CN102493687A - Ecological industrial factory building - Google Patents

Ecological industrial factory building Download PDF

Info

Publication number
CN102493687A
CN102493687A CN2011104196046A CN201110419604A CN102493687A CN 102493687 A CN102493687 A CN 102493687A CN 2011104196046 A CN2011104196046 A CN 2011104196046A CN 201110419604 A CN201110419604 A CN 201110419604A CN 102493687 A CN102493687 A CN 102493687A
Authority
CN
China
Prior art keywords
building
solar energy
conditioning system
air conditioning
factory building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104196046A
Other languages
Chinese (zh)
Other versions
CN102493687B (en
Inventor
孙有芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Bath Technology Development Co., Ltd.
Original Assignee
孙有芳
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 孙有芳 filed Critical 孙有芳
Priority to CN201110419604.6A priority Critical patent/CN102493687B/en
Publication of CN102493687A publication Critical patent/CN102493687A/en
Application granted granted Critical
Publication of CN102493687B publication Critical patent/CN102493687B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an ecological industrial factory building. A novel prefabricated reinforced concrete screw pile independent base, an assembly prefabricated light steel composite frame, assembly prefabricated light steel composite bearing wall plates, assembly prefabricated light steel composite roof panels, closed high-insulation windows and doors, multifunctional composite outer shutters, and a thermal island type solar natural air conditioning system are adopted, and a novel building technology and advanced production and installation equipment are utilized, so a high-quality industrial factory building in the building field is constructed. All building units are industrially produced, an assembly dry construction method is used for construction, and compared with that of the conventional building, the construction period of the ecological industrial factory building can be saved by more than 80 percent; and the building is anti-seismic, fireproof, mute, and environment-friendly, and can realize ultra low carbon, zero energy consumption; noise is not produced during installation of a system; the appearance of a wall body and the shape of a roof are combined with a using function; the service life of a building main body can reach more than 70 years; the engineering comprehensive construction cost of the ecological industrial factory building is close to that of the conventional industrial factory building; and the ecological industrial factory building is a classic item which is worth vigorously popularizing.

