CN102535838A - 一种500千伏地下变电站环境污染控制方法 - Google Patents

一种500千伏地下变电站环境污染控制方法 Download PDF

Info

Publication number
CN102535838A
CN102535838A CN2010105921692A CN201010592169A CN102535838A CN 102535838 A CN102535838 A CN 102535838A CN 2010105921692 A CN2010105921692 A CN 2010105921692A CN 201010592169 A CN201010592169 A CN 201010592169A CN 102535838 A CN102535838 A CN 102535838A
Authority
CN
China
Prior art keywords
underground
environment
construction
substation
control method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105921692A
Other languages
English (en)
Inventor
梅志农
马骏
陈家盛
金刚
张雷
徐萍
乐群
钱文进
梁辰
冯舰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
Shanghai Jiulong Electric Power Technology Co Ltd
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiulong Electric Power Technology Co Ltd, Shanghai Municipal Electric Power Co filed Critical Shanghai Jiulong Electric Power Technology Co Ltd
Priority to CN2010105921692A priority Critical patent/CN102535838A/zh
Publication of CN102535838A publication Critical patent/CN102535838A/zh
Pending legal-status Critical Current

Links

Abstract

本发明涉及一种500千伏地下变电站环境污染控制方法,该方法包括以下步骤:1)制定变电站地下施工的工艺流程,根据建筑环境,梳理分析关键要素,找出影响环境和职业健康的因素,合理安排工序,避免相互影响;2)制定电气安装施工的环境保护措施,安装先进的检测设备;3)控制地下封闭环境的噪音;4)控制地下空间的废气排放和通风;5)合理布置地下架空临时电源线;6)管理地下变电站的人员现场出入。与现有技术相比,本发明具有解决了地下施工排废通风、噪音控制等技术难点,提高了电力工程建设的环保水平和职业健康保护水平等优点。

Description

一种500千伏地下变电站环境污染控制方法
技术领域
本发明涉及一种环境污染控制方法,尤其是涉及一种500千伏地下变电站环境污染控制方法。
背景技术
由于变电站是地下布置的筒体结构,在进入电气安装阶段后施工将在封闭的地下进行,与地上变电站相比,施工难度加大,施工条件和环境更加恶劣,此外由于地处中心城区,施工产生的污染受到更多的限制,因此电气施工阶段的环境控制和对施工人员的职业健康保护的重要性更加突出。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种解决了地下施工排废通风、噪音控制等技术难点,提高了电力工程建设的环保水平和职业健康保护水平的500千伏地下变电站环境污染控制方法。
本发明的目的可以通过以下技术方案来实现:一种500千伏地下变电站环境污染控制方法,该方法包括以下步骤:1)制定变电站地下施工的工艺流程,根据建筑环境,梳理分析关键要素,找出影响环境和职业健康的因素,合理安排工序,避免相互影响;2)制定电气安装施工的环境保护措施,安装先进的检测设备;3)控制地下封闭环境的噪音;4)控制地下空间的废气排放和通风;5)合理布置地下架空临时电源线;6)管理地下变电站的人员现场出入。
与现有技术相比,本发明具有解决了地下施工排废通风、噪音控制等技术难点,提高了电力工程建设的环保水平和职业健康保护水平的优点。
具体实施方式
下面结合具体实施例对本发明进行详细说明。
实施例
一种500千伏地下变电站环境污染控制方法,该方法包括以下步骤:
步骤1)制定世博站地下施工的工艺流程,根据建筑环境,梳理分析关键要素,找出影响环境和职业健康的因素,合理安排工序,避免相互影响。
世博站电气安装工程,犹如一个小型发电厂安装工程,除了电气安装工程本身,还包括了变电站辅助系统(消防系统、冷冻系统、通风及空调系统、循环水及水处理系统)的安装与调试。这些工程环环相扣,且相互交叉,需要合理安排工程节奏以最大程度规避对地下空间环境的影响。
步骤2)对照国内外类似电气安装施工的环境保护方法,制定环境保护措施、掌握先进的检测方法。
如何做到清洁生产,降低施工过程中有毒、有害气体对环境的影响以及对施工人员的职业健康的危害,需要客观分析生产流程,采取一些科学的检测和防止措施最大程度降低对施工环境的影响。
步骤3)控制地下封闭环境噪音。
地下噪音源由一系列施工机械或者安装过程中的噪音所形成,超标的地下噪音对施工人员会造成一定的生理影响,世博站对噪音控制采取一系列措施以达到控制目标的要求。
步骤4)控制地下空间的废气排放和通风。
地下空间在安装过程中将产生不少工程废气,如果不将这些废气排出筒体外,将对地下作业人员的身体健康照成严重危害。根据现场实际情况采取怎样的措施,以最大程度降低空间污染程度,是技术的关键之一。
步骤5)合理布置地下架空临时电源线。
500kV静安(世博)变电站由于地下空间大、作业点多,为了防止施工用电现场不发生停电的事故以及临时用电的实用性和文明施工,作为现场落实安全措施的技术关键,根据现场的实际情况分析了负荷的分配、线径的选择和配电系统的布置。
步骤6)管理地下变电站的人员现场出入。
由于500KV世博变电站现场施工人员非常多,涉及到土建施工人员、电气安装人员、辅助系统中的制冷、通风系统;补给水、水处理系统;循环水系统;消防系统等各专业的施工人员,在施工高峰期间达到近500人之多。
引进国内比较先进成熟的RFID人员管理系统,对提高施工现场的人员出入管理,提高安全管理的水平,将起到到实质性的推动作用。

