CN102561316A - Construction method for diaphragm walls - Google Patents

Construction method for diaphragm walls Download PDF

Info

Publication number
CN102561316A
CN102561316A CN201210017921XA CN201210017921A CN102561316A CN 102561316 A CN102561316 A CN 102561316A CN 201210017921X A CN201210017921X A CN 201210017921XA CN 201210017921 A CN201210017921 A CN 201210017921A CN 102561316 A CN102561316 A CN 102561316A
Authority
CN
China
Prior art keywords
wall
ground
construction
reinforcing cage
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210017921XA
Other languages
Chinese (zh)
Inventor
裴鸿斌
亓立刚
闫克启
袁跃华
崔爱珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201210017921XA priority Critical patent/CN102561316A/en
Publication of CN102561316A publication Critical patent/CN102561316A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a construction method for diaphragm walls. The method comprises the following construction steps of: constructing guide walls for the diaphragm walls; excavating trench sections after completing the guide walls for the diaphragm walls, and using slurry retaining walls; machining steel reinforcement cages section by section; cleaning sediment at the bottom of the trenches after excavating the trench sections; suspending the machined steel reinforcement cages into the excavated trench sections section by section sequentially; and concreting, and completing the construction of the diaphragm walls. According to the construction method, the shapes of the guide walls for the diaphragm walls are fully used, the corner trenching quality is ensured, the steel reinforcement cages are machined section by section, the rigidity of the steel reinforcement cages is reduced, the difficulty that the steel reinforcement cages are suspended into the trenches is reduced, the construction difficulty is reduced, the construction quality is ensured, and the construction progress is accelerated.

Description

A kind of ground-connecting-wall job practices
Technical field
The present invention relates to a kind of ground-connecting-wall job practices, relate in particular to for the ground-connecting-wall degree of depth deeply, thickness is bigger, the ground-connecting-wall job practices that the reinforcing cage ratio of rigidity is bigger.
Background technology
The especially special-shaped ground-connecting-wall of ground-connecting-wall (like " Z " shape ground-connecting-wall, " T " shape ground-connecting-wall) construction according to design size; Construction case in conjunction with existing " Z " shape ground-connecting-wall; Shown in Fig. 1-4, ground-connecting-wall is led suitably outer the putting of wall 10 widen certain size, generally do not do further outer putting and widen (like Fig. 1) but ground-connecting-wall is led wall 10 corners; Adopt mud off then, utilize the shoveling of various grooving machinery to form groove section 11 (like Fig. 2); Processing view picture reinforcing cage 12 (like Fig. 3) on platform lift view picture reinforcing cage 12 groove inlet sections 11 interior, concretings simultaneously, accomplish the construction (like Fig. 4) of " Z " shape ground-connecting-wall 13.On the one hand, the corner that this job practices is led wall 10 to ground-connecting-wall is not done and is widened processing, can not guarantee corner end soil body verticality or cave in because of other reasons produces, necking down causes that the soil body invades, thereby cause that reinforcing cage transfers difficulty; On the other hand, this job practices adopts view picture processing to reinforcing cage, and view picture reinforcing cage 12 rigidity are bigger; The reinforcing cage of particularly ultra dark, ultra wide, rigid joint (such as the I shape steel plate for sealing water); In the lifting process, produce the distortion back and be difficult to recover again, put into the groove difficulty will cause under, can only take reinforcing cage hung out and redress the groove section or fall processing such as the measure of putting or cut off reinforcing cage by force; Have a strong impact on the ground-connecting-wall construction quality, also have a strong impact on construction speed.Therefore for ground-connecting-wall, especially special-shaped ground-connecting-wall is necessary to propose a kind of new job practices.
Summary of the invention
Existence in view of the prior art problem; The present invention discloses a kind of ground-connecting-wall job practices; Through put widened section outside the corner construction of leading wall at ground-connecting-wall, with the reinforcing cage segmental machining, put into groove down respectively, guaranteed that ground-connecting-wall leads the cell wall quality of wall corner, reduced reinforcing cage rigidity, reduced reinforcing cage and transfer difficulty.
For realizing above-mentioned technique effect, the present invention provides a kind of ground-connecting-wall job practices, and this method comprises following construction sequence:
Lead wall according to designing requirement construction ground-connecting-wall;
After ground-connecting-wall to be accomplished was led wall, the box cut section adopted mud off;
The segmental machining reinforcing cage;
After groove section excavation is accomplished, cleaning bottom land sediment;
The reinforcing cage segmentation that machines is hung successively in the groove section of excavation completion;
Concreting is accomplished the ground-connecting-wall construction.
Further, described construction ground-connecting-wall is led the wall step and is also comprised: outside ground-connecting-wall is led the construction of wall angle position, put widened section.
Further, the said outer width of putting widened section is 600mm.
Further, said processing reinforcing cage step also comprises: the reinforcing cage segmentation that machines is hung successively in the groove section of excavation completion, reserve a spacing between the reinforcing cage of said segmentation.
Further, the spacing of reserving between the reinforcing cage of said segmentation is less than 150mm.
Ground-connecting-wall job practices of the present invention can make full use of ground-connecting-wall and lead the wall shape; Guarantee that ground-connecting-wall leads wall corner grooving quality, the reinforcing cage segmentation is processed, reduced the rigidity of reinforcing cage; Having reduced reinforcing cage hangs into the groove difficulty; Reduce difficulty of construction greatly, guaranteed construction quality, accelerated construction speed.
Description of drawings
Fig. 1 leads the structural representation of wall for existing " Z " shape ground-connecting-wall;
Fig. 2 leads the structural representation that wall excavates out the groove section for " Z " shape ground-connecting-wall of Fig. 1;
Fig. 3 is the structural representation of existing " Z " shape reinforcing cage;
Fig. 4 hangs the structural representation after the groove section of Fig. 2 for existing " Z " shape reinforcing cage;
Fig. 5 is the structural representation that the present invention " Z " shape ground-connecting-wall is led wall;
Fig. 6 leads the structural representation that wall excavates out the groove section for " Z " shape ground-connecting-wall of Fig. 5;
Fig. 7 is the structural representation that the present invention " Z " shape reinforcing cage is divided into two " L " shape reinforcing cages;
Fig. 8 is the part-structure sketch map of the termination backfill of the present invention " Z " shape ground-connecting-wall, body of wall concreting;
Fig. 9 is the structural representation after the present invention " Z " shape reinforcing cage hangs the groove section of Fig. 6.
The specific embodiment
For the benefit of to the understanding of ground-connecting-wall job practices of the present invention, further specify the present invention below in conjunction with accompanying drawing 5-9 and with " Z " shape ground-connecting-wall as an embodiment, the concrete steps of the method for this " Z " shape ground-connecting-wall of construction are following:
As shown in Figure 5; At first lead wall 21 according to designing requirement size normal construction " Z " shape ground-connecting-wall; Outside " Z " shape ground-connecting-wall is led 4 sections of wall 21 corners constructions, put widened section 211, this outer width L1 of putting widened section 2 11 surpasses about design width 600mm, so that during the groover excavation soil body; Can thoroughly excavate " Z " shape ground-connecting-wall and lead the soil body of wall 21 corners, assurance " Z " shape ground-connecting-wall is led the soil body of wall 21 corners and is not invaded in the groove section of designing requirement.
Then adopt groover or other mechanical equivalent of light excavation to form a groove section 22 (like Fig. 6), mud off is corrected the cell wall verticality at any time; Open-width headed by " if Z " shape ground-connecting-wall; The tip lengths of each groove section 22 is dug to the designing requirement degree of depth than the big approximately 200mm of design length, removes the bottom land sediment.
The present invention adopts segmental machining " Z " shape reinforcing cage; It is indeformable in lifting " Z " shape reinforcing cage process so can to make " Z " shape ground-connecting-wall lead wall 21; Reduce the difficulty of putting into groove down, in addition, according to the designing requirement size and combine field condition; The spacing of " Z " shape reinforcing cage of said segmentation preferably is controlled in the 150mm; " Z " shape reinforcing cage is made moulding on moulding bed, the processing platform planeness is less than 8mm, can make " Z " shape reinforcing cage of segmentation in groove section 22 these FX, have one regulate self-position cushion space.As shown in Figure 7; Can " Z " shape reinforcing cage 23 be divided into two (or a plurality of) " L " shape reinforcing cages 231,232 processes; Two " L " shape reinforcing cage 231,232 spacing L2 are 150mm; Such one " L " shape reinforcing cage 231 hangs in the groove inlet section 22; Another " L " shape reinforcing cage 232 just can be in remaining space (150mm that comprises spacing L2) according to self size adjustment position, or hang two " L " shape reinforcing cages simultaneously and also can avoid touching mutually each other influencing construction quality in 231,232 o'clock because of the existence of spacing L2.
As shown in Figure 9; 231,232 segmentations of two " L " shape reinforcing cages are hung in the groove section 22 of excavation completion; If open-width headed by the groove section 22,, groove section termination 221 employing joint casees or 24 shutoff of sand bag are transferred the concreting conduit after tight ins conjunction with shown in Figure 8; Remove bottom land sediment after-pouring walls concrete once more, accomplish the construction of the present invention " Z " shape ground-connecting-wall 20.
The job practices of " Z " of the present invention shape ground-connecting-wall 20; It is at first through leading the outer widened section 211 of putting of wall 21 corners construction to " Z " shape ground-connecting-wall; Solve " Z " shape ground-connecting-wall and lead wall 21 corner grooving quality; And with " Z " shape reinforcing cage 23 segmental machining, segmentation is transferred in the groove inlet section 22 successively, and the spacing of " L " shape reinforcing cage of segmentation is controlled in the 150mm.It is excessive that such working design has reduced reinforcing cage rigidity, and distortion post-equalization difficulty is put into problems such as groove difficulty down, has reduced difficulty of construction, has improved efficiency of construction, has guaranteed construction quality, has accelerated construction speed.

Claims (5)

1. ground-connecting-wall job practices is characterized in that this method comprises following construction sequence:
Lead wall according to designing requirement construction ground-connecting-wall;
After ground-connecting-wall to be accomplished was led wall, the box cut section adopted mud off;
The segmental machining reinforcing cage;
After said groove section excavation is accomplished, cleaning bottom land sediment;
The reinforcing cage segmentation that machines is hung successively in the groove section of excavation completion;
Concreting is accomplished the ground-connecting-wall construction.
2. ground-connecting-wall job practices according to claim 1 is characterized in that described construction ground-connecting-wall leads the wall step and also comprise: outside ground-connecting-wall is led the construction of wall angle position, put widened section.
3. ground-connecting-wall job practices according to claim 2 is characterized in that the said outer width of putting widened section is 600mm.
4. ground-connecting-wall job practices according to claim 1 is characterized in that said segmental machining reinforcing cage step also comprises: the reinforcing cage segmentation that machines is hung successively in the groove section of excavation completion, reserve a spacing between the reinforcing cage of said segmentation.
5. ground-connecting-wall job practices according to claim 4, the spacing that it is characterized in that reserving between the reinforcing cage of said segmentation is less than 150mm.
CN201210017921XA 2012-01-20 2012-01-20 Construction method for diaphragm walls Pending CN102561316A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210017921XA CN102561316A (en) 2012-01-20 2012-01-20 Construction method for diaphragm walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210017921XA CN102561316A (en) 2012-01-20 2012-01-20 Construction method for diaphragm walls

Publications (1)

Publication Number Publication Date
CN102561316A true CN102561316A (en) 2012-07-11

Family

ID=46407797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210017921XA Pending CN102561316A (en) 2012-01-20 2012-01-20 Construction method for diaphragm walls

Country Status (1)

Country Link
CN (1) CN102561316A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981859A (en) * 2014-06-05 2014-08-13 北京住总集团有限责任公司 Node structure of guide walls of underground diaphragm wall and ground under heavy load and construction method thereof
CN104499489A (en) * 2013-06-14 2015-04-08 孔志坚 Foundation pit construction method
CN107724380A (en) * 2016-08-11 2018-02-23 中国二十冶集团有限公司 The construction of guide wall method of diaphragm wall on heavy grade place
CN107956220A (en) * 2017-11-23 2018-04-24 上海建科工程咨询有限公司 A kind of prefabricated construction method for diaphragm walls based on TRD grooving
CN110172965A (en) * 2019-06-04 2019-08-27 江苏中南建筑产业集团有限责任公司 Diaphram wall steel bar segmentation formula constructing device and construction method
CN110387874A (en) * 2019-07-30 2019-10-29 杭州江润科技有限公司 Diaphram wall and construction method
CN112922028A (en) * 2021-02-02 2021-06-08 中铁四局集团有限公司 Construction method suitable for oversized circular subway station
CN113006046A (en) * 2021-02-24 2021-06-22 中建八局轨道交通建设有限公司 Underground diaphragm wall drilling and grooving construction method
CN113814336A (en) * 2021-09-27 2021-12-21 中铁二十四局集团有限公司 Integral processing method of underground diaphragm wall Z-shaped steel reinforcement cage

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06264437A (en) * 1993-03-10 1994-09-20 Taisei Corp Construction of continuous wall in underground
CN1143703A (en) * 1996-08-02 1997-02-26 北京乾坤基础工程有限公司 3 in 1 underground continuous wall and construction method thereof
JP2009007810A (en) * 2007-06-27 2009-01-15 Ohbayashi Corp Earth retaining wall structure and method of constructing earth retaining wall structure
CN101560767A (en) * 2009-05-12 2009-10-21 广东省长大公路工程有限公司 Method for connecting slotted sections in underground construction of diaphragm wall
CN101864764A (en) * 2010-05-04 2010-10-20 中交第二航务工程局有限公司 Retaining wall structure of Y-shaped rock-inlaid trough section of diaphgram wall and trough-forming construction method thereof
CN201962688U (en) * 2010-12-02 2011-09-07 中交四航局第一工程有限公司 Diaphram wall wharf pile foundation structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06264437A (en) * 1993-03-10 1994-09-20 Taisei Corp Construction of continuous wall in underground
CN1143703A (en) * 1996-08-02 1997-02-26 北京乾坤基础工程有限公司 3 in 1 underground continuous wall and construction method thereof
JP2009007810A (en) * 2007-06-27 2009-01-15 Ohbayashi Corp Earth retaining wall structure and method of constructing earth retaining wall structure
CN101560767A (en) * 2009-05-12 2009-10-21 广东省长大公路工程有限公司 Method for connecting slotted sections in underground construction of diaphragm wall
CN101864764A (en) * 2010-05-04 2010-10-20 中交第二航务工程局有限公司 Retaining wall structure of Y-shaped rock-inlaid trough section of diaphgram wall and trough-forming construction method thereof
CN201962688U (en) * 2010-12-02 2011-09-07 中交四航局第一工程有限公司 Diaphram wall wharf pile foundation structure

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
《西部探矿工程》 20060430 石文艳 "Z"型幅地下连续墙的施工工艺技术问题 第63-65页 1-5 , 第4期 *
叶晨立: "异形幅地下连续墙施工质量控制", 《福建建筑》 *
李东俊: "建筑中异形地下连续墙施工技术探讨", 《广东科技》 *
石文艳: ""Z"型幅地下连续墙的施工工艺技术问题", 《西部探矿工程》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499489A (en) * 2013-06-14 2015-04-08 孔志坚 Foundation pit construction method
CN104499489B (en) * 2013-06-14 2017-01-11 孔志坚 Foundation pit construction method
CN103981859A (en) * 2014-06-05 2014-08-13 北京住总集团有限责任公司 Node structure of guide walls of underground diaphragm wall and ground under heavy load and construction method thereof
CN107724380A (en) * 2016-08-11 2018-02-23 中国二十冶集团有限公司 The construction of guide wall method of diaphragm wall on heavy grade place
CN107956220A (en) * 2017-11-23 2018-04-24 上海建科工程咨询有限公司 A kind of prefabricated construction method for diaphragm walls based on TRD grooving
CN110172965A (en) * 2019-06-04 2019-08-27 江苏中南建筑产业集团有限责任公司 Diaphram wall steel bar segmentation formula constructing device and construction method
CN110172965B (en) * 2019-06-04 2021-08-10 江苏中南建筑产业集团有限责任公司 Sectional construction device and construction method for underground continuous wall reinforcing steel bars
CN110387874A (en) * 2019-07-30 2019-10-29 杭州江润科技有限公司 Diaphram wall and construction method
CN112922028A (en) * 2021-02-02 2021-06-08 中铁四局集团有限公司 Construction method suitable for oversized circular subway station
CN113006046A (en) * 2021-02-24 2021-06-22 中建八局轨道交通建设有限公司 Underground diaphragm wall drilling and grooving construction method
CN113814336A (en) * 2021-09-27 2021-12-21 中铁二十四局集团有限公司 Integral processing method of underground diaphragm wall Z-shaped steel reinforcement cage
CN113814336B (en) * 2021-09-27 2023-06-23 中铁二十四局集团有限公司 Integral processing method of Z-shaped reinforcement cage of diaphragm wall

Similar Documents

Publication Publication Date Title
CN102561316A (en) Construction method for diaphragm walls
CN103806440B (en) One can be assembled and be inserted self-clamping type precast hollow diaphram wall and construction method thereof
CN101672041B (en) Top-down construction method of large underground structure outer wall
CN104196034A (en) Foundation pit construction method employing steel sheet piles as support cofferdam
CN101560767A (en) Method for connecting slotted sections in underground construction of diaphragm wall
CN107119691A (en) One kind is applied to the square deep basal pit of the high pressure-bearing of rich water sand gravel layer and its excavation method
CN102561404B (en) Steel reinforced concrete column type joint and construction method of underground diaphragm wall using same
CN103410174B (en) GXJ underground diaphragm wall rubber is every water joint tool and constructional method thereof
CN102535519A (en) I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure
CN104652418A (en) Continuous wall underground pipeline position construction method
CN102363955A (en) Prefabricated transverse H-shaped underground continuous wall joint section structure
CN101949226B (en) Cross construction method for large pool body
CN202466644U (en) Profile steel concrete column type connector
CN204590122U (en) A kind of groover hydraulic grab with correction push pedal
CN104099946A (en) Novel jacking pipe intersegment overhaul well
CN103953027A (en) Method for constructing underground continuous wall in base rock
CN107313430A (en) The deep big foundation pit subregion construction method of three face Nearby Structures
CN203559431U (en) Precast guide wall of underground diaphragm wall
CN104929129A (en) Concrete cover-weight consolidation grouting method for non-cover-weight combination of different holes through guide pipes
CN111997044A (en) Diaphragm wall construction process based on BIM technology
CN102425156A (en) Cross section-variable underground continuous wall and construction method thereof
CN206956731U (en) One kind is applied to the square deep basal pit of the high pressure-bearing of rich water sand gravel layer
CN205742151U (en) A kind of continuous underground wall structure of adverse construction method
CN205116181U (en) Closed system of going along with sb. to guard him of trellis
CN102434718A (en) Method for reinforcing originating end of push bench

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120711