Description

Environmental industrial premises
Technical field:
The invention belongs to the industrial construction field, be specifically related to a kind of environmental industrial premises
Background technology:
At present; China city and township enterprise build fast development, and its construction mode major part still adopts Traditional industrial architectural design and construction technology, belong to high energy consumption industrial construction system; Safety, the feature of environmental protection, comfortableness can not satisfy modern enterprise production demand; Under the day by day deficient background of global fossil energy, can only use endless destruction natural ecological environment and continuous economic the input and high energy consumption, reach the desired ambient conditions of modern industry facility.And the invention of environmental industrial premises, instead traditional industry building the required each item condition of work of the modern industry production facility that is beyond one's reach.
Summary of the invention:
The object of the present invention is to provide a kind of environmental industrial premises.This invention has solved that production environment that the traditional industry building cann't be solved requires and problems such as high energy consumption.
Environmental industrial premises, its used whole member are to adopt batch production production, assembling installation; It is by novel precast reinforced concrete screw pile single footing, prefabricated light steel compound frame, the compound jowar load-bearing of prefabricated light steel basis wallboard; Prefabricated light steel composite lead-bearing wallboard, prefabricated light steel composite roof board, the high thermal insulation door of closed; Sealed high insulation light inlet window, multi-functional compound outer luffer boards tectonic association, high insulation daylighting curtain wall; The outer luffer boards of roller blind insulation, heat island formula solar energy natural air conditioning system adopts novel Building technology technology; And advanced production, erection equipment, be built into environmental industrial premises.
A kind of environmental industrial premises assembly construction method is made up of following steps:
1. main building construction
According to take over towards, the due south respective design of 10 degree of positive facade daylighting, use vehicle-mounted pile rotating machine that the precast reinforced concrete screw pile is screwed in the foundation soil; On the stake top, welding anchoring steel concrete prefabricated spiral pile cap is installed, gate-type steel structure frame post; Gate-type steel structure frame beam; Prefabricated light steel composite lead-bearing basis wallboard is installed in the side anchor weldering outside gate-type steel structure frame patten cushion cap, and prefabricated light steel composite lead-bearing wallboard is installed in the side anchor weldering outside gate-type steel structure frame post, on gate-type steel structure frame beam; Prefabricated light steel composite roof board is installed in the anchor weldering; At last roof panel is prolonged outer body of wall periphery, do integral solder, make it form the complete light steel compound frame structure construction building system of a cover by the working drawing design.
2. door and window is installed sealing
According to corresponding working drawing design; With the high insulation of closed folding door, sealed high insulation light inlet window is again with multi-functional compound outer luffer boards tectonic association; High insulation daylighting curtain wall; The outer luffer boards of roller blind insulation are installed on door, window opening mouth place respectively, and making the building maintenance structure form the ring enclosed does not have the heat bridge heat insulation system.
3. heat island formula solar energy natural air conditioning system is installed
The adjustable empty filter air inlet port of solar energy natural air conditioning system is installed; The cryogenerator of solar energy natural air conditioning system; The low temperature air outlet of solar energy natural air conditioning system; The adjustable air outlet of solar energy natural air conditioning system utilizes the heat collector of the solar energy natural air conditioning system that high roof is provided with.
(1) hot season, solar energy natural air conditioning system flow process
The ring enclosed of utilizing light steel compound frame structure construction building system of the present invention and building maintenance structure to form does not have the heat bridge heat insulation system, reaches 10 ℃ of left and right sides constant temperature indoor environmental condition that the formed face of land, flooring heat island phenomenon is produced, can be with outdoor natural air; Adjustable empty filter air inlet port through being provided with at the building back gets into cryogenerator, under the effect of face of land heat island low temp area effect; The cold gas that produces through the low temperature air outlet, gets in the factory building; Thereby the normal temperature air on top, space in the space temperature in the adjusting factory building, factory building, the high temperature air that utilizes the heat collector of the solar energy natural air conditioning system that high roof is provided with to produce; The air strong convection that produces with normal temperature air in the factory building, through stack effect, with room air by adjustable air outlet; Discharge by force; Owing to after air-flow is discharged, be utilized in the negative pressure that the space produces in the factory building, outdoor fresh air sucked in the factory building by adjustable empty filter air inlet port; Under the effect of its air negative pressure, convection current, make the inside and outside air of factory building produce controlled natural circulation.
(2) severe cold season, solar energy nature heating system flow process
The ring enclosed of utilizing light steel compound frame structure construction building system of the present invention and building maintenance structure to form does not have the heat bridge heat insulation system; Reach 10 ℃ of left and right sides isoperibol conditions that the formed face of land, flooring heat island phenomenon is produced; Again through being arranged on the height insulation daylighting curtain wall of the positive facade of building; The solar irradiation heat that receives, the common temperature that produces reaches heating effect required in the factory building.
4. building internal and external ornament
According to the design of corresponding working drawing, because of all side fascia plate faces, before dispatching from the factory, carried out internal and external ornament, need not to plaster, decorate carrying out indoor and outdoor, only with outer wall construction seam place, prefabricated inside and outside decorative thread is installed is got final product.
Beneficial effect of the present invention:
All building unit is batch production production, and assembling is done the way construction, can save the duration more than 80% than traditional architecture; This building aseismicity, fire prevention, quiet, Ultra-low carbon, super low energy consumption, environmental protection; And in system's installation process, do not produce noise, the body of wall outward appearance combines with function of use with roof shape, and building body can reach more than 70 years application life; The engineering comprehensive cost is close than the traditional industry factory building, is the elaboration project that is worth promoting in the industrial construction field.
Description of drawings:
Accompanying drawing 1 is an organigram of the present invention;
