CN102499012A - Planting technique for roadside trees - Google Patents

Planting technique for roadside trees Download PDF

Info

Publication number
CN102499012A
CN102499012A CN2011103653190A CN201110365319A CN102499012A CN 102499012 A CN102499012 A CN 102499012A CN 2011103653190 A CN2011103653190 A CN 2011103653190A CN 201110365319 A CN201110365319 A CN 201110365319A CN 102499012 A CN102499012 A CN 102499012A
Authority
CN
China
Prior art keywords
tree
pit
grid
hole
silt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103653190A
Other languages
Chinese (zh)
Other versions
CN102499012B (en
Inventor
胡再国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan University
Original Assignee
Sichuan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan University filed Critical Sichuan University
Priority to CN 201110365319 priority Critical patent/CN102499012B/en
Publication of CN102499012A publication Critical patent/CN102499012A/en
Application granted granted Critical
Publication of CN102499012B publication Critical patent/CN102499012B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a planting technique for roadside trees, designs a tree planting scheme, and mainly aims to solve the problems that roadside trees fall easily and the tree roots destroy the pavement. A deep pit with 1.5 meters in depth is dug, a tree is planted in the pit, then a soil layer of 0.5 meter in thickness is filled in the pit, and the tree hardly falls due to deep foundation; and a cement wall is arranged around the pit, so that the tree root is promoted to grow downwards, and damages to the pavement can be reduced. Space is formed in the pit and the cement wall and can receive leaves and silt collected by sanitation men; and a grid with holes is placed above the pit, and the leaves and silt can fall into the pit from the grid, so that garbage can be reduced.

Description

The plantation skill of the other tree in road
Technical field
The present invention relates to the field of planting of the other tree in road, city.
Background technology
Be implanted with a lot of trees other kind of the road in city, beautified environment, the cool place and the ozone in summer are provided.But because that the other tree in road is often planted is superficial, lodging easily; And root system is closer from the road surface, along with the growth of trees, and the growing up of tree root, big tree root often arches upward the road surface, causes the destruction on road surface, causes the pedestrian to trip easily.
Summary of the invention
In order to reduce the other lodging of setting and the destruction of root road pavement, the method that the present invention adopts other tree to plant deeply.
The technical solution adopted for the present invention to solve the technical problems is: with the tree root of tree be embedded in 1.5 meters dark underground; Cover 0.5 meter thick soil then; Soil layer overhead leaves 1 meter high space, and silt that the sanitationman sweeps the floor, leaf etc. can be accepted in this part space, and leaf rots to generate fertilizer; The continuous landfill of silt can constantly be reinforced the firm degree of trees, reduces the intensity that intensity that rubbish sweeps and rubbish transport so simultaneously; And adopt 1.5 meters high cement walls that tree is surrounded, and impel tree root to spatial development below 1.5 meters, avoid tree root overhead too near.
The invention has the beneficial effects as follows:, can effectively reduce influence ground because tree root is overhead distant; Alleviate garbage disposal intensity, strengthen tree nutrition.
Description of drawings
Fig. 1 is the plantation sketch map of other tree.
Wherein, 1, the edge, sand pit, 2, the sand pit, 3, cement wall, 4, tree, 5, tree well, 6, cover plate, 7, arboreal growth space.
Embodiment
The tree well 5 of planting trees is 1.5 meters wide squares; Cement wall 3 is arranged on every side, dig a hole apart from 1.5 meters, road surface at the bottom of the hole in the hole 5 that plants trees and to set on 4 kinds, the soil in cement wall behind 0.5 meter of the landfill; Having peace of mind tramp with one's feet a little a bit, and it is empty to reserve 1 meter high space in the cement wall.The purpose of cement wall is to guarantee the long as far as possible subsurface at 1.5 meters of tree root, the space of 1 meter height of reservation is used to accept the sanitationman when sweeping sand and dust and leaf.
Cement wall is outward a sand pit 2, is designed to 0.25 meter wide zone, and edge, sand pit 1 is the road surface; The sand pit also can stay a part of space to be used to accept green rubbish such as sand and dust, leaf; This moment is for strengthening its intensity, can be in the sand pit cement wall of edge designs, advise 0.5 meter height.The sand pit can also be designed to be lower than slightly road surface 1-2cm, can accept the part rainwater on rainy day, and rain leakage is to underground, and a part offers arboreal growth, and another part is converted into underground water.Owing to there is cement wall to separate between sand pit and the tree well, can prevent effectively that permanent rainy day, the waterlogging situation appearred in tree well.
Ground relates to the cover plate 6 of a cement grid, and cover plate is a square, 2 meters of the length of sides, and the protection pedestrian does not fall tree well, is the growth that protects trees, and a big circular hole is left in the centre, and the about 15cm of Edge Distance trunk of circle is proper.Cover plate has some rectangular openings, and the size in hole is wide 2-3cm, and about long 10cm, assurance dust and leaf can be fallen into wherein smoothly.

