CN102493687B - Ecological industrial factory building fabricated construction method - Google Patents

Ecological industrial factory building fabricated construction method Download PDF

Info

Publication number
CN102493687B
CN102493687B CN201110419604.6A CN201110419604A CN102493687B CN 102493687 B CN102493687 B CN 102493687B CN 201110419604 A CN201110419604 A CN 201110419604A CN 102493687 B CN102493687 B CN 102493687B
Authority
CN
China
Prior art keywords
building
factory building
solar energy
conditioning system
air conditioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110419604.6A
Other languages
Chinese (zh)
Other versions
CN102493687A (en
Inventor
孙有芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Bath Technology Development Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110419604.6A priority Critical patent/CN102493687B/en
Publication of CN102493687A publication Critical patent/CN102493687A/en
Application granted granted Critical
Publication of CN102493687B publication Critical patent/CN102493687B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses an ecological industrial factory building fabricated construction method. A novel prefabricated reinforced concrete screw pile independent base, an assembly prefabricated light steel composite frame, assembly prefabricated light steel composite bearing wall plates, assembly prefabricated light steel composite roof panels, closed high-insulation windows and doors, multifunctional composite outer shutters, and a thermal island type solar natural air conditioning system are adopted, and a novel building technology and advanced production and installation equipment are utilized, so a high-quality industrial factory building in the building field is constructed. All building units are industrially produced, an assembly dry construction method is used for construction, and compared with that of the conventional building, the construction period of the ecological industrial factory building can be saved by more than 80 percent; and the building is anti-seismic, fireproof, mute, and environment-friendly, and can realize ultra low carbon, zero energy consumption; noise is not produced during installation of a system; the appearance of a wall body and the shape of a roof are combined with a using function; the service life of a building main body can reach more than 70 years; the engineering comprehensive construction cost of the ecological industrial factory building is close to that of the conventional industrial factory building; and the ecological industrial factory building is a classic item which is worth vigorously popularizing.

