CN102494572A - Blasting method for undermining and tunnelling in mode of distributing hollow holes at periphery and solid hole in center - Google Patents

Blasting method for undermining and tunnelling in mode of distributing hollow holes at periphery and solid hole in center Download PDF

Info

Publication number
CN102494572A
CN102494572A CN2011104313815A CN201110431381A CN102494572A CN 102494572 A CN102494572 A CN 102494572A CN 2011104313815 A CN2011104313815 A CN 2011104313815A CN 201110431381 A CN201110431381 A CN 201110431381A CN 102494572 A CN102494572 A CN 102494572A
Authority
CN
China
Prior art keywords
hole
emptying aperture
slotting
center
blasting method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104313815A
Other languages
Chinese (zh)
Inventor
宫国慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Group Mining Co Ltd
Original Assignee
Angang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Group Mining Co Ltd filed Critical Angang Group Mining Co Ltd
Priority to CN2011104313815A priority Critical patent/CN102494572A/en
Publication of CN102494572A publication Critical patent/CN102494572A/en
Pending legal-status Critical Current

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention relates to a blasting method for undermining and tunnelling in a mode of distributing hollow holes at the periphery and a solid hole in the center. The blasting method is characterized by comprising the following steps of: distributing a central hole at the position 1/2 to 1/3 away from the vertical distance h of a tunnelling roadway bottom plate, namely an undermining center, and arranging a group of hollow holes around the central hole, so that the group of hollow holes and the central hole form an undermining hole; arranging more than three layers of auxiliary holes from inside to outside around the undermining hole, wherein a peripheral hole is formed in the outermost layer and comprises an arch hole, a bottom hole, a ditch bottom hole and two assistance holes; filling explosives into the central hole; arranging an explosive roll at the bottom of each hollow hole, filling the explosives at intervals into the arch hole of the peripheral hole, and filling the explosives into the two assistance holes and the bottom hole; and connecting by using half-second detonators, and detonating stage by stage, namely detonating the central hole and a group of hollow holes sequentially, detonating a first layer of auxiliary holes adjacent to the undermining hole secondly and so on, and detonating the bottom hole, the two assistance holes and the arch hole sequentially. The blasting method has a smooth blasting effect, is high in drilling footage rate and has wide practicality.

