CN104612701B - 左右转向时盾构推进油缸水平分区压力配比的确定方法 - Google Patents

左右转向时盾构推进油缸水平分区压力配比的确定方法 Download PDF

Info

Publication number
CN104612701B
CN104612701B CN201510014103.8A CN201510014103A CN104612701B CN 104612701 B CN104612701 B CN 104612701B CN 201510014103 A CN201510014103 A CN 201510014103A CN 104612701 B CN104612701 B CN 104612701B
Authority
CN
China
Prior art keywords
mrow
msub
areas
msup
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510014103.8A
Other languages
English (en)
Other versions
CN104612701A (zh
Inventor
张茜
亢澜
亢一澜
蔡宗熙
侯振德
仇巍
曲传咏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201510014103.8A priority Critical patent/CN104612701B/zh
Publication of CN104612701A publication Critical patent/CN104612701A/zh
Application granted granted Critical
Publication of CN104612701B publication Critical patent/CN104612701B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

一种左右转向时盾构推进油缸水平分区压力配比的确定方法,包括:1)计算盾构机左右转向时的回转弯矩Mh;2)计算B区推进油缸的位置偏移量RB;3)计算D区推进油缸的位置偏移量RD;4)计算D区与B区推进油缸压力的配比值:式中:Dh为单个油缸直径,单位mm;P′为B区油缸基准压力,单位kPa。本发明当盾构机掘进中伴有左右转向时,可根据地质条件、掘进速度及掘进轨迹,确定工程全线的推进油缸水平分区压力配比的定量控制目标,改善了原有经验控制方式的滞后性和不确定性,为维持盾构机高效安全的沿预设路线掘进提供科学的数据依据。

