CN102587409A - Foundation underpinning joint treatment method - Google Patents

Foundation underpinning joint treatment method Download PDF

Info

Publication number
CN102587409A
CN102587409A CN2011100026046A CN201110002604A CN102587409A CN 102587409 A CN102587409 A CN 102587409A CN 2011100026046 A CN2011100026046 A CN 2011100026046A CN 201110002604 A CN201110002604 A CN 201110002604A CN 102587409 A CN102587409 A CN 102587409A
Authority
CN
China
Prior art keywords
wall
beams
construction
wall beam
sandwich wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100026046A
Other languages
Chinese (zh)
Inventor
闵卫国
施臻
杨敏
赵琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No2 Building Co Ltd
Original Assignee
Shanghai No2 Building Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No2 Building Co Ltd filed Critical Shanghai No2 Building Co Ltd
Priority to CN2011100026046A priority Critical patent/CN102587409A/en
Publication of CN102587409A publication Critical patent/CN102587409A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The invention discloses a foundation underpinning joint treatment method. The foundation underpinning joint treatment method includes excavating earthwork on two sides of a wall, and reserving a construction space for follow-up construction of wall sandwiched beams; arranging a plurality of I-beam holes on wall surfaces of rectangular grooves; setting an I-beam in each I-beam holes; carrying out construction of formworks and reinforcing steel bars of the wall sandwiched beams in the two grooves; welding the I-beams with main reinforcement of the wall sandwiched beams; reserving pile holes in the wall sandwiched beams; carrying out pouring of the wall sandwiched beams; and penetrating piles through the reserved pile holes to carry out construction of static-pressure piles. The foundation underpinning joint treatment method solves problems that sedimentation is caused in a underpinning joint treatment procedure of the prior art and increase of carrying capacity is not obvious, the wall sandwiched beams are disposed on two sides of the wall, the I-beams penetrate through the wall to be welded with the wall sandwiched beams, the wall sandwiched beams are penetratingly provided with anchor piles, accordingly, pressure on the wall is transferred onto the anchor piles via the I-beams and the wall sandwiched beams, and carrying capacity of the wall is greatly improved.