Claims (1)

1.一种500千伏地下变电站环境污染控制方法,其特征在于,该方法包括以下步骤:
1)制定变电站地下施工的工艺流程,根据建筑环境,梳理分析关键要素,找出影响环境和职业健康的因素,合理安排工序,避免相互影响;
2)制定电气安装施工的环境保护措施,安装先进的检测设备;
3)控制地下封闭环境的噪音;
4)控制地下空间的废气排放和通风;
5)合理布置地下架空临时电源线;
6)管理地下变电站的人员现场出入。
CN2010105921692A 2010-12-16 2010-12-16 一种500千伏地下变电站环境污染控制方法 Pending CN102535838A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105921692A CN102535838A (zh) 2010-12-16 2010-12-16 一种500千伏地下变电站环境污染控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105921692A CN102535838A (zh) 2010-12-16 2010-12-16 一种500千伏地下变电站环境污染控制方法

Publications (1)

Publication Number Publication Date
CN102535838A true CN102535838A (zh) 2012-07-04

Family

ID=46343730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105921692A Pending CN102535838A (zh) 2010-12-16 2010-12-16 一种500千伏地下变电站环境污染控制方法

Country Status (1)

Country Link
CN (1) CN102535838A (zh)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3045294B1 (ja) * 1999-02-03 2000-05-29 イソライト工業株式会社 吸音壁

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3045294B1 (ja) * 1999-02-03 2000-05-29 イソライト工業株式会社 吸音壁

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
何伟然,许有颐: "建设地下变电站的有关问题", 《华东电力》, no. 8, 31 August 1991 (1991-08-31), pages 31 - 32 *
金志明: "上海人民广场220kV地下变电站简介", 《供用电》, no. 5, 31 May 1994 (1994-05-31), pages 8 - 9 *
黄平等: "500kV世博地下变电站环境保护研究", 《华东电力》, vol. 36, no. 11, 30 November 2008 (2008-11-30), pages 1389 - 1393 *

Similar Documents

Publication Publication Date Title
Topchiy et al. Environmental situation in construction, reconstruction and re-profiling of facilities in high-density urban development
Bai et al. Hazard identification and analysis of urban utility tunnels in China
Canto-Perello et al. Risks and potential hazards in utility tunnels for urban areas
CN105260491A (zh) 管道综合布管建模方法
CN101928579B (zh) 干熄焦火灾自动报警系统安装方法
CN109244888A (zh) 一种具有散热功能的户外箱式变电站
Chen et al. Key issues study on the operation management of medical waste incineration disposal facilities
CN102535838A (zh) 一种500千伏地下变电站环境污染控制方法
CN106909127B (zh) 质子重离子加速器循环冷却水泄漏与加速器联动防灾系统
Zu-Ming et al. Smoke control–Discussion of switching elevator to evacuation elevator in high-rise building
CN106200514A (zh) 一种用于电力系统户外机柜的监控系统
CN105220763B (zh) 一种寿命较长的智能直埋式一体化预制泵站
CN209386522U (zh) 一种地下消防工程通风降噪装置
CN209040343U (zh) 一种医用防辐射混凝土墙体的过墙孔洞结构
CN109970037A (zh) 一种六氟磷酸锂制备泄漏自动处理系统
CN211047611U (zh) 正压防爆柜的机能空调装置
CN208611630U (zh) 一种防火墙变压器油防喷溅装置
Boczkowski Designing of noise protection systems in industrial environment
CN206379187U (zh) 核电站调试时环廊地坑临时蓄水池
KR20200086125A (ko) 원자력시설의 환기 계통 해체방법 및 이를 이용한 시스템
CN205960973U (zh) 移动式暗湿环境施工安全电压照明电源装置
CN110408730B (zh) 一种钢渣热闷排水管廊排汽装置
CN111006222A (zh) 固废焚烧系统的电气控制优化方法
CN203798979U (zh) 一种微机保护带电整组传动试验平台
CN213581192U (zh) 一种用于电网诊断的自动检测装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA SHANGHAI POWER COM

Free format text: FORMER OWNER: SHANGHAI JIULONG ELECTRIC POWER SCIENCE + TECHNOLOGY CO., LTD.

Effective date: 20121226

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121226

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Applicant after: Shanghai Electric Power Communication Co., Ltd.

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant before: Shanghai Electric Power Corporation

Applicant before: Shanghai Jiulong Electric Power Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120704