Description

左右转向时盾构推进油缸水平分区压力配比的确定方法
技术领域
本发明涉及一盾构推进油缸水平分区压力配比。特别是涉及一种左右转向时盾构推进油缸水平分区压力配比的确定方法。
背景技术
近年来,随着许多城市大力发展地下交通建设,盾构施工法作为一种暗挖隧道方法、以其对周围环境扰动小等优点被广泛应用于地铁工程施工。在盾构机掘进过程中,其推进油缸不同分区的压力配比需根据地质条件、掘进速度及掘进轨迹的变化等多种因素确定。当盾构机掘进中伴随左右转向时,需要准确设定并实时调整推进油缸B区和D区(水平方向的两个分区)的压力匹配来实现装备在水平方向的控制,保证盾构机按照预设路线掘进。目前,该推进油缸水平分区压力的配比设定与调整主要依靠盾构机操纵人员的经验,在某些地质条件变化剧烈的施工段,由于缺乏定量的参数控制依据,可能导致盾构机实际掘进轨迹与预设线路发生偏离,造成较大的损失。因此,提出一种左右转向时盾构机推进油缸水平分区压力配比的确定方法,早已成为盾构机施工领域之急需。
发明内容
本发明所要解决的技术问题是,提供一种能够为盾构机施工提供可靠的参数控制依据的左右转向时盾构推进油缸水平分区压力配比的确定方法。
本发明所采用的技术方案是:一种左右转向时盾构推进油缸水平分区压力配比的确定方法,包括如下步骤:
1)计算盾构机左右转向时的回转弯矩Mh
式中:n表示掘进面地质分层数;hi为第i层地质的厚度,单位m;xi为掘进面第i层地质中心的宽度,单位m;Ei为掘进面第i层土体的弹性模量单位MPa;μi为掘进面第i层土体的泊松比;为掘进面土体的平均弹性模量,单位MPa;为掘进面土体的平均泊松比;β为刀盘回转角,单位度,盾构机左转时回转角为正值,右转时回转角为负值;R为刀盘半径,单位m;η为刀盘开口率;L为盾壳长度,单位m;
2)计算B区推进油缸的位置偏移量RB
式中:rBj为B区第j个推进油缸至盾构机中心轴线的水平距离,单位m;m为B区推进油缸的总个数;
3)计算D区推进油缸的位置偏移量RD
式中:rDi为D区第i个推进油缸至盾构机中心轴线的水平距离,单位m;n为D区推进油缸的总个数;
4)计算D区与B区推进油缸压力的配比值λDB
式中:Dh为单个油缸直径,单位mm;P′为B区油缸基准压力,单位kPa。
本发明的左右转向时盾构推进油缸水平分区压力配比的确定方法,当盾构机掘进中伴有左右转向时,可根据地质条件、掘进速度及掘进轨迹,确定工程全线的推进油缸水平分区压力配比的定量控制目标,改善了原有经验控制方式的滞后性和不确定性,为维持盾构机高效安全的沿预设路线掘进提供科学的数据依据。
附图说明
图1是本发明中盾构机推进油缸水平分区位置示意图。
具体实施方式
下面结合实施例和附图对本发明的左右转向时盾构推进油缸水平分区压力配比的确定方法做出详细说明,需要说明的是本实施例是叙述性的,而不是限定性的,不以此限定本发明的保护范围。
本发明的左右转向时盾构推进油缸水平分区压力配比的确定方法,包括如下步骤:
1)计算盾构机左右转向时的回转弯矩Mh
式中:n表示掘进面地质分层数;hi为第i层地质的厚度,单位m;xi为掘进面第i层地质中心的宽度,单位m;Ei为掘进面第i层土体的弹性模量单位MPa;μi为掘进面第i层土体的泊松比;为掘进面土体的平均弹性模量,单位MPa;为掘进面土体的平均泊松比;β为刀盘回转角,单位度(°),盾构机左转时回转角为正值,右转时回转角为负值;R为刀盘半径,单位m;η为刀盘开口率;L为盾壳长度,单位m;
2)计算B区推进油缸的位置偏移量RB
式中:rBj为B区第j个推进油缸至盾构机中心轴线的水平距离,单位m;m为B区推进油缸的总个数;
3)计算D区推进油缸的位置偏移量RD
式中:rDi为D区第i个推进油缸至盾构机中心轴线的水平距离,单位m;n为D区推进油缸的总个数;
4)计算D区与B区推进油缸压力的配比值λDB
式中:Dh为单个油缸直径,单位mm;P′为B区油缸基准压力,单位kPa。
下面是具体实例:
本实例的工程所使用的盾构机结构参数如下:刀盘半径R=3.2m,刀盘开口率η=44%,盾壳长度L=8.2m,单个油缸直径Dh=450mm,B区共有5个油缸,各油缸至盾构机中心轴线的水平距离分别为rB1=2.56m,rB2=2.78m,rB3=2.91m,rB4=2.78m,rB5=2.56m,D区共有5个油缸,各油缸至盾构机中心轴线的水平距离分别为rD1=2.56m,rD2=2.78m,rD3=2.91m,rD4=2.78m,rD5=2.56m。该工程掘进到第150环时伴有左右调向,因此以掘进到该环时的地质条件与操作状态为例,给出计算盾构机掘进到该环时所需推进油缸水平分区压力配比的详细步骤,其他各环均可按照相同的方法进行计算。
计算中所涉及的地质参数均取自地质报告,该工程第150环处的地质参数如下:开挖面地质共分n=4层,第1层为粉土:弹性模量E1=7.6MPa,泊松比μ1=0.29,地质层厚度h1=0.5m,宽度x1=2.4m。第2层为砾质粘土:E2=20MPa,μ2=0.30,h2=2.7m,x2=5.8m。第3层为砂质粘土:E3=18.0MPa,μ3=0.29,h3=2.3m,x3=6.0m。第4层为粉砂:E4=8.9MPa,μ4=0.23,h4=0.9m,x4=3.2m。此外,平均弹性模量平均泊松比
计算中所涉及的操作参数由盾构机自动记录,该工程掘进至第150环处时回转角β=1°,B区油缸基准压力P′=12.8MPa。
第一步计算盾构机左右转向时的回转弯矩Mh
将上述相关参数代入公式可得:
Mh=27465.89kNm;
第二步计算B区推进油缸的位置偏移量RB
将上述相关参数代入公式可得RB=13.59m;
第三步计算D区推进油缸的位置偏移量RD
将上述相关参数代入公式可得RD=13.59m;
第四步计算D区与B区推进油缸压力的配比值λDB
将上述相关参数和第一步~第三步的结果代入公式可得λDB=1.99。
至此,已计算出该地铁工程掘进至第150环处时,D区与B区推进油缸压力的配比值λDB=1.99。掘进至150环处时D区油缸压力应为B区油缸基准压力P′=12.8MPa的1.99倍,即25.5MPa。其余各环均可按照相同方法计算,由此可预先确定整个工程标段中的推进油缸水平分区压力的定量控制目标,为保证盾构机沿预定路线掘进提供科学有效的数据依据。