Description

A kind of ecological industrial factory building assembly construction method
Technical field
The invention belongs to industrial construction field, be specifically related to a kind of ecological industrial factory building assembly construction method.
Background technology
At present, China city and township enterprise build fast development, its construction mode major part still adopts traditional industrial building design and construction technology, belong to high energy consumption industrial construction system, safety, the feature of environmental protection, comfortableness can not meet modern enterprise Production requirement, at global fossil energy, day by day under deficient background, can only, by endless destruction natural ecological environment and continuous economic input and high energy consumption, reach the desired ambient conditions of modern industry facility.And the invention of ecological industrial factory building, can replace traditional industry building the required work in every condition of the modern industry production facility that is beyond one's reach.
Summary of the invention
The object of the present invention is to provide a kind of ecological industrial factory building assembly construction method.This invention has solved that production environment that traditional industry building cann't be solved requires and the problems such as high energy consumption.
A kind of ecological industrial factory building assembly construction method, its whole member used is to adopt batch production to produce, assembling installation, it is by novel precast reinforced concrete screw pile single footing, assembled prefabricated light steel compound frame, the compound jowar load-bearing of assembled prefabricated light steel base panel, assembling prefabricated light steel composite load-bearing wall panel, assembled prefabricated light steel composite roof board, the high thermal insulation door of closed, sealed high insulation light inlet window, Multifunctional composite external window board structure combination, high insulation daylighting curtain wall, roller blind insulation external window board, heat island type solar energy natural air conditioning system, adopt novel Building technology technique, and advanced production, erection equipment, be built into ecological industrial factory building,
An assembly construction method, consists of following steps:
1. main building construction
According to positive elevation lighting towards, the take over respective design of 10 degree of due south, use vehicle-mounted pile rotating machine that precast reinforced concrete screw pile is screwed in foundation soil, on stake top, welding anchoring steel concrete prefabricated spiral pile cap is installed, gate-type steel structure frame post, gate-type steel framework beam, outside gate-type steel structure frame patten cushion cap, assembled prefabricated light steel composite lead-bearing base panel is installed in side anchor weldering, outside gate-type steel structure frame post, assembling prefabricated light steel composite load-bearing wall panel is installed in side anchor weldering, on gate-type steel framework beam, assembled prefabricated light steel composite roof board is installed in anchor weldering, finally roof panel is prolonged to exterior wall periphery, by construction drawing design, do integral solder, make it form a set of complete light steel compound frame Structural Tectonics building system.
2. erection of doors and windows sealing
According to corresponding construction drawing design, by the high insulation of closed folding door, sealed high insulation light inlet window, again by Multifunctional composite external window board structure combination, high insulation daylighting curtain wall, roller blind insulation external window board, is installed on respectively door, window hole place, makes building maintenance formation of structure ring enclosed without heat bridge heat insulation system.
3. heat island type solar energy natural air conditioning system is installed
The adjustable air filter air inlet port of solar energy natural air conditioning system is installed, the cryogenerator of solar energy natural air conditioning system, the low temperature air outlet of solar energy natural air conditioning system, the adjustable air outlet of solar energy natural air conditioning system, utilizes the heat collector of the solar energy natural air conditioning system that high roof arranges.
(1) hot season, solar energy natural air conditioning system flow process
Utilize the ring enclosed of light steel compound frame Structural Tectonics building system of the present invention and building maintenance formation of structure without heat bridge heat insulation system, and 10 ℃ of left and right constant temperature indoor environmental condition producing of formed earth's surface, flooring heat island phenomenon, can be by outdoor natural air, by the adjustable air filter air inlet port arranging at the building back, enter cryogenerator, under the effect of earth's surface heat island low temp area effect, the cold gas that produces, by low temperature air outlet, enter in factory building, thereby space temperature in adjusting factory building, the normal temperature air on top, space in factory building, the high temperature air that utilizes the heat collector of the solar energy natural air conditioning system that high roof arranges to produce, the air strong convection producing with normal temperature air in factory building, pass through stack effect, by room air by adjustable air outlet, discharge by force, after air-flow discharge, the utilization negative pressure that space produces in factory building, outdoor fresh air is sucked in factory building by adjustable air filter air inlet port, in its air negative pressure, under the effect of convection current, make in factory building, outer air produces controlled natural circulation.
