CN102493811A - Concrete loading and unloading device for vertical shaft construction - Google Patents

Concrete loading and unloading device for vertical shaft construction Download PDF

Info

Publication number
CN102493811A
CN102493811A CN2011103672365A CN201110367236A CN102493811A CN 102493811 A CN102493811 A CN 102493811A CN 2011103672365 A CN2011103672365 A CN 2011103672365A CN 201110367236 A CN201110367236 A CN 201110367236A CN 102493811 A CN102493811 A CN 102493811A
Authority
CN
China
Prior art keywords
well
conveyor
bucket
lifting
shaft construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103672365A
Other languages
Chinese (zh)
Inventor
周海振
张小军
程志彬
刘增东
江军
庆文奎
刚绍连
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 5 Construction Co Ltd
Original Assignee
China Coal No 5 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 5 Construction Co Ltd filed Critical China Coal No 5 Construction Co Ltd
Priority to CN2011103672365A priority Critical patent/CN102493811A/en
Publication of CN102493811A publication Critical patent/CN102493811A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a concrete loading and unloading device for vertical shaft construction, and relates to concrete loading and unloading devices. The device is provided with a plurality of belt conveyers, a lifting device and a master control device, wherein the lifting device is arranged above a shaft mouth; the master control device is connected with the lifting device for controlling a working state of the lifting device; the bottom of the shaft mouth is provided with a secondary control device; the lifting device is connected with lifting buckets through lifting ropes; the number of the lifting buckets is the same as that of the belt conveyers; and the belt conveyers are provided with ash receiving grooves. The device has the advantages that: space in the shaft mouth is not occupied and a track is not required to be mounted; few ground personnel are occupied, and the labor intensity is low; working procedures can be reduced; safety is high; and time is saved.

Description

A kind of shaft construction concrete device of removing stage makeup and costume
Technical field
The present invention relates to the concrete handler, specifically is a kind of shaft construction concrete device of removing stage makeup and costume.
Background technology
In the shaft construction process, need build discharging platform in well head one side, closure plate need be laid track, places flat car, and construction period is more loaded down with trivial details, and operation is more, and the ground staff is more.Use the discharging platform discharging, this one procedure is minimum wants 7 minutes, needs 8 people simultaneously at least, pushes away grey narrow-necked earthen jar, steady narrow-necked earthen jar, and labour intensity is bigger.
Summary of the invention
In order to overcome the shortcoming of above-mentioned prior art, the present invention provides a kind of shaft construction concrete device of removing stage makeup and costume, and conveniently accomplishes concrete loading and unloading in the shaft construction process fast.
The present invention realizes with following technical scheme: a kind of shaft construction concrete device of removing stage makeup and costume; Comprise several conveyors; Be arranged on the boom hoisting of well head top, be connected the master control set that is used to control the boom hoisting duty with boom hoisting, the well head bottom is provided with secondary control device; Boom hoisting is connected with well-bucket through lifting rope, and the quantity of well-bucket is identical with the quantity of conveyor; Conveyor is provided with and connects ash-pit.
The invention has the beneficial effects as follows:
(1) uses conveyor to carry out discharging, do not take space in the well head, and track need not be installed.
(2) use conveyor to carry out discharging, the ground staff takies less, if use double hook to promote, places two conveyors, and the user of service is 6 people (conveyor 3 people), and labour intensity is little.
(3) use conveyor, can reduce operation and safer, saved grey narrow-necked earthen jar is placed on this procedure on the flat car.
(4) save time, use the conveyor discharging, carry from grey narrow-necked earthen jar and put well head and only need 3~4 minutes, and can realize twoly promoting greyly at present together, shortened the engineering time greatly to the dress ash to narrow-necked earthen jar down.
Description of drawings
Below in conjunction with accompanying drawing the present invention is described further.
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the vertical view of Fig. 1.
Among the figure: 1, boom hoisting, 2, well-bucket, 3, conveyor, 4, castor, 5, connect ash-pit.
The specific embodiment
As depicted in figs. 1 and 2, a kind of shaft construction concrete device of removing stage makeup and costume has several conveyors 3, and the well head top is provided with a boom hoisting 1, is connected the master control set that is used to control the boom hoisting duty with boom hoisting 1, and the well head bottom is provided with the secondary device of controlling; Boom hoisting 1 is connected with well-bucket 2 through lifting rope, and the quantity of well-bucket 2 is identical with the quantity of conveyor 3; Conveyor 3 is provided with and connects ash-pit 5.Conveyor moves for ease, and 4 castors are installed on the conveyor 3.Well-bucket adopts bottom discharge bucket, convenient concrete unloading.Boom hoisting is an electric block; Major and minor control device adopts PLC, and secondary control device is used to control the open and close of the bottom of well-bucket.
The quantity of conveyor is 1~3, and is as shown in Figure 2, respectively puts a conveyor in the well head both sides, for ease of moving; Conveyor is carried by four tires, and conveyor 3 front ends are in the upper edge of well-bucket 2, and well head is stretched out in the rear end; Ash narrow-necked earthen jar car is put ash to connecing ash-pit, in conveyor is transported to well-bucket then directly to the rear end of conveyor; After treating the well-bucket chengman, conveyor is retreated to beyond the trapdoor, transfer well-bucket then and accomplished time ash work.
The course of work: (1) when the down-hole possesses beat grey condition after and after object such as hanging scaffold ash divider all transfers to the down-hole; Well-bucket is transported to well head; Utilize electric block kibble hoist to trapdoor, with promoting gib head well-bucket is mentioned height about 0.5 meter then, set the position of well-bucket; The well-bucket that falls, directly seat is on well lid.
(2) be pushed into well head to conveyor, and mix up the position, front end belt head must put in the well-bucket inner edge, and concrete is just in time fallen in the well-bucket, and the rear end is stretched out well head and is convenient to grey tank car and unloads.
(3) first starting conveyor is put ash then, must not put too soon when putting ash, treats that well-bucket also surplus 0.2 meter high the time, stops to put ash, and concrete on the conveyor has been sent, and stops conveyor, then conveyor is retreated to beyond the trapdoor, prevents a jar cap collision conveyor front.
(4) after guaranteeing that jar cap is safe and punctual up and down, master control set sends signal, and bottom discharge bucket is carried to the down-hole, and when well-bucket arrived the bottom, secondary control device sent signal, and open the bottom of well-bucket.
(5) wait to beat ash and finish after, the defeated machine of belt is released beyond the well head, water is rinsed well, all bearing portions are safeguarded with butter, are convenient to use next time.

