CN102587355A - Octagonal pile and foundation structure applying octagonal pile - Google Patents

Octagonal pile and foundation structure applying octagonal pile Download PDF

Info

Publication number
CN102587355A
CN102587355A CN2012100649751A CN201210064975A CN102587355A CN 102587355 A CN102587355 A CN 102587355A CN 2012100649751 A CN2012100649751 A CN 2012100649751A CN 201210064975 A CN201210064975 A CN 201210064975A CN 102587355 A CN102587355 A CN 102587355A
Authority
CN
China
Prior art keywords
pile
octagonal
pile body
piling
stiffener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100649751A
Other languages
Chinese (zh)
Other versions
CN102587355B (en
Inventor
许建军
郭福明
王东
王崇康
张新尧
钟存武
钟富春
尹萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Shunde Electric Power Design Institute Co ltd
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Original Assignee
FOSHAN SHUNDE ELECTRIC POWER DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOSHAN SHUNDE ELECTRIC POWER DESIGN INSTITUTE Co Ltd filed Critical FOSHAN SHUNDE ELECTRIC POWER DESIGN INSTITUTE Co Ltd
Priority to CN201210064975.1A priority Critical patent/CN102587355B/en
Publication of CN102587355A publication Critical patent/CN102587355A/en
Application granted granted Critical
Publication of CN102587355B publication Critical patent/CN102587355B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses an octagonal pile and a foundation structure applying the octagonal pile. The octagonal pile comprises a pile body, the cross section of the pile body is in an octagonal shape, reinforcing steel bars are arranged in the pile body, the length direction of the reinforcing steel bars is consistent with the direction of the pile body, and fine stone concrete is filled among the reinforcing steel bars. When applied in a pile foundation, the octagonal pile saves more materials than the traditional square piles, tubular piles, wood piles and the like, thereby benefiting of reducing construction cost. When applied in the foundation treatment, the octagonal pile is more assuring on the piling quality than deep stirring piles, bored concrete piles and the like, is more flexible and rapid in construction and greatly shortens the construction period. The octagonal pile is simple in construction and adopts hammering type piling. Piling equipment is composed of a pile hammer, a piling frame, accessory equipment (such as a pile cap, a cushion, a pile follower and the like) and the like and has obviously lower field requirement than other piling machines.