Description

Real hole, emptying aperture center slotting driving blasting method all around
Technical field
The present invention relates to metallic ore tunnelling blasting technique field, the blasting method of the particularly a kind of real hole slotting of emptying aperture center all around driving.
Background technology
China's metal mine industry roadway construction mainly is at present that the mode of driling explosion is carried out.Though development machine comes into operation, because it costs an arm and a leg (one at 600-1000 more than ten thousand yuan), body is huge, multiple factors such as operation inconvenience, by the mine produce do not adopt.And in practice for many years, metal mine driving blasting technique has obtained significant progress aspect technology, equipment, the safe practice, but unstable the hanging down with single big gun explosion drilling depth rate of photoface exploision effect is ubiquitous problem.Especially the quick-fried rock mass of hard difficulty, the problems referred to above are even more serious.
For realizing speedy drivage, improve the single big gun drilling depth of the quick-fried rock mass of hard difficulty rate, driving slotting technology more and more comes into one's own; Generally adopt " 5 heart hole Cut Blasting technology ", " rhombus diging groove blasting technique " " seam formula Cut Blasting technology " and " wedge shot technology " at present, the emptying aperture of these slotting technology is few, and the powder charge hole is many; In hard rock mass borehole blasting, its explosion scope of freedom is few, and big gun hole asphyxia by external pressure on the chest and abdomen situation is more after the explosion; Be difficult to obtain desirable drilling depth, therefore, how utilize existing rock drilling equipment and production technology to improve metal mine explosion drilling depth; Accelerating driving speed, is problem demanding prompt solution in the tunnelling blast working.
Summary of the invention
The purpose of this invention is to provide the real hole slotting of the emptying aperture center all around driving blasting method that a kind of photoface exploision is effective, the drilling depth rate is high.
The objective of the invention is to realize through following technical proposals:
Real hole, emptying aperture center slotting driving blasting method around of the present invention; Pattern, the slotting emptying aperture that it is characterized in that comprising emptying aperture center reality hole slotting around adopting deepened powder charge, reduction slotting center, implemented the detonation mode of photoface exploision, and concrete steps are following:
1) carry out the operation of cloth hole,
1. confirm the position at slotting center, promptly the 1/2-1/3 place apart from the vertical range h of digging laneway base plate is the slotting center, and at this slotting center arrangement centre bore,
2. arrange one group of emptying aperture around this centre bore then, this group of emptying aperture forms keyhole with centre bore,
3. arrange via hole more than three layers from inside to outside around the circumferencial direction of said keyhole, outermost layer is a periphery hole, and this periphery hole comprises that hole, arch, bottom outlet, ditch bottom outlet and two help the hole,
2) carry out charging, said centre bore is filled explosive, and an explosive cartridge is all adorned in the bottom of said one group of emptying aperture, and described via hole is filled explosive, and the equal spaced loading in hole is helped in the hole, arch and two of said periphery hole,
3) operation of detonating with half second detonator line, is detonated piecemeal, and firing order is that centre bore detonates earlier, is one group of emptying aperture then, secondly is the ground floor via hole of contiguous keyhole, and the like; For outermost periphery hole, the bottom outlet that detonates earlier is two to help the hole then, and what detonate at last is hole, arch and ditch bottom outlet.
The hole depth of said centre bore is 1500-3000mm.
The quantity of described one group of emptying aperture is 3-8 emptying apertures.
The spacing of said one group of emptying aperture and centre bore is 70-80mm, and the emptying aperture of this keyhole is than the dark 200mm of hollow hole of centre.
The arch pitch of holes of said periphery hole is 400-600mm, and two to help pitch-row be 650-750mm, and the pitch-row of bottom outlet is 500-600mm.
Adorn 3-4 explosive cartridges in each hole in hole, said arch, said two help to adorn 5-6 explosive cartridges in each hole in hole, and said ditch bottom outlet is filled explosive.
The advantage of real hole, emptying aperture center slotting driving blasting method is around of the present invention:
1, adopt centre bore to fill explosive, an explosive cartridge is adorned in one group of emptying aperture bottom on every side, form after the Cut Blasting tubular keyhole around real hole, emptying aperture center cutting method, the explosion scope of freedom is many, avoid explosion after the big gun hole taken place by the situation of asphyxia by external pressure on the chest and abdomen;
2, emptying aperture of the present invention is than the center hole depth 1500-3000mm of keyhole.After the centre bore explosion, because the center
The hole does not have emptying aperture dark, so the explosive in the emptying aperture can not be destroyed, can be after half second in the centre bore explosion, and the explosive in the emptying aperture just normally detonates, thereby reaches the purpose that the explosion disintegrating slag in the slotting is released fully;
Vertical range 1300-the 1400m of the slotting centre-to-centre spacing digging laneway base plate that 3, will generally adopt at present reduces to 1000m; Be convenient to encrypt the via hole and the bottom outlet of keyhole below; After guaranteeing explosion; The above and below of whole excavation operation face is similar to a plane, avoids occurring leaving the phenomenon of foundation (base plate leaves the big bag of drum).
Photoface exploision of the present invention is effective, and the drilling depth rate is high, has practicality widely.
Description of drawings
Fig. 1 is that sketch map is arranged in big gun of the present invention hole.
The specific embodiment
Below in conjunction with the description of drawings specific embodiment of the present invention.
Embodiment
As shown in Figure 1; Real hole, emptying aperture center slotting driving blasting method around of the present invention; Pattern, the slotting emptying aperture that it is characterized in that comprising emptying aperture center reality hole slotting around adopting deepened powder charge, reduction slotting center, implemented the detonation mode of photoface exploision, and concrete steps are following:
1) carry out the operation of cloth hole,
1. confirm the position at slotting center; Promptly the 1/2-1/3 place apart from the vertical range h of digging laneway base plate is the slotting center; And, confirm the position at slotting center at this slotting center arrangement centre bore 7, promptly the vertical range 1m place apart from the digging laneway base plate is the slotting center; And at this slotting center arrangement centre bore 7, the hole depth of this centre bore 7 is 1900-2000mm; Be convenient to encrypt the via hole and the bottom outlet of keyhole below, guarantee explosion after, the above and below of whole excavation operation face be similar to a plane, avoids occurring leaving the phenomenon that foundation and drum wrap greatly.
2. arrange 6 emptying apertures 5 around this centre bore 7 then, the spacing of these 6 emptying apertures 5 and centre bore 7 is 73-
75mm, said 6 emptying apertures 5 form the burn cut hole with centre bore 7, and the centre bore that adopts keyhole is than conventional center hole depth 200mm; Emptying aperture is than the mode of the center hole depth 200mm of keyhole; After the centre bore explosion, the explosive in the emptying aperture can not be destroyed, can be in the centre bore explosion after half second; Explosive in the emptying aperture just normally detonates, thereby reaches the purpose that the explosion disintegrating slag in the slotting is released fully;
3. arrange via hole 2,3,4 more than three layers from inside to outside around the circumferencial direction of said keyhole; Outermost layer is a periphery hole; This periphery hole comprises that hole, arch 1, bottom outlet 8, ditch bottom outlet 9 and two help hole 6; The hole, arch 1 of said periphery hole is apart from being 400-600mm, and two help hole 6 apart from being 650-750mm, and the pitch-row of bottom outlet 8 is 500-600mm;
2) carry out charging, said centre bore is filled explosive, and an explosive cartridge is all adorned in the bottom of 6 emptying apertures 5, adopts this kind charging means, forms the tubular keyhole after the explosion, and the explosion scope of freedom is many, avoid explosion after the big gun hole taken place by the situation of asphyxia by external pressure on the chest and abdomen.Described via hole 2,3,4 is filled explosive; Hole 6 equal spaced loadings are helped in the hole, arch 1 and two of said periphery hole; 3-4 explosive cartridge of dress in each hole in hole, said arch 1; Said two help 5-6 explosive cartridge of dress in each hole in hole 6, and with the moulding of assurance photoface exploision periphery hole, described ditch bottom outlet 9 is filled explosive;
3) operation of detonating with half second detonator line, is detonated piecemeal; Firing order is that centre bore 7 detonates earlier, is 6 emptying apertures 5 then, secondly is the ground floor via hole 4 of contiguous keyhole; And the like; The outermost periphery hole bottom outlet 8 that detonates earlier is two to help hole 6 then, and what detonate at last is hole, arch 1 and ditch bottom outlet 9.
Photoface exploision of the present invention is effective, and the drilling depth rate is high, has practicality widely.

