CN102381539B - Multifunctional tower crane elevator - Google Patents

Multifunctional tower crane elevator Download PDF

Info

Publication number
CN102381539B
CN102381539B CN201110367924.1A CN201110367924A CN102381539B CN 102381539 B CN102381539 B CN 102381539B CN 201110367924 A CN201110367924 A CN 201110367924A CN 102381539 B CN102381539 B CN 102381539B
Authority
CN
China
Prior art keywords
tower body
drive sprocket
motor
barrel
baffle plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110367924.1A
Other languages
Chinese (zh)
Other versions
CN102381539A (en
Inventor
李荣华
李长平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongling Rike Electronics Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110367924.1A priority Critical patent/CN102381539B/en
Publication of CN102381539A publication Critical patent/CN102381539A/en
Application granted granted Critical
Publication of CN102381539B publication Critical patent/CN102381539B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention relates to the technical field of crane machinery, in particular to a multifunctional tower crane elevator. The multifunctional tower crane elevator is provided with a tower body and is characterized in that: a material lifting device is arranged in the tower body; a feeding box is arranged on one side of the lower part of the tower body; a discharge barrel is arranged on the other side of the upper part of the tower body; the material lifting device comprises a feeding hopper, a drive sprocket, a driven sprocket, a transmission chain, a controller, a speed reducer and a hoisting motor; the hoisting motor is controlled by the controller; an input shaft of the speed reducer is connected with the hoisting motor; an output shaft is fixedly connected with the drive sprocket; the drive sprocket and the driven sprocket are fixed on the tower body respectively; the drive sprocket is connected with the driven sprocket through the transmission chain; and the feeding hopper is arranged on the transmission chain. The invention has the advantages of novel structure, multiple functions, convenience in operation, high working efficiency, quick construction progress, energy conservation, high safety, stable project quality and the like.