Claims (4)

1. shaft construction concrete device of removing stage makeup and costume; It is characterized in that: comprise several conveyors (3); Be arranged on the boom hoisting (1) of well head top, be connected the master control set that is used to control the boom hoisting duty with boom hoisting (1), the well head bottom is provided with secondary control device; Boom hoisting (1) is connected with well-bucket (2) through lifting rope, and the quantity of well-bucket (2) is identical with the quantity of conveyor (3); Conveyor (3) is provided with and connects ash-pit (5).
2. a kind of shaft construction according to claim 1 concrete device of removing stage makeup and costume, it is characterized in that: the quantity of described conveyor is 1~3.
3. a kind of shaft construction according to claim 1 concrete device of removing stage makeup and costume is characterized in that: 4 castors are installed on the conveyor (3).
4. according to each described a kind of shaft construction of claim 1~3 concrete device of removing stage makeup and costume, it is characterized in that: described well-bucket (2) adopts bottom discharge bucket.
CN2011103672365A 2011-11-18 2011-11-18 Concrete loading and unloading device for vertical shaft construction Pending CN102493811A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103672365A CN102493811A (en) 2011-11-18 2011-11-18 Concrete loading and unloading device for vertical shaft construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103672365A CN102493811A (en) 2011-11-18 2011-11-18 Concrete loading and unloading device for vertical shaft construction

Publications (1)

Publication Number Publication Date
CN102493811A true CN102493811A (en) 2012-06-13

Family

ID=46185664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103672365A Pending CN102493811A (en) 2011-11-18 2011-11-18 Concrete loading and unloading device for vertical shaft construction

Country Status (1)

Country Link
CN (1) CN102493811A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3820762A (en) * 1971-06-23 1974-06-28 Robacks Medaniska Verkstad Bos Mobile concrete station
CN101344011A (en) * 2008-08-15 2009-01-14 中铁四局集团第五工程有限公司 Simple automatic slag discharging device of deep large silo
CN201351361Y (en) * 2009-01-21 2009-11-25 路桥集团国际建设股份有限公司 Conveyor belt type concrete conveying device
CN201484749U (en) * 2009-08-26 2010-05-26 中冶集团华冶资源开发有限责任公司 Bottom discharge bucket
CN101956557A (en) * 2010-10-20 2011-01-26 中煤第一建设有限公司第十工程处 Concrete transport system
CN202325526U (en) * 2011-11-18 2012-07-11 中煤第五建设有限公司 Device for unloading and loading concrete in vertical shaft construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3820762A (en) * 1971-06-23 1974-06-28 Robacks Medaniska Verkstad Bos Mobile concrete station
CN101344011A (en) * 2008-08-15 2009-01-14 中铁四局集团第五工程有限公司 Simple automatic slag discharging device of deep large silo
CN201351361Y (en) * 2009-01-21 2009-11-25 路桥集团国际建设股份有限公司 Conveyor belt type concrete conveying device
CN201484749U (en) * 2009-08-26 2010-05-26 中冶集团华冶资源开发有限责任公司 Bottom discharge bucket
CN101956557A (en) * 2010-10-20 2011-01-26 中煤第一建设有限公司第十工程处 Concrete transport system
CN202325526U (en) * 2011-11-18 2012-07-11 中煤第五建设有限公司 Device for unloading and loading concrete in vertical shaft construction

Similar Documents

Publication Publication Date Title
CN104057537B (en) The production system of concrete component
CN109733821B (en) Brewing material pit-lifting detection conveying device
CN209396575U (en) Hollow brick automatically unloads base machine
CN203565035U (en) Automatic feeding device
CN102381538B (en) Hoisting machine of tower crane
CN201942181U (en) Convenient conveyor bucket vehicle for construction
CN102381539B (en) Multifunctional tower crane elevator
CN202325526U (en) Device for unloading and loading concrete in vertical shaft construction
CN203820331U (en) Material hoist with built-in steel wire rope
CN210854900U (en) Vertical material lifting machine
CN205294338U (en) Automatic distributing device of bulk material warehouse all standing formula
CN204958320U (en) Building heavy object lifting machine
CN102383604A (en) Construction device capable of blanking mixed materials of block-shaped waste concrete
CN201678198U (en) Ball loading and unloading container of grinder
CN204152210U (en) A kind of building operations refuse collection hopper
CN102493811A (en) Concrete loading and unloading device for vertical shaft construction
CN203160722U (en) Construction wall building constructing device
CN103274310A (en) Self-lifting type cableway transporting device
CN202765879U (en) Unloading system for dump truck with indicating device
CN202321479U (en) Multifunctional tower crane hoist
CN205527498U (en) Utilize pulley system's hoist and mount and conveyer
CN208916624U (en) A kind of shield-tunneling construction slag discharging system
CN202465054U (en) Self-detachable lifting bucket
CN207468053U (en) Full angle crane
CN207090911U (en) One breeding ass transport apparatus for automatically lifting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120613