CN102535770A - 一种防冰雪的楼梯台阶 - Google Patents

一种防冰雪的楼梯台阶 Download PDF

Info

Publication number
CN102535770A
CN102535770A CN2012100820980A CN201210082098A CN102535770A CN 102535770 A CN102535770 A CN 102535770A CN 2012100820980 A CN2012100820980 A CN 2012100820980A CN 201210082098 A CN201210082098 A CN 201210082098A CN 102535770 A CN102535770 A CN 102535770A
Authority
CN
China
Prior art keywords
heating wire
ice
marble
snow
electrode strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100820980A
Other languages
English (en)
Inventor
李宏光
冯宇
单爱慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ludong University
Original Assignee
Ludong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ludong University filed Critical Ludong University
Priority to CN2012100820980A priority Critical patent/CN102535770A/zh
Publication of CN102535770A publication Critical patent/CN102535770A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Cleaning Of Streets, Tracks, Or Beaches (AREA)

Abstract

本发明提供了一种防冰雪的楼梯台阶,其主要由大理石1及其内部的碳纤维层2和隔热层4组成。碳纤维层2距大理石1上部1cm~2cm,通过大理石1两侧的接线点3经变压器与城市电网相连接,隔热层4位于碳纤维层2下面。其中,在接线点3与变压器之间有一个由电压表、电流表以及定时器组成监控设备。使用时接通电源,电流流过碳纤维层2即可产生热量,融化楼梯台阶上的冰雪。

Description

一种防冰雪的楼梯台阶
技术领域
本发明涉及一种楼梯台阶,特别涉及一种防冰雪的楼梯台阶。
背景技术
宾馆外面或其它公共场所的露天台阶一般都采用硬度高、表面光滑的大理石,冬天附着在大理石上面的结冰或积雪特别容易使人滑倒造成身体伤害,本发明旨在提供一种具有融雪化冰功能的楼梯台阶,能够在通电状态下,融化台阶表面的冰雪。在查询到的专利技术中,都是针对公路或其它领域的,如中国专利公开号为 CN101235621,公开日为2008年08月06日,名为“ 水泥混凝土桥面融雪化冰的电热法”的发明专利,提供了一种融雪化冰控制电路,以及时对路面的冰、雪进行清理;专利公开号为CN1451818名为“ 利用地热的融雪装置”的发明专利,提出了大型融雪场合利用地热能来融雪的技术方案,但都不适用与上面所提到的场合。
发明内容
本发明为了解决上述问题,提供了一种适用于露天楼梯的防冰雪的台阶。
为实现上述目的,本发明采用如下技术方案:
一种防冰雪的楼梯台阶,由大理石1作为基体,内部置有发热丝2、电极条5和隔热层4,所述的发热丝2、电极条5和隔热层4为大理石1成型过程中压入,具有良好的防水性;发热丝2距离大理石上表面1~2cm,电极条5位于发热丝2两端,给发热丝2供电,接线点3由电极条5中间引出,各接线点3采用并联方式连接到总线,连接接头为防水快插式接头,总线通过控制器与市电连接;所述隔热层4位于发热丝2下面,其为硬质保温材料,可为硬质石棉板、硅酸铝板、硅酸钙板等。
所述电极条5为宽度1cm左右金属条,通过焊点与发热丝2连接。
所述的发热丝2可为碳纤维发热丝、碳晶发热丝或金属发热丝。
本发明的有益效果。
1本发明通过电加热发热材料实现自动化除雪的目的,安全、高效,也不污染环境;
2本发明将发热丝压制在大理石内,热导性高,同时防止了漏电现象的发生;
3本发明中使用了隔热层,减少了热量的流失。
附图说明
图1 本发明的结构示意图。
图2本发明的侧面结构示意图。
具体实施方式
下面结合附图以及实施例对本发明作进一步详细描述:
由图1、图2可知,本发明由大理石1作为基体,内部置有发热丝2、电极条5和隔热层4,所述的发热丝2、电极条5和隔热层4为大理石1成型过程中压入,具有良好的防水性;发热丝2距离大理石上表面1~2cm,电极条5位于发热丝2两端,给发热丝2供电,接线点3由电极条5中间引出,各接线点3采用并联方式连接到总线,连接接头为防水快插式接头,总线通过控制器与市电连接;所述隔热层4位于发热丝2下面,其为硬质保温材料,可为硬质石棉板、硅酸铝板、硅酸钙板等。
 所述电极条5为宽度1cm左右金属条,通过焊点与发热丝2连接。
    所述的发热丝2可为碳纤维发热丝、碳晶发热丝或金属发热丝。
在本实施例中,隔热层4为一个厚度为10mm的硅酸钙板,具有绝热和绝缘双重功能,楼梯台阶中所有的接线点3经防水快插式接头并联,通过监控装置、变压器与城市电网相连接,且所有的接线点3由一个电源开关S统一控制。其中,接线点3电压值为110V,在接线点3与变压器之间的监控装置由电压表、电流表、时间定时器、温度传感器、湿度传感器以及微处理器组成,用于实时监测电路的电压值、电流值,并根据实际情况对电路的工作时间进行设定。
下雪时,实时监测电路检测到冰雪信号,闭合电源开关S接通电源,设定电路的工作时间T,电路中的电流流过大理石1中的发热丝2时即可产生热量,由于位于发热丝2下面的隔热层4具有绝热的功能,所以发热丝2产生的大部分热量只能向大理石1的上部传递,进而实现对楼梯台阶融雪化冰的目的,防止了楼梯台阶上出现积雪或者结冰的现象,当实时监测电路检测到冰雪已经融化净时,电路停止工作。
在本发明中,大理石是天然的无机绝缘材料,隔热层4采用的硅酸钙板也具有绝缘的功能,接线点3位于台阶两侧,通过防水接头并行连接,因此本发明不存在漏电的隐患,对行人的安全不存在威胁。

