CN102581542A CN2012100265605A CN201210026560A CN102581542A CN 102581542 A CN102581542 A CN 102581542A CN 2012100265605 A CN2012100265605 A CN 2012100265605A CN 201210026560 A CN201210026560 A CN 201210026560A CN 102581542 A CN102581542 A CN 102581542A
Authority
CN
China
Prior art keywords
waste
oil well
well pipe
old oil
old
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100265605A
Other languages
English (en)
Other versions
CN102581542B (zh
Inventor
吕学民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MEIHEKOU CITY HONGYE SEAMLESS STEEL TUBE CO Ltd
Original Assignee
MEIHEKOU CITY HONGYE SEAMLESS STEEL TUBE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MEIHEKOU CITY HONGYE SEAMLESS STEEL TUBE CO Ltd filed Critical MEIHEKOU CITY HONGYE SEAMLESS STEEL TUBE CO Ltd
Priority to CN2012100265605A priority Critical patent/CN102581542B/zh
Publication of CN102581542A publication Critical patent/CN102581542A/zh
Application granted granted Critical
Publication of CN102581542B publication Critical patent/CN102581542B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Processing Of Solid Wastes (AREA)
  • Lubricants (AREA)

Abstract

本发明公开了一种废旧油井管性能恢复工艺,如下所述:第一步、加热处理;第二步、分选处理;第三步、等径减壁处理;第四步、热扩处理;第五步、负张力减径;第六步、分选、定尺;第七步、拉伸、水压试验:将分选、定尺后的废旧油井管进行拉伸和水压试验;第八步、包装:将经检验、检测合格的油井管进行包装,交付使用;本发明的有益效果:废旧油井管重新进行锻造,使修复后的油井管内部组织更致密、更耐腐、更耐磨,对废旧油井管进行等规格再生性修复,能够达到规范以及“API”标准要求,达到节能降耗、变废为宝。