Description

The processing method of foundation underpinning node
Technical field
The present invention relates to a kind of job practices, relate in particular to a kind of processing method of foundation underpinning node.
Background technology
Foundation underpinning is claimed underground underpining (Under pinning) again, says it is in order to increase the support supporting capacity on existing building basis, to increase new permanent supporter or basis in the bottom on existing basis on the narrow sense; In a broad sense when being close to or under existing foundation construction thing during earth excavation; In order to eliminate the influence that possibly bring to existing foundation construction thing function and structure etc., to existing foundation construction thing carry out reinforcement and strengthening, to the bearing stratum ground of building improve, engineerings such as new basis instrument and new and old basic replacement.Therefore certainly exist in the transfer process of load that joist (or truss, as follows) is torn post (or wall, or stake is as follows) open, joist connects post and joist changes technical processes such as post.
Along with the greatly developing of construction that with the city underground is the underground public transit facility of main body; Underground installation is more and more crowded; The continuous three-dimensional of the utilization of the underground space; Urban construction demonstrate ground → underground top layer → shallow depth underground → development trend of big depth underground, so underpinning technique occupies more and more important position in the civil construction of city in modern times.
For common underpin node processing, a kind of is the stress surface that strengthens original base now, and another kind is that the soil body polar water mud of original base below is reinforced, and these two kinds of processing may produce following shortcoming:
1, is to strengthen the soil body that basic cross section or grouting and reinforcing all certainly will disturbance original base belows, causes to produce disadvantageous sedimentation;
2, still at first floor soil, bearing capacity does not have reinforcement fundamentally to above two kinds of method holding power layers.
Summary of the invention
The invention discloses a kind of processing method of foundation underpinning node, strengthen unconspicuous problem in order to sedimentation and the bearing capacity that causes in the processing procedure that solves prior art foundation underpinning node.
Above-mentioned purpose of the present invention realizes through following technical scheme:
A kind of processing method of foundation underpinning node wherein, comprising:
Step 1 101: the earthwork of excavation body of wall both sides, for construction space is reserved in the construction of follow-up sandwich wall beam;
Step 2 102: offer a plurality of i iron hole on the metope in rectangular recess;
Step 3 103: in each i iron hole, an i iron is set;
Step 4 104: in two grooves, carry out the template of sandwich wall beam and the construction of reinforcing bar;
Step 5 105: with the main muscle welding of i iron and sandwich wall beam;
Step 6 106: in the sandwich wall beam, reserve the stake hole;
Step 7 107: carry out building of sandwich wall beam;
Step 8 108: a reservation stake hole is passed in stake carried out construction of Static Pressure Pile.
The processing method of aforesaid foundation underpinning node wherein, also comprises after the step 1 101, with brush cleaning i iron hole.
The processing method of aforesaid foundation underpinning node wherein, also comprises after the step 7 107, and the intensity of sandwich wall beam is tested, and after the intensity of sandwich wall beam reaches setting value, carries out the construction of step 8 108.
The processing method of aforesaid foundation underpinning node wherein, also comprises concrete perfusion in pile body after the step 8 108.
The processing method of aforesaid foundation underpinning node, wherein, a plurality of i iron hole in the step 3 103 is opened on the same level height.
In sum; The processing method of foundation underpinning node of the present invention has solved the sedimentation and the bearing capacity that cause in the processing procedure of prior art foundation underpinning node and has strengthened unconspicuous problem, in the body of wall both sides sandwich wall beam is set; I iron is passed body of wall and the welding of sandwich wall beam; Pass the sandwich wall beam anchor pole stake is set, make the pressure of body of wall transfer in the anchor pole stake, strengthened the bearing capacity of body of wall greatly through i iron and sandwich wall beam.
Description of drawings
Fig. 1 is the flow chart of foundation underpinning node processing method of the present invention.
The specific embodiment
Be further described below in conjunction with the accompanying drawing specific embodiments of the invention:
Fig. 1 is the flow chart of foundation underpinning node processing method of the present invention, sees also Fig. 1, and a kind of processing method of foundation underpinning node wherein, comprising:
Step 1 101: the earthwork of excavation body of wall both sides, reserve construction space for the construction of follow-up sandwich wall beam, offer two rectangular recess in the both sides of body of wall, to adapt to the shape of sandwich wall beam.
Step 2 102: offer a plurality of i iron hole on the metope in rectangular recess, reserve construction space in body of wall for i iron is set.
Step 3 103: in each i iron hole, an i iron is set; I iron has, and bending resistance is strong, construction is simple, practice thrift cost, construction weight, advantage that mechanical property is good, and the downforce that i iron receives body of wall is set in body of wall can be shifted through i iron.
Step 4 104: in two grooves, carry out the template of sandwich wall beam and the construction of reinforcing bar,, build the sandwich wall beam, make that building the suffered power of completion back wall at the sandwich wall beam can shift through two sandwich wall beams in the both sides of body of wall in order to build the framework of a sandwich wall beam in advance.
Step 5 105: with the main muscle welding of i iron and sandwich wall beam; Make the script body of wall be applied to the body of wall downforce that underpins on the node originally and transfer on the main muscle, and then can downforce and self gravitation that body of wall receives be transferred on the sandwich wall beam of building completion through i iron.
Step 6 106: in the sandwich wall beam, reserve the stake hole, be follow-up pile sinking ready for operation.
Step 7 107: carry out building of sandwich wall beam, cement is poured in the template, accomplish the construction of sandwich wall beam.
Step 8 108: a reservation stake hole is passed in stake carried out the construction of static pressed pile; The stake position anchor pole stake that the present invention uses; Both a hole is passed in the anchor pole stake and sunk to undergroundly, and carry out concrete perfusion, accomplish the reinforcing bar of perfusion back configuration some more than the sandwich wall beam; Pour into a mould with concrete again, can guarantee the secure fixation of anchor pole stake and sandwich wall beam.
Also comprise after the step 1 101 of the present invention,, avoid foreign material in the i iron hole to influence the construction of i iron with brush cleaning i iron hole.
Also comprise after the step 7 107 of the present invention; Intensity to the sandwich wall beam is tested;, the intensity of sandwich wall beam carries out the construction of step 8 108 after reaching setting value; Avoid the insufficient strength of sandwich wall beam to cause in the piling construction process and error occurs, or cause the damage of sandwich wall beam, influence the effect of foundation underpinning.
Also comprise concrete perfusion in pile body after the step 8 108 of the present invention.
A plurality of i iron hole in the step 3 103 of the present invention is opened on the same level height, is convenient to the main muscle and the i iron of sandwich wall beam are welded.
In sum; The processing method of foundation underpinning node of the present invention has solved the sedimentation and the bearing capacity that cause in the processing procedure of prior art foundation underpinning node and has strengthened unconspicuous problem, in the body of wall both sides sandwich wall beam is set; I iron is passed body of wall and the welding of sandwich wall beam; Pass the sandwich wall beam anchor pole stake is set, make the pressure of body of wall transfer in the anchor pole stake, strengthened the bearing capacity of body of wall greatly through i iron and sandwich wall beam.
More than the specific embodiment of the utility model is described in detail, but it is just as example, the utility model is not restricted to the specific embodiment of above description.To those skilled in the art, any equivalent modifications that the utility model is carried out with substitute also all among the category of the utility model.Therefore, impartial conversion and the modification under spirit that does not break away from the utility model and scope, done all should be encompassed in the scope of the utility model.