Claims (1)

1. the plantation skill of the other tree in road of the present invention designs a kind of scheme of tree planting, it is characterized in that: dig one 1.5 meters dell, plant trees at the end, hole, bury 0.5 meter thick soil layer then; 1.5 meters high cement enclosure wall is arranged around the hole; Hole and enclosure wall have living space outward and accept leaf and the silt that environmental sanitation is collected; Above the hole is porose grid, makes leaf and silt fall into tree well from grid, and the size of grid is wide 2-3cm, about long 10cm.
CN 201110365319 2011-11-17 2011-11-17 Planting technique for roadside trees Expired - Fee Related CN102499012B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110365319 CN102499012B (en) 2011-11-17 2011-11-17 Planting technique for roadside trees

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110365319 CN102499012B (en) 2011-11-17 2011-11-17 Planting technique for roadside trees

Publications (2)

Publication Number Publication Date
CN102499012A true CN102499012A (en) 2012-06-20
CN102499012B CN102499012B (en) 2013-03-13

Family

ID=46211194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110365319 Expired - Fee Related CN102499012B (en) 2011-11-17 2011-11-17 Planting technique for roadside trees

Country Status (1)

Country Link
CN (1) CN102499012B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110268958A (en) * 2019-08-01 2019-09-24 陕西科技大学 The irrigation rig and method of a kind of pair of trees

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2265673Y (en) * 1996-07-08 1997-10-29 张丽 Protection cover plate device for plants for making green by planting them
CN1404715A (en) * 2002-11-12 2003-03-26 辽宁省水利水电科学研究院 Film-bag tree planting method in sand-land

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2265673Y (en) * 1996-07-08 1997-10-29 张丽 Protection cover plate device for plants for making green by planting them
CN1404715A (en) * 2002-11-12 2003-03-26 辽宁省水利水电科学研究院 Film-bag tree planting method in sand-land

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
莫长斌: "行道树树池 方寸之间溶入美与科学", 《中国花卉报》, 1 January 2009 (2009-01-01) *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110268958A (en) * 2019-08-01 2019-09-24 陕西科技大学 The irrigation rig and method of a kind of pair of trees

Also Published As

Publication number Publication date
CN102499012B (en) 2013-03-13

Similar Documents

Publication Publication Date Title
CN204670016U (en) A kind of saline land greening arbor pattern of farming
CN101112157B (en) Method for greening high precipitous rock slope
CN102577789B (en) Method of cyclic sustainable vegetation recovery for waste dump of grassland mining area
CN101336593B (en) Method for constructing ecology garden landscape compound structures to improve salt-affected soil
CN104396494B (en) A kind of heavy saline original soil greening method
CN102392455A (en) Technique for safe improvement as well as ecological repair and reconstruction of mine soil discharge yard
CN101213910A (en) Method for using gridding plant biological bag to process greening slope
CN204220612U (en) Repair the green of heavy metals mining area soil and plant structure
CN1943316A (en) Anti-leakage, water conversion, water-saving fertilizer nutrition liquid irrigation planting method for thin film horizontal band ditch and bucket type bag
CN101843204A (en) Shiny-leaved yellowhorn non-irrigation culture method
CN104652452A (en) Water-collecting irrigation device for slope protection in karst regions
CN111543233A (en) Construction method for planting seedlings in muddy saline-alkali soil in coastal island region
CN105325225A (en) Method improving tree plantation survival rate in severe saline-alkali soil
KR20170112842A (en) Tree planting method by tree roots growth control induction machine
CN103098629A (en) Method for planting trees with soil and film composite drought resistance tree-planting hopper
CN202479197U (en) Simple structure for health improvement of refuse landfill
CN102499012B (en) Planting technique for roadside trees
KR20120098082A (en) Method for guiding roots
CN107288408A (en) A kind of Ecology City System and its construction method
CN105756015B (en) Method for restoring biodiversity dynamic landscape ecological composite system
CN207739092U (en) Landscape ecology Pavement Construction
CN105714835A (en) Abrupt slope greening protection device
CN204343308U (en) A kind of water-collecting irrigation device for karst bank protection
KR20060122367A (en) Tree pot and method of plant
CN202559492U (en) Natural drainage system for step of side slope

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130313

Termination date: 20151117

EXPY Termination of patent right or utility model