Claims (1)

1.一种左右转向时盾构推进油缸水平分区压力配比的确定方法,其特征在于,包括如下步骤:
1)计算盾构机左右转向时的回转弯矩Mh
<mrow> <msub> <mi>M</mi> <mi>h</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <mrow> <mo>&amp;lsqb;</mo> <mfrac> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>&amp;eta;</mi> <mo>)</mo> <msub> <mi>E</mi> <mi>i</mi> </msub> <msub> <mi>h</mi> <mi>i</mi> </msub> <msup> <msub> <mi>x</mi> <mi>i</mi> </msub> <mn>2</mn> </msup> <mi>t</mi> <mi>a</mi> <mi>n</mi> <mi>&amp;beta;</mi> </mrow> <mrow> <mn>8</mn> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <msup> <msub> <mi>&amp;mu;</mi> <mi>i</mi> </msub> <mn>2</mn> </msup> <mo>)</mo> </mrow> </mrow> </mfrac> <mo>&amp;rsqb;</mo> </mrow> <mo>+</mo> <mfrac> <mrow> <mover> <mi>E</mi> <mo>&amp;OverBar;</mo> </mover> <msup> <mi>RL</mi> <mn>2</mn> </msup> <mi>t</mi> <mi>a</mi> <mi>n</mi> <mi>&amp;beta;</mi> </mrow> <mrow> <mn>3</mn> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <msup> <mover> <mi>&amp;mu;</mi> <mo>&amp;OverBar;</mo> </mover> <mn>2</mn> </msup> <mo>)</mo> </mrow> </mrow> </mfrac> </mrow>
式中:n表示掘进面地质分层数;hi为第i层地质的厚度,单位m;xi为掘进面第i层地质中心的宽度,单位m;Ei为掘进面第i层土体的弹性模量单位MPa;μi为掘进面第i层土体的泊松比;为掘进面土体的平均弹性模量,单位MPa;为掘进面土体的平均泊松比;β为刀盘回转角,单位度,盾构机左转时回转角为正值,右转时回转角为负值;R为刀盘半径,单位m;η为刀盘开口率;L为盾壳长度,单位m;
2)计算左侧的B区推进油缸的位置偏移量RB
<mrow> <msub> <mi>R</mi> <mi>B</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>m</mi> </munderover> <msub> <mi>r</mi> <mrow> <mi>B</mi> <mi>j</mi> </mrow> </msub> </mrow>
式中:rBj为左侧的B区第j个推进油缸至盾构机中心轴线的水平距离,单位m;m为左侧的B区推进油缸的总个数;
3)计算右侧的D区推进油缸的位置偏移量RD
<mrow> <msub> <mi>R</mi> <mi>D</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>r</mi> <mrow> <mi>D</mi> <mi>i</mi> </mrow> </msub> </mrow>
式中:rDi为右侧的D区第i个推进油缸至盾构机中心轴线的水平距离,单位m;n为右侧的D区推进油缸的总个数;
4)计算右侧的D区与左侧的B区推进油缸压力的配比值λDB
<mrow> <msub> <mi>&amp;lambda;</mi> <mrow> <mi>D</mi> <mi>B</mi> </mrow> </msub> <mo>=</mo> <mfrac> <mrow> <mn>4</mn> <msub> <mi>M</mi> <mi>h</mi> </msub> </mrow> <mrow> <msup> <msub> <mi>&amp;pi;D</mi> <mi>h</mi> </msub> <mn>2</mn> </msup> <msup> <mi>P</mi> <mo>&amp;prime;</mo> </msup> <msub> <mi>R</mi> <mi>D</mi> </msub> </mrow> </mfrac> <mo>+</mo> <mfrac> <msub> <mi>R</mi> <mi>B</mi> </msub> <msub> <mi>R</mi> <mi>D</mi> </msub> </mfrac> </mrow>
式中:Dh为单个油缸直径,单位mm;P′为左侧的B区油缸基准压力,单位kPa。
CN201510014103.8A 2015-01-12 2015-01-12 左右转向时盾构推进油缸水平分区压力配比的确定方法 Active CN104612701B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510014103.8A CN104612701B (zh) 2015-01-12 2015-01-12 左右转向时盾构推进油缸水平分区压力配比的确定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510014103.8A CN104612701B (zh) 2015-01-12 2015-01-12 左右转向时盾构推进油缸水平分区压力配比的确定方法

Publications (2)

Publication Number Publication Date
CN104612701A CN104612701A (zh) 2015-05-13
CN104612701B true CN104612701B (zh) 2017-08-25

Family

ID=53147326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510014103.8A Active CN104612701B (zh) 2015-01-12 2015-01-12 左右转向时盾构推进油缸水平分区压力配比的确定方法

Country Status (1)

Country Link
CN (1) CN104612701B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725067B (zh) * 2016-02-19 2019-01-25 中铁一局集团有限公司 盾构通用环管片拼装点位确定方法
CN108035728B (zh) * 2017-11-22 2019-07-23 天津大学 模拟tbm施工作业真实工况实验台的围岩特性模拟装置

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010077651A (ja) * 2008-09-25 2010-04-08 Ihi Corp シールドジャッキの圧力制御装置
CN201531272U (zh) * 2009-10-27 2010-07-21 大连华锐股份有限公司 盾构机前盾稳定靴液压系统
CN201794593U (zh) * 2010-08-26 2011-04-13 中铁隧道装备制造有限公司 盾构负载敏感控制系统
CN102562079B (zh) * 2012-01-17 2013-11-06 天津大学 盾构掘进中沿深度方向调向时俯仰弯矩的计算方法
CN102562086B (zh) * 2012-01-17 2013-11-13 天津大学 盾构掘进左右转向时回转弯矩的计算方法

Also Published As

Publication number Publication date
CN104612701A (zh) 2015-05-13

Similar Documents

Publication Publication Date Title
CN102996136B (zh) 盾构近距离下穿复合地基建筑物的变形控制方法
Hunt Predicting the ground movements above twin tunnels constructed in London Clay
CN104612701B (zh) 左右转向时盾构推进油缸水平分区压力配比的确定方法
Moeinossadat et al. Calculation of maximum surface settlement induced by EPB shield tunnelling and introducing most effective parameter
Huang et al. Field test optimization of shield tunnelling parameters undercrossing an existing high-speed railway tunnel: a case study
Perras et al. Geological and geotechnical observations from the Niagara Tunnel Project
Sheil et al. Prediction of pipe-jacking forces using a Bayesian updating approach
CN102562079B (zh) 盾构掘进中沿深度方向调向时俯仰弯矩的计算方法
CN104329093A (zh) 一种盾构区间隧道组段划分方法
CN103422867B (zh) 一种基于数字化的隧道微扰动施工控制方法
He et al. Surface settlement induced by slurry shield tunnelling in sandy cobble strata—A case study
CN103352705A (zh) 盾构机刀盘系统推力的计算方法
CN102562086B (zh) 盾构掘进左右转向时回转弯矩的计算方法
Mei et al. Experimental Study on Shield Tunneling Control in Full Section Water‐Rich Sand Layer of Collapsible Loess
Newman et al. Effects of changing geology on the performance of a tunnel boring machine for the Thames Tideway Tunnel, London, UK
Hsiung A case record of bored tunnels in sand based on the Kaohsiung mass rapid transit system project
Park et al. A study of shield TBM tunnelling-induced volume loss estimation considering shield machine configurations and driving data
Sindhwani et al. Construction of Rock-Socketed Secant Piles in Vicinity of Heritage and High-Rise Buildings: Case of Mumbai Metro
CN114075978B (zh) 地表沉降控制方法及系统
CN104632239B (zh) 分层地质中盾构机推进油缸垂直分区压力配比的确定方法
Hu et al. Study on construction risk analysis and risk counter-measures of river-crossing tunnel of large-diameter metro
Tran et al. Assessment on the performance of EPB-TBM in the construction of pilot metro line in Ho Chi Minh city (Vietnam)
Cheng et al. Ground Settlement Behaviour In Chalk Due To TBM Excavations
Ates et al. The relations between surface settlements and TBM excavation parameters
Bennett et al. Prevention of Internal Erosion in Homogeneous Dams—A Case Study

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 300350 District, Jinnan District, Tianjin Haihe Education Park, 135 beautiful road, Beiyang campus of Tianjin University

Patentee after: Tianjin University

Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92

Patentee before: Tianjin University