Description

废旧油井管性能恢复工艺
技术领域
本发明涉及一种油井管性能恢复工艺,特别涉及一种废旧油井管性能恢复工艺。
背景技术
目前,在油田生产中会产生大量的废旧油井管,目前废旧油井管的处理通常采用两种方式:一种是按废钢处理,重新回炉冶炼;第二种是进行简单的修复处理。
采用第一种方式会造成资源的极大浪费,并消耗大量能源,污染环境;第二种处理方式采用加热或用清洗剂清洗,除锈后选出状态好的重新加工端部螺纹,即完成修复工作。用这种方法修复的废旧油井管使用寿命不长,内表面的腐蚀点、偏磨部位、划伤部位和卡伤部位没有彻底进行修复,而且用第二种方式修复的废旧油井管的各项机械性能达不到规范和美国石油协会“API”标准要求。
发明内容
本发明的目的是为了解决油田生产中产生的大量废旧油井管回炉冶炼耗能大、污染环境以及用常规方法修复废旧油井管时不能从根本上恢复油井管的原规格尺寸和机械性能而提供的一种废旧油井管性能恢复工艺。
本发明所述的废旧油井管性能恢复工艺如下所述:
第一步、加热处理:把废旧油井管运送到多线辊底式连续热处理炉中进行加热,加热温度860±10℃,在加热过程中能够将废旧油井管上残留油污燃烧掉,加热后的废旧油井管被运到冷却台上进行自然冷却,冷却后通过矫直机矫直,以松动废旧油井管内外表面的残留物,并用空压机对废旧油井管的内外表面进行高压吹风,把上面的残留物彻底清除;
第二步、分选处理:检查经第一步工序处理的废旧油井管,将内壁磨损深度≥3mm的废旧油井管切掉;没有修复价值的废旧油井管报废处理;
第三步、等径减壁处理:将分选出来的废旧油井管经过酸洗、磷化和皂化后,利用100吨液压拔机进行等径减壁拔制;
酸洗的条件如下:
酸洗液所用的酸为硫酸,酸洗液浓度:22-24%;温度:新酸20-25℃,陈酸60-75℃;酸洗液中的亚铁含量:小于200-250g/L;酸洗时间:30-60分钟;
磷化的条件如下:
磷化液各成分重量比:Zn(NO3)28克/升,H3PO47克/升,ZnO1.25克/升游离酸度(FA):2-4pt(点);总酸度(TA):20-40pt(点);处理温度:60-80℃;处理时间:3-10分钟;
皂化条件如下:
脂肪酸钠浓度2.0-3.5(B.N)值;游离酸度:0-1.0点;处理温度:70-80℃;
处理时间:3-5分钟;
本道工序可以将废旧油井管内壁上偏磨部位的缺陷消除;
第四步、热扩处理:将等径减壁的废旧油井管通过多线辊底式连续热处理炉进行热扩处理,使金属定向合理流动并达到下道工序工艺要求;
第五步、负张力减径:将热扩后的废旧油井管经再加热炉中加热后,进入到负张力减径机内,再加热炉的加热方式为中频连续加热,废旧油井管在负张力减径机内经压延式镦轧和修复外径,使被修复油井管的壁厚、外径达到“API5CT规范”要求,将减径处理后的废旧油井管运送到冷却台上进行自然冷却,油管冷却后进入矫直机进行矫直;
第六步、分选、定尺:将矫直后的废旧油井管进行检查,短尺的废旧油井管利用摩擦焊机进行焊接;
第七步、拉伸、水压试验:将分选、定尺后的废旧油井管进行拉伸和水压试验;
第八步、包装:将经检验、检测合格的油井管进行包装,交付使用。
本发明的工作原理:
废旧油井管先在多线辊底式连续热处理炉内加热后进行清洗,清洗完后再进入到多线辊底式连续热处理炉内加热,加热后进行修复,废旧油井管的清洗与修复同时并列进行,具体如下所述:
加热清洗:把需要修复的废旧油井管运送到多线辊底式连续热处理炉中进行加热,在加热的过程中,废旧油井管上的残留油污一起进行燃烧,这样会增加炉内的热量,并且降低了一定的加热成本,废旧油井管从多线辊底式连续热处理炉加热完以后被运到冷却台上进行自然冷却,冷却后把油管运到矫直机内进行矫直,以松动旧油管内外表面的残留物,矫直后用空压机对旧油管的内外表面进行高压吹风,把上面的残留物彻底清除,加热清洗完毕。
修复:把清洗完的旧油管分选处理,将分选出来的废旧油井管经过酸洗、磷化和皂化后,利用100吨液压拔机进行等径减壁拔制,这样可以将废旧油井管内壁上偏磨部位的缺陷消除,将等径减壁的废旧油井管通过多线辊底式连续热处理炉进行热扩处理,使金属定向合理流动并达到下道工序工艺要求;将热扩后的废旧油井管经再加热炉中加热后,进入到负张力减径机内,再加热炉的加热方式为中频连续加热,废旧油井管在负张力减径机内经压延式镦轧和修复外径,使被修复油井管的壁厚、外径达到“API规范”要求,将减径处理后的废旧油井管运送到冷却台上进行自然冷却,油管冷却后进入矫直机进行矫直;将矫直后的废旧油井管进行检查,短尺的废旧油井管利用摩擦焊机进行焊接;将分选、定尺后的废旧油井管进行拉伸和水压试验;将经检验、检测合格的油井管进行包装,交付使用。
上述加热清洗时的加热和修复时旧油管在拔机处理后的加热都在多线辊底式连续热处理炉内加热,多线辊底式连续热处理炉内设置有两条加热油管线路,因此上述的加热清洗和修复工序同时进行,互不干扰。
本发明的有益效果:废旧油井管重新进行锻造,使修复后的油井管内部组织更致密、更耐腐、更耐磨,对废旧油井管进行等规格再生性修复,能够达到规范以及“API”标准要求,达到节能降耗、变废为宝。
具体实施方式
本发明所述的废旧油井管性能恢复工艺如下所述:
第一步、加热处理:把废旧油井管运送到多线辊底式连续热处理炉中进行加热,加热温度860±10℃,在加热过程中能够将废旧油井管上残留油污燃烧掉,加热后的废旧油井管被运到冷却台上进行自然冷却,冷却后通过矫直机矫直,以松动废旧油井管内外表面的残留物,并用空压机对废旧油井管的内外表面进行高压吹风,把上面的残留物彻底清除;
第二步、分选处理:检查经第一步工序处理的废旧油井管,将内壁磨损深度≥3mm的废旧油井管切掉;没有修复价值的废旧油井管报废处理;
第三步、等径减壁处理:将分选出来的废旧油井管经过酸洗、磷化和皂化后,利用100吨液压拔机进行等径减壁拔制;以Φ73.02普通油管为例,拔模规格为芯头规格为Φ65±0.01,拔制力为35吨,拔制后油管外经为Φ73.6-Φ73.75,内径为Φ64.8-Φ64.89;
酸洗条件如下:
酸洗液所用的酸为硫酸,酸洗液浓度:22-24%;温度:新酸20-25℃,陈酸60-75℃;酸洗液中的亚铁含量:小于200-250g/L;酸洗时间:30-60分钟;
磷化条件如下:
磷化液各成分重量比:Zn(NO3)28克/升,H3PO47克/升,ZnO1.25克/升游离酸度(FA):2-4pt(点);总酸度(TA):20-40pt(点);处理温度:60-80℃;处理时间:3-10分钟;
皂化的条件如下:
脂肪酸钠浓度2.0-3.5(B.N)值;游离酸度:0-1.0点;处理温度:70-80℃;
处理时间:3-5分钟。
本道工序可以将废旧油井管内壁上偏磨部位的缺陷消除;
第四步、热扩处理:将等径减壁的废旧油井管通过多线辊底式连续热处理炉进行热扩处理,比如Φ73.02普通油管,外径需热扩至Φ93-Φ98mm,使金属定向合理流动并达到下道工序工艺要求;
第五步、负张力减径:将热扩后的废旧油井管经再加热炉中加热后,进入到负张力减径机内,再加热炉的加热方式为中频连续加热,废旧油井管在负张力减径机内经压延式镦轧和修复外径,使被修复油井管的壁厚、外径达到“API规范”要求,经修复后的Φ73.02普通油管经减径后外径为
Figure BDA0000134327060000051
壁厚为5.5mm,将减径处理后的废旧油井管运送到冷却台上进行自然冷却,油管冷却后进入矫直机进行矫直;
第六步、分选、定尺:将矫直后的废旧油井管进行检查,短尺的废旧油井管利用摩擦焊机进行焊接;
第七步、拉伸、水压试验:将分选、定尺后的废旧油井管进行拉伸和水压试验;经过修复后的Φ73.02普通油管J55钢级拉伸检测拉力为42吨,压力检测为40MPa;
第八步、包装:将经检验、检测合格的油井管进行包装,交付使用。
经过上述工艺修复的废旧油井管的相关性能指标如下表所示:
Figure BDA0000134327060000061
从上表中可以看出,经过本发明所述工艺修复的J55级废旧油井管的性能指标完全能够达到规范标准要求。
本发明所述生产工艺中所用设备均为现有设备,因此具体型号和规格没有进一步进行赘述。