Among the figure: steel concrete prefabricated screw pile 1, steel concrete prefabricated spiral pile cap 2, gate-type steel structure frame post 3; Gate-type steel structure frame beam 4, prefabricated light steel composite lead-bearing basis body of wall 5, prefabricated light steel composite lead-bearing body of wall 6; Prefabricated light steel composite roof board 7, the high insulation of closed folding door 8, sealed high insulation light inlet window 9; Multi-functional compound outer luffer boards tectonic association 10, high insulation daylighting curtain wall 11, the outer luffer boards 12 of roller blind insulation; The adjustable empty filter air inlet port 13 of solar energy natural air conditioning system, the cryogenerator 14 of solar energy natural air conditioning system, face of land heat island district 15; The low temperature air outlet 16 of solar energy natural air conditioning system, the adjustable air outlet 17 of solar energy natural air conditioning system, the heat collector 18 of solar energy natural air conditioning system.
The specific embodiment:
Shown in accompanying drawing, a kind of environmental industrial premises, it is a steel concrete prefabricated screw pile 1; Steel concrete prefabricated spiral pile cap 2, gate-type steel structure frame post 3, gate-type steel structure frame beam 4; Prefabricated light steel composite lead-bearing basis body of wall 5, prefabricated light steel composite lead-bearing body of wall 6, prefabricated light steel composite roof board 7; The high insulation of closed folding door 8, sealed high insulation light inlet window 9, multi-functional compound outer luffer boards tectonic association 10; High insulation daylighting curtain wall 11, the outer luffer boards 12 of roller blind insulation, the adjustable empty filter air inlet port 13 of solar energy natural air conditioning system; The cryogenerator 14 of solar energy natural air conditioning system, face of land heat island district 15, the low temperature air outlet 16 of solar energy natural air conditioning system; The adjustable air outlet 17 of solar energy natural air conditioning system utilizes the heat collector 18 of the solar energy natural air conditioning system that high roof is provided with, and forms environmental industrial premises jointly.
A kind of environmental industrial premises assembly construction method is made up of following steps:
1. main building construction
According to take over towards, the due south respective design of 10 degree of positive facade daylighting, use vehicle-mounted pile rotating machine that precast reinforced concrete screw pile 1 is screwed in the foundation soil; On the stake top, welding anchoring steel concrete prefabricated spiral pile cap 2 is installed, gate-type steel structure frame post 3; Gate-type steel structure frame beam 4; Prefabricated light steel composite lead-bearing basis wallboard 5 is installed in the side anchor weldering outside gate-type steel structure frame post 3 foundation platforms, and prefabricated light steel composite lead-bearing wallboard 6 is installed in the side anchor weldering outside gate-type steel structure frame post 3, on gate-type steel structure frame beam 4; Prefabricated light steel composite roof board 7 is installed in the anchor weldering; At last roof panel is prolonged outer body of wall periphery, do integral solder, make it form the complete light steel compound frame structure construction building system of a cover by the working drawing design.
2. door and window is installed sealing
According to corresponding working drawing design; With the high insulation of closed folding door 8, sealed high insulation light inlet window 9 is again with multi-functional compound outer luffer boards tectonic association 10; High insulation daylighting curtain wall 11; The outer luffer boards 12 of roller blind insulation are installed on door, window opening mouth place respectively, and making the building maintenance structure form the ring enclosed does not have the heat bridge heat insulation system.
3. heat island formula solar energy natural air conditioning system is installed
The adjustable empty filter air inlet port 13 of solar energy natural air conditioning system is installed; The cryogenerator 14 of solar energy natural air conditioning system; The low temperature air outlet 16 of solar energy natural air conditioning system; The adjustable air outlet 17 of solar energy natural air conditioning system utilizes the heat collector 18 of the solar energy natural air conditioning system that high roof is provided with.
(1) hot season, solar energy natural air conditioning system flow process
The ring enclosed of utilizing light steel compound frame structure construction building system of the present invention and building maintenance structure to form does not have the heat bridge heat insulation system, reaches 10 ℃ of left and right sides constant temperature indoor environmental condition that the formed face of land, flooring heat island phenomenon is produced, can be with outdoor natural air; Adjustable empty filter air inlet port 13 through being provided with at the building back gets into cryogenerator 14, under the effect of face of land heat island district 15 cryogenic effects; The cold gas that produces through low temperature air outlet 16, gets in the factory building; Thereby the normal temperature air on top, space in the space temperature in the adjusting factory building, factory building, the high temperature air that utilizes the heat collector 18 of the solar energy natural air conditioning system that high roof is provided with to produce; The air strong convection that produces with normal temperature air in the factory building, through stack effect, with room air by adjustable air outlet 17; Discharge by force; Owing to after air-flow is discharged, be utilized in the negative pressure that the space produces in the factory building, outdoor fresh air sucked in the factory building by adjustable empty filter air inlet port 13; Under the effect of its air negative pressure, convection current, make the inside and outside air of factory building produce controlled natural circulation.
(2) severe cold season, solar energy nature heating system flow process,
The ring enclosed of utilizing light steel compound frame structure construction building system of the present invention and building maintenance structure to form does not have the heat bridge heat insulation system; Reach 10 ℃ of left and right sides isoperibol conditions that the formed face of land, flooring heat island phenomenon is produced; Again through being arranged on the height insulation daylighting curtain wall 11 of the positive facade of building; The solar irradiation heat that receives, the common temperature that produces reaches heating effect required in the factory building.
4. building internal and external ornament
According to the design of corresponding working drawing, because of all side fascia plate faces, before dispatching from the factory, carried out internal and external ornament, need not to plaster, decorate carrying out indoor and outdoor, only with outer wall construction seam place, prefabricated inside and outside decorative thread is installed is got final product.
Beneficial effect of the present invention
All building unit is batch production production, and assembling is done the way construction, can save the duration more than 80% than traditional architecture; This building aseismicity, fire prevention, quiet, Ultra-low carbon, super low energy consumption, environmental protection; And in system's installation process, do not produce noise, the body of wall outward appearance combines with function of use with roof shape, and building body can reach more than 70 years application life; The engineering comprehensive cost is close than the traditional industry factory building, is the elaboration project that is worth promoting in the industrial construction field.
The above only is preferred embodiment of the present invention, is not the present invention is done any pro forma restriction, and any simple modification, equivalent variations and modification that every foundation technical spirit of the present invention is done all belong within the technical scheme scope of the present invention.

