CN217461335U - Ruler moving tool for gypsum mortar plastering wall surface screeding construction - Google Patents

Ruler moving tool for gypsum mortar plastering wall surface screeding construction Download PDF

Info

Publication number
CN217461335U
CN217461335U CN202220849863.6U CN202220849863U CN217461335U CN 217461335 U CN217461335 U CN 217461335U CN 202220849863 U CN202220849863 U CN 202220849863U CN 217461335 U CN217461335 U CN 217461335U
Authority
CN
China
Prior art keywords
handle
chi
fork
gypsum mortar
mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220849863.6U
Other languages
Chinese (zh)
Inventor
康建军
陈钢
程永水
郑贤好
郭茂林
潘文同
许昌虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Sanjian Engineering Co Ltd
Original Assignee
Anhui Sanjian Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Sanjian Engineering Co Ltd filed Critical Anhui Sanjian Engineering Co Ltd
Priority to CN202220849863.6U priority Critical patent/CN217461335U/en
Application granted granted Critical
Publication of CN217461335U publication Critical patent/CN217461335U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a chi instrument that moves of gypsum mortar plastering wall screed construction usefulness, take off the chi fork including handle, long handle takes off chi fork one end and connects in handle one end, and long handle takes off the chi fork other end radiation and separately becomes the Y-shaped, is connected with the fine rule between the Y-shaped opening part both ends. The utility model discloses can make things convenient for the staff to remove the guiding ruler that bonds with the mortar, whole process need not the high-order operation, directly can accomplish on ground, has eliminated the operation potential safety hazard of ascending a height.