Description

Multifunctional tower crane elevator
Technical field
The utility model relates to elevator machinery technical field, specifically a kind of Multifunctional tower crane elevator.
Background technology
As everyone knows, hoisting machine of tower crane is that the requisite weight-lifting equipment of construction trade is varied, there is the Foundation of Wharf Gantry Crane that is applied to harbour aspect to hang coat hanging gig, this machine carries out the loading and unloading operation between bank and ship, ship and ship, deficiency is: handling bulk freight progress is slow, consume energy high, workman's labour intensity is large, inefficiency, there is the hoisting machine of tower crane that is applied to building aspect to be provided with tower body, tower body is to be interfixed and formed by unit steel bar framework upper and lower side, tower body upper end is provided with jacking frame, lower end and supporting base fix, jacking frame upper end is connected with revoliving arm through rotary disk, both sides are connected with tower body through jacking fluid cylinder, jacking fluid cylinder rises direct motor drive certainly through fluid power, revoliving arm is provided with luffing electrical motor, elevating motor and slewing motor, lifting and revolution while slinging building materials with control tower, revoliving arm one end is provided with lifting hook, the other end is provided with clump weight, during work, the skip bucket that material is housed is transferred to the floor of appointment through lifting hook, its deficiency is: unreasonable structure, function singleness, inefficiency, during day, work capacity only accounts for 30 percent, 70 percent standby stops hanging, be unfavorable for the construction to heavy construction.After floor tentatively builds up, for skyscraper operation, general using concrete pumping mode is transported to cement concrete the camp site of skyscraper by pipeline, the deficiency of this concrete pump truck is: while constructing for many skyscrapers simultaneously, need every building to be equipped with a set of pumping standpipe, the input amount of pumping standpipe is very large, and power consumption is large, cost is high.For low latitude pouring practice, its concrete lift machine is normally equipped with horizontal guide wheel and wireline pulley on the jacking frame of tower body, steel rope is connected with ground winch through track adjusting wheel with wireline pulley one end by horizontal guide wheel, the other end connects skip bucket, tower body one side is provided with unloading track and storage ash bucket, promote the central authorities that track is located at tower body, during work, concrete skip hoisting will be housed to corresponding floor, cement concrete is discharged in storage ash bucket, reinstalling hand barrow pours into a mould, its deficiency is: unreasonable structure, the one, circulation of the every work of gig, can only promote a storage ash bucket material, energy consumption is large, inefficiency, construction speed is long, the 2nd, work man-hour, need the passage of hand push hand barrow through setting up between floor and pylon, cement concrete in storage ash bucket could be packed in hand barrow, poor stability.
Summary of the invention
The purpose of this utility model is to solve above-mentioned the deficiencies in the prior art, provides a kind of novel structure, function is many, easy to operate, work efficiency is high, construction speed is fast, conserve energy, safe, construction quality is stablized, the Multifunctional tower crane elevator that can simultaneously construct to many floors.
The utility model solves the technical scheme that its technical matters adopts:
A kind of Multifunctional tower crane elevator, be provided with tower body, it is characterized in that being provided with in tower body material lifting device, tower body bottom one side is provided with material feeding box, top opposite side is provided with discharge tank, material lifting device comprises conveyer bucket, drive sprocket, driven sprocket, driving chain, controller, reductor and lifting motor, gig via controller is controlled, reductor input shaft is connected with lifting motor, output shaft and drive sprocket are fixedly connected, drive sprocket and driven sprocket are separately fixed on tower body, drive sprocket is connected with driven sprocket through driving chain, driving chain is provided with conveyer bucket, by lifting motor, drive, make reductor drive drive sprocket rotation, drive on the conveyer bucket on driving chain and move, conveyer bucket on driving chain is poured the materials such as cement concrete or sandstone into discharge tank successively after driving chain is transferred to tower body top, the utility model can be used as sea port dock door machine and hangs coat hanging gig handling bulk goods operation use, substitute the work of existing door machine rotation grab type handling bulk goods, improve handling goods progress, energy efficiency.