Description

A kind of octagonal pile and the foundation structure of using this octagonal pile
Technical field
The present invention relates to a kind of octagonal pile; The invention still further relates to a kind of foundation structure.
Background technology
Traditional building material belongs to basic raw material industry, and portioned product is produced seriously polluted, and resource consumption is high, and the waste soil threatens ecological environment, is difficult to adapt to the requirement of national economic development and modernized society's development.In the more area of weak soil geology distribution, many equipment and enclosed structure all need be made based process in the power engineering, and existing type of foundation often can not meet design requirement on selecting aptly; Usually waste one's talent on a petty job; Select concrete prefabricated side's stake for use, bored pile, castinplace pile dusts; Even have enclosure wall all to use the situation of φ 400 pile for prestressed pipe, construction cost is improved greatly; And the direct foundation presses down timber, though cost is lower, its reliability and poor durability are difficult to satisfy the quality requirement of building.
Summary of the invention
The technical problem that the present invention will solve provides the pile body that a kind of construction cost is low, construction quality is high; The present invention also will provide a kind of foundation structure of this pile body of application.
In order to solve the problems of the technologies described above, a kind of octagonal pile of the present invention comprises pile body, and the cross section of said pile body is an octagon, is provided with stiffener in the pile body, and the length direction of this stiffener is consistent with pile body, is filled with pea gravel concreten between the stiffener.
As the improvement of technique scheme, said stiffener is 3 to 5, is distributed in pile body inside ringwise.
As the improvement of technique scheme, an end of said pile body is a cone point, and the other end is the plane butt end, is reduced gradually by the cross section of plane butt end to cone point.
Said stiffener is the 70# high tensile reinforcement, and said pea gravel concreten is the C25 pea gravel concreten.
A kind of foundation structure comprises concrete cushion, and said concrete cushion is connected fixing with octagonal pile body upper end, has the cushion cap that covers pile body on the concrete cushion.
Said concrete cushion edge exceeds the cushion cap edge, forms stepped.
Said stiffener is 3 to 5, is distributed in pile body inside ringwise.
One end of said pile body is a cone point, and the other end is the plane butt end, is reduced gradually by the cross section of plane butt end to cone point, and the plane butt end of said pile body is connected fixing with concrete cushion.
The invention has the beneficial effects as follows: octagonal pile than economical with materials more such as the stake of tradition side, pile tube, timber, is beneficial to the reduction construction cost in the application of pile foundation.In the application that ground is handled, also more guaranteed than pile qualities such as deep-mixed pile, castinplace piles, construct more flexibly and fast, greatly the reduction of erection time.The construction of octagonal pile is simple, adopts paddle type mill piling.Pile driving equipment is by pile monkey, pile driving frame and ancillary service formations such as (beating with replacing such as pile cover, cushion pad, pile follower).Pile driving equipment is low weight, has only about 1 ton 20,000 yuan of its cost less thaies.Pile driving frame is high 7 meters, and iron hammer weighs 300 kilograms, optional 1~3 meter of stroke.Convenient transportation, piling machinery only need 1.5 meters wide roads just can arrive, and it is obviously much lower than other machines to site requirements.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is done further detailed explanation.
Fig. 1 is an octagonal pile structural representation of the present invention;
Fig. 2 is a foundation structure sketch map of the present invention.
The specific embodiment
With reference to Fig. 1.A kind of octagonal pile of the present invention comprises pile body 1, and the cross section of said pile body 1 is an octagon, is provided with stiffener 2 in the pile body 1, and the length direction of this stiffener 2 is consistent with pile body, is filled with pea gravel concreten 3 between the stiffener 2.Said stiffener 2 is 3 to 5, is distributed in pile body 1 inside ringwise, is guaranteeing that pile body has under the prerequisite of sufficient intensity, the control cost of production.
In the present embodiment, an end of said pile body 1 is a cone point, and the other end is the plane butt end, is reduced gradually by the cross section of plane butt end to cone point, and pile body is driven underground more easily, can adopt small-sized pile driver construction.Said pile body 1 adopts 70# high tensile reinforcement and the pouring of C25 pea gravel concreten to form, and has higher structural strength.Manufacturing process is simple, and it is made and adopts homemade combined steel, present most octagonal pile production is that manual pouring is made.According to sectional dimension, pile body 1 mainly contains 4 kinds of specifications, is respectively 3 meters, 140 millimeters in tail footpath; 4 meters, 155 millimeters in tail footpath; 5 meters, 165 millimeters in tail footpath; 6 meters, 170 millimeters in tail footpath.
