CN102493344A - 氢气球牵引缆索跨越峡谷或河道施工方法 - Google Patents

氢气球牵引缆索跨越峡谷或河道施工方法 Download PDF

Info

Publication number
CN102493344A
CN102493344A CN2011103819887A CN201110381988A CN102493344A CN 102493344 A CN102493344 A CN 102493344A CN 2011103819887 A CN2011103819887 A CN 2011103819887A CN 201110381988 A CN201110381988 A CN 201110381988A CN 102493344 A CN102493344 A CN 102493344A
Authority
CN
China
Prior art keywords
main
cable
haulage cable
hauling
inferior
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103819887A
Other languages
English (en)
Inventor
张传刚
张国红
周仲猛
王传明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway No 12 Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway No 12 Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway No 12 Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN2011103819887A priority Critical patent/CN102493344A/zh
Publication of CN102493344A publication Critical patent/CN102493344A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了氢气球牵引缆索跨越峡谷或河道施工方法,属桥梁施工技术领域,解决轻型悬索桥主缆跨越问题。包括以下步骤:(1)主塔完成后,一侧主缆索锚固,另一侧地锚后端安卷扬机;(2)将次牵引绳固定在氢气球上上升,上升极限后再安装第二个氢气球,如此往复,次牵引绳进行跨越后两侧同步牵引至桥位,并固定在主塔上;(3)将主牵引绳与次牵引绳连接,并将次牵引绳固定于卷扬机上,将主牵引绳牵引跨越;(4)将主缆索活动端与主牵引绳连接并牵引至对岸;(5)主缆跨越后,施工地锚,安装主缆。本发明提供了一种快速便捷、经济合理、安全可靠的逐级牵引的施工方法,解决了深谷或水流比较湍急的宽阔河段缆索跨越施工的问题。

Description

氢气球牵引缆索跨越峡谷或河道施工方法
技术领域
本发明属于桥梁施工技术领域,涉及轻型悬索桥施工中一种主缆过峡谷或河道施工方法,具体涉及一种氢气球牵引缆索跨越峡谷或河道施工方法。
背景技术
峡谷或宽阔河道为了方便施工、人员通行,需设置大跨度的轻型悬索桥,悬索桥施工必须考虑主缆跨越的问题。以往常用的是人工直接牵引跨越或船只跨越的施工方法。但在深谷或无法通船的河流普通的主缆跨越方法往往并不适用。针对这种情况,需要研究一种快速便捷、经济合理、安全可靠的主缆跨越施工方法。
发明内容
本发明是为了解决轻型悬索桥主缆跨越或其他领域缆索跨越的问题,而提供了一种氢气球牵引缆索跨越峡谷或河道施工方法。
本发明是通过以下技术方案实现的:
氢气球牵引缆索跨越峡谷或河道施工方法,包括以下步骤:
(1)前期准备工作:当两侧主塔施工完成后,将一侧主缆索通过地锚锚固,另一侧地锚后端安装卷扬机;
(2)次牵引钢丝绳跨越:在风向非顺河道的条件下,将次牵引钢丝绳固定在第一个氢气球上,氢气球的浮力带动次牵引钢丝绳上升,达到上升极限时再安装第二个氢气球,次牵引钢丝绳继续上升,如此往复,次牵引钢丝绳通过氢气球上升并借助风向进行跨越,次牵引钢丝绳跨越后,在对面较高位置掌握次牵引钢丝绳前端下垂部分,然后两侧同步将次牵引钢丝绳牵引至桥位,并固定在主塔上;
(3)主牵引钢丝绳跨越:将主牵引钢丝绳与次牵引钢丝绳连接,并将次牵引钢丝绳固定于卷扬机上,通过卷扬机及主塔顶部滑移设施将主牵引钢丝绳牵引跨越;
(4)主缆跨越:将主缆索活动端与主牵引钢丝绳连接,采取与主牵引钢丝绳相同的方式,将主缆索牵引至对岸;
(5)主缆固定:主缆跨越后,施工地锚,按设计安装主缆。
本发明提供了一种快速便捷、经济合理、安全可靠的逐级牵引的施工方法,解决了深谷或水流比较湍急的宽阔河段缆索跨越施工的问题。
具体实施方式
氢气球牵引缆索跨越峡谷或河道施工方法,包括以下步骤:
(1)前期准备工作:当两侧主塔施工完成后,将一侧主缆索通过地锚锚固,另一侧地锚后端安装卷扬机;
(2)次牵引钢丝绳跨越:选择天气晴朗,风向非顺河道的时期,在上游较为宽阔的河谷地段,将φ6次牵引钢丝绳固定在第一个氢气球上(为方便收回,前端预留部分下垂长度),氢气球的浮力带动钢丝绳上升,达到上升极限时再安装第二个氢气球,钢丝绳继续上升,如此往复,钢丝绳通过氢气球上升并借助自然风进行跨越,钢丝绳跨越后,在对面较高位置掌握钢丝绳前端下垂部分,然后两侧同步将次牵引钢丝绳牵引至桥位,并固定在主塔上;
(3)主牵引钢丝绳跨越:将φ16主牵引钢丝绳与φ6次牵引钢丝绳连接,并将φ6次牵引钢丝绳固定于卷扬机上,通过卷扬机及主塔顶部滑移设施将φ16主牵引钢丝绳牵引跨越;
(4)主缆跨越:将主缆索活动端与φ16主牵引钢丝绳连接,采取与主牵引绳相同的方式,将主缆索牵引至对岸;
(5)主缆固定:主缆跨越后,施工地锚,按设计安装主缆。