Claims (1)

1.一种废旧油井管性能恢复工艺,其工艺步骤如下所述:
第一步、加热处理:把废旧油井管运送到多线辊底式连续热处理炉中进行加热,加热温度860±10℃,加热后的废旧油井管被运到冷却台上进行自然冷却,冷却后通过矫直机矫直,并用空压机对废旧油井管的内外表面进行高压吹风,把上面的残留物彻底清除;
第二步、分选处理:检查经第一步工序处理的废旧油井管,将内壁磨损深度≥3mm的废旧油井管切掉;没有修复价值的废旧油井管报废处理;
第三步、等径减壁处理:将分选出来的废旧油井管经过酸洗、磷化和皂化后,利用100吨液压拔机进行等径减壁拔制;
酸洗的条件如下:
酸洗液所用的酸为硫酸,酸洗液浓度:22-24%;温度:新酸20-25℃,陈酸60-75℃;酸洗液中的亚铁含量:小于200-250g/L;酸洗时间:30-60分钟;
磷化的条件如下:
磷化液各成分重量比:Zn(NO3)2 8克/升,H3PO4 7克/升,ZnO1.25克/升,游离酸度(FA):2-4pt(点);总酸度(TA):20-40pt(点);处理温度:60-80℃;处理时间:3-10分钟;
皂化的条件如下:
脂肪酸钠浓度2.0-3.5(B.N)值;游离酸度:0-1.0点;处理温度:70-80℃;
处理时间:3-5分钟;
第四步、热扩处理:将等径减壁的废旧油井管通过多线辊底式连续热处理炉进行热扩处理,使金属定向合理流动并达到下道工序工艺要求;
第五步、负张力减径:将热扩后的废旧油井管经再加热炉中加热后,进入到负张力减径机内,废旧油井管在负张力减径机内经压延式镦轧和修复外径,将减径处理后的废旧油井管运送到冷却台上进行自然冷却,油管冷却后进入矫直机进行矫直;
第六步、分选、定尺:将矫直后的废旧油井管进行检查,短尺的废旧油井管利用摩擦焊机进行焊接;
第七步、拉伸、水压试验:将分选、定尺后的废旧油井管进行拉伸和水压试验;
第八步、包装:将经检验、检测合格的油井管进行包装,交付使用。
CN2012100265605A 2012-02-07 2012-02-07 废旧油井管性能恢复工艺 Active CN102581542B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100265605A CN102581542B (zh) 2012-02-07 2012-02-07 废旧油井管性能恢复工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100265605A CN102581542B (zh) 2012-02-07 2012-02-07 废旧油井管性能恢复工艺