Pile body 1 length can be had made to order, and general 3~6 meters, can pile follower 1 meter, so can reach 7 meters with its Ground Treatment degree of depth.The production of this type still has no technical regulation, estimates its pile body axial compressive strength, A pf cφ c=213.7kN, tension, compressive strength are obviously superior than timber.Octagonal pile is mainly used in the middle of the building foundation engineering of enclosure wall, the small-sized capital construction of individual layer, pond, various electromechanical equipments or the like; At these building engineering fields; Octagonal pile is compared with traditional side's stake, pile tube, timber, at aspects such as cost, constructions remarkable advantages is arranged all.
Octagonal pile of the present invention, side's stake of its performance and cross section 200x200 millimeter is comparatively approaching.Side's stake is following with the octagonal pile main technical requirements:
The stake of table 1 side is compared with the octagonal pile main technical requirements
Figure 2012100649751100002DEST_PATH_IMAGE001
A kind of foundation structure comprises concrete cushion 4, and said concrete cushion 4 is connected fixing with octagonal pile body 1 upper end; Have the cushion cap 5 that covers pile body 1 on the concrete cushion 4, said concrete cushion 4 edges exceed cushion cap 5 edges, form stepped; Said stiffener 2 is 3 to 5; Be distributed in pile body 1 inside ringwise, an end of said pile body 1 is a cone point, and the other end is the plane butt end; Cross section by plane butt end to cone point reduces gradually, and the plane butt end of said pile body 1 is connected fixing with concrete cushion 4.
Below provide some specific embodiments as aid illustration.
Embodiment 1:
Be positioned at Yunfu City transformer station, 180 millimeters thick enclosure walls and 59 equipment of 292 meters of length are arranged in the power station.Wherein the weight of equipment is 0.7 ton and does not wait to 1.0 tons; Make footing beam under the brick enclosure wall of 180 millimeters thick, per 5 meters pillars, totally 60.Because the face of land is not waited for 1 to 3 meter and is backfill, it is infeasible directly to do the direct foundation, need do the ground processing.And, one side the power station close on a fish pond, a stake machine can not get into.In this case, it is lower that we have expected that the job site requires, and job practices is octagonal pile more flexibly.
We have also contrasted two kinds of foundation treatment modes quality economically simultaneously:
1. 250x250 precast concrete square pile: only make friction pile and consider, 1 of the following needs of every enclosing wall column, but the requirement of consideration bending resistance square, the result wants two; Do one under every Equipment Foundations, by every 870 yuan of calculations, meter stake machine admission fee 60000 yuan (place is remote) adds up to 215730 yuan of investments in addition.
2. octagonal pile: only make friction pile and consider that cloth is two under every enclosing wall column, does two under every Equipment Foundations, long 5 meters of root, 1 meter of pile follower by every 50 yuan of calculations, adds up to 11900 yuan of investments.
Be because the restriction of job site is the consideration from economic factor on the one hand, and we confirm to select for use octagonal pile at last on the one hand, this power station enclosure wall, Equipment Foundations are accomplished has had nearly six months so far, and mode of occupation is good.
Embodiment 2:
An interim agitator that is positioned at moral famous scenic spot, Shuande district requires to do ground and handles, and this area's geological condition is relatively poor, and the top layer weak soil covers thicker.In application for developing, we make following assessment:
Handle if do the castinplace pile that dusts, by every square metre of distribution, need 100, every long 6 meters, considers by the cost of 50 yuan every meter of the stakes of dusting, and needs 30000 yuan of investments; As use octagonal pile instead, according to every square metre of 4 distributions, stake is long to be similarly 6 meters, considers by every 55 yuan costs, needs 22000 yuan of investments.It is thus clear that it is under the situation that effectiveness equates, select octagonal pile to reduce investment outlay relatively, and reliable.In the piling process, know the effect that ground is handled immediately, can on-the-spot quantity and the length that increases or reduce stake, also needn't as other, do detection.
Embodiment 3:
Be positioned at one small electrical room, Shuande, need make ground and handle, compare two feasible programs below:
As select for use the direct foundation to press down timber, and need 60 of 5 meters long φ 120 pine stakes, by every 70 yuan of calculating of 5 meters timbers, purchasing stake needs 4200 yuan; As use octagonal pile instead, by every 50 yuan of calculating of 5 meters long octagonal piles, purchasing stake needs 3000 yuan.It is thus clear that only the investment aspect stake has just economized 29%.Moreover this area termite is serious to the erosion of timber, and timber can not be ignored by other factor corrosion phenomenons; By contrast; The pile quality of octagonal pile uses much more stable than timber, and intensity is much bigger, and the use of saving timber also is the environmental protection of advocating now.
The above is merely preferential embodiment of the present invention, as long as realize that with basic identical means the technical scheme of the object of the invention all belongs within protection scope of the present invention.

