CN102491072B - Method and device for controlling material discharging of material bin of sintering and burdening system - Google Patents

Method and device for controlling material discharging of material bin of sintering and burdening system Download PDF

Info

Publication number
CN102491072B
CN102491072B CN201110424902.4A CN201110424902A CN102491072B CN 102491072 B CN102491072 B CN 102491072B CN 201110424902 A CN201110424902 A CN 201110424902A CN 102491072 B CN102491072 B CN 102491072B
Authority
CN
China
Prior art keywords
blanking
mode
state
sintered material
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110424902.4A
Other languages
Chinese (zh)
Other versions
CN102491072A (en
Inventor
李宗平
孙英
陈猛胜
王付其
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongye Changtian International Engineering Co Ltd
Original Assignee
Zhongye Changtian International Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongye Changtian International Engineering Co Ltd filed Critical Zhongye Changtian International Engineering Co Ltd
Priority to CN201110424902.4A priority Critical patent/CN102491072B/en
Publication of CN102491072A publication Critical patent/CN102491072A/en
Application granted granted Critical
Publication of CN102491072B publication Critical patent/CN102491072B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a method for controlling material discharging of a material bin of a sintering and burdening system. The method comprises the following steps of: acquiring a working state of the sintering and burdening system; if the working state is a restarting state, controlling the material bin to discharge materials according to a preset delay time after the material bin of the sintering and burdening system is started; and if the working state is a stopped state, controlling the material bin to discharge the materials immediately after the material bin of the sintering and burdening system is started. Furthermore, the invention also provides a device for controlling the material discharging of the material bin. According to the embodiment of the invention, the working state of the system is acquired, so that the material bin can be controlled to discharge the materials according to the preset delay time or discharge the materials immediately after the system is started to work on the basis of different working states; and therefore, a phenomenon of the absence of materials gathered on a mixed belt is avoided. An aim of avoiding waste materials caused by the material absence phenomenon during burdening is fulfilled; the quality of the sintering process is improved; and the energy consumption is reduced.