Claims (2)

1. environmental industrial premises, it is characterized in that: it is a steel concrete prefabricated screw pile (1), steel concrete prefabricated spiral pile cap (2); Gate-type steel structure frame post (3), gate-type steel structure frame beam (4), prefabricated light steel composite lead-bearing basis body of wall (5); Prefabricated light steel composite lead-bearing body of wall (6), prefabricated light steel composite roof board (7), the high insulation of closed folding door (8); Sealed high insulation light inlet window (9), multi-functional compound outer luffer boards tectonic association (10), high insulation daylighting curtain wall (11); Roller blind insulation outer luffer boards (12); The adjustable empty filter air inlet port (13) of solar energy natural air conditioning system, the cryogenerator of solar energy natural air conditioning system (14), face of land heat island district (15); The low temperature air outlet (16) of solar energy natural air conditioning system; The adjustable air outlet (17) of solar energy natural air conditioning system utilizes the heat collector (18) of the solar energy natural air conditioning system that high roof is provided with, and forms environmental industrial premises jointly.
2. a kind of environmental industrial premises as claimed in claim 1 is characterized in that, environmental industrial premises assembly construction method is made up of following steps:
1. main building construction
According to take over towards, the due south respective design of 10 degree of positive facade daylighting, use vehicle-mounted pile rotating machine that precast reinforced concrete screw pile (1) is screwed in the foundation soil; On the stake top, welding anchoring steel concrete prefabricated spiral pile cap (2) is installed, gate-type steel structure frame post (3); Gate-type steel structure frame beam (4); Prefabricated light steel composite lead-bearing basis wallboard (5) is installed in the side anchor weldering outside gate-type steel structure frame post (3) foundation platform, and prefabricated light steel composite lead-bearing wallboard (6) is installed in the side anchor weldering outside gate-type steel structure frame post (3), on gate-type steel structure frame beam (4); Prefabricated light steel composite roof board (7) is installed in the anchor weldering; At last roof panel is prolonged outer body of wall periphery, do integral solder, make it form the complete light steel compound frame structure construction building system of a cover by the working drawing design;
2. door and window is installed sealing
According to corresponding working drawing design; With the high insulation of closed folding door (8), sealed high insulation light inlet window (9) is again with multi-functional compound outer luffer boards tectonic association (10); High insulation daylighting curtain wall (11); Roller blind, insulation outer luffer boards (12) are installed on door, window opening mouth place respectively, and making the building maintenance structure form the ring enclosed does not have the heat bridge heat insulation system;
Heat island formula solar energy natural air conditioning system is installed
The adjustable empty filter air inlet port (13) of solar energy natural air conditioning system is installed; The cryogenerator of solar energy natural air conditioning system (14); The low temperature air outlet (16) of solar energy natural air conditioning system; The adjustable air outlet (17) of solar energy natural air conditioning system utilizes the heat collector (18) of the solar energy natural air conditioning system that high roof is provided with;
(1) hot season, solar energy natural air conditioning system flow process
The ring enclosed of utilizing light steel compound frame structure construction building system of the present invention and building maintenance structure to form does not have the heat bridge heat insulation system, reaches 10 ℃ of left and right sides constant temperature indoor environmental condition that the formed face of land, flooring heat island phenomenon is produced, can be with outdoor natural air; Adjustable empty filter air inlet port (13) through being provided with at the building back gets into cryogenerator (14), under the effect of face of land heat island district (15) cryogenic effect; The cold gas that produces through low temperature air outlet (16), gets in the factory building; Thereby the normal temperature air on top, space in the space temperature in the adjusting factory building, factory building, the high temperature air that utilizes the heat collector (18) of the solar energy natural air conditioning system that high roof is provided with to produce; The air strong convection that produces with normal temperature air in the factory building, through stack effect, with room air by adjustable air outlet (17); Discharge by force; Owing to after air-flow is discharged, be utilized in the negative pressure that the space produces in the factory building, outdoor fresh air sucked in the factory building by adjustable empty filter air inlet port (13); Under the effect of its air negative pressure, convection current, make the inside and outside air of factory building produce controlled natural circulation;
(2) severe cold season, solar energy nature heating system flow process
The ring enclosed of utilizing light steel compound frame structure construction building system of the present invention and building maintenance structure to form does not have the heat bridge heat insulation system; Reach 10 ℃ of left and right sides isoperibol conditions that the formed face of land, flooring heat island phenomenon is produced; Again through being arranged on the height insulation daylighting curtain wall (11) of the positive facade of building; The solar irradiation heat that receives, the common temperature that produces reaches heating effect required in the factory building;
The building internal and external ornament
Because of all side fascia plate faces, before dispatching from the factory, carried out internal and external ornament, need not to plaster, decorate carrying out indoor and outdoor, only with outer wall construction seam place, prefabricated inside and outside decorative thread is installed is got final product.
CN201110419604.6A 2011-12-15 2011-12-15 Ecological industrial factory building fabricated construction method Active CN102493687B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110419604.6A CN102493687B (en) 2011-12-15 2011-12-15 Ecological industrial factory building fabricated construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110419604.6A CN102493687B (en) 2011-12-15 2011-12-15 Ecological industrial factory building fabricated construction method