Claims (6)

1. blasting method is tunneled in an emptying aperture center reality hole slotting all around, it is characterized in that comprising pattern, slotting emptying aperture intensification powder charge, the reduction slotting center of adopting emptying aperture center reality hole slotting all around, the detonation mode of implementing photoface exploision, and concrete steps are following:
1) carry out the operation of cloth hole,
1. confirm the position at slotting center, promptly the 1/2-1/3 place apart from the vertical range height h of digging laneway base plate is the slotting center, and at this slotting center arrangement centre bore,
2. arrange one group of emptying aperture around this centre bore then, this group of emptying aperture forms keyhole with centre bore,
3. arrange via hole more than three layers from inside to outside around the circumferencial direction of said keyhole, outermost layer is a periphery hole, and this periphery hole comprises that hole, arch, bottom outlet, ditch bottom outlet and two help the hole,
2) carry out charging, said centre bore is filled explosive, and an explosive cartridge is all adorned in the bottom of said one group of emptying aperture, and described via hole is filled explosive, and the equal spaced loading in hole is helped in the hole, arch and two of said periphery hole,
3) operation of detonating with half second detonator line, is detonated piecemeal, and firing order is that centre bore detonates earlier, is one group of emptying aperture then, secondly is the ground floor via hole of contiguous keyhole, and the like; For outermost periphery hole, the bottom outlet that detonates earlier is two to help the hole then, and what detonate at last is hole, arch and ditch bottom outlet.
2. real hole, emptying aperture center slotting driving blasting method around according to claim 1, the hole depth that it is characterized in that said centre bore is 1500-3000mm.
3. real hole, emptying aperture center slotting driving blasting method around according to claim 1, the quantity that it is characterized in that described one group of emptying aperture is 3-8 emptying apertures.
4. the blasting method of real hole, emptying aperture center slotting driving is characterized in that the spacing of said one group of emptying aperture and centre bore is 70-80mm around according to claim 1, and the emptying aperture of this keyhole is than the dark 200mm of hollow hole of centre.
5. real hole, emptying aperture center slotting driving blasting method around according to claim 1, the arch pitch of holes that it is characterized in that said periphery hole is 400-600mm, and two to help pitch-row be 650-750mm, and the pitch-row of bottom outlet is 500-600mm.
6. real hole, emptying aperture center slotting driving blasting method around according to claim 1 is characterized in that adorning 3-4 explosive cartridges in each hole in hole, said arch, and said two help to adorn 5-6 explosive cartridges in each hole in hole, and said ditch bottom outlet is filled explosive.
CN2011104313815A 2011-12-21 2011-12-21 Blasting method for undermining and tunnelling in mode of distributing hollow holes at periphery and solid hole in center Pending CN102494572A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104313815A CN102494572A (en) 2011-12-21 2011-12-21 Blasting method for undermining and tunnelling in mode of distributing hollow holes at periphery and solid hole in center

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104313815A CN102494572A (en) 2011-12-21 2011-12-21 Blasting method for undermining and tunnelling in mode of distributing hollow holes at periphery and solid hole in center

Publications (1)

Publication Number Publication Date
CN102494572A true CN102494572A (en) 2012-06-13

Family

ID=46186416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104313815A Pending CN102494572A (en) 2011-12-21 2011-12-21 Blasting method for undermining and tunnelling in mode of distributing hollow holes at periphery and solid hole in center

Country Status (1)

Country Link
CN (1) CN102494572A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102997763A (en) * 2012-11-29 2013-03-27 青海山金矿业有限公司 Method for blasting inclined thin ore body by dividing ores and rocks in area in drift driving
CN103742136A (en) * 2013-12-14 2014-04-23 金川集团股份有限公司 Rock drilling and explosion method for mining
CN103868420A (en) * 2014-03-31 2014-06-18 江西稀有金属钨业控股集团有限公司 Mine gallery driving cut blasting method
CN104266557A (en) * 2014-07-31 2015-01-07 山东华联矿业股份有限公司 Precontrol roof sublevel ore breaking once shaft forming method
CN104613830A (en) * 2014-12-18 2015-05-13 招金矿业股份有限公司夏甸金矿 One-time-formed smooth blasting method for laneway
CN106225618A (en) * 2016-08-29 2016-12-14 华北科技学院 The method split is expanded in a kind of semo-infinite rock mass borehole blasting
CN107131806A (en) * 2017-05-09 2017-09-05 深圳市中金岭南有色金属股份有限公司 Service shaft is disposable into well blasting method
CN107843156A (en) * 2016-09-20 2018-03-27 南京梅山冶金发展有限公司 Gallery(Tunnel)The method of driving enhancing Cut Blasting efficiency
CN108060925A (en) * 2017-03-06 2018-05-22 内蒙古康宁爆破有限责任公司 The steel for shot structure of small section tunnel Cut Blasting
CN110953944A (en) * 2019-11-21 2020-04-03 中交隧道工程局有限公司 Method for rapid tunneling by hole-by-hole detonation of flat guide straight-hole cut of extra-long tunnel
CN112302673A (en) * 2020-10-30 2021-02-02 何满潮 Method for tunneling roadway by using instantaneous bursting device
CN113188392A (en) * 2021-06-10 2021-07-30 嵩县金牛有限责任公司 Well type medium-length hole perforation sectional blasting method
CN113340165A (en) * 2021-06-28 2021-09-03 嵩县金牛有限责任公司 Roadway blasting structure and blasting method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06323797A (en) * 1993-05-12 1994-11-25 Asahi Chem Ind Co Ltd Blasting method
EP0692611A2 (en) * 1994-07-13 1996-01-17 SUNKYONG ENGINEERING & CONSTRUCTION LIMITED Method for excavating a working face
CN101846484A (en) * 2010-04-02 2010-09-29 攀钢集团冶金工程技术有限公司 Blasting method of driving, mining and cutting drift under ultrahard fault

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06323797A (en) * 1993-05-12 1994-11-25 Asahi Chem Ind Co Ltd Blasting method
EP0692611A2 (en) * 1994-07-13 1996-01-17 SUNKYONG ENGINEERING & CONSTRUCTION LIMITED Method for excavating a working face
CN101846484A (en) * 2010-04-02 2010-09-29 攀钢集团冶金工程技术有限公司 Blasting method of driving, mining and cutting drift under ultrahard fault

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冯士棠: "多空眼在直线掏槽中的作用", 《探矿工程》, 29 June 1984 (1984-06-29) *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102997763A (en) * 2012-11-29 2013-03-27 青海山金矿业有限公司 Method for blasting inclined thin ore body by dividing ores and rocks in area in drift driving
CN103742136A (en) * 2013-12-14 2014-04-23 金川集团股份有限公司 Rock drilling and explosion method for mining
CN103868420A (en) * 2014-03-31 2014-06-18 江西稀有金属钨业控股集团有限公司 Mine gallery driving cut blasting method
CN104266557A (en) * 2014-07-31 2015-01-07 山东华联矿业股份有限公司 Precontrol roof sublevel ore breaking once shaft forming method
CN104613830A (en) * 2014-12-18 2015-05-13 招金矿业股份有限公司夏甸金矿 One-time-formed smooth blasting method for laneway
CN104613830B (en) * 2014-12-18 2017-01-18 招金矿业股份有限公司夏甸金矿 One-time-formed smooth blasting method for laneway
CN106225618A (en) * 2016-08-29 2016-12-14 华北科技学院 The method split is expanded in a kind of semo-infinite rock mass borehole blasting
CN106225618B (en) * 2016-08-29 2018-06-15 华北科技学院 A kind of method that semo-infinite rock mass borehole blasting expansion is split
CN107843156A (en) * 2016-09-20 2018-03-27 南京梅山冶金发展有限公司 Gallery(Tunnel)The method of driving enhancing Cut Blasting efficiency
CN108060925A (en) * 2017-03-06 2018-05-22 内蒙古康宁爆破有限责任公司 The steel for shot structure of small section tunnel Cut Blasting
CN107131806A (en) * 2017-05-09 2017-09-05 深圳市中金岭南有色金属股份有限公司 Service shaft is disposable into well blasting method
CN107131806B (en) * 2017-05-09 2019-11-12 深圳市中金岭南有色金属股份有限公司 Service shaft is disposably at well blasting method
CN110953944A (en) * 2019-11-21 2020-04-03 中交隧道工程局有限公司 Method for rapid tunneling by hole-by-hole detonation of flat guide straight-hole cut of extra-long tunnel
CN112302673A (en) * 2020-10-30 2021-02-02 何满潮 Method for tunneling roadway by using instantaneous bursting device
CN112302673B (en) * 2020-10-30 2021-10-26 何满潮 Method for tunneling roadway by using instantaneous bursting device
CN113188392A (en) * 2021-06-10 2021-07-30 嵩县金牛有限责任公司 Well type medium-length hole perforation sectional blasting method
CN113340165A (en) * 2021-06-28 2021-09-03 嵩县金牛有限责任公司 Roadway blasting structure and blasting method
CN113340165B (en) * 2021-06-28 2024-05-24 嵩县金牛有限责任公司 Tunnel blasting structure and blasting method

Similar Documents

Publication Publication Date Title
CN102494572A (en) Blasting method for undermining and tunnelling in mode of distributing hollow holes at periphery and solid hole in center
CN102808622B (en) Method for recovering ore pillar by medium-length hole and deep hole combined blasting technology
CN100564803C (en) Rock lane digging method
CN103306679B (en) " ︱ type " scope of freedom slotting simultaneous shaft sin king technique
CN101738148B (en) Tunnel medium-length hole smooth blasting method
CN102878876B (en) Mine roadway advancing and undermining method and main blasting parameters
CN106091848B (en) It is a kind of to realize overlength, the method for high inclination-angle tunnel anchorage top bar explosion
CN101864961B (en) Method for actively preventing and controlling rock burst
CN103123247A (en) Damping blasting method for steep dip small crossing angle layered surrounding rock small-distance tunnel excavation
CN103244180B (en) Gob-side entry driving surrounding rock control method using remaining small pillars
CN107816353B (en) A kind of excessive drop tomography new method of fully-mechanized mining working
CN102401616A (en) Blasting excavation method of vertical shaft
CN106089212B (en) Hard rock quickly digs courtyard blasting design method
CN108086979B (en) Mining process of vertical deep hole columnar cartridge bag ore breaking stage by using chamber method
CN102080545B (en) High-risk pillar open-air deep hole collaborative stoping method
CN108489350A (en) Smooth blasting construction method for rapid tunneling of upper step of grade-III surrounding rock tunnel
CN104482816A (en) Gradient pre-splitting blasting method and device of lancing cartridges around vertical shaft
CN109373843A (en) A kind of no courtyard deep hole kerf blasting method
CN101539020A (en) Upward layered mining method
CN106288991B (en) A kind of underground mining cuts kerve method of going up a hill
CN108204775A (en) A kind of deep-lying tunnel instant type rock burst active preventing control method
CN102620614B (en) Cave depot is slagged tap the construction method of funnel
RU2334875C1 (en) Method of underground mining of steep field of firm mineral
CN209623525U (en) The steel for shot structure of roadway development blasting
CN102494575B (en) Efficient filling method for outdoor chamber blasting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120613