Claims (5)

1. the processing method of a foundation underpinning node is characterized in that, comprising:
Step 1 101: the earthwork of excavation body of wall both sides, for construction space is reserved in the construction of follow-up sandwich wall beam;
Step 2 102: offer a plurality of i iron hole on the metope in rectangular recess;
Step 3 103: in each i iron hole, an i iron is set;
Step 4 104: in two grooves, carry out the template of sandwich wall beam and the construction of reinforcing bar;
Step 5 105: with the main muscle welding of i iron and sandwich wall beam;
Step 6 106: in the sandwich wall beam, reserve the stake hole;
Step 7 107: carry out building of sandwich wall beam;
Step 8 108: a reservation stake hole is passed in stake carried out construction of Static Pressure Pile.
2. the processing method of foundation underpinning node according to claim 1 is characterized in that, also comprises after the step 1 101, with brush cleaning i iron hole.
3. the processing method of foundation underpinning node according to claim 1 is characterized in that, also comprises after the step 7 107, and the intensity of sandwich wall beam is tested, and after the intensity of sandwich wall beam reaches setting value, carries out the construction of step 8 108.
4. the processing method of the foundation underpinning node of stating according to claim 1 is characterized in that, also comprises concrete perfusion in pile body after the step 8 108.
5. the processing method of foundation underpinning node according to claim 1 is characterized in that, a plurality of i iron hole in the step 3 103 is opened on the same level height.
CN2011100026046A 2011-01-07 2011-01-07 Foundation underpinning joint treatment method Pending CN102587409A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100026046A CN102587409A (en) 2011-01-07 2011-01-07 Foundation underpinning joint treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100026046A CN102587409A (en) 2011-01-07 2011-01-07 Foundation underpinning joint treatment method

Publications (1)

Publication Number Publication Date
CN102587409A true CN102587409A (en) 2012-07-18

Family

ID=46476600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100026046A Pending CN102587409A (en) 2011-01-07 2011-01-07 Foundation underpinning joint treatment method

Country Status (1)

Country Link
CN (1) CN102587409A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306831A (en) * 2019-07-12 2019-10-08 上海建工七建集团有限公司 Existing wall support system and its construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1132302A (en) * 1995-09-29 1996-10-02 哈尔滨市道里区房屋土地开发公司 Structure displacement method of building
JP2007170070A (en) * 2005-12-22 2007-07-05 Takenaka Komuten Co Ltd Method for rebuilding building
CN101429819A (en) * 2007-11-07 2009-05-13 上海天演建筑物移位工程有限公司 Wall and column underpinning method
CN101725258A (en) * 2008-10-30 2010-06-09 上海天演建筑物移位工程有限公司 Integral jacking method of heritage buildings

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1132302A (en) * 1995-09-29 1996-10-02 哈尔滨市道里区房屋土地开发公司 Structure displacement method of building
JP2007170070A (en) * 2005-12-22 2007-07-05 Takenaka Komuten Co Ltd Method for rebuilding building
CN101429819A (en) * 2007-11-07 2009-05-13 上海天演建筑物移位工程有限公司 Wall and column underpinning method
CN101725258A (en) * 2008-10-30 2010-06-09 上海天演建筑物移位工程有限公司 Integral jacking method of heritage buildings

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306831A (en) * 2019-07-12 2019-10-08 上海建工七建集团有限公司 Existing wall support system and its construction method

Similar Documents

Publication Publication Date Title
CN105756091B (en) A kind of Metro station excavation construction method of control adjacent building composition deformation
CN101509261B (en) Method for pile plate base for ultra-high voltage electric power line steel tower on soft foundation
CN207092107U (en) A kind of anti-subsidence structure using diaphram wall
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN108005399A (en) Add the construction method for building multi-layer underground space under a kind of existing building group
CN109024662A (en) Method of the anchor pile underpinning without basement building underground space increasing layer
CN106245927A (en) A kind of frame structure building underground that is applicable to increases method and the building of layer
CN112982481A (en) Structure construction method for crossing subway intersection node on pipe gallery
CN208517810U (en) A kind of temporary trestle bridge for deep big foundation pit excavation construction
CN108385693B (en) Equal-generation anchor bolt supporting method and system for staged basement supporting
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN209941754U (en) High-voltage power pipe culvert in-situ protection structure
CN111549789A (en) Reinforcing structure for foundation pit support and construction method thereof
CN207728018U (en) The building structure of skyscraper is built suitable for tier building set
CN207597914U (en) Add the construction stress structure for building multi-layer underground space under a kind of existing building group
CN217517602U (en) Nearly river dike underground structure
RU2371547C1 (en) Method for strengthening of slopes and slot maker for its realisation
CN105951863A (en) Construction device of active assembling type open caisson and construction method using same
CN113585336B (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN102587409A (en) Foundation underpinning joint treatment method
CN107916798A (en) The building structure of skyscraper is built suitable for tier building set
CN210887256U (en) Straight combined sheet pile-ground wall-connecting type frame of water retaining cofferdam
CN203755292U (en) Weak bearing stratum foundation reinforcing structure
CN210737587U (en) Cantilever type retaining wall structure
CN111894036A (en) Construction method for additionally arranging basement in strip foundation building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120718