Description

Ruler moving tool for gypsum mortar plastering wall surface screeding construction
Technical Field
The utility model relates to a building wall construction method field specifically is a chi instrument that moves of gypsum mortar plastering wall screeding construction usefulness.
Background
With the development of new technology and new process of building construction, the gypsum mortar as the plastering material of new wall comes into operation. The plastering gypsum mortar is a product which replaces cement mortar and is more updated, more environment-friendly and more economic and is mainly popularized in China, has the strength of cement, is healthier, more environment-friendly and more durable than cement, has the advantages of large bonding force, difficult pulverization, no cracking, no hollowing, no powder falling and the like, is simple and convenient to use, and saves the cost.
The traditional method for plastering the building wall by using the gypsum mortar comprises the following steps: cleaning a base layer, finding out a standard and pasting a plaster cake, punching a wall surface rib, plastering bottom ash, plastering surface ash, making a door and window hole corner protector, and plastering a cement windowsill. The wall surface reinforcement punching important link method comprises the following steps: setting plastering mortar standard ribs according to the flatness and verticality of a wall surface base layer, wherein the distance of the vertical standard ribs is preferably 1.2-1.5 m, and the width of the standard ribs is 30-50 mm. The concrete method is that plaster mortar is smeared between an upper mortar cake and a lower mortar cake which are made in advance, a scaffold is required to be erected at a high position for operation, then the mortar is scraped to be parallel and level to the mortar cakes by using a guiding rule and the upper mortar cake and the lower mortar cake as references, and then the standard ribs are vertically cut to be even, so that the standard rib manufacturing is completed. If the guiding rule is bonded with the mortar, high-level and low-level operation is needed to separate the guiding rule from the mortar, and potential safety hazards exist during the high-level operation.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a chi instrument of moving of gypsum mortar plastering wall screed construction usefulness to need the high-order operation to remove the problem of guiding rule when solving prior art building wall screed in-process guiding rule and mortar bonding.
In order to achieve the above purpose, the utility model adopts the technical scheme that:
the utility model provides a move chi instrument of gypsum mortar plastering wall screeding construction usefulness, includes handle, long handle and takes off the chi fork, long handle takes off chi fork one end and connects in handle one end, and the long handle takes off the chi fork other end radiation and separately becomes the Y-shaped, and is connected with the fine rule between long handle takes off chi fork other end Y-shaped opening part both ends.
Further, the handle is a telescopic handle.
Furthermore, the long-handle release fork comprises two sections of round steel, one end of each section of round steel is connected to one end of the handle, the other ends of the two sections of round steel are radiated and separated to form a fork-shaped opening, and the fine wire is connected between the other ends of the two sections of round steel.
The utility model is used for during the dashing muscle operation, when guiding rule and mortar bond, can avoid high-order operation. When the guiding rule needs to be removed, the thin line is arranged between the guiding rule and mortar, then the handle is pulled to move the thin line from top to bottom along the guiding rule, so that the guiding rule and the mortar can be separated, the guiding rule is convenient for a worker to remove, the whole process does not need high-position operation, and the operation can be directly completed on the ground. Therefore, the construction quality can be guaranteed, the working efficiency is improved, the labor intensity is reduced, and potential safety hazards of climbing operation are eliminated.
Drawings
Fig. 1 is a front view of the wall body constructed by the utility model.
Fig. 2 is a side view of the wall body constructed by the utility model.
Fig. 3 is a schematic view of the guiding rule structure of the present invention.
Fig. 4 is a structural schematic view of the long handle knife of the present invention.
Fig. 5 is a schematic structural view of the ruler moving tool of the present invention.
Detailed Description
The present invention will be further explained with reference to the drawings and examples.
The utility model discloses the structure is shown in fig. 5, moves chi instrument 3 and takes off chi fork 33 including telescopic handle 31, long handle, and long handle takes off chi fork 33 includes two sections round steel, and the one end at telescopic handle 31 is fixed to two sections round steel one end, and two sections round steel 33 other ends separately are the Y-type to the Y-type opening both ends that long handle took off chi fork 33 are connected with fine rule 32 between two sections round steel 33 other ends promptly.
Utilize the utility model discloses a have and move chi instrument, the utility model discloses still can be used to a new gypsum mortar plaster wall dowel construction method, this method includes following step:
step one, measuring and paying off: firstly, according to the size of a wall body 5 to be plastered, the position of a screed bar 4 on the wall surface of the wall body 5 is determined by combining the plastering construction process, the marking is made on the snapping line on the wall body 5, and if a plurality of screed bars 4 need to be constructed, the horizontal distance between every two adjacent screed bars 4 is 1.2-1.5 meters. And then, comprehensively evaluating according to factors such as the actual vertical and flatness conditions of the wall 5, the design thickness of the plastering surface and the like, and determining the specific thickness of the plastering layer. Erecting a laser leveling instrument 6, and adjusting the position of the laser leveling instrument 6 according to the thickness of the plastering layer to ensure that the surface scanned by a laser line emitted by the laser leveling instrument 6 is a reference surface of the plastering layer.
Step two, as shown in fig. 1 and 2, carrying out mortar construction on the marking ribs 4: cleaning the base layer of the wall body 5, taking gypsum mortar consistent with the plastering material of the wall body 5, and mixing with water. An appropriate guiding rule 1 is prepared according to the height of the wall body 5, and the structure of the guiding rule 1 is shown in figure 3 and is a commercially available aluminum alloy guiding rule. The guiding ruler 1 is in a vertical state, one side of the guiding ruler 1 faces the wall 5 as the inner side, gypsum mortar is smeared on the inner side of the guiding ruler 1, and the thickness of the gypsum mortar is slightly larger than the set thickness of the plastering layer. According to the elastic line position of the previous marking bar 4, the guiding ruler 1 is leaned against the position of the marking bar 4 on the wall surface of the wall body 5, wherein the guiding ruler 1 is tightly attached to the wall surface through the gypsum mortar smeared on the guiding ruler.
Step three, calibrating the marking ribs 4: and lightly pressing the guiding ruler 1 to ensure that the inner side surface (the surface coated with the gypsum mortar) of the guiding ruler 1 is superposed with the laser line emitted by the laser swinger 6. And (3) cutting off and scraping away the gypsum mortar overflowing from the side edge of the guiding rule 1 by using a long-handle opening knife 2.
The structure of the long-handle knife 2 is shown in fig. 4, and the long-handle knife comprises a telescopic handle 21, and a knife head 22 is fixedly connected to one end of the telescopic handle 21. The length of the telescopic handle 21 can be adjusted to meet the requirements of scraping gypsum mortar at different height positions.
Step four, marking reinforcement 4 mortar to remove the ruler: the guiding rule 1 is removed by using a rule moving tool 3. The thin line 32 on the long-handle release fork 33 is placed between the inner side face of the guiding rule 1 and the gypsum mortar, the thin line 32 is tightly attached to the guiding rule 1, and then the whole ruler moving tool 3 slides from top to bottom by pulling the telescopic handle 31, so that the guiding rule 1 is separated from the gypsum mortar. After separation, the guiding rule 1 is moved away to finish one-time reinforcement punching work, and a mark reinforcement 4 is formed on the wall surface by gypsum mortar.
Step five, checking and accepting the marked ribs 4: and repeating the second, third and fourth steps to finish the manufacture of a plurality of the mark ribs 4 on the whole wall body 5. And erecting the laser leveling instrument 6 again, providing a reference line for the plastering layer of the whole wall body 5, checking the verticality of each marking rib 4, the internal and external corner squareness of the adjacent wall, the thickness of the plastering layer and the like by matching with detection tools such as a steel tape, an angle square and the like, and performing rework and rectification if the verticality does not meet the requirement.
It can be seen that the utility model discloses can be used to the guiding ruler 1 separation when guiding ruler 1 bonds with the gypsum mortar, need not make the high-order operation of staff guiding ruler 1 high point and gypsum mortar separation, only need the staff stand and can accomplish guiding ruler 1 separation work on ground.
The embodiment of the utility model is only to the description that the preferred embodiment of the utility model goes on, it is not right the utility model discloses the design and scope are injectd, under the prerequisite that does not deviate from the utility model relates to an idea, the engineering technical staff in this field is right the various variants and the improvement that the technical scheme of the utility model made all should fall into the protection scope of the utility model, the technical content of the utility model application request protection has all been described in the claim.