Publications (2)

Publication Number Publication Date
CN102493687A true CN102493687A (en) 2012-06-13
CN102493687B CN102493687B (en) 2014-02-05

Family

ID=46185541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110419604.6A Active CN102493687B (en) 2011-12-15 2011-12-15 Ecological industrial factory building fabricated construction method

Country Status (1)

Country Link
CN (1) CN102493687B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452350A (en) * 2013-09-02 2013-12-18 中建一局集团建设发展有限公司 Fabricated electronic workshop and construction method thereof
CN103899103A (en) * 2012-12-29 2014-07-02 青岛市城阳区新世纪预制构件有限公司 Industrial plant
CN104420675A (en) * 2013-09-04 2015-03-18 中集集团集装箱控股有限公司 Workshop suitable for welding operation
CN104675147A (en) * 2015-02-27 2015-06-03 杨怡 Passive ultra-low energy-consumption green building for recyclable materials
CN105464155A (en) * 2014-09-06 2016-04-06 任丘市永基建筑安装工程有限公司 Reutilization technique for prefabricated housing foundation beams
CN105672479A (en) * 2015-12-25 2016-06-15 黑龙江高格建材科技股份有限公司 Full-assembly detachable building structure and installation and construction technology
CN107869149A (en) * 2017-11-22 2018-04-03 山东电力工程咨询院有限公司 Building or structures Construction Organization Method after a kind of stove
CN109267776A (en) * 2018-08-21 2019-01-25 鼎宸建设管理有限公司 A kind of nomadic PC component workshop convenient for fast assembling-disassembling
CN110359738A (en) * 2019-06-19 2019-10-22 北京首钢建设集团有限公司 A kind of ecological industrial factory building assembly construction method
CN113622695A (en) * 2021-08-06 2021-11-09 高惠芬 Sunshade device for building roof construction and installation method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101790944A (en) * 2010-03-30 2010-08-04 满意 Low-carbon emission greenhouse arranged on roof of tunnel kiln

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201354522Y (en) * 2009-01-16 2009-12-02 西安市碑林区南菇北移食用菌研究所 Fresh straw mushroom factory production cultivation room

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101790944A (en) * 2010-03-30 2010-08-04 满意 Low-carbon emission greenhouse arranged on roof of tunnel kiln

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103899103A (en) * 2012-12-29 2014-07-02 青岛市城阳区新世纪预制构件有限公司 Industrial plant
CN103899103B (en) * 2012-12-29 2016-06-15 青岛新世纪预制构件有限公司 Industrial premises
CN103452350A (en) * 2013-09-02 2013-12-18 中建一局集团建设发展有限公司 Fabricated electronic workshop and construction method thereof
CN104420675A (en) * 2013-09-04 2015-03-18 中集集团集装箱控股有限公司 Workshop suitable for welding operation
CN105464155A (en) * 2014-09-06 2016-04-06 任丘市永基建筑安装工程有限公司 Reutilization technique for prefabricated housing foundation beams
CN104675147A (en) * 2015-02-27 2015-06-03 杨怡 Passive ultra-low energy-consumption green building for recyclable materials
CN105672479A (en) * 2015-12-25 2016-06-15 黑龙江高格建材科技股份有限公司 Full-assembly detachable building structure and installation and construction technology
CN107869149A (en) * 2017-11-22 2018-04-03 山东电力工程咨询院有限公司 Building or structures Construction Organization Method after a kind of stove
CN109267776A (en) * 2018-08-21 2019-01-25 鼎宸建设管理有限公司 A kind of nomadic PC component workshop convenient for fast assembling-disassembling
CN110359738A (en) * 2019-06-19 2019-10-22 北京首钢建设集团有限公司 A kind of ecological industrial factory building assembly construction method
CN113622695A (en) * 2021-08-06 2021-11-09 高惠芬 Sunshade device for building roof construction and installation method thereof

Also Published As

Publication number Publication date
CN102493687B (en) 2014-02-05

Similar Documents

Publication Publication Date Title
CN102493687B (en) Ecological industrial factory building fabricated construction method
Evola et al. Cost-effective design solutions for low-rise residential Net ZEBs in Mediterranean climate
CN102493678B (en) Fabricated construction method of ecological-type house
CN202467240U (en) Assembled steel structure hollow building
CN105756404A (en) Modular passive energy-saving building and construction method thereof
CN104790523A (en) Energy-saving glass house
CN110331778B (en) Construction method of green energy-saving fabricated building
CN207988131U (en) A kind of integrated house
CN205063382U (en) Building structure and passive room of equipment integration
CN110821210A (en) House system of assembled positive energy room
CN102759155A (en) Solar wall body air conditioner and indoor air adjusting method thereof
CN210483161U (en) Tunnel shaft light steel is dustproof to fall and is fallen isolation canopy of making an uproar
CN201650049U (en) Efficient natural draft louver window
CN211667957U (en) Novel ventilation of dry coal canopy enclosed construction of steel presses down dirt device
CN212613167U (en) Layered assembled durable decorative wall
CN204899282U (en) Ultralow energy consumption green building of passive form of material use can recycle
CN210049434U (en) Assembled unit periphery protector
WO2017092249A1 (en) Movable aluminium alloy house
CN106368500A (en) Building method of energy-saving building
CN205088865U (en) Thin film photovoltaic solar energy daylighting top curtain
RU164507U1 (en) FAST MODULAR HOUSE OF INCREASED SEISMIC RESISTANCE, ENERGY EFFICIENCY AND CONVENIENCE
CN203782916U (en) Environment-friendly anti-seismic energy-saving house
CN218149135U (en) Energy-saving unit curtain wall structure integrating perforated aluminum plate and opening window
Mancini et al. Upgrading 20th century historic buildings in accordance to principles of energy efficiency
CN202248575U (en) Lighting and ventilating structure for light-weight steel roof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: DAQING YUYANG TECHNOLOGY DEVELOPMENT CO., LTD.

Free format text: FORMER OWNER: SUN YOUFANG

Effective date: 20141017

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20141017

Address after: 163000 Heilongjiang city of Daqing Province, Honggang District Road No. 85 large hospital on the north side of the 2 floor room 101

Patentee after: Daqing Bath Technology Development Co., Ltd.

Address before: 163000, No. three, No. 82, Fu San Road, SA District, Heilongjiang, Daqing

Patentee before: Sun Youfang