(2) severe cold season, solar energy Natural Heating system flow
Utilize the ring enclosed of light steel compound frame Structural Tectonics building system of the present invention and building maintenance formation of structure without heat bridge heat insulation system, and 10 ℃ of left and right isoperibol conditions producing of formed earth's surface, flooring heat island phenomenon, again by being arranged on the height insulation daylighting curtain wall of the positive facade of building, the solar irradiation heat receiving, the common temperature producing, reaches required heating effect in factory building.
4. Discussion on architecture is decorated
According to corresponding construction drawing design, because of all side fascia plate faces, before dispatching from the factory, carried out internal and external ornament, without plastering, decorate carrying out indoor and outdoor, only by exterior wall constuction joint place, prefabricated inside and outside decorative thread is installed.
Beneficial effect of the present invention:
All building unit is batch production production, the dry way construction of assembling, compared with traditional architecture, can save the duration more than 80%, this building aseismicity, fire prevention, quiet, Ultra-low carbon, super low energy consumption, environmental protection, and in system installation process, do not produce noise, body of wall outward appearance combines with using function with roof shape, and building body can reach more than 70 years application life, engineering comprehensive cost is close compared with traditional industry factory building, is the fine work project being worth promoting in industrial construction field.
accompanying drawing explanation:
Accompanying drawing 1 is organigram of the present invention;
In figure: steel concrete prefabricated screw pile 1, steel concrete prefabricated spiral pile cap 2, gate-type steel structure frame post 3, gate-type steel framework beam 4, assembled prefabricated light steel composite lead-bearing basis body of wall 5, assembled prefabricated light steel composite load bearing wall body 6, assembled prefabricated light steel composite roof board 7, the high insulation of closed folding door 8, sealed high insulation light inlet window 9, Multifunctional composite external window board structure combination 10, high insulation daylighting curtain wall 11, roller blind insulation external window board 12, the adjustable air filter air inlet port 13 of solar energy natural air conditioning system, the cryogenerator 14 of solar energy natural air conditioning system, heat island district, earth's surface 15, the low temperature air outlet 16 of solar energy natural air conditioning system, the adjustable air outlet 17 of solar energy natural air conditioning system, the heat collector 18 of solar energy natural air conditioning system.
the specific embodiment:
Shown in accompanying drawing, a kind of ecological industrial factory building assembly construction method, it is steel concrete prefabricated screw pile 1, steel concrete prefabricated spiral pile cap 2, gate-type steel structure frame post 3, gate-type steel framework beam 4, assembled prefabricated light steel composite lead-bearing basis body of wall 5, assembled prefabricated light steel composite load bearing wall body 6, assembled prefabricated light steel composite roof board 7, the high insulation of closed folding door 8, sealed high insulation light inlet window 9, Multifunctional composite external window board structure combination 10, high insulation daylighting curtain wall 11, roller blind insulation external window board 12, the adjustable air filter air inlet port 13 of solar energy natural air conditioning system, the cryogenerator 14 of solar energy natural air conditioning system, heat island district, earth's surface 15, the low temperature air outlet 16 of solar energy natural air conditioning system, the adjustable air outlet 17 of solar energy natural air conditioning system, utilize the heat collector 18 of the solar energy natural air conditioning system of high roof setting, the common ecological industrial factory building that forms.
An assembly construction method, consists of following steps:
1. main building construction
