CN102562086B - 盾构掘进左右转向时回转弯矩的计算方法 - Google Patents

盾构掘进左右转向时回转弯矩的计算方法 Download PDF

Info

Publication number
CN102562086B
CN102562086B CN2012100134223A CN201210013422A CN102562086B CN 102562086 B CN102562086 B CN 102562086B CN 2012100134223 A CN2012100134223 A CN 2012100134223A CN 201210013422 A CN201210013422 A CN 201210013422A CN 102562086 B CN102562086 B CN 102562086B
Authority
CN
China
Prior art keywords
shield
moment
flexure
revolution
bending moment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2012100134223A
Other languages
English (en)
Other versions
CN102562086A (zh
Inventor
张茜
亢一澜
曲传咏
蔡宗熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN2012100134223A priority Critical patent/CN102562086B/zh
Publication of CN102562086A publication Critical patent/CN102562086A/zh
Application granted granted Critical
Publication of CN102562086B publication Critical patent/CN102562086B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明提出了一种盾构掘进中进行左右转向时回转弯矩的计算方法,为盾构施工提供科学有效的参数控制依据。计算方法分为以下二个步骤:(1)计算左右转向时刀盘的回转弯矩M1;(2)计算左右转向时盾壳挤压土体形成的回转弯矩M2,进行左右转向时盾构总回转弯矩M=M1+M2。当盾构机在上下分层地质条件中掘进时,可根据工程沿线地质分层情况及预设掘进轨迹,预先确定工程全线的回转弯矩控制目标,并可随着掘进过程中地质条件和操作状态的改变随时进行调整,改善了原有控制方法的滞后性,为维持盾构高效安全的沿预设路线掘进提供科学有效的数据依据。