Claims (3)

1. The utility model provides a move chi instrument of gypsum mortar plastering wall screeding construction usefulness which characterized in that, includes handle, long handle takes off the chi fork, long handle takes off chi fork one end and connects in handle one end, and the long handle takes off the chi fork other end radiation and separately becomes the Y-shaped, and is connected with the fine rule between long handle takes off the chi fork other end Y-shaped opening part both ends.
2. The ruler moving tool for the construction of the screed of the gypsum mortar plastered wall surface according to claim 1, wherein the handle is a telescopic handle.
3. The movable ruler tool for the plastering of gypsum mortar wall surface and the screeding construction according to claim 1, wherein the long-handle release ruler fork comprises two sections of round steel, one end of the two sections of round steel is connected to one end of the handle, the other end of the two sections of round steel is radiated and separated to form a fork-shaped opening, and the thin wire is connected between the other ends of the two sections of round steel.
CN202220849863.6U 2022-04-13 2022-04-13 Ruler moving tool for gypsum mortar plastering wall surface screeding construction Active CN217461335U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220849863.6U CN217461335U (en) 2022-04-13 2022-04-13 Ruler moving tool for gypsum mortar plastering wall surface screeding construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220849863.6U CN217461335U (en) 2022-04-13 2022-04-13 Ruler moving tool for gypsum mortar plastering wall surface screeding construction

Publications (1)

Publication Number Publication Date
CN217461335U true CN217461335U (en) 2022-09-20

Family

ID=83270414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220849863.6U Active CN217461335U (en) 2022-04-13 2022-04-13 Ruler moving tool for gypsum mortar plastering wall surface screeding construction

Country Status (1)

Country Link
CN (1) CN217461335U (en)

Similar Documents

Publication Publication Date Title
CN106988533B (en) A kind of construction method of concrete staircase tiling dual side-edge wall not lattice side's centering
CN105019651B (en) Hollow brick fills wall into the efficient installation engineering method of winding box
CN217461335U (en) Ruler moving tool for gypsum mortar plastering wall surface screeding construction
CN113374221B (en) Method for controlling flatness and verticality of plastering surface of aluminum die forming shear wall and building block
CN102605938B (en) Building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs
CN105822048A (en) Wall surface plastering robot
CN205735590U (en) Ceramic tile cutting auxiliary device
CN114809492A (en) Gypsum mortar plastering wall surface screeding construction method
CN103912127A (en) Building formwork or floor slab construction control method and special straightedge
CN206158117U (en) Wall ground floating screed instrument of making level
US7513058B2 (en) Construction rule tape and layout tool
KR20190003200U (en) Multi-functional jig for constructing work
CN211081053U (en) Combined tool for controlling thickness of aluminum template plate and avoiding paying-off
CN113323314A (en) External wall paving construction method for sintered ceramic tiles in freeze-thaw environment
CN114000722A (en) Structural repairing and method for dry hanging of outer wall brick building
CN110894740B (en) Operation method for building indoor wall
CN111042531A (en) Quick construction method for common plastering engineering plaster cake
CN107798470B (en) Stair full-period lean management construction method
CN110805278A (en) Method for controlling thickness and flatness of concrete floor
CN217581339U (en) Masonry construction is with building by laying bricks or stones thick liquid box of spreading
CN111075195A (en) Wall building block mortar joint thickness and wall perpendicularity control method
CN212897693U (en) Self-made tool for drawing high altitude marking line
CN216866025U (en) Cast-in-place concrete floor thickness control measuring tool chi
CN211499639U (en) Device for controlling precision of plastering mortar cake
CN210067497U (en) Tool for preventing falling ash by secondary masonry made of template excess material

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant