CN205676911U - A kind of skyscraper pipe pile foundation being applicable to weak soil place - Google Patents
A kind of skyscraper pipe pile foundation being applicable to weak soil place Download PDFInfo
- Publication number
- CN205676911U CN205676911U CN201620529127.7U CN201620529127U CN205676911U CN 205676911 U CN205676911 U CN 205676911U CN 201620529127 U CN201620529127 U CN 201620529127U CN 205676911 U CN205676911 U CN 205676911U
- Authority
- CN
- China
- Prior art keywords
- skyscraper
- prefabricated tubular
- applicable
- weak soil
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of skyscraper pipe pile foundation being applicable to weak soil place, include successively from top to bottom: mixed layer, soft mud and hard stratum, it is provided with prefabricated tubular pile in described mixed layer, soft mud and hard stratum, described prefabricated tubular pile stretches into degree of depth D4 in hard stratum and is more than 2 meters, the thickness D2 of described mixed layer is more than 3 meters, at the reinforced bed that is provided above of described mixed layer, the top of prefabricated tubular pile is fixed by described reinforced bed.By the way, the utility model can have the place election use prefabricated tubular pile compared with deep soft clay at ground shallow, and avoids using in weak soil place occur inclined stake, the problem such as stake, broken pile in the work progress of prefabricated tubular pile.
Description
Technical field
The utility model relates to building field, particularly relates to a kind of skyscraper pile tube base being applicable to weak soil place
Plinth.
Background technology
As people in the countryside constantly move to city, town site growing tension, the height of building is also increasingly
Height, the subsoil that past multi-story structure commonly uses is inapplicable, and pile foundation is almost the essential side of all skyscrapers
Case, according to pile installation, commonly use at present has prefabricated tubular pile and cast-in-plase pile.
In the south of the River etc. area due to lake, pond more, a lot of places shallow-layers of building have thicker soft mud, owing to becoming silted up
The unfavorable factors such as dirt bed moisture content is high, intensity is low, mobility is big, existing pile tube code is mostly limited in this weak soil place and makes
With prestressed concrete pipe pile, main cause is that prefabricated tubular pile diameter is little, cross section concrete is few, quantity of reinforcement is little, and weak soil can not have
Effect limits the sidesway of stake, and stable, the shear resistance of pile body can not meet use and require, typically all selects showing of major diameter during design
Pouring concrete bored concrete pile;Even if there being part to select to use prefabricated tubular pile, soft soil foundation is not treated, can be when excavation of foundation pit yet
Through being commonly encountered inclined stake, the problem such as stake, broken pile of falling.
Problems of the prior art have 2 points: 1. can not have at ground shallow makes compared with the place election of deep soft clay
With prefabricated tubular pile cheap, convenient, efficient, can only select to use cast-in-place large-diameter concrete bored concrete pile, thus bring construction week
The unfavorable factors such as phase length, cost height, difficulty of construction mud contamination environment big, a large amount of, pile bearing capacity are low.
2. select to have at ground shallow to use prefabricated tubular pile compared with the place election of deep soft clay, through being commonly encountered partially during excavation
Stake, the problem such as stake, broken pile of falling.
Utility model content
The utility model is mainly solving the technical problems that provide a kind of skyscraper pile tube base being applicable to weak soil place
Plinth, can have at ground shallow and use prefabricated tubular pile compared with the place election of deep soft clay, and avoid using in weak soil place
The work progress of prefabricated tubular pile occurs inclined stake, the problem such as stake, broken pile of falling.
For solving above-mentioned technical problem, the technical scheme that the utility model uses is: provide one to be applicable to weak soil
The skyscraper pipe pile foundation in place, includes from top to bottom successively: mixed layer, soft mud and hard stratum, described mixed layer,
Being provided with prefabricated tubular pile in soft mud and hard stratum, described prefabricated tubular pile stretches into degree of depth D4 in hard stratum and is more than 2 meters, described
The thickness D2 of mixed layer is more than 3 meters, and at the reinforced bed that is provided above of described mixed layer, described reinforced bed is by prefabricated tubular pile
Top fix.
Preferably, degree of depth D3 of described reinforced bed is in the range of 16 ~ 30cm.
Preferably, degree of depth D3 of described reinforced bed is 20cm.
Preferably, it in described prefabricated tubular pile, is filled with armored concrete fill core.
Preferably, described armored concrete fills the concrete in core and uses C50 high-strength concrete.
Preferably, described reinforced bed uses 6mm reinforced mesh.
The beneficial effects of the utility model are: the 1st, prefabricated tubular pile short construction period, the work that construction bored concrete pile completes for month
Cheng Liang, if converted to prefabricated tubular pile only needs just can complete for 2 days, improves efficiency of construction;2nd, prefabricated tubular pile cost is low, same to sample ruler
A very little pile, bored concrete pile cost than prefabricated tubular pile expensive about 50%, and survey bearing capacity not as prefabricated tubular pile high;3rd, prefabricated pipe
Stake pile quality is good, because using factorial praluction, and product percent of pass almost 100%, and bored concrete pile is at underground construction, quality is difficult
With monitoring;4th, prefabricated tubular pile easy construction, environmental protection, and bored concrete pile needs field fabrication material, operation is loaded down with trivial details, and produces a large amount of
Mud contamination environment.
Brief description
Fig. 1 is the structure of a kind of skyscraper pipe pile foundation one preferred embodiment being applicable to weak soil place of the utility model
Schematic diagram;
In accompanying drawing, the mark of each parts is as follows: the 1st, mixed layer, the 2nd, soft mud, the 3rd, hard stratum, the 4th, prefabricated tubular pile, the 5th, arrangement of reinforcement
Bed course, the 6th, reinforcing bar.
Detailed description of the invention
Below in conjunction with the accompanying drawings preferred embodiment of the present utility model is described in detail, so that advantage of the present utility model
Can be easier to be readily appreciated by one skilled in the art with feature, thus protection domain of the present utility model is made apparent clearly
Define.
Referring to Fig. 1, the utility model embodiment includes:
A kind of skyscraper pipe pile foundation being applicable to weak soil place, includes from top to bottom successively: mixed layer the 1st, silt soil
Layer 2 and hard stratum 3, be provided with prefabricated tubular pile 4, described prefabricated tubular pile 4 in described mixed layer the 1st, soft mud 2 and hard stratum 3
Stretching into degree of depth D4 in hard stratum 3 is 2 meters, and the thickness D2 of described mixed layer 1 is 3 meters, being provided above of described mixed layer 1
Reinforced bed 5, the top of prefabricated tubular pile 4 is fixed by described reinforced bed 5.
Construction method of the present utility model is as follows: the first, basement process: fill soft mud 2 top mud and cement
Dividing stirring, under basis, about 3m scope forms a mixed layer 1;2nd, drive piles;3rd, basement process and piling is opened after completing
Dig to stake top mark relative superiority or inferiority 30cm, then do the thick reinforced bed 5 of a 20cm;4th, carry out to prefabricated tubular pile 4 filling core, typically require
Filled 2 times 2m of soft mud, and vertical compression intensity in soft mud 2 for the prefabricated tubular pile 4, shearing strength can be increased and resist
Curved intensity.
Soft mud 2 top mud and cement are first sufficiently stirred for by the utility model, about 3m scope under basis
Forming a mixed layer 1, the effect of this mixed layer 1 is the computational length that can reduce prefabricated tubular pile in soft mud 2, makes stake
Bearing capacity reducing coefficient increase;Mixed layer 1 can also limit prefabricated tubular pile 4 head sidesway, is similar to original unstrained pile
Head is to fixing transformation, and this also can increase bearing capacity reducing coefficient;Owing to skyscraper has elevator foundation pit, in mixed layer 1
Excavation pit will not occur phenomenon of caving in, and also will not produce soil body flow and cause inclined stake, stake, pile breaking phenomenon;Mixed layer 1 is also
Movement and the construction of engineering machinery can be facilitated.
Further, described reinforced bed 5 can link together all prefabricated tubular pile 4 pile crowns, in excavation hole during hole
Prefabricated tubular pile 4 would not be subjected to displacement, it is ensured that the perpendicularity of stake.
The foregoing is only embodiment of the present utility model, not thereby limit the scope of the claims of the present utility model, every
Utilize the equivalent structure that the utility model specification and accompanying drawing content made or equivalence flow process conversion, or be directly or indirectly used in
Other related technical fields, all in like manner include in scope of patent protection of the present utility model.