Publications (2)

Publication Number Publication Date
CN102581542A true CN102581542A (zh) 2012-07-18
CN102581542B CN102581542B (zh) 2013-12-04

Family

ID=46471075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100265605A Active CN102581542B (zh) 2012-02-07 2012-02-07 废旧油井管性能恢复工艺

Country Status (1)

Country Link
CN (1) CN102581542B (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103831596A (zh) * 2014-03-28 2014-06-04 淄博弘扬石油设备集团有限公司 注水井用旧管修复方法
CN104786001A (zh) * 2015-04-13 2015-07-22 梅河口市弘业无缝钢管有限公司 一种废旧隔热油管性能恢复工艺
US20160151819A1 (en) * 2012-08-24 2016-06-02 Michael Eric Johnson Sucker rod
CN106312437A (zh) * 2015-06-29 2017-01-11 南通市嘉业机械制造有限公司 芯棒等径修复工艺
CN106734330A (zh) * 2016-12-12 2017-05-31 濮阳市顺康石油工程技术有限公司 废旧油管热轧精锻新工艺
CN108044306A (zh) * 2017-11-30 2018-05-18 王国利 一种废旧钢边棒料的节能绿色加工技术
US10195699B2 (en) 2012-08-24 2019-02-05 Trc Services, Inc. Sucker rod
CN109514170A (zh) * 2018-10-12 2019-03-26 庄河市液压件厂 一种液压阀再制造工艺
CN109877522A (zh) * 2019-03-21 2019-06-14 冮振双 一种废旧油管热轧再造修复工艺
CN111136121A (zh) * 2019-12-31 2020-05-12 乐陵市云发钢管制造有限公司 一种热扩冷锻修复装置及修复方法
CN113000623A (zh) * 2021-02-22 2021-06-22 吕学民 热轧塑变油田废旧油管等径等厚修复工艺

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007044725A (ja) * 2005-08-09 2007-02-22 Babcock Hitachi Kk 流れ加速腐食減肉部の補修方法
RU2312201C1 (ru) * 2006-07-06 2007-12-10 Закрытое Акционерное Общество Научно-Производственное Предприятие "Нефтетрубосервис" Способ подготовки к эксплуатации нарезных нефтегазопромысловых труб и комплекс для его осуществления
CN101249507A (zh) * 2008-04-02 2008-08-27 王剑波 油田废旧油管翻新方法
CN101333911A (zh) * 2007-06-28 2008-12-31 张二建 小口径冷拔油管及其加工方法
CN201685076U (zh) * 2010-05-21 2010-12-29 梅河口市弘业无缝钢管有限公司 废旧油井管性能恢复系统
CN101947714A (zh) * 2010-08-19 2011-01-19 杨永利 废旧油管再制造的整体加工工艺方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007044725A (ja) * 2005-08-09 2007-02-22 Babcock Hitachi Kk 流れ加速腐食減肉部の補修方法
RU2312201C1 (ru) * 2006-07-06 2007-12-10 Закрытое Акционерное Общество Научно-Производственное Предприятие "Нефтетрубосервис" Способ подготовки к эксплуатации нарезных нефтегазопромысловых труб и комплекс для его осуществления
CN101333911A (zh) * 2007-06-28 2008-12-31 张二建 小口径冷拔油管及其加工方法
CN101249507A (zh) * 2008-04-02 2008-08-27 王剑波 油田废旧油管翻新方法
CN201685076U (zh) * 2010-05-21 2010-12-29 梅河口市弘业无缝钢管有限公司 废旧油井管性能恢复系统
CN101947714A (zh) * 2010-08-19 2011-01-19 杨永利 废旧油管再制造的整体加工工艺方法