Claims (1)

1.一种氢气球牵引缆索跨越峡谷或河道施工方法,其特征是包括以下步骤:
(1)前期准备工作:当两侧主塔施工完成后,将一侧主缆索通过地锚锚固,另一侧地锚后端安装卷扬机;
(2)次牵引钢丝绳跨越:在风向非顺河道的条件下,将次牵引钢丝绳固定在第一个氢气球上,氢气球的浮力带动次牵引钢丝绳上升,达到上升极限时再安装第二个氢气球,次牵引钢丝绳继续上升,如此往复,次牵引钢丝绳通过氢气球上升并借助风向进行跨越,次牵引钢丝绳跨越后,在对面较高位置掌握次牵引钢丝绳前端下垂部分,然后两侧同步将次牵引钢丝绳牵引至桥位,并固定在主塔上;
(3)主牵引钢丝绳跨越:将主牵引钢丝绳与次牵引钢丝绳连接,并将次牵引钢丝绳固定于卷扬机上,通过卷扬机及主塔顶部滑移设施将主牵引钢丝绳牵引跨越;
(4)主缆跨越:将主缆索活动端与主牵引钢丝绳连接,采取与主牵引钢丝绳相同的方式,将主缆索牵引至对岸;
(5)主缆固定:主缆跨越后,施工地锚,按设计安装主缆。
CN2011103819887A 2011-11-28 2011-11-28 氢气球牵引缆索跨越峡谷或河道施工方法 Pending CN102493344A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103819887A CN102493344A (zh) 2011-11-28 2011-11-28 氢气球牵引缆索跨越峡谷或河道施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103819887A CN102493344A (zh) 2011-11-28 2011-11-28 氢气球牵引缆索跨越峡谷或河道施工方法

Publications (1)

Publication Number Publication Date
CN102493344A true CN102493344A (zh) 2012-06-13

Family

ID=46185200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103819887A Pending CN102493344A (zh) 2011-11-28 2011-11-28 氢气球牵引缆索跨越峡谷或河道施工方法

Country Status (1)

Country Link
CN (1) CN102493344A (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2628061A1 (fr) * 1988-03-03 1989-09-08 Aerazur Constr Aeronaut Dispositif perfectionne de suspension de la nacelle pour ballon dirigeable souple
JPH08144218A (ja) * 1994-11-17 1996-06-04 Honsyu Shikoku Renrakukiyou Kodan ヘリコプタを用いてパイロットロープを張力管理しながら空中架線する方法
CN1936189A (zh) * 2006-10-13 2007-03-28 浙江省舟山连岛工程建设指挥部 一种用于悬索桥牵引系统中架设先导索的方法
CN101096839A (zh) * 2007-05-11 2008-01-02 大庆石油管理局 施工工作索的高空发送方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2628061A1 (fr) * 1988-03-03 1989-09-08 Aerazur Constr Aeronaut Dispositif perfectionne de suspension de la nacelle pour ballon dirigeable souple
JPH08144218A (ja) * 1994-11-17 1996-06-04 Honsyu Shikoku Renrakukiyou Kodan ヘリコプタを用いてパイロットロープを張力管理しながら空中架線する方法
CN1936189A (zh) * 2006-10-13 2007-03-28 浙江省舟山连岛工程建设指挥部 一种用于悬索桥牵引系统中架设先导索的方法
CN101096839A (zh) * 2007-05-11 2008-01-02 大庆石油管理局 施工工作索的高空发送方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
广东省公路工程总公司悬索桥施工处: "虎门大桥悬索桥工程介绍", 《广东公路交通》 *
王武勤: "大跨度悬索桥主缆的架设", 《铁道建筑技术》 *

Similar Documents

Publication Publication Date Title
CN202012047U (zh) 塔架钢绞线斜拉扣挂系统
CN202423978U (zh) 架空线跨越架
CN102108710B (zh) 一种大型钢沉井施工中水平摆动的止摆方法
CN105780658B (zh) 一种空间索面结构缆索系统横向对拉方法
CN102733615B (zh) 非对称整体提升施工方法
CN201667508U (zh) 一种架空线路跨越架
CN106194569A (zh) 潮流发电系统的维护装置
CN102593759B (zh) 大截面导线一牵二展放施工工艺
CN202116199U (zh) 缆索起重机钢绞线缆风张拉调节及锚固装置
CN102493344A (zh) 氢气球牵引缆索跨越峡谷或河道施工方法
CN101966823A (zh) 一种承力索跨越架及其架设方法
CN103956683A (zh) 一种500千伏变电站220千伏出现工程架线用跨越架系统
CN103296616A (zh) 架空输电线路施工用刚性跨越支架及跨越方法
CN201252365Y (zh) 超、特高压输电线路施工带电跨越装置
CN203174516U (zh) 悬索桥合龙段施工梁段牵引预偏装置
CN202383915U (zh) 倒落式抱杆整体起立铝合金多功能抢修塔模拟教学沙盘
CN109768502A (zh) 一种输电线路跨海不落水牵放迪尼玛施工方法
CN201362337Y (zh) 临时过江浮船
CN202170473U (zh) 一种地面塌陷用应急悬吊桥
CN205399213U (zh) 一种空间索面结构缆索系统横向对拉装置
CN202657878U (zh) 一种重物牵引机构
CN201376843Y (zh) 穿心式千斤顶拉缆风绳
CN202483238U (zh) 一种利用钢丝锚固钢柱的装置
CN206017043U (zh) 潮流发电系统的维护装置
CN206099243U (zh) 用于输电线路的张力自锁型输电电缆挂具

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120613