Claims (6)
1. the skyscraper pipe pile foundation being applicable to weak soil place, it is characterised in that include successively from top to bottom: mixing
Layer, soft mud and hard stratum, be provided with prefabricated tubular pile, described prefabricated pipe in described mixed layer, soft mud and hard stratum
Stake is stretched into degree of depth D4 in hard stratum and is more than 2 meters, and the thickness D2 of described mixed layer is more than 3 meters, sets above described mixed layer
Being equipped with reinforced bed, the top of prefabricated tubular pile is fixed by described reinforced bed.
2. a kind of skyscraper pipe pile foundation being applicable to weak soil place according to claim 1, it is characterised in that described
Degree of depth D3 of reinforced bed is in the range of 16 ~ 30cm.
3. a kind of skyscraper pipe pile foundation being applicable to weak soil place according to claim 2, it is characterised in that described
Degree of depth D3 of reinforced bed is 20cm.
4. a kind of skyscraper pipe pile foundation being applicable to weak soil place according to claim 1, it is characterised in that in institute
It is filled with armored concrete in stating prefabricated tubular pile and fill core.
5. a kind of skyscraper pipe pile foundation being applicable to weak soil place according to claim 4, it is characterised in that described
Armored concrete fills the concrete in core and uses C50 high-strength concrete.
6. any one according to claim 1 or 2 or 3 is applicable to the skyscraper pipe pile foundation in weak soil place, its feature
Being, described reinforced bed uses 6mm reinforced mesh.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620529127.7U CN205676911U (en) | 2016-06-03 | 2016-06-03 | A kind of skyscraper pipe pile foundation being applicable to weak soil place |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620529127.7U CN205676911U (en) | 2016-06-03 | 2016-06-03 | A kind of skyscraper pipe pile foundation being applicable to weak soil place |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205676911U true CN205676911U (en) | 2016-11-09 |
Family
ID=57433675
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620529127.7U Active CN205676911U (en) | 2016-06-03 | 2016-06-03 | A kind of skyscraper pipe pile foundation being applicable to weak soil place |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205676911U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107956194A (en) * | 2017-12-25 | 2018-04-24 | 武汉广益交通科技股份有限公司 | Ensure the soft soil roadbed structure and construction method of roadbed reclamation |
-
2016
- 2016-06-03 CN CN201620529127.7U patent/CN205676911U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107956194A (en) * | 2017-12-25 | 2018-04-24 | 武汉广益交通科技股份有限公司 | Ensure the soft soil roadbed structure and construction method of roadbed reclamation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105840207B (en) | Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body | |
CN103233473B (en) | Many ribs of high polymer stake grouting method | |
CN101775814B (en) | Anti-slip cement soil pile soil blocking structure and construction method thereof | |
CN100501011C (en) | Hole drilling mudjack pile construction method | |
CN202466594U (en) | Horizontal jet grouting soil anchoring and cast-in-place pile compound foundation pit supporting structure | |
JP6279945B2 (en) | Soil surface anti-slip method for earth structure | |
CN104480956B (en) | A kind of minor diameter mold-bagged concrete pile composite foundation | |
CN104294821B (en) | Pile forming method for confined reinforced cement soil pile | |
CN102330436A (en) | Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank | |
CN103603379A (en) | Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system | |
CN208472592U (en) | Close to the steel pipe pile reinforced construction of deep basal pit bridge friction pile | |
CN203613568U (en) | Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system | |
CN205676911U (en) | A kind of skyscraper pipe pile foundation being applicable to weak soil place | |
CN205712121U (en) | Foundation pit supporting construction | |
CN1514073A (en) | Supporitng structure of breast wall | |
CN208309626U (en) | A kind of floating tubular pole and its dykes and dams soil-baffling structure | |
CN205205829U (en) | Weak soil underground structure | |
RU2354783C1 (en) | Reinforcement construction for building or facility foundation | |
Malik | Geotechnical statistical evaluation of Lahore site data and deep excavation design | |
Aziz et al. | Cost and schedule savings from directly-driven soil nail and innovative fascia systems | |
CN106149729A (en) | A kind of building foundation pit quaternity circular section interlocking pile supporting construction | |
CN109680695A (en) | Bore forming technique is perfused in anhydrous thickness sand cobble stratum long auger | |
CN204491627U (en) | A kind of building foundation pit quaternity circular section interlocking pile supporting and protection structure | |
RU2467126C1 (en) | Soil-concrete reinforced pile and method of its production | |
CN104153359B (en) | Construction method of prestressed concrete sparse-rebar pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |