CN107724380A - The construction of guide wall method of diaphragm wall on heavy grade place - Google Patents

The construction of guide wall method of diaphragm wall on heavy grade place Download PDF

Info

Publication number
CN107724380A
CN107724380A CN201610653803.6A CN201610653803A CN107724380A CN 107724380 A CN107724380 A CN 107724380A CN 201610653803 A CN201610653803 A CN 201610653803A CN 107724380 A CN107724380 A CN 107724380A
Authority
CN
China
Prior art keywords
wall
construction
diaphragm
groove
diaphragm wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610653803.6A
Other languages
Chinese (zh)
Inventor
施群凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201610653803.6A priority Critical patent/CN107724380A/en
Publication of CN107724380A publication Critical patent/CN107724380A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/187Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a kind of construction of guide wall method of diaphragm wall on heavy grade place, this method measures the center line of diaphragm wall and leads wall sideline and mark diaphragm wall per the framing center line of groove segment and the occupation of land scope of pipe extractor first, and measures the gradient in construction of diaphragm wall section;Wall will be led and be designed as stepped form along its length, the high low head of step is controlled, connected between adjacent step by the gradient, draw the horizontal width between single step;Setting leads the slope sideline of bench-table rank apart from half of the framing center line more than pipe extractor base width;Broken pavement of road, digs out the groove for leading wall;Reinforcing bar, formwork supporting plate, casting concrete, maintenance are tied up in groove, completes construction of guide wall.Slurry liquid identity distance during this method guarantee diaphragm wall soil diging groove-forming in same groove segment is identical from wall apical side height is led, mud is improved to the stability of cell wall, is not easy to cave in, it is ensured that pipe extractor keeps coaxial with continuous wall connector pipe, tube drawing ability is improved, avoids potential safety hazard.

Description

The construction of guide wall method of diaphragm wall on heavy grade place
Technical field
The present invention relates to a kind of construction of guide wall method of diaphragm wall on heavy grade place.
Background technology
It all should be set during construction of diaphragm wall and lead wall, construction of guide wall is to ensure that the key of diaphragm wall axial location and grooving quality Process.In architectural engineering, especially in city underground architectural engineering, the foundation ditch of subway station is arranged in road mostly Between, and the wall of leading as the diaphram wall of foundation pit enclosure structure is typically configured according to the situation of road, when running into big slope Road surface is spent, wall is led in construction, and typically following problems may be encountered:If it can be caused in continuous wall trench 1. being built along road grade and leading wall The mud liquid level at both ends is located at the height difference for leading wall top in same groove segment during shoveling so that side of the mud to diaphragm wall cell wall Pressure is different, and influences the stability of groove section, reduces the effect of mud off;2. it is slope due to leading wall, for the company of pulling The pipe extractor of continuous wall joint pipe smooth can not be put, and cause pipe extractor to keep coaxial line with junction block, will production in tube drawing Raw oblique component, causes difficulty in decannulation, or even can cause to lead the damage of wall or equipment.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of construction of guide wall method of diaphragm wall on heavy grade place, this Method solves the construction difficult problem that wall is led on heavy grade place, ensures the same groove segment during diaphram wall soil diging groove-forming Wall apical side height is identical from leading for interior slurry liquid identity distance, improves mud to the stability of cell wall, is not easy to cave in, it is ensured that pipe extractor with Continuous wall connector pipe keeps coaxial, improves tube drawing ability, avoids potential safety hazard.
In order to solve the above technical problems, the construction of guide wall method of diaphragm wall includes following step on heavy grade place of the present invention Suddenly:
Step 1: upper on construction ground obtain the center line of diaphragm wall by setting-out and lead wall sideline and mark the every width of diaphragm wall The framing center line of groove section and the occupation of land scope of pipe extractor;
Step 2: the gradient in construction of diaphragm wall section is drawn by actual measurement;
Step 3: will lead wall is designed as stepped form along its length, with reference to the slope control in construction of diaphragm wall section, to lead wall every The high low head of individual step is connected between 200~300mm between adjacent step by the gradient, draws the water between single step Flat width;
Step 4: setting leads the slope sideline of bench-table rank apart from half of the framing center line more than pipe extractor base width, it is ensured that pulls out Pipe device substrate is smooth, uniform force;
Step 5: crushing pavement of road using excavating machinery, the groove for leading wall is dug out;
Step 6: tying up reinforcing bar, formwork supporting plate, casting concrete, maintenance in the groove for lead wall, construction of guide wall is completed.
It is further, described that to lead the gradient between the adjacent step of wall be 30~60 °.
Further, the height for leading wall is more than 1.5 meters.
Because the construction of guide wall method of diaphragm wall on heavy grade place of the present invention employs above-mentioned technical proposal, i.e. this method first Measure the center line of diaphragm wall and lead wall sideline and mark diaphragm wall per the framing center line of groove segment and the occupation of land model of pipe extractor Enclose, and measure the gradient in construction of diaphragm wall section;Wall will be led and be designed as stepped form along its length, control the high low of step Difference, connected by the gradient between adjacent step, draw the horizontal width between single step;The slope sideline distance of bench-table rank is led in setting Framing center line is more than the half of pipe extractor base width, it is ensured that pipe extractor substrate is smooth, uniform force;Broken pavement of road, Dig out the groove for leading wall;Reinforcing bar, formwork supporting plate, casting concrete, maintenance are tied up in groove, completes construction of guide wall.Present method solves The construction difficult problem of wall is led on heavy grade place, is ensured in the slurry liquid during diaphram wall soil diging groove-forming in same groove segment Wall apical side height is identical from leading for identity distance, improves mud to the stability of cell wall, is not easy to cave in, it is ensured that pipe extractor and continuous wall connector Pipe keeps coaxial, improves tube drawing ability, avoids potential safety hazard.
Brief description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is the plan for leading wall on heavy grade place of the present invention in the construction of guide wall method of diaphragm wall;
Fig. 2 is Fig. 1 C-C direction views.
Embodiment
As depicted in figs. 1 and 2, the construction of guide wall method of diaphragm wall includes following step to embodiment on heavy grade place of the present invention Suddenly:
Step 1: upper on construction ground obtain the center line of diaphragm wall by setting-out and lead the sideline of wall 1 and mark the every width of diaphragm wall The framing center line 2 of groove section 3 and the occupation of land scope A of pipe extractor;
Step 2: the gradient in construction of diaphragm wall section is drawn by actual measurement;
Step 3: will lead wall 1 is designed as stepped form along its length, wall 1 is led with reference to the slope control in construction of diaphragm wall section The high low head of each step 11 is connected by the gradient 12 between adjacent step 11 between 200~300mm, draws single Horizontal width B between rank;
Step 4: the half that the slope sideline 13 of the step of wall 1 is more than pipe extractor base width A apart from framing center line 2 is led in setting, really It is smooth to protect pipe extractor substrate, uniform force;
Step 5: crushing pavement of road using excavating machinery, the groove for leading wall 1 is dug out;
Step 6: tying up reinforcing bar, formwork supporting plate, casting concrete, maintenance in the groove for leading wall 1, construction of guide wall is completed.
It is preferably, described that to lead the gradient between the adjacent step 11 of wall 1 be 30~60 °.
Preferably, the height for leading wall 1 is more than 1.5 meters.
This method is simple to operate, and generalization is strong, should carry out the flatness control of each step during construction, and each step can be with It is made up of multiple continuous wall groove segments.It can be ensured during diaphram wall soil diging groove-forming in same groove segment using this method Slurry liquid identity distance wall apical side height is identical from leading, so as to ensure stability of the mud to cell wall, avoid caving in;Make tube drawing simultaneously Device can be horizontally mounted in and lead on wall, ensure that the central axis of pipe extractor and the axis of junction block coincide, so as to improve tube drawing The ability of device tube drawing;Wall length of bench is led by reasonably dividing, arrangement of reinforcement plan can be carried out in advance to Steel Reinforcing Bar Material, in favor of Reinforcing bar is saved, avoids wasting.

Claims (3)

1. a kind of construction of guide wall method of diaphragm wall on heavy grade place, it is characterised in that this method comprises the following steps:
Step 1: upper on construction ground obtain the center line of diaphragm wall by setting-out and lead wall sideline and mark the every width of diaphragm wall The framing center line of groove section and the occupation of land scope of pipe extractor;
Step 2: the gradient in construction of diaphragm wall section is drawn by actual measurement;
Step 3: will lead wall is designed as stepped form along its length, with reference to the slope control in construction of diaphragm wall section, to lead wall every The high low head of individual step is connected between 200~300mm between adjacent step by the gradient, draws the water between single step Flat width;
Step 4: setting leads the slope sideline of bench-table rank apart from half of the framing center line more than pipe extractor base width, it is ensured that pulls out Pipe device substrate is smooth, uniform force;
Step 5: crushing pavement of road using excavating machinery, the groove for leading wall is dug out;
Step 6: tying up reinforcing bar, formwork supporting plate, casting concrete, maintenance in the groove for lead wall, construction of guide wall is completed.
2. the construction of guide wall method of diaphragm wall on heavy grade place according to claim 1, it is characterised in that:It is described to lead wall The gradient is 30~60 ° between adjacent step.
3. the construction of guide wall method of diaphragm wall on heavy grade place according to claim 1, it is characterised in that:It is described to lead wall Height be more than 1.5 meters.
CN201610653803.6A 2016-08-11 2016-08-11 The construction of guide wall method of diaphragm wall on heavy grade place Pending CN107724380A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610653803.6A CN107724380A (en) 2016-08-11 2016-08-11 The construction of guide wall method of diaphragm wall on heavy grade place

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610653803.6A CN107724380A (en) 2016-08-11 2016-08-11 The construction of guide wall method of diaphragm wall on heavy grade place

Publications (1)

Publication Number Publication Date
CN107724380A true CN107724380A (en) 2018-02-23

Family

ID=61200202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610653803.6A Pending CN107724380A (en) 2016-08-11 2016-08-11 The construction of guide wall method of diaphragm wall on heavy grade place

Country Status (1)

Country Link
CN (1) CN107724380A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101319498A (en) * 2008-07-17 2008-12-10 万勇 Lattice type prefabricated prestressed underground continuous wall and its construction method
CN102312445A (en) * 2010-06-29 2012-01-11 中交第三航务工程勘察设计院有限公司 Diaphragm wall and construction method thereof
CN102561316A (en) * 2012-01-20 2012-07-11 中国建筑第八工程局有限公司 Construction method for diaphragm walls
CN203440831U (en) * 2013-07-25 2014-02-19 中国建筑土木建设有限公司 Novel basement concrete shear wall guide wall structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101319498A (en) * 2008-07-17 2008-12-10 万勇 Lattice type prefabricated prestressed underground continuous wall and its construction method
CN102312445A (en) * 2010-06-29 2012-01-11 中交第三航务工程勘察设计院有限公司 Diaphragm wall and construction method thereof
CN102561316A (en) * 2012-01-20 2012-07-11 中国建筑第八工程局有限公司 Construction method for diaphragm walls
CN203440831U (en) * 2013-07-25 2014-02-19 中国建筑土木建设有限公司 Novel basement concrete shear wall guide wall structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冉瑞乾: "《建筑基础工程施工》", 30 September 2014 *

Similar Documents

Publication Publication Date Title
CN107313431B (en) Close on not contour foundation pit method for synchronously constructing
CN103556579B (en) A kind of comprehensive grouting pressurize adds the box culvert pushing construction method of pipe curtain supporting
CN206298888U (en) For the pin shoe jacket structure of offshore boosting station
CN103741657B (en) The construction method of large-sized multifunction waterborne traffic accident
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN106499413A (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN103114599B (en) Deep basal pit sealing dewatering device and construction method thereof
CN104674863B (en) A kind of reinforcement means to existing municipal piping lane within the scope of deep pit digging
CN104652364A (en) Construction method of vertical water-sealing structure for water conservancy project
CN107059920A (en) Loess formation piping lane construction technology
CN112376589A (en) Landslide belt pile plate type comprehensive protection construction system and construction method
CN109454746B (en) Concrete pouring device for building construction and construction method thereof
CN103742157A (en) Method of newly building underground space under ground by pipe jacking method
CN104264663A (en) Hard cutting construction technology for secant piles
CN105064381A (en) High-low cutting edge double-wall steel cofferdam reinforced concrete once bottom sealing construction method
CN103670448A (en) Underground pipeline protection device and support method applying underground pipeline protection device
CN104594379B (en) Between rail yard interior lines, be incubated culvert pipe system and burial and construction method
CN106968692B (en) Tunnel excavation supporting structure and construction method thereof
CN112281810A (en) Construction method of underground diaphragm wall with water-rich fine sand layer
CN104032767A (en) Tower crane foundation in deep foundation pit and construction method of tower crane foundation
CN203625883U (en) Steel sheet support pile with pipes for foundation pit construction
CN204401485U (en) The construction structure of high roadbed draining Steel Corrugated Pipe Culvert
CN106087996B (en) Manual digging pile construction method based on self leveling backpressure device
CN110685291A (en) Supporting device for concrete cofferdam in deep water area and construction process thereof
CN115821949A (en) Support system and support method for existing high and steep slope in narrow space

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180223