Description

盾构掘进左右转向时回转弯矩的计算方法
技术领域
本发明属于盾构机械施工技术,具体涉及一种盾构掘进中进行左右转向时预测其回转弯矩的计算方法。
背景技术
近年来,随着许多城市大力发展地下交通建设,盾构施工法作为一种暗挖隧道方法、以其对周围环境扰动小等优点被广泛应用于地铁工程施工。在盾构掘进过程中,其载荷值(推力、扭矩及弯矩等)均需随着地质条件、掘进速度及掘进轨迹的变化实时调整。其中推力和扭矩用于驱动盾构整体向前推进以及刀盘的旋转,而弯矩则用于控制盾构的掘进轨迹。在隧道工程中,盾构预设掘进路线在左右方向多为曲线掘进,需要通过设定并实时调整回转弯矩实现盾构左右转向,从而保证盾构按照预设路线掘进。目前,该回转弯矩的施加主要依靠盾构机操纵人员的经验,在某些地质条件变化剧烈的施工段,由于缺乏预先的调整依据,常常会使得盾构实际掘进线路与预设轨迹发生偏离,造成较大的损失。因此,提出一种盾构掘进中进行左右转向时回转弯矩的计算方法,是盾构施工领域亟待解决的难题。
发明内容
本发明的目的是,提出一种盾构掘进中进行左右转向时回转弯矩的计算方法,为盾构施工提供科学有效的参数控制依据。
本发明的计算方法分为以下二个步骤:
(1)计算左右转向时刀盘的回转弯矩M1
(2)计算左右转向时盾壳挤压土体形成的回转弯矩M2
具体计算式为:
M 1 = Σ i = 1 n [ ( 1 - η ) E i h i x i 2 tan β 8 ( 1 - μ i 2 ) ]
M 2 = E ‾ R L 2 tan β 3 ( 1 - μ ‾ 2 )
进行左右转向时盾构总回转弯矩M=M1+M2
式中:n表示设定的掘进面自上而下地质层数;hi为第i层的厚度(m);xi为掘进面第i层地质中心的宽度(m);Ei为掘进面第i层土体的弹性模量(MPa);
Figure GDA00003614203600013
为掘进面土体的平均弹性模量;μi为掘进面第i层土体的泊松比;
Figure GDA00003614203600014
为掘进面土体的平均泊松比;β为刀盘回转角(°),盾构左转时回转角为正值,右转时回转角为负值;R为刀盘半径(m);η为刀盘开口率;L为盾壳长度(m)。
上述回转弯矩M的计算公式的结果为正值时,表示需要给盾构刀盘施加一个使其左转的弯矩以保证盾构按预设轨迹掘进,弯矩的大小为|M|,当计算结果为负值时,则表示需要施加一个使其右转的弯矩,弯矩的大小亦为|M|。
本发明的特点以及产生的积极效果是,当盾构在上下分层地质条件中掘进时,可根据工程沿线地质分层情况及预设掘进轨迹,预先确定工程全线的回转弯矩控制目标,并可随着掘进过程中地质条件和操作状态的改变随时进行调整,改善了原有控制方法的滞后性,为维持盾构高效安全的沿预设路线掘进提供科学有效的数据依据。
具体实施方式
以下通过具体实施例对本发明的计算过程作进一步的说明,需要说明的是本实施例是叙述性的,而不是限定性的,不以此限定本发明的保护范围。
盾构掘进左右转向时回转弯矩的计算方法,具体计算分为以下二个步骤:
(1)计算左右转向时刀盘的回转弯矩M1
M 1 = Σ i = 1 n [ ( 1 - η ) E i h i x i 2 tan β 8 ( 1 - μ i 2 ) ]
式中:n表示设定的掘进面自上而下地质层数;hi为第i层的厚度(m);xi为掘进面第i层地质中心的宽度(m);Ei为掘进面第i层土体的弹性模量(MPa);μi为掘进面第i层土体的泊松比,β为刀盘回转角(°),盾构左转时回转角为正值,右转时回转角为负值;η为刀盘开口率。
(2)计算左右转向时盾壳挤压土体形成的回转弯矩M2
M 2 = E ‾ R L 2 tan β 3 ( 1 - μ ‾ 2 )
式中:
Figure GDA00003614203600023
为掘进面土体的平均弹性模量(MPa);R为刀盘半径(m);L为盾壳长度(m);
Figure GDA00003614203600024
为掘进面土体的平均泊松比。
进行左右转向时盾构总回转弯矩:M=M1+M2
总回转弯矩M的计算公式的结果为正值时,需要给盾构刀盘施加一个使其左转的弯矩以保证盾构按预设轨迹掘进,弯矩的大小为|M|,当M计算结果为负值时,则需要施加一个使其右转的弯矩,弯矩的大小亦为|M|。
以某地铁工程作为实施例。该工程所使用的盾构机结构参数如下:刀盘半径R=3.2m,刀盘开口率η=44%,盾壳长度L=8.2m。该工程掘进到第150环时处于左右调向状态,因此以掘进到该环时的地质条件与操作状态为例,给出计算盾构掘进到该环时所需回转弯矩的详细步骤,其他各环均可按照相同的方法进行计算。
计算中所涉及的地质参数均取自地质报告,该工程第150环处的地质参数如下:开挖面自上而下共分n=4层。第1层为淤泥质粉质粘土:弹性模量E1=4.4MPa,泊松比μ1=0.44,地质层厚度h1=0.5m,宽度x1=2.4m。第2层为粉质粘土:E2=5.5MPa,μ2=0.29,h2=2.7m,x2=5.8m。第3层为粉土:E3=7.6MPa,μ3=0.29,h3=2.3m,x3=6.0m。第4层为粉砂:E4=8.9MPa,μ4=0.23,h4=0.9m,x4=3.2m。此外,平均弹性模量
Figure GDA00003614203600033
平均泊松比
计算中所涉及的操作参数由盾构机自动记录,该工程掘进至第150环处时的操作参数为,回转角β=4°。
第一步计算刀盘回转弯矩M1
M 1 = Σ i = 1 n [ ( 1 - η ) E i h i x i 2 tan β 8 ( 1 - μ i 2 ) ] , 得到M1=9.4kNm
第二步计算盾壳挤压土体形成的回转弯矩M2
M 2 = E ‾ R L 2 tan β 3 ( 1 - μ ‾ 2 ) , 得到M2=36.5kNm
第三步计算左右调向时盾构总回转弯矩M:
由M=M1+M2,得到M=45.9kNm。计算结果为正值,说明掘进到第150环时需要给刀盘施加一个使其左转,大小为45.9kNm的回转弯矩。
至此,为保证盾构沿预设路线掘进,已预先计算出该地铁工程掘进至第150环处时,盾构所需的回转弯矩值。其余各环均可按照相同方法确定,由此可预先获得盾构在整段工程标段中的回转弯矩预设方案,为盾构施工提供科学有效的数据依据。

Claims (1)

1.盾构掘进左右转向时回转弯矩的计算方法,其特征在于具体计算分为以下二个步骤:
(1)计算左右转向时刀盘的回转弯矩M1
M 1 = Σ i = 1 n [ ( 1 - η ) E i h i x i 2 tan β 8 ( 1 - μ i 2 ) ]
式中:n表示设定的掘进面自上而下地质层数;hi为第i层的厚度;xi为掘进面第i层地质中心的宽度;Ei为掘进面第i层土体的弹性模量;μi为掘进面第i层土体的泊松比;β为刀盘回转角,盾构左转时回转角为正值,右转时回转角为负值;η为刀盘开口率,
(2)计算左右转向时盾壳挤压土体形成的回转弯矩M2
M 2 = E ‾ R L 2 tan β 3 ( 1 - μ ‾ 2 )
式中:
Figure FDA00003614203500013
为掘进面土体的平均弹性模量;R为刀盘半径;L为盾壳长度;为掘进面土体的平均泊松比,
进行左右转向时盾构总回转弯矩:M=M1+M2
总回转弯矩M的计算公式的结果为正值时,需要给盾构刀盘施加一个使其左转的弯矩以保证盾构按预设轨迹掘进,弯矩的大小为|M|,当M计算结果为负值时,则需要施加一个使其右转的弯矩,弯矩的大小亦为|M|。
CN2012100134223A 2012-01-17 2012-01-17 盾构掘进左右转向时回转弯矩的计算方法 Active CN102562086B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100134223A CN102562086B (zh) 2012-01-17 2012-01-17 盾构掘进左右转向时回转弯矩的计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100134223A CN102562086B (zh) 2012-01-17 2012-01-17 盾构掘进左右转向时回转弯矩的计算方法