The utility model can be provided with supporting base in tower body lower end, corresponding discharge tank below is provided with a minute barrel, divide in barrel and be provided with spiral plate along line of centers, divide barrel one side to be provided with discharge bucket, between discharge bucket and minute barrel, be provided with discharging controller, discharging controller is by baffle plate, handle and hinge form, baffle plate is located at discharge bucket feeding mouth, baffle plate one end intersects and is fixedly connected with handle, between baffle plate and handle, through hinge and a minute barrel, be hinged, so that the materials such as cement concrete or sandstone flow to a minute barrel by discharge tank, spiral plate convolution in minute barrel is to dirty, pull the handle of the discharging controller of corresponding required concrete floor, baffle plate is separated with discharge bucket, the material such as cement concrete or sandstone is flow in hand barrow by discharge bucket, the utility model can be constructed to many floors simultaneously simultaneously, easy to operate, work efficiency is high, construction speed is fast, conserve energy, safe, construction quality is stable,
Tower body in the utility model is to be interfixed and formed by unit steel bar framework upper and lower side, tower body upper end is provided with jacking frame, lower end and supporting base fix, jacking frame upper end is connected with revoliving arm through rotary disk, both sides are connected with tower body through jacking fluid cylinder, jacking fluid cylinder rises direct motor drive certainly through fluid power, revoliving arm is provided with luffing electrical motor, elevating motor and slewing motor, lifting and revolution while slinging building materials with control tower, revoliving arm one end is provided with lifting hook, the other end is provided with clump weight, the utility model is in lifting material, also can to many floors, construct simultaneously simultaneously, easy to operate, work efficiency is high, construction speed is fast, conserve energy, safe, construction quality is stable.
The utility model is owing to adopting said structure, not only can lift by crane material, and can also be in lifting material, to each floor convey materials simultaneously, there is novel structure, the advantage such as function is many, easy to operate, work efficiency is high, construction speed is fast, conserve energy, safe, construction quality is stablized.
accompanying drawing explanation
Fig. 1 is the structural representation of a kind of embodiment of the utility model.
Fig. 2 is the structural representation of the utility model the second embodiment.
Fig. 3 is the structural representation of the third embodiment of the utility model.
Fig. 4 is the structural representation of minute barrel in the utility model.
Reference numeral: tower body 1, material feeding box 2, discharge tank 3, conveyer bucket 4, drive sprocket 5, driven sprocket 6, driving chain 7, reductor 8, lifting motor 9, minute barrel 10, spiral plate 11, discharge bucket 12, discharging controller 13, baffle plate 14, shake hands 15, jacking frame 16, supporting base 17, fluid power be from rising electrical motor 18, revoliving arm 19, luffing electrical motor 20, elevating motor 21, slewing motor 22.
The specific embodiment:
Below in conjunction with accompanying drawing, the utility model is further illustrated:
As shown in Figure 1, a kind of Multifunctional tower crane elevator, be provided with tower body 1, it is characterized in that being provided with material lifting device in tower body 1, tower body 1 bottom one side is provided with material feeding box 2, top opposite side is provided with discharge tank 3, material lifting device comprises conveyer bucket 4, drive sprocket 5, driven sprocket 6, driving chain 7, controller, reductor 8 and lifting motor 9, lifting motor via controller is controlled, reductor 8 input shafts are connected with lifting motor 9, output shaft and drive sprocket 5 are fixedly connected, drive sprocket 5 and driven sprocket 6 are separately fixed on tower body 1, drive sprocket 5 is connected with driven sprocket 6 through driving chain 7, driving chain 7 is provided with conveyer bucket 4, the utility model is preferably laid with conveyer bucket 4 on driving chain 7, by lifting motor 9, drive, make reductor 8 drive drive sprocket 5 rotations, drive on the conveyer bucket 4 on driving chain 7 and move, conveyer bucket 4 on driving chain 7 is poured the bulk materials such as fluid or sandstone into discharge tank 3 successively after driving chain 7 is transferred to tower body 1 top, again by packing into successively in car, the utility model can replace sea port dock door machine to hang or coat hanging gig, doing the operation of handling bulk goods uses, substitute the work of existing door machine rotation grab type handling bulk goods, improve handling goods progress, energy efficiency.
As shown in Figure 2, the utility model can be provided with in the lower end of tower body 1 supporting seat 17, corresponding discharge tank 3 belows are provided with minute barrel 10, minute barrel 10 is interior is provided with spiral plate 11 along line of centers, divide barrel 10 1 sides to be provided with discharge bucket 12, between discharge bucket 12 and minute barrel 10, be provided with discharging controller 13, discharging controller is by baffle plate 14, handle 15 and hinge form, baffle plate 14 is located at discharge bucket 12 feeding mouths, baffle plate 14 one end intersect and are fixedly connected with handle 15, between baffle plate 14 and handle 15, through hinge and a minute barrel 10, be hinged, so that the bulk materials such as cement concrete or sandstone flow to minute barrel 10 by discharge tank 3, spiral plate 11 convolutions in minute barrel 10 are to dirty, pull the handle 15 of the discharging controller 13 of corresponding required concrete floor, baffle plate 14 is separated with discharge bucket 12, cement concrete is flow in hand barrow by discharge bucket 12, the utility model can be constructed to many floors simultaneously simultaneously, easy to operate, work efficiency is high, construction speed is fast, conserve energy, safe, construction quality is stable.
As shown in Figure 3, tower body 1 in the utility model is to be interfixed and formed by unit steel bar framework upper and lower side, tower body 1 upper end is provided with jacking frame 16, lower end and supporting base 17 fix, jacking frame 16 upper ends are connected with revoliving arm 19 through rotary disk, both sides are connected with tower body 1 through jacking fluid cylinder, jacking fluid cylinder drives from rising electrical motor 18 through fluid power, revoliving arm 19 is provided with luffing electrical motor 20, elevating motor 21 and slewing motor 22, lifting and revolution while slinging building materials with control tower, revoliving arm 19 one end are provided with lifting hook, the other end is provided with clump weight, corresponding discharge tank 3 belows are provided with minute barrel 10, minute barrel 10 is interior is provided with spiral plate 11 along line of centers, divide barrel 10 1 sides to be provided with discharge bucket 12, between discharge bucket 12 and minute barrel 10, be provided with discharging controller 13, discharging controller 13 is by baffle plate 14, handle 15 and hinge form, baffle plate 14 is located at discharge bucket 12 feeding mouths, baffle plate 14 one end intersect and are fixedly connected with handle 15, between baffle plate 14 and handle 15, through hinge and a minute barrel 10, be hinged, so that the materials such as cement concrete or sandstone flow to minute barrel 10 by discharge tank 3, spiral plate 11 convolutions in minute barrel 10 are to dirty, pull the handle 15 of the discharging controller 13 of corresponding required concrete floor, baffle plate 14 is separated with discharge bucket 12, cement concrete is flow in scene or hand barrow by discharge bucket 12, the utility model is in lifting material, also can to many floors, construct simultaneously simultaneously, easy to operate, work efficiency is high, construction speed is fast, conserve energy, safe, construction quality is stable.
As shown in Figure 4, the utility model can be respectively equipped with adapter plate at minute barrel 10 two ends, is fixedly connected, successively to increase according to the progress of constructing and to fix minute barrel 10 between minute barrel 10 and minute barrel 10 through adapter plate.
If the utility model is used in sea port dock, available crane hangs the utility model to stand in cabin, bulk material drives reductor to drive drive sprocket and driven sprocket to rotate through lifting motor, drive on the conveyer bucket on driving chain and move to tower body top, then material is entered and dressed up in storage bin hopper through discharge tank connection downstream siphunculus, by waggon, transported again, accelerated progress of cargo work, increased work efficiency, save the energy
When if the utility model is used in building ground construction, the utility model discharge bucket 12 can be fixed through support and floor, if lifting material, drive luffing electrical motor 20, elevating motor 21 and slewing motor 22, the skip bucket that building materials material is housed is transferred to the floor of appointment through lifting hook, if when delivering concrete or sandstone, start lifting motor 9, make reductor 8 drive drive sprocket 5 rotations, drive on the conveyer bucket 4 on driving chain 7 and move, conveyer bucket 4 on driving chain 7 is transferred to the materials such as cement concrete or sandstone tower body 1 top and pours discharge tank 3 into through driving chain 7 successively, the material such as cement concrete or sandstone flows to minute barrel 10 by discharge tank 3, spiral plate 11 convolutions in minute barrel 10 are to dirty, pull the handle 15 of the discharging controller 13 of corresponding required concrete floor, baffle plate 14 is separated with discharge bucket 12, cement concrete is flow in place or hand barrow by discharge bucket 12, the utility model can be provided with discharge bucket 12 in minute barrel 10 sides by corresponding floor, be beneficial to many floors to construct simultaneously, accelerating construction progress, conserve energy.
The utility model is owing to adopting said structure, a tractor serves several purposes not only can meet building demand, can also substitute Foundation of Wharf Gantry Crane lifting and unload bulk goods, there is novel structure, the advantage such as function is many, easy to operate, work efficiency is high, construction speed is fast, conserve energy, safe, construction quality is stablized.