Claims (8)

1. octagonal pile; Comprise pile body (1), it is characterized in that: the cross section of said pile body (1) is an octagon, is provided with stiffener (2) in the pile body (1); The length direction of this stiffener (2) is consistent with pile body, is filled with pea gravel concreten (3) between the stiffener (2).
2. octagonal pile according to claim 1 is characterized in that: said stiffener (2) is 3 to 5, is distributed in pile body (1) inside ringwise.
3. octagonal pile according to claim 1 and 2 is characterized in that: an end of said pile body (1) is a cone point, and the other end is the plane butt end, is reduced gradually by the cross section of plane butt end to cone point.
4. octagonal pile according to claim 1 is characterized in that: said stiffener (2) is the 70# high tensile reinforcement, and said pea gravel concreten (3) is the C25 pea gravel concreten.
5. an application rights requires the foundation structure of 1 said octagonal pile; Comprise concrete cushion (4); It is characterized in that: said concrete cushion (4) is connected fixing with octagonal pile body (1) upper end, has the cushion cap (5) of covering pile body (1) on the concrete cushion (4).
6. foundation structure according to claim 5 is characterized in that: said concrete cushion (4) edge exceeds cushion cap (5) edge, forms stepped.
7. foundation structure according to claim 5 is characterized in that: said stiffener (2) is 3 to 5, is distributed in pile body (1) inside ringwise.
8. foundation structure according to claim 5; It is characterized in that: an end of said pile body (1) is a cone point; The other end is the plane butt end, is reduced gradually by the cross section of plane butt end to cone point, and the plane butt end of said pile body (1) is connected fixing with concrete cushion (4).
CN201210064975.1A 2012-01-13 2012-01-13 Octagonal pile and foundation structure applying octagonal pile Active CN102587355B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210064975.1A CN102587355B (en) 2012-01-13 2012-01-13 Octagonal pile and foundation structure applying octagonal pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210064975.1A CN102587355B (en) 2012-01-13 2012-01-13 Octagonal pile and foundation structure applying octagonal pile

Publications (2)

Publication Number Publication Date
CN102587355A true CN102587355A (en) 2012-07-18
CN102587355B CN102587355B (en) 2015-07-15

Family

ID=46476548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210064975.1A Active CN102587355B (en) 2012-01-13 2012-01-13 Octagonal pile and foundation structure applying octagonal pile

Country Status (1)

Country Link
CN (1) CN102587355B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966097A (en) * 2012-11-30 2013-03-13 华侨大学 Novel composite foundation with vertical bearing piles

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60156827A (en) * 1984-01-25 1985-08-17 Hokuriku Concrete Kogyo Kk Foundation work
EP0379838B1 (en) * 1989-01-27 1992-09-16 Ibico Inter Binding Gmbh Device for binding sheets by heat
CN2160680Y (en) * 1993-02-16 1994-04-06 肖铁英 Prefabricated screw pile
CN2425133Y (en) * 2000-01-03 2001-03-28 邹宗煊 Building foundation variable section composite pile footing
CN1619065A (en) * 2004-12-09 2005-05-25 天津大学 Composite ground and composite stake base of stake top setting full flexible stake pad and its construction method
CN101302759A (en) * 2008-07-03 2008-11-12 大连大金马基础建设有限公司 Prestress square pile
CN101302758A (en) * 2008-07-02 2008-11-12 大连大金马基础建设有限公司 Method for processing prestress square pile
CN101363229A (en) * 2008-05-30 2009-02-11 温州东瓯建设集团有限公司 Rigid and flexible pile composite foundation
CN101532296A (en) * 2008-03-12 2009-09-16 贵阳铝镁设计研究院 Reinforcement treatment method for pile foundation
CN201459717U (en) * 2009-08-05 2010-05-12 李劼 Prestressed concrete polygonal solid or hollow pile
CN202450516U (en) * 2012-01-13 2012-09-26 佛山市顺德电力设计院有限公司 Octagonal pile and foundation structure applying same

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60156827A (en) * 1984-01-25 1985-08-17 Hokuriku Concrete Kogyo Kk Foundation work
EP0379838B1 (en) * 1989-01-27 1992-09-16 Ibico Inter Binding Gmbh Device for binding sheets by heat
CN2160680Y (en) * 1993-02-16 1994-04-06 肖铁英 Prefabricated screw pile
CN2425133Y (en) * 2000-01-03 2001-03-28 邹宗煊 Building foundation variable section composite pile footing
CN1619065A (en) * 2004-12-09 2005-05-25 天津大学 Composite ground and composite stake base of stake top setting full flexible stake pad and its construction method
CN101532296A (en) * 2008-03-12 2009-09-16 贵阳铝镁设计研究院 Reinforcement treatment method for pile foundation
CN101363229A (en) * 2008-05-30 2009-02-11 温州东瓯建设集团有限公司 Rigid and flexible pile composite foundation
CN101302758A (en) * 2008-07-02 2008-11-12 大连大金马基础建设有限公司 Method for processing prestress square pile
CN101302759A (en) * 2008-07-03 2008-11-12 大连大金马基础建设有限公司 Prestress square pile
CN201459717U (en) * 2009-08-05 2010-05-12 李劼 Prestressed concrete polygonal solid or hollow pile
CN202450516U (en) * 2012-01-13 2012-09-26 佛山市顺德电力设计院有限公司 Octagonal pile and foundation structure applying same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966097A (en) * 2012-11-30 2013-03-13 华侨大学 Novel composite foundation with vertical bearing piles

Also Published As

Publication number Publication date
CN102587355B (en) 2015-07-15

Similar Documents

Publication Publication Date Title
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN101343871A (en) Composite pile with high permanent stability protection layer and its production and construction method
CN101922146A (en) Method for performing foundation treatment by using permeable concrete pipe piles
CN101544022B (en) Preparation method for preformed hole fender pile
CN203174619U (en) Reverse raft concrete terrace
CN105200879A (en) Water-permeable foam concrete pile compound foundation
CN202450516U (en) Octagonal pile and foundation structure applying same
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN102587355B (en) Octagonal pile and foundation structure applying octagonal pile
CN201605588U (en) Structure for reinforcing and fixing slope surface of prestress anchoring frame beam
CN208235562U (en) A kind of static pressure pile structure for Collapsible Loess Stabilized
CN201531021U (en) Prefabricated member cement-treated-soil drilling and filling pile
CN202672161U (en) Cement-soil mixing drum sheet-pile united slope structure with soil nails
CN205776152U (en) Prestressed anchor waveform sheet pile retaining structure
CN203256771U (en) Semi-gravity type column and board combined retaining wall structure
CN1644804A (en) Construction of concrete piles
CN208563295U (en) A kind of stiff composite pile handling soft layer ground
CN203514305U (en) Pressure dispersing type prestressing force anti-pulling anti-floating pile
CN207121898U (en) Super-large diameter bores and buries steel pipe hollow foundation pile
CN207452887U (en) A kind of underwater high-strength degree concrete tubular pile
CN205676911U (en) A kind of skyscraper pipe pile foundation being applicable to weak soil place
CN207619919U (en) A kind of assembled eco-embankment structure
CN104153359B (en) Construction method of prestressed concrete sparse-rebar pile
CN110512615A (en) A kind of assembled concrete core cement soil barricade combination supporting system and its construction method
CN205663095U (en) Precast concrete composite floor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 528300, No. 81, Tonghui Road, Shunde District, Guangdong, Foshan, Daliang

Applicant after: SHUNDE ELECTRIC POWER DESIGN INSTITUTE CO., LTD.

Address before: 528300, No. 81, Tonghui Road, Shunde District, Guangdong, Foshan, Daliang

Applicant before: Foshan Shunde Electric Power Design Institute Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: FOSHAN SHUNDE ELECTRIC POWER DESIGN INSTITUTE CO., LTD. TO: GUANGDONG SHUNDE ELECTRIC POWER DESIGN INSTITUTE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220531

Address after: 1 / F, 2 / F, 3 / F, guipan Shangdong villa complex building, 123 dongle Road, Yunlu community residents committee, Daliang sub district office, Foshan City, Guangdong Province 528300 (only for office use)

Patentee after: GUANGDONG SHUNDE ELECTRIC POWER DESIGN INSTITUTE CO.,LTD.

Patentee after: Foshan Power Supply Bureau of Guangdong Power Grid Co., Ltd

Address before: 528300 No. 81 Tonghui Road, Daliang, Shunde District, Foshan City, Guangdong Province

Patentee before: GUANGDONG SHUNDE ELECTRIC POWER DESIGN INSTITUTE CO.,LTD.

TR01 Transfer of patent right