Description

A kind of bin blanking control method and device of sintered material system
Technical field
The present invention relates to the control technology field, particularly relate to a kind of bin blanking control method and device of sintered material system.
Background technology
As shown in Figure 1, system architecture schematic diagram for the sintered material system, wherein, the feed bin group can comprise a plurality of feed bins 10, a kind of material of the interior splendid attire of each feed bin 10 (material can comprise the material etc. that mixes ore deposit, limestone, returns mine and mix), be provided with at least one blanking disk 11 below feed bin, the exit of each blanking disk also arranges respectively a blanking belt conveyer scale 12, and blanking disk 11 and the blanking belt conveyer scale 12 corresponding with it form blanking row.When the sintered material system works, each feed bin is default delay time according to self respectively, the material of splendid attire in feed bin is dumped into to the blanking disk by a certain percentage, and then by the outlet of blanking disk, material is dumped into to corresponding blanking belt conveyer scale, finally by the blanking belt conveyer scale, material is sent to and mixes belt 20.
Mix belt for gathering the material of each feed bin unloading, and move according to the direction of diagram f, mixed material is sent to the mixer (not shown), after twice mixer mixes, form mixture, after oversintering, fragmentation, cooling, screening etc. are processed, final finished is transported to the storage of finished product ore storage bin again.
In above-mentioned sintering process, the sintered material system often there will be restarts or the stop and start phenomenon.For system is restarted phenomenon (also can be called along opening phenomenon), because the sintered material system is just to start after mixing the material full scale clearance unloaded on belt, therefore each feed bin delay time discharging default according to self, what on the mixing belt, transmit is also material up to specification, not there will be and lacks the material phenomenon.But for stop and start phenomenon (being the phenomenon that reopens again work after the sintered material system halt), if after system starts, also default discharging delay time according to self of each feed bin, mix the material gathered on belt and just there will be scarce material phenomenon, if still carry out sintering in the situation that lack certain material, can affect the quality of finished product.For example, if there is no fuel in mixture, mixture abundant sintering just, cause occurring a large amount of waste products so; If there is no flux in mixture, can cause the basicity of finished product too low, be still waste product.Produce waste product for fear of sintering in scarce material situation, generally, the mixture that will lack certain material is considered as waste material, it is not carried out to sintering processes, and this just causes the great wasting of resources.
As shown in Figure 2, mix the structural representation of the stockpile gathered on belt while occurring restarting phenomenon for system normal operation or system, No. 1 feed bin is at T 1the time material A that it is inner is unloaded to mixes on belt, through d delay time 1after, No. 2 feed bins are at T 2(T 2=T 1+ d 1) the time material B that it is inner is unloaded to and mixes on belt, now mixes the blanking position that just in time is sent to No. 2 feed bins on belt with the stockpile of material A, the layered laminate stockpile that the two formation comprises material A and B; Then pass through d delay time 2after, the stockpile that comprises material A and B is sent to the blanking position of No. 3 feed bins, and No. 3 feed bins are at T 3(T 3=T 2+ d 2) the time material C that it is inner is unloaded to and mixes on belt, the layered laminate stockpile formed by material A, B and C continues to next feed bin transmission again; According to said process, until be sent to last feed bin of feed bin group, then mix the material gathered on belt and just enter the mixer mixing.
But, after the system stop and start, mix the stockpile transmitted on belt and just there will be scarce material phenomenon.As shown in Figure 3, mix the stockpile gathered on belt during for system halt, mix on the position that belt is corresponding with No. 2 feed bins and gather the stockpile that comprises material A is arranged, gather the stockpile that comprises material A and B is arranged on the mixing belt position corresponding with No. 3 feed bins, by that analogy.After system starts again, No. 1 feed bin blanking immediately, No. 2 feed bin needs through d 1delay time after just blanking, now, when the stockpile under No. 2 feed bins is sent to the position of No. 3 bin blankings, lack material B in stockpile; And No. 3 feed bins need to pass through d 2just blanking delay time, that is to say in No. 3 feed bins are sent to the stockpile of next feed bin and lack material C, by that analogy, this just makes system after stop and start, mixes the material transmitted on belt and the material phenomenon occurs lacking.
Summary of the invention
The embodiment of the present invention provides a kind of bin blanking control method and device of sintered material system, when realizing the system stop and start, mixes the purpose that the material phenomenon does not appear lacking in the material gathered on belt.
For this reason, the invention provides following technical scheme:
A kind of bin blanking control method of sintered material system, described method comprises:
Obtain the mode of operation of sintered material system:
If described mode of operation is rebooting status, after the feed bin in described sintered material system starts, control described feed bin according to default blanking delay time;
If described mode of operation is the stop and start state, after the feed bin in described sintered material system starts, control the blanking immediately of described feed bin.
A kind of bin blanking control setup of sintered material system, described device comprises:
The state of the system acquiring unit, for obtaining the mode of operation of sintered material system;
Control unit, while for the mode of operation in described sintered material system, being rebooting status, the feed bin in described sintered material system is controlled described feed bin according to default blanking delay time after starting; When the mode of operation of described sintered material system is the stop and start state, after described feed bin starts, control the blanking immediately of described feed bin.
The embodiment of the invention discloses following technique effect:
Bin blanking control method and the device of embodiment of the present invention sintered material system, the auto acquisition system mode of operation, and then after system unlatching work, just can be according to different working state control feed bins according to the diverse ways blanking, to realize mixing the purpose that the material phenomenon does not appear lacking in the material gathered on belt.When system occurs restarting phenomenon, control the delay time blanking default according to self of each feed bin, meet the batching requirement thereby guarantee to mix the material transmitted on belt, not there will be and lack the material phenomenon.When the stop and start phenomenon appears in system, control the blanking immediately after startup work of each feed bin, thereby realize mixing the purpose that the material phenomenon does not appear lacking in the material gathered on belt.The purpose that realizes the embodiment of the present invention to avoid in blending process occurring lacking the material phenomenon and cause producing waste material, one side can improve the quality of sintering process, the consumption that can also save on the other hand the energy.
The accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, below will the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described, apparently, the accompanying drawing the following describes is only some embodiment that put down in writing in the application, for those of ordinary skills, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the system architecture schematic diagram of sintered material system;
Fig. 2 is sintered material system normal operation or the structural representation that mixes the stockpile gathered on belt while occurring restarting phenomenon;
When being the sintered material system halt, mixes Fig. 3 the structural representation of the stockpile gathered on belt;
Fig. 4 is the schematic flow sheet of the bin blanking control method of embodiment of the present invention sintered material system;
Fig. 5 is the schematic flow sheet that obtains the sintered material working state of system in the embodiment of the present invention;
Fig. 6 is the structural representation of the bin blanking control setup of embodiment of the present invention sintered material system;
Fig. 7 is the structural representation of the state of the system acquiring unit in the embodiment of the present invention;
Fig. 8 is the structural representation of the blanking row acquiring unit in the embodiment of the present invention.
The specific embodiment
In order to make those skilled in the art person understand better the present invention program, below in conjunction with drawings and embodiments, the embodiment of the present invention is described in further detail.
Bin blanking control method and the device of embodiment of the present invention sintered material system, by obtaining working state of system, and take different discharging control methods for the different operating state, to realize mixing the purpose that the material phenomenon does not appear lacking in the material gathered on belt.The mode of operation of restarting for system, blanking delay time that each feed bin can be default according to self; And, for the mode of operation of system stop and start, need the blanking immediately after startup work of each feed bin.
As shown in Figure 4, be the diagram of circuit of the bin blanking control method of embodiment of the present invention sintered material system, comprising:
Step 101, obtain the mode of operation of sintered material system.
The present invention is by obtaining the mode of operation of sintered material system, and then different discharging control methods is set for system in the different operating state, realize mixing the purpose that the material phenomenon does not appear lacking in the material gathered on belt, therefore, this step is that the technical foundation of discharging control method is set for system, only have the mode of operation that obtains accurately system, could correct discharging control method be set for this mode of operation.
As shown in Figure 5, a kind of implementation for the present invention obtains working state of system specifically comprises as follows:
Step 201, obtain the mode of operation that blanking is listed as, if all blankings row are, stops the blanking state, and recording the current time is very first time t 1.
The blanking row comprise blanking disk and the blanking belt conveyer scale corresponding with the blanking disk, so the blanking row mode of operation obtained in this step comprises the mode of operation of blanking disk and the mode of operation of blanking belt conveyer scale.If the mode of operation of blanking disk and corresponding blanking belt conveyer scale thereof is quit work, judge that this blanking is classified as and stop the blanking state.
In the engineering application, practical application needs according to sintered material, may suspend certain feed bin or suspend some bin blanking, for example, when fuel X is replaced with to fuel Y, just need to control the feed bin that fuel X is housed and stop blanking, now, the mode of operation of the blanking of this feed bin row is and stops the blanking state.Therefore, for fear of the erroneous judgement working state of system, all blanking row that only comprise in system are while stopping the blanking state, just will the time now be recorded as very first time t 1.
Step 202, obtain the mode of operation that mixes belt, if mix belt for stopping delivery status, recording the current time is the second time t 2.Whether judgement mixes the mode of operation of belt for stopping delivery status, can mix by following two aspect judgements the mode of operation of belt: the on off state of the motor of belt transfer rate and drive belt transmission.If motor switch is closure state, but the belt transfer rate is zero, or motor switch is off-state, thinks and mixes belt in stopping delivery status, and recording the current time is the second time t 2.
Step 203, calculate the interval between the very first time and the second time, if interval is less than default delay time of the sum of all feed bins, the mode of operation that judges the sintered material system is the stop and start state; Otherwise the mode of operation of judgement sintered material system is rebooting status.
Interval of delta t=t 2-t 1;
Default delay time of the sum of all feed bins is
Figure BDA0000121404660000051
wherein, d ibe the blanking delay time of i feed bin, the number that n is the feed bin that comprises of sintered material system, n is natural number.
If Δ t<d, decision-making system is in the stop and start state, on mixing belt corresponding to bin blanking position, has stockpile;
If Δ t >=d, decision-making system is in rebooting status, on mixing belt corresponding to bin blanking position, do not have stockpile, removed clean.
Step 102, according to the judgement of step 101, if working state of system is rebooting status,, after feed bin startup work, control feed bin according to default blanking delay time.
Step 103, according to the judgement of step 101, if working state of system is the stop and start state,, after feed bin startup work, control feed bin blanking immediately.Still take Fig. 3 as example, after system starts, not only No. 1 feed bin blanking immediately, No. 2 also blankings immediately after system starts of feed bin, it is sent in the stockpile of No. 3 feed bins and not only comprises material A but also comprise material B, not there will be the situation that lacks material B.In like manner, the also blanking immediately after system starts of No. 3 feed bins, so it is sent in the stockpile of next feed bin and also can lack material C, by that analogy, control bin blanking according to this method and just can guarantee after the stop and start phenomenon appears in system, mix the stockpile transmitted on belt and not there will be scarce material phenomenon.
Correspondingly, the embodiment of the present invention also provides a kind of bin blanking control setup of sintered material system, and as shown in Figure 6, the structural representation for embodiment of the present invention bin blanking control setup specifically comprises:
State of the system acquiring unit 61, for obtaining the mode of operation of sintered material system.
Control unit 62, while for the mode of operation in the sintered material system, being rebooting status, after the feed bin in the sintered material system starts, control feed bin according to default blanking delay time; When the mode of operation of sintered material system is the stop and start state, after feed bin starts, control feed bin blanking immediately.
As shown in Figure 7, the state of the system acquiring unit specifically comprises:
Blanking row state acquiring unit 71, for obtaining the mode of operation of blanking row, stop the blanking state if all blankings row are, and recording the current time is the very first time;
Mix belt state acquiring unit 72, for obtaining the mode of operation that mixes belt, if mix belt for stopping delivery status, recording the current time was the second time;
Time gap calculating unit 73, for calculating the interval between the very first time and the second time, if interval is less than default delay time of the sum of all feed bins, the mode of operation that judges the sintered material system is the stop and start state; Otherwise the mode of operation of judgement sintered material system is rebooting status.
As shown in Figure 8, blanking row acquiring unit specifically comprises:
Blanking disk state acquiring unit 81, for obtaining the mode of operation of blanking disk;
Blanking belt conveyer scale state acquiring unit 82, for obtaining the mode of operation of blanking belt conveyer scale;
Identifying unit 83, the status information of obtaining for receiving blanking disk state acquiring unit and blanking belt conveyer scale state acquiring unit, if the mode of operation of the two is quit work, and judges that blanking is classified as to stop the blanking state;
Time record cell 84, while for being at all blanking row, stopping the blanking state, recording the current time is the very first time.
The present invention program can describe in the general context of the computer executable instructions of being carried out by computing machine, for example program element.Usually, program element comprises the routine carrying out particular task or realize particular abstract data type, program, object, assembly, data structure etc.Also can in DCE, put into practice the present invention program, in these DCEs, be executed the task by the teleprocessing equipment be connected by communication network.In DCE, program element can be arranged in the local and remote computer-readable storage medium that comprises storage equipment.
Each embodiment in this specification sheets all adopts the mode of going forward one by one to describe, and between each embodiment, identical similar part is mutually referring to getting final product, and each embodiment stresses is the difference with other embodiment.Especially, for system embodiment, due to it, substantially similar in appearance to embodiment of the method, so describe fairly simplely, relevant part gets final product referring to the part explanation of embodiment of the method.System embodiment described above is only schematic, the wherein said unit as the separating component explanation can or can not be also physically to separate, the parts that show as unit can be or can not be also physical locations, can be positioned at a place, or also can be distributed on a plurality of network elements.Can select according to the actual needs some or all of module wherein to realize the purpose of the present embodiment scheme.Those of ordinary skills in the situation that do not pay creative work, can understand and implement.
Above the embodiment of the present invention is described in detail, has applied the specific embodiment herein the present invention is set forth, the explanation of above embodiment is just for helping to understand method and apparatus of the present invention; , for one of ordinary skill in the art, according to thought of the present invention, all will change in specific embodiments and applications, in sum, this description should not be construed as limitation of the present invention simultaneously.

Claims (6)

1. the bin blanking control method of a sintered material system, is characterized in that, described method comprises:
Obtain the mode of operation of sintered material system, described mode of operation comprises: mean to exist on mixing belt corresponding to bin blanking position stockpile the stop and start state, mean not exist on mixing belt corresponding to bin blanking position the rebooting status of stockpile;
If described mode of operation is rebooting status, after the feed bin in described sintered material system starts, control described feed bin according to default blanking delay time;
If described mode of operation is the stop and start state, after the feed bin in described sintered material system starts, control the blanking immediately of described feed bin.
2. method according to claim 1, is characterized in that, the described mode of operation that obtains the sintered material system comprises:
Obtain the mode of operation of blanking row, if all blankings row are, stop the blanking state, recording the current time is the very first time;
Obtain the mode of operation that mixes belt, if mix belt for stopping delivery status, recording the current time was the second time;
Calculate the interval between the described very first time and described the second time, if described interval is less than default delay time of the sum of all feed bins, the mode of operation that judges described sintered material system is the stop and start state; Otherwise the mode of operation that judges described sintered material system is rebooting status.
3. method according to claim 2, is characterized in that, the described mode of operation that obtains the blanking row comprises:
Obtain the mode of operation of blanking disk and the mode of operation of blanking belt conveyer scale, if the mode of operation of the two is quit work, judge that described blanking is classified as and stop the blanking state.
4. the bin blanking control setup of a sintered material system, is characterized in that, described device comprises:
The state of the system acquiring unit, for obtaining the mode of operation of sintered material system, described mode of operation comprises: mean to exist on mixing belt corresponding to bin blanking position stockpile the stop and start state, mean not exist on mixing belt corresponding to bin blanking position the rebooting status of stockpile;
Control unit, while for the mode of operation in described sintered material system, being rebooting status, the feed bin in described sintered material system is controlled described feed bin according to default blanking delay time after starting; When the mode of operation of described sintered material system is the stop and start state, after described feed bin starts, control the blanking immediately of described feed bin.
5. device according to claim 4, is characterized in that, described state of the system acquiring unit comprises:
Blanking row state acquiring unit, for obtaining the mode of operation of blanking row, stop the blanking state if all blankings row are, and recording the current time is the very first time;
Mix belt state acquiring unit, for obtaining the mode of operation that mixes belt, if mix belt for stopping delivery status, recording the current time was the second time;
The time gap calculating unit, for calculating the interval between the described very first time and described the second time, if described interval is less than default delay time of the sum of all feed bins, the mode of operation that judges described sintered material system is the stop and start state; Otherwise the mode of operation that judges described sintered material system is rebooting status.
6. device according to claim 5, is characterized in that, described blanking row acquiring unit comprises:
Blanking disk state acquiring unit, for obtaining the mode of operation of blanking disk;
Blanking belt conveyer scale state acquiring unit, for obtaining the mode of operation of blanking belt conveyer scale;
Identifying unit, the status information of obtaining for receiving described blanking disk state acquiring unit and blanking belt conveyer scale state acquiring unit, if the mode of operation of the two is quit work, and judges that described blanking is classified as to stop the blanking state;
The time record cell, while for being at all blanking row, stopping the blanking state, recording the current time is the very first time.
CN201110424902.4A 2011-12-16 2011-12-16 Method and device for controlling material discharging of material bin of sintering and burdening system Active CN102491072B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110424902.4A CN102491072B (en) 2011-12-16 2011-12-16 Method and device for controlling material discharging of material bin of sintering and burdening system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110424902.4A CN102491072B (en) 2011-12-16 2011-12-16 Method and device for controlling material discharging of material bin of sintering and burdening system

Publications (2)

Publication Number Publication Date
CN102491072A CN102491072A (en) 2012-06-13
CN102491072B true CN102491072B (en) 2014-01-01

Family

ID=46182944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110424902.4A Active CN102491072B (en) 2011-12-16 2011-12-16 Method and device for controlling material discharging of material bin of sintering and burdening system

Country Status (1)

Country Link
CN (