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160151819A1 (en) * 2012-08-24 2016-06-02 Michael Eric Johnson Sucker rod
US10195699B2 (en) 2012-08-24 2019-02-05 Trc Services, Inc. Sucker rod
CN103831596B (zh) * 2014-03-28 2016-08-17 淄博弘扬石油设备集团有限公司 注水井用旧管修复方法
CN103831596A (zh) * 2014-03-28 2014-06-04 淄博弘扬石油设备集团有限公司 注水井用旧管修复方法
CN104786001B (zh) * 2015-04-13 2017-06-23 梅河口市弘业无缝钢管有限公司 一种废旧隔热油管性能恢复工艺
CN104786001A (zh) * 2015-04-13 2015-07-22 梅河口市弘业无缝钢管有限公司 一种废旧隔热油管性能恢复工艺
CN106312437A (zh) * 2015-06-29 2017-01-11 南通市嘉业机械制造有限公司 芯棒等径修复工艺
CN106734330A (zh) * 2016-12-12 2017-05-31 濮阳市顺康石油工程技术有限公司 废旧油管热轧精锻新工艺
CN106734330B (zh) * 2016-12-12 2019-01-18 濮阳市顺康石油工程技术有限公司 废旧油管热轧精锻新工艺
CN108044306A (zh) * 2017-11-30 2018-05-18 王国利 一种废旧钢边棒料的节能绿色加工技术
CN109514170A (zh) * 2018-10-12 2019-03-26 庄河市液压件厂 一种液压阀再制造工艺
CN109877522A (zh) * 2019-03-21 2019-06-14 冮振双 一种废旧油管热轧再造修复工艺
CN111136121A (zh) * 2019-12-31 2020-05-12 乐陵市云发钢管制造有限公司 一种热扩冷锻修复装置及修复方法
CN113000623A (zh) * 2021-02-22 2021-06-22 吕学民 热轧塑变油田废旧油管等径等厚修复工艺

Also Published As

Publication number Publication date
CN102581542B (zh) 2013-12-04

Similar Documents

Publication Publication Date Title
CN102581542B (zh) 废旧油井管性能恢复工艺
CN109500130B (zh) 一种直径920㎜的长管拖车气瓶用无缝钢管的制造方法
CN101691630B (zh) 无缝钢管的制造方法
CN101623719B (zh) 核电热交换器用不锈钢传热管的制造方法
CN201685076U (zh) 废旧油井管性能恢复系统
CN108262359B (zh) 一种改善冷轧钛带卷表面质量的工艺方法
CN103074482B (zh) 一种报废Cr5锻钢工作辊的再生方法
CN104894485A (zh) 耐高温抗脆断Φ508mm以上核电站用无缝钢管的生产方法
CN101671773A (zh) 无缝钢管的制造方法
CN113061783A (zh) 一种高温合金无缝异型管及其生产方法
CN104862593B (zh) 铁素体不锈钢无缝钢管的制备方法
CN102560057A (zh) 一种热轧无缝钢管的热处理工艺方法及系统
CN112024637A (zh) 高效换热设备用精密超长不锈钢管的生产线
CN102463270A (zh) 一种无缝钢管的制造方法
CN101551197B (zh) 硫铁矿制酸中焙烧炉冷却排管修复方法
CN100408905C (zh) 一种压力管道用无缝钢管的制造方法
CN102465200A (zh) 无缝钢管的制造方法
CN213288196U (zh) 高效换热设备用精密超长不锈钢管的生产线
CN101691629B (zh) 无缝钢管的制造方法
CN103331326B (zh) 一种高钼合金的制管工艺以及高钼合金无缝钢管
CN215279270U (zh) 一种油田废旧油管修复设备
CN102463269A (zh) 无缝钢管的制造方法
CN101691628A (zh) 无缝钢管的制造方法
CN103028813A (zh) G42CrMo4N冷轧轴套局部破损的焊接修复方法
CN101165306A (zh) 一种抽油杆冷拔复新制造工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Waste and old oil well pipe performance recovery process

Effective date of registration: 20180329

Granted publication date: 20131204

Pledgee: Jilin Liang Cheng guarantee investment Co., Ltd.

Pledgor: Meihekou City Hongye Seamless Steel Tube Co., Ltd.

Registration number: 2018220000009