Claims (3)

1.一种防冰雪的楼梯台阶,其特征在于:所述防冰雪的楼梯台阶由大理石(1)作为基体,内部置有发热丝(2)、电极条(5)和隔热层(4),所述的发热丝(2)、电极条(5)和隔热层(4)为大理石(1)成型过程中压入,具有良好的防水性,发热丝(2)距离大理石上表面1~2cm,电极条(5)位于发热丝(2)两端,给发热丝(2)供电,接线点(3)由电极条(5)中间引出,各接线点(3)采用并联方式连接到总线,连接接头为防水快插式接头,总线通过控制器与市电连接;所述隔热层(4)位于发热丝(2)下面,其为硬质保温材料,可为硬质石棉板、硅酸铝板、硅酸钙板等。
2.根据权利要求1所述的防冰雪的楼梯台阶,其特征在于,所述电极条(5)为宽度1cm左右金属条,通过焊点与发热丝(2)连接。
3.根据权利要求1所述的防冰雪的楼梯台阶,其特征在于,所述的发热丝(2)可为碳纤维发热丝、碳晶发热丝或金属发热丝。
CN2012100820980A 2012-03-27 2012-03-27 一种防冰雪的楼梯台阶 Pending CN102535770A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100820980A CN102535770A (zh) 2012-03-27 2012-03-27 一种防冰雪的楼梯台阶

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100820980A CN102535770A (zh) 2012-03-27 2012-03-27 一种防冰雪的楼梯台阶

Publications (1)

Publication Number Publication Date
CN102535770A true CN102535770A (zh) 2012-07-04

Family

ID=46343664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100820980A Pending CN102535770A (zh) 2012-03-27 2012-03-27 一种防冰雪的楼梯台阶

Country Status (1)

Country Link
CN (1) CN102535770A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019077413A3 (en) * 2017-10-16 2019-06-27 Nvent Services Gmbh Suspension mounted heating system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0831552A (ja) * 1994-07-21 1996-02-02 Dainippon Ink & Chem Inc 階段融雪用発熱体
US5550350A (en) * 1994-11-17 1996-08-27 Donald W. Barnes Heated ice-melting blocks for steps
CN1451818A (zh) * 2002-04-12 2003-10-29 米砂瓦环境技术株式会社 利用地热的融雪装置
CN101235621A (zh) * 2007-12-25 2008-08-06 大连理工大学 水泥混凝土桥面融雪化冰的电热法
CN202047335U (zh) * 2011-04-19 2011-11-23 宗翠成 一种路面用电热网带
CN102345263A (zh) * 2011-09-14 2012-02-08 博睿思科技(大连)有限公司 一种碳纤维加热带混凝土路板

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0831552A (ja) * 1994-07-21 1996-02-02 Dainippon Ink & Chem Inc 階段融雪用発熱体
US5550350A (en) * 1994-11-17 1996-08-27 Donald W. Barnes Heated ice-melting blocks for steps
CN1451818A (zh) * 2002-04-12 2003-10-29 米砂瓦环境技术株式会社 利用地热的融雪装置
CN101235621A (zh) * 2007-12-25 2008-08-06 大连理工大学 水泥混凝土桥面融雪化冰的电热法
CN202047335U (zh) * 2011-04-19 2011-11-23 宗翠成 一种路面用电热网带
CN102345263A (zh) * 2011-09-14 2012-02-08 博睿思科技(大连)有限公司 一种碳纤维加热带混凝土路板

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019077413A3 (en) * 2017-10-16 2019-06-27 Nvent Services Gmbh Suspension mounted heating system

Similar Documents

Publication Publication Date Title
WO2010060388A1 (zh) 一种基于碳纤维-玻璃纤维复合编织网的融雪、化冰方法
CN205501771U (zh) 一种具有融雪化冰功能的道路
CN101235621A (zh) 水泥混凝土桥面融雪化冰的电热法
CN103132421B (zh) 路面自动除水及除冰雪的系统
KR20150009795A (ko) 포장도로의 융설장치 및 그의 설치방법
CN104032645A (zh) 一种热循环桥面防冻解冻系统
CN202131554U (zh) 一种路面主动保温防滑设施
CN205617181U (zh) 一种便于微波加热融雪的钢渣沥青混合料路面结构
CN202124819U (zh) 预防结冰积雪的公路桥梁
CN203113194U (zh) 路面自动除水及除冰雪的系统
CN108103887B (zh) 一种电加热融冰雪路面结构及其施工方法
CN206673532U (zh) 一种输电用自动除冰雪式复合材料横担
CN203904797U (zh) 智能环保型防冻路桥面结构
CN104631277B (zh) 一种路面施工方法
CN102535770A (zh) 一种防冰雪的楼梯台阶
CN203904798U (zh) 一种应用于市政道路的电融雪沥青混凝土路面
TWI352767B (zh)
KR20150109902A (ko) 태양광 및 전기전도 발열 콘크리트를 이용한 도로 결빙 방지 시스템 및 이를 이용한 도로 시공 방법
CN203947384U (zh) 热循环桥面防冻解冻系统
CN208748469U (zh) 一种应用于市政道路的自除冰融雪系统
CN110284397A (zh) 一种自动除冰雪路面结构及路面
CN1946253A (zh) 碳纤维复合材料制作的公路、机场电加热专用电缆
CN203639828U (zh) 一种用于混凝土桥面融雪化冰的碳纤维供热系统
CN105297558B (zh) 一种铁路隧道除冰装置
KR20150009699A (ko) 비닐하우스의 융설장치 및 그의 설치방법

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120704