According to positive elevation lighting towards, the take over respective design of 10 degree of due south, use vehicle-mounted pile rotating machine that precast reinforced concrete screw pile 1 is screwed in foundation soil, on stake top, welding anchoring steel concrete prefabricated spiral pile cap 2 is installed, gate-type steel structure frame post 3, gate-type steel framework beam 4, outside gate-type steel structure frame post 3 foundation platforms, assembled prefabricated light steel composite lead-bearing base panel 5 is installed in side anchor weldering, in the outer side anchor weldering of gate-type steel structure frame post 3, assembling prefabricated light steel composite load-bearing wall panel 6 is installed, on gate-type steel framework beam 4, assembled prefabricated light steel composite roof board 7 is installed in anchor weldering, finally roof panel is prolonged to exterior wall periphery, by construction drawing design, do integral solder, make it form a set of complete light steel compound frame Structural Tectonics building system.
2. erection of doors and windows sealing
According to corresponding construction drawing design, by the high insulation of closed folding door 8, sealed high insulation light inlet window 9, again by Multifunctional composite external window board structure combination 10, high insulation daylighting curtain wall 11, roller blind insulation external window board 12, is installed on respectively door, window hole place, makes building maintenance formation of structure ring enclosed without heat bridge heat insulation system.
3. heat island type solar energy natural air conditioning system is installed
The adjustable air filter air inlet port 13 of solar energy natural air conditioning system is installed, the cryogenerator 14 of solar energy natural air conditioning system, the low temperature air outlet 16 of solar energy natural air conditioning system, the adjustable air outlet 17 of solar energy natural air conditioning system, utilizes the heat collector 18 of the solar energy natural air conditioning system that high roof arranges.
(1) hot season, solar energy natural air conditioning system flow process
Utilize the ring enclosed of light steel compound frame Structural Tectonics building system of the present invention and building maintenance formation of structure without heat bridge heat insulation system, and 10 ℃ of left and right constant temperature indoor environmental condition producing of formed earth's surface, flooring heat island phenomenon, can be by outdoor natural air, by the adjustable air filter air inlet port 13 arranging at the building back, enter cryogenerator 14, under the effect of heat island district, earth's surface 15 cryogenic effects, the cold gas that produces, by low temperature air outlet 16, enter in factory building, thereby space temperature in adjusting factory building, the normal temperature air on top, space in factory building, the high temperature air that utilizes the heat collector 18 of the solar energy natural air conditioning system that high roof arranges to produce, the air strong convection producing with normal temperature air in factory building, pass through stack effect, by room air by adjustable air outlet 17, discharge by force, after air-flow discharge, the utilization negative pressure that space produces in factory building, outdoor fresh air is sucked in factory building by adjustable air filter air inlet port 13, in its air negative pressure, under the effect of convection current, make in factory building, outer air produces controlled natural circulation.
(2) severe cold season, solar energy Natural Heating system flow,
Utilize the ring enclosed of light steel compound frame Structural Tectonics building system of the present invention and building maintenance formation of structure without heat bridge heat insulation system, and 10 ℃ of left and right isoperibol conditions producing of formed earth's surface, flooring heat island phenomenon, again by being arranged on the height insulation daylighting curtain wall 11 of the positive facade of building, the solar irradiation heat receiving, the common temperature producing, reaches required heating effect in factory building.
4. Discussion on architecture is decorated
According to corresponding construction drawing design, because of all side fascia plate faces, before dispatching from the factory, carried out internal and external ornament, without plastering, decorate carrying out indoor and outdoor, only by exterior wall constuction joint place, prefabricated inside and outside decorative thread is installed.
Beneficial effect of the present invention
All building unit is batch production production, the dry way construction of assembling, compared with traditional architecture, can save the duration more than 80%, this building aseismicity, fire prevention, quiet, Ultra-low carbon, super low energy consumption, environmental protection, and in system installation process, do not produce noise, body of wall outward appearance combines with using function with roof shape, and building body can reach more than 70 years application life, engineering comprehensive cost is close compared with traditional industry factory building, is the fine work project being worth promoting in industrial construction field.
The above is only preferred embodiment of the present invention, not the present invention is done to any pro forma restriction, and any simple modification, equivalent variations and modification that every foundation technical spirit of the present invention is done, within all belonging to technical solution of the present invention scope.

Claims (1)

1. an ecological industrial factory building assembly construction method, it is characterized in that: a: it is steel concrete prefabricated screw pile (1), steel concrete prefabricated spiral pile cap (2), gate-type steel structure frame post (3), gate-type steel framework beam (4), assembled prefabricated light steel composite lead-bearing basis body of wall (5), assembled prefabricated light steel composite load bearing wall body (6), assembled prefabricated light steel composite roof board (7), the high insulation of closed folding door (8), sealed high insulation light inlet window (9), Multifunctional composite external window board structure combination (10), high insulation daylighting curtain wall (11), roller blind insulation external window board (12), the adjustable air filter air inlet port (13) of solar energy natural air conditioning system, the cryogenerator of solar energy natural air conditioning system (14), heat island district, earth's surface (15), the low temperature air outlet (16) of solar energy natural air conditioning system, the adjustable air outlet (17) of solar energy natural air conditioning system, utilize the heat collector (18) of the solar energy natural air conditioning system of high roof setting, the common ecological industrial factory building that forms,
B: a kind of ecological industrial factory building assembly construction method, consists of following steps:
1. main building construction
According to positive elevation lighting towards, the take over respective design of 10 degree of due south, use vehicle-mounted pile rotating machine that precast reinforced concrete screw pile (1) is screwed in foundation soil, on stake top, welding anchoring steel concrete prefabricated spiral pile cap (2) is installed, gate-type steel structure frame post (3), gate-type steel framework beam (4), outside gate-type steel structure frame post (3) foundation platform, assembled prefabricated light steel composite lead-bearing base panel (5) is installed in side anchor weldering, outside gate-type steel structure frame post (3), assembling prefabricated light steel composite load-bearing wall panel (6) is installed in side anchor weldering, on gate-type steel framework beam (4), assembled prefabricated light steel composite roof board (7) is installed in anchor weldering, finally roof panel is prolonged to exterior wall periphery, by construction drawing design, do integral solder, make it form a set of complete light steel compound frame Structural Tectonics building system,
2. erection of doors and windows sealing
According to corresponding construction drawing design, by the high insulation of closed folding door (8), sealed high insulation light inlet window (9), again by Multifunctional composite external window board structure combination (10), high insulation daylighting curtain wall (11), roller blind, insulation external window board (12), be installed on respectively door, window hole place, makes building maintenance formation of structure ring enclosed without heat bridge heat insulation system;
3. heat island type solar energy natural air conditioning system is installed
The adjustable air filter air inlet port (13) of solar energy natural air conditioning system is installed, the cryogenerator of solar energy natural air conditioning system (14), the low temperature air outlet (16) of solar energy natural air conditioning system, the adjustable air outlet (17) of solar energy natural air conditioning system, utilizes the heat collector (18) of the solar energy natural air conditioning system that high roof arranges;
(1) hot season, solar energy natural air conditioning system flow process
Utilize the ring enclosed of light steel compound frame Structural Tectonics building system of the present invention and building maintenance formation of structure without heat bridge heat insulation system, and 10 ℃ of left and right constant temperature indoor environmental condition producing of formed earth's surface, flooring heat island phenomenon, can be by outdoor natural air, by the adjustable air filter air inlet port (13) arranging at the building back, enter cryogenerator (14), under the effect of heat island district, earth's surface (15) cryogenic effect, the cold gas that produces, by low temperature air outlet (16), enter in factory building, thereby space temperature in adjusting factory building, the normal temperature air on top, space in factory building, the high temperature air that utilizes the heat collector (18) of the solar energy natural air conditioning system that high roof arranges to produce, the air strong convection producing with normal temperature air in factory building, pass through stack effect, by room air by adjustable air outlet (17), discharge by force, after air-flow discharge, the utilization negative pressure that space produces in factory building, outdoor fresh air is sucked in factory building by adjustable air filter air inlet port (13), in its air negative pressure, under the effect of convection current, make in factory building, outer air produces controlled natural circulation,
(2) severe cold season, solar energy Natural Heating system flow
Utilize the ring enclosed of light steel compound frame Structural Tectonics building system of the present invention and building maintenance formation of structure without heat bridge heat insulation system, and 10 ℃ of left and right isoperibol conditions producing of formed earth's surface, flooring heat island phenomenon, again by being arranged on the height insulation daylighting curtain wall (11) of the positive facade of building, the solar irradiation heat receiving, the common temperature producing, reaches required heating effect in factory building;
4. Discussion on architecture is decorated
Because of all side fascia plate faces, before dispatching from the factory, carried out internal and external ornament, without plastering, decorate carrying out indoor and outdoor, only by exterior wall constuction joint place, prefabricated inside and outside decorative thread is installed.
CN201110419604.6A 2011-12-15 2011-12-15 Ecological industrial factory building fabricated construction method Active CN102493687B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110419604.6A CN102493687B (en) 2011-12-15 2011-12-15 Ecological industrial factory building fabricated construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110419604.6A CN102493687B (en) 2011-12-15 2011-12-15 Ecological industrial factory building fabricated construction method

Publications (2)

Publication Number Publication Date
CN102493687A CN102493687A (en) 2012-06-13
CN102493687B true CN102493687B (en) 2014-02-05

Family

ID=46185541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110419604.6A Active CN102493687B (en) 2011-12-15 2011-12-15 Ecological industrial factory building fabricated construction method

Country Status (1)