Claims (1)

1. a Multifunctional tower crane elevator, be provided with tower body, it is characterized in that being provided with in tower body material lifting device, tower body bottom one side is provided with material feeding box, top opposite side is provided with discharge tank, tower body upper end is provided with jacking frame, lower end is provided with supporting base, described material lifting device comprises conveyer bucket, drive sprocket, driven sprocket, driving chain, controller, reductor and lifting motor, lifting motor via controller is controlled, reductor input shaft is connected with lifting motor, output shaft and drive sprocket are fixedly connected, drive sprocket and driven sprocket are separately fixed on tower body, drive sprocket is connected with driven sprocket through driving chain, driving chain is provided with conveyer bucket, corresponding discharge tank below is provided with a minute barrel, divide in barrel and be provided with spiral plate along line of centers, divide barrel one side to be provided with discharge bucket, between discharge bucket and minute barrel, be provided with discharging controller, described discharging controller is by baffle plate, handle and hinge form, baffle plate is located at discharge bucket feeding mouth, baffle plate one end intersects and is fixedly connected with handle, between baffle plate and handle, through hinge and a minute barrel, be hinged, described jacking frame upper end is connected with revoliving arm through rotary disk, both sides are connected with tower body through jacking fluid cylinder, jacking fluid cylinder rises direct motor drive certainly through fluid power, revoliving arm is provided with luffing electrical motor, elevating motor and slewing motor, revoliving arm one end is provided with lifting hook, the other end is provided with clump weight.
CN201110367924.1A 2011-11-18 2011-11-18 Multifunctional tower crane elevator Active CN102381539B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110367924.1A CN102381539B (en) 2011-11-18 2011-11-18 Multifunctional tower crane elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110367924.1A CN102381539B (en) 2011-11-18 2011-11-18 Multifunctional tower crane elevator

Publications (2)

Publication Number Publication Date
CN102381539A CN102381539A (en) 2012-03-21
CN102381539B true CN102381539B (en) 2014-03-12

Family

ID=45821456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110367924.1A Active CN102381539B (en) 2011-11-18 2011-11-18 Multifunctional tower crane elevator

Country Status (1)

Country Link
CN (1) CN102381539B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106276056B (en) * 2016-08-30 2018-08-07 上海市基础工程集团有限公司 Multi-segmental combined type earthwork perpendicular lifting apparatus
CN109279271B (en) * 2018-08-31 2020-05-12 安徽万磁电子有限公司 Cargo circulating lifting device and electromagnetic power generation mechanism thereof
CN110255338B (en) * 2019-05-20 2020-09-04 方建霞 Self-adaptive floor intelligent feeding and feeding lifting device and using method
CN110861997A (en) * 2019-12-07 2020-03-06 荆门市佰思机械科技有限公司 Lifting device utilizing tower crane body
CN112661046A (en) * 2021-03-13 2021-04-16 浙江建工水利水电建设有限公司 Building construction class material hoisting device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2212036Y (en) * 1995-02-22 1995-11-08 曾绍昌 Two purpose machine for tower crane and concrete lift
DE19623143A1 (en) * 1996-06-10 1996-10-31 Roland Prof Guenther Conveyor for continuous inclined and vertical transport
DE19610217A1 (en) * 1996-03-15 1997-09-18 Krupp Foerdertechnik Gmbh Vertical lifting system for solid material
US6158627A (en) * 1998-01-14 2000-12-12 Brenner; Horst Device for feeding liquid-containing material to a separator
DE20015552U1 (en) * 2000-09-08 2001-02-01 Aumund Foerdererbau Belt bucket elevator with elastic bucket attachment
CN201730340U (en) * 2010-06-11 2011-02-02 中国一冶集团有限公司 Double-outlet concrete discharging hopper
CN202030294U (en) * 2010-05-06 2011-11-09 王军 Multifunctional conveyor
CN202321479U (en) * 2011-11-18 2012-07-11 李荣华 Multifunctional tower crane hoist

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6945386B2 (en) * 2002-05-06 2005-09-20 Universal Industries, Inc. Bucket elevator conveyors

