automatic perpendicularity correcting function | |
CN209652996U (en) | A kind of observing and controlling tool built for closing in type circular inspection well | |
CN113550610A (en) | Tool for building quick-forming mortar joint | |
CN217461335U (en) | Ruler moving tool for gypsum mortar plastering wall surface screeding construction | |
CN112408189A (en) | Hoisting ring capable of being partially recycled | |
CN205062990U (en) | Mould for inspection shaft | |
CN202299444U (en) | Cement mortar construction device for building construction | |
CN211499639U (en) | Device for controlling precision of plastering mortar cake | |
CN211164557U (en) | Triangular concrete block manufacturing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201110 |
|
RJ01 | Rejection of invention patent application after publication |