Country Link
CN (1) CN102493687B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103899103B (en) * 2012-12-29 2016-06-15 青岛新世纪预制构件有限公司 Industrial premises
CN103452350B (en) * 2013-09-02 2016-04-06 中建一局集团建设发展有限公司 Assembling electronic workshop and construction method thereof
CN104420675B (en) * 2013-09-04 2017-11-03 中集集团集装箱控股有限公司 It is adapted to the factory building of weld job
CN105464155A (en) * 2014-09-06 2016-04-06 任丘市永基建筑安装工程有限公司 Reutilization technique for prefabricated housing foundation beams
CN104675147A (en) * 2015-02-27 2015-06-03 杨怡 Passive ultra-low energy-consumption green building for recyclable materials
CN105672479B (en) * 2015-12-25 2017-10-20 哈尔滨高格建筑科技有限公司 One kind assembles detachable building structure and construction technique entirely
CN107869149A (en) * 2017-11-22 2018-04-03 山东电力工程咨询院有限公司 Building or structures Construction Organization Method after a kind of stove
CN109267776B (en) * 2018-08-21 2020-07-17 广东博智林机器人有限公司 Nomadic PC component factory building convenient to quick assembly disassembly
CN110359738B (en) * 2019-06-19 2020-09-22 北京首钢建设集团有限公司 Assembly type construction method for ecological industrial factory building
CN113622695A (en) * 2021-08-06 2021-11-09 高惠芬 Sunshade device for building roof construction and installation method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201354522Y (en) * 2009-01-16 2009-12-02 西安市碑林区南菇北移食用菌研究所 Fresh straw mushroom factory production cultivation room
CN101790944B (en) * 2010-03-30 2011-09-14 满意 Low-carbon emission greenhouse arranged on roof of tunnel kiln

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201354522Y (en) * 2009-01-16 2009-12-02 西安市碑林区南菇北移食用菌研究所 Fresh straw mushroom factory production cultivation room
CN101790944B (en) * 2010-03-30 2011-09-14 满意 Low-carbon emission greenhouse arranged on roof of tunnel kiln

Also Published As

Publication number Publication date
CN102493687A (en) 2012-06-13

Similar Documents

Publication Publication Date Title
CN102493687B (en) Ecological industrial factory building fabricated construction method
WO2017041517A1 (en) Movable aluminum alloy house
CN102493678B (en) Fabricated construction method of ecological-type house
CN202467240U (en) Assembled steel structure hollow building
CN204282709U (en) Diatom veneer rock wool composite wall
WO2017036186A1 (en) Structure for connecting pillar of aluminum alloy house to wallboard, door and window
CN205369639U (en) Automatic daylight roof of rotation type
CN110331778B (en) Construction method of green energy-saving fabricated building
CN104790523A (en) Energy-saving glass house
Potienko et al. The global experience of deployment of energy-efficient technologies in high-rise construction
CN201850709U (en) Corridor-shaped green energy-saving roof
CN210483161U (en) Tunnel shaft light steel is dustproof to fall and is fallen isolation canopy of making an uproar
CN207988131U (en) A kind of integrated house
CN205063382U (en) Building structure and passive room of equipment integration
CN102759155A (en) Solar wall body air conditioner and indoor air adjusting method thereof
CN206917010U (en) A kind of framework spinning bolt-type integrates inner partition plate
CN114482626A (en) New energy house
CN201526172U (en) Energy-saving house
WO2017092249A1 (en) Movable aluminium alloy house
CN212613167U (en) Layered assembled durable decorative wall
CN210049434U (en) Assembled unit periphery protector
CN106368500A (en) Building method of energy-saving building
CN202248575U (en) Lighting and ventilating structure for light-weight steel roof
CN202248576U (en) Lighting and ventilating structure of arched corrugated steel roof
CN205088865U (en) Thin film photovoltaic solar energy daylighting top curtain

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: DAQING YUYANG TECHNOLOGY DEVELOPMENT CO., LTD.

Free format text: FORMER OWNER: SUN YOUFANG

Effective date: 20141017

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20141017

Address after: 163000 Heilongjiang city of Daqing Province, Honggang District Road No. 85 large hospital on the north side of the 2 floor room 101

Patentee after: Daqing Bath Technology Development Co., Ltd.

Address before: 163000, No. three, No. 82, Fu San Road, SA District, Heilongjiang, Daqing

Patentee before: Sun Youfang