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2212036Y (en) * 1995-02-22 1995-11-08 曾绍昌 Two purpose machine for tower crane and concrete lift
DE19610217A1 (en) * 1996-03-15 1997-09-18 Krupp Foerdertechnik Gmbh Vertical lifting system for solid material
DE19623143A1 (en) * 1996-06-10 1996-10-31 Roland Prof Guenther Conveyor for continuous inclined and vertical transport
US6158627A (en) * 1998-01-14 2000-12-12 Brenner; Horst Device for feeding liquid-containing material to a separator
DE20015552U1 (en) * 2000-09-08 2001-02-01 Aumund Foerdererbau Belt bucket elevator with elastic bucket attachment
CN202030294U (en) * 2010-05-06 2011-11-09 王军 Multifunctional conveyor
CN201730340U (en) * 2010-06-11 2011-02-02 中国一冶集团有限公司 Double-outlet concrete discharging hopper
CN202321479U (en) * 2011-11-18 2012-07-11 李荣华 Multifunctional tower crane hoist

Also Published As

Publication number Publication date
CN102381539A (en) 2012-03-21

Similar Documents

Publication Publication Date Title
CN102381539B (en) Multifunctional tower crane elevator
CN200958000Y (en) Crane for automatically-balancing rotary electric container
CN202030294U (en) Multifunctional conveyor
CN102381538B (en) Hoisting machine of tower crane
CN103449204B (en) A kind of bucket continuous ship unloader
CN205772950U (en) A kind of Small-size crane for building construction
CN202321480U (en) Tower crane lifter
CN212953994U (en) Suspension grab crane
CN202321479U (en) Multifunctional tower crane hoist
CN201276385Y (en) Automatic unloading bucket
CN201080414Y (en) Container multipurpose machine for assembling and disassembling door
CN203049587U (en) Multifunctional concrete storehouse surface placing boom
CN104649103A (en) Material hoister for constructional engineering
CN201660900U (en) Hydraulic energy storage concrete horizontal tank
CN108328364B (en) High-efficiency energy-saving ship unloader
CN106006095A (en) Energy-saving environment-friendly mobile ship loader
CN206634962U (en) A kind of removable simple and easy hoisting equipment
CN102887438A (en) Maintenance crane for electric full-variable frequency rock crushing station
CN109649994B (en) Material lifting machine for building engineering
CN202899035U (en) Assembling type gabion gravity anchor casting and unmooring device
CN208034991U (en) Propeller casting mixing device
CN202482022U (en) Grab bucket replacing auxiliary platform for grab bucket ship unloader
CN202518146U (en) Self-loading and self-unloading trailer
CN202642043U (en) Bulk carrier loading and unloading crane
CN207660286U (en) Large-span industrial building device and concrete vertical transport

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Ronghua

Inventor after: Li Changping

Inventor before: Li Ronghua

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI RONGHUA TO: LI RONGHUA LI CHANGPING

GR01 Patent grant
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170214

Address after: 264500 Rushan City, Weihai, white sand beach town of Bay Industrial Park

Patentee after: RUSHAN HAIYUAN ELECTRONIC SCIENCE & TECHNOLOGY CO., LTD.

Address before: 264200 Shandong City, Weihai Province, building No. 14, Jimo Road, unit 402

Patentee before: Li Ronghua

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180205

Address after: 102600, No. 3, building 2, building 4, Paradise Road, Beijing, Daxing District, 1, unit 317

Patentee after: Beijing informed investment home intellectual property rights Operation Co., Ltd.

Address before: 264500 Rushan City, Weihai, white sand beach town of Bay Industrial Park

Patentee before: RUSHAN HAIYUAN ELECTRONIC SCIENCE & TECHNOLOGY CO., LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181213

Address after: 210024 1 Xikang Road, Gulou District, Nanjing, Jiangsu

Patentee after: Li Wenkang

Address before: 102600 3 floor, 2 building, No. 4 Daxing District Garden Road, Beijing, 1 unit 317

Patentee before: Beijing informed investment home intellectual property rights Operation Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190906

Address after: 244000 lion mountain Economic Development Zone, Anhui, Tongling

Patentee after: Tongling Rike Electronics Co., Ltd.

Address before: Xikang Road, Gulou District of Nanjing city of Jiangsu Province, No. 1 210024

Patentee before: Li Wen Kang