Publications (2)

Publication Number Publication Date
CN102562086A CN102562086A (zh) 2012-07-11
CN102562086B true CN102562086B (zh) 2013-11-13

Family

ID=46408520

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100134223A Active CN102562086B (zh) 2012-01-17 2012-01-17 盾构掘进左右转向时回转弯矩的计算方法

Country Status (1)

Country Link
CN (1) CN102562086B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612701B (zh) * 2015-01-12 2017-08-25 天津大学 左右转向时盾构推进油缸水平分区压力配比的确定方法
CN104632239B (zh) * 2015-01-12 2017-05-17 天津大学 分层地质中盾构机推进油缸垂直分区压力配比的确定方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102289588A (zh) * 2011-08-18 2011-12-21 天津大学 上下分层地质条件下盾构刀盘俯仰弯矩的计算方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10220170A (ja) * 1997-02-06 1998-08-18 Toda Constr Co Ltd シールド掘進機の姿勢検出方法および装置

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102289588A (zh) * 2011-08-18 2011-12-21 天津大学 上下分层地质条件下盾构刀盘俯仰弯矩的计算方法

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
张莹等.盾构机掘进参数的关联分析与地质特征识别.《哈尔滨工程大学学报》.2011,第32卷(第4期),476-480.
曾晓星等.盾构机复合岩土层掘进刀盘弯矩特性分析.《上海交通大学学报》.2010,第44卷(第1期),51-55.
盾构刀盘掘进载荷的数值模拟;苏翠侠等;《天津大学学报》;20110630;第44卷(第6期);522-528 *
盾构机复合岩土层掘进刀盘弯矩特性分析;曾晓星等;《上海交通大学学报》;20100131;第44卷(第1期);51-55 *
盾构机掘进参数的关联分析与地质特征识别;张莹等;《哈尔滨工程大学学报》;20110430;第32卷(第4期);476-480 *
苏翠侠等.盾构刀盘掘进载荷的数值模拟.《天津大学学报》.2011,第44卷(第6期),522-528.

Also Published As

Publication number Publication date
CN102562086A (zh) 2012-07-11

Similar Documents

Publication Publication Date Title
Li et al. Response of a double-decked metro tunnel to shield driving of twin closely under-crossing tunnels
Ates et al. Estimating torque, thrust and other design parameters of different type TBMs with some criticism to TBMs used in Turkish tunneling projects
CN102262712B (zh) 上下分层地质条件下盾构刀盘正面载荷的计算方法
CN102562079B (zh) 盾构掘进中沿深度方向调向时俯仰弯矩的计算方法
Jain et al. Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps–a case study
CN108241780B (zh) 复合盾构在岩土混合地质中掘进刀盘扭矩的计算方法
CN107885899A (zh) 一种盾构tbm掘进效能综合评价方法
CN110704963B (zh) 一种优化土压平衡式盾构机掘进参数的快速方法
CN104389615A (zh) 滨海软土地层小半径曲线大坡度盾构施工方法
CN108268709B (zh) 复合盾构在岩土混合地质中掘进总推力的计算方法
CN102562086B (zh) 盾构掘进左右转向时回转弯矩的计算方法
CN102147826B (zh) 隧道掘进机在不同地质下最优掘进速度的计算方法
CN102129499B (zh) 隧道掘进机刀盘驱动载荷计算方法
CN104329093A (zh) 一种盾构区间隧道组段划分方法
Xie et al. Parametric analysis of mixshield tunnelling in mixed ground containing mudstone and protection of adjacent buildings: case study in Nanning metro
Perras et al. Geological and geotechnical observations from the Niagara Tunnel Project
CN103470263A (zh) 一种露天金属矿山的新水平开拓方法
CN102289588B (zh) 上下分层地质条件下盾构刀盘俯仰弯矩的计算方法
CN103899328B (zh) 曲面型土压平衡盾构刀盘正面扭矩的计算方法
CN103352705A (zh) 盾构机刀盘系统推力的计算方法
CN104612701B (zh) 左右转向时盾构推进油缸水平分区压力配比的确定方法
CN103575522B (zh) 隧道全断面掘进机刀盘模拟加载装置
CN116933378A (zh) 一种盾构切桩推力预测方法
CN109184705B (zh) 一种盾构隧道复杂掘进环境下控制地层变形的方法
Liu et al. The thin coal seam (TCS) mining technology for open pit mines in China

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant