Service shaft is disposably at well blasting method
Technical field
The invention belongs to mining technical fields, and in particular to a kind of service shaft is disposably at well blasting method.
Background technique
In metal mine upraise technical aspect, the method for uplink sectional blasting method driving is continued to use all the time, by
In the safety of the complexity of explosion program, related personnel and equipment and the restriction of rock drilling machinery equipment, all the time by
The highest attention and exploration of people.
In recent years, it in look forward to universal of mine and is used and explosion simultaneous shaft sin king due to efficient drill jumbo mechanical equipment
The advantages that safety is good, effect is high, and can Improving Measurements well driving when related personnel working environment and equipment safety;Cause
This, more and more research institutions and enterprise put into a large amount of fund, technology and personnel and try explosion simultaneous shaft sin king technology
It tests and optimizes.But due to the irrationality at well explosion design parameter, along with the shadow of the factors such as construction level, drilling instrument
It rings, causes service shaft simultaneous shaft sin king explosion easily to go out " asphyxia by external pressure on the chest and abdomen " phenomenon and the inadequate or coarse problem of wall surface smoothness, thus can not
Reach demolition effect expected from service shaft.
Summary of the invention
The present invention overcomes the disadvantages of the prior art, provides a kind of service shaft disposably into well blasting method, improves
Measure is into construction efficiency, the demolition effect and wall surface smoothness of the disposable Cheng Jing of Improving Measurements well.
In order to solve the above-mentioned technical problem, the present invention is achieved by the following technical solutions:
A kind of service shaft is disposably at well blasting method, comprising the following steps:
1) trolley punches: making a call to 1 centre bore, 4 emptying apertures and from inside to outside totally 4 upwards in turn in the chamber of service shaft lower part
Enclose charging hole;The centre bore is located at service shaft center position, and the emptying aperture is located at centre bore periphery and square arrangement,
4 emptying apertures are located at square four apexes;4 circle charging holes are successively arranged 4,8,9,14 charging holes from inside to outside;Often
Circle charging hole is equidistantly arranged on the circumference using centre bore as the center of circle;
2) emulsion and detonator, each built-in two hairs thunder of charging hole powder charge: are packed into centre bore and all charging holes
Pipe, and detonator is sent out into primacord doubling connection two;Aperture is blocked with stemming after powder charge;Detonator section in 4 circle charging holes is by interior
It is followed successively by 1 section, 10 sections, 15 sections and 20 sections (the high detonator delay time of section is long) outward;
3) explosion: detonating using outside electric detonator hole, blasthole short-delay blasting from inside to outside.
Compared with the prior art, service shaft of the present invention arranges medium-length hole length disposably at well blasting method
Shi Jing (within 6 meters of measure well depth) punches simultaneous shaft sin king blasting technique using trolley, is arranged by reasonable blasthole and parameter
Design, and the construction method of optimization, it is ensured that service shaft simultaneous shaft sin king demolition effect has reached the smooth expection mesh of the borehole wall
Other simultaneous shaft sin king explosions are played guidance and reference function by mark.
Further, 4 emptying aperture equidistant arrangements described in step 1) and away from service shaft central point 0.2m, 4 circle charging holes are by interior
Outward respectively away from service shaft central point 0.3m, 0.5m, 0.8m, 1.2m, every circle charging hole is circumferentially equidistantly arranged, and adjacent two
The charging hole of powder charge circle mutually staggers.Pass through the rational design to steel for shot mode, it can be ensured that good demolition effect.
Further, the aperture of centre bore described in step 1) and emptying aperture is 89mm, centre bore bottom hole and top chamber bottom plate
Distance be 0.5m, emptying aperture run through top chamber bottom plate.The aperture of centre bore and emptying aperture is larger to facilitate slotting formation explosion certainly
By face;Centre bore bottom hole stays 0.5 meter not punch punching when can prevent explosion, and facilitates powder charge.
Further, the 64mm of charging hole aperture described in step 1), bottom hole are 0.5m at a distance from the chamber bottom plate of top.Aperture
It is larger to form the explosion scope of freedom convenient for slotting;Bottom hole stays 0.5 meter not punch punching when can prevent explosion, and facilitates powder charge.
Further, in step 2), the 1st circle charging hole aperture stemming length is 20cm, remaining charging hole aperture stemming length
For 1.1m.1st circle stemming length shortens to 20cm convenient for forming the scope of freedom, remaining charging hole aperture stemming length is that 1.1m can be with
It reduces explosive specific charge and forms photoface exploision.
Further, primacord length described in step 2) is identical as hole depth, and exposed hole is not outer to prevent by phase for primacord
It is ignited when adjacent difference section explosion, part caused by explosive is discontinuous in the hole that the built-in primacord of blasthole is likely to occur in order to prevent
It miss-fires.
Further, using 2 hair electronic detonator initiatings when step 3) explosion, electric detonator ignites 2 groups of on line detonators, and every group is adopted
With 2 hair detonator on lines.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and is used to explain the present invention together with embodiments of the present invention,
It is not construed as limiting the invention, in the accompanying drawings:
Fig. 1 is the blast-hole design figure of blasting method of the present invention;
Fig. 2 is the blast hole loading structure schematic diagram of blasting method of the present invention.
Wherein, K1 is center hole, and K2~K5 is emptying aperture, and 1~4 is first lap charging hole, and 5~12 be the second circle charging hole,
13~21 be third circle charging hole, and 22~35 be the 4th circle charging hole, and 1#, 10#, 15# and 20# indicate detonator section;
110 be Nonel detonator, and 210 be detonator, and 310 be primacord, and 410 be emulsion, and 510 be stemming.
Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein
Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
Please refer to Fig. 1 and Fig. 2, wherein Fig. 1 is the blast-hole design figure of blasting method of the present invention;Fig. 2 is this
The blast hole loading structure schematic diagram of the invention blasting method.A kind of service shaft provided by the invention is disposably at well explosion side
Method, comprising the following steps:
1) trolley punches: successively stamping 1 centre bore K1,4 emptying aperture K2~K5 in chamber, and totally 4 encloses from inside to outside
Charging hole 1~35;The centre bore K1 is located at service shaft center position, and the emptying aperture K2~K5 is located at the periphery centre bore K1 simultaneously
Square arrangement, 4 emptying aperture K2~K5 are located at square four apexes;4 circle charging holes are successively arranged from inside to outside
4,8,9,14 charging holes, i.e. 1~4 is first lap charging hole in Fig. 1, and 5~12 for the second circle charging hole, 13~21 be third circle
Charging hole, 22~35 be the 4th circle charging hole;Every circle charging hole is equidistantly arranged on the circumference using centre bore K1 as the center of circle;This reality
It applies in example, the aperture of centre bore K1 and emptying aperture K2~K5 are 89mm, and centre bore K1 bottom hole is with top chamber bottom plate distance h1
0.5m, emptying aperture K2~K5 run through top chamber bottom plate.The aperture 64mm of the charging hole 1~35, bottom hole and top chamber bottom plate
Distance h1 be 0.5m.In the present embodiment, 4 emptying aperture K2~K5 equidistant arrangements and away from service shaft central point 0.2m, 4 circle dresses
Medicine hole is from inside to outside respectively away from service shaft central point 0.3m, 0.5m, 0.8m, 1.2m (radius of circumference where i.e. 4 circle charging holes);
The distance of adjacent two charging hole of 1st circle charging hole is 0.4m, and the distance of adjacent two charging hole of the 2nd circle charging hole is 0.4m, the 3rd circle
The distance of adjacent two charging hole of charging hole is 0.55m, and the distance of adjacent two charging hole of the 4th circle charging hole is 0.6m.Every circle powder charge
Hole is circumferentially equidistantly arranged, and the charging hole of adjacent two powder charges circle mutually staggers.
2) powder charge: being packed into emulsion and detonator in centre bore and all charging holes, and each built-in two hair of charging hole is led
Booster detonator, and detonator is sent out into primacord doubling connection two;Aperture is blocked with stemming after powder charge;Detonator section in 4 circle charging holes
Position is followed successively by 1 section, 10 sections, 15 sections and 20 sections (the high detonator delay time of section is long) from inside to outside;In the present embodiment, the 1st circle
The aperture stemming length h2 of charging hole 1~4 is 20cm, remaining charging hole aperture stemming length is 1.1m;The primacord 310
Totally 36, the length of every primacord is blast hole depth, and primacord is not outside exposed hole.
3) explosion: detonating using outside electric detonator hole, blasthole short-delay blasting from inside to outside.Using the 2 sub- thunders of power generation when explosion
Pipe detonation, electric detonator ignite 2 groups of on line detonators, and every group using 2 hair detonator on lines.
Following safety measure should be taken when bursting work: bursting work is on duty should to hang warning sign in explosion influence area;
It needs to ensure good ventilation in powder charge process;Before charge operation, the float stone of top chamber top plate need to be handled, when operating personnel wants
Work clothes need to be put on by carving the vigilant float stone fallen and mechanical damage, operating personnel, with appliances for labor protection such as good mask, safety caps;
Top chamber mouth need to block warning tape when the heading charge operation of lower part, and personnel must not enter top chamber.If having to enter into, need to assist
Mix up the disengaging time of operating personnel;Powder height and blocking are highly in strict accordance with the height of design requirement when powder charge;It blows out
When should withdraw setting in advance;Qing Ganggong is carried out before detonation, the personnel in explosion influence area must withdraw setting in advance.
Compared with the prior art, service shaft of the present invention arranges medium-length hole length disposably at well blasting method
Shi Jing punches simultaneous shaft sin king blasting technique using trolley, is arranged by reasonable blasthole and parameter designing, and the construction of optimization
Method, it is ensured that service shaft simultaneous shaft sin king demolition effect has reached the smooth target of the borehole wall, to other simultaneous shaft sin king explosions
Play guidance and reference function.
Finally, it should be noted that these are only the preferred embodiment of the present invention, it is not intended to restrict the invention, although
Referring to embodiment, invention is explained in detail, for those skilled in the art, still can be to aforementioned
Technical solution documented by each embodiment is modified or equivalent replacement of some of the technical features, but it is all
Within the spirit and principles in the present invention, any modification, equivalent replacement, improvement and so on should be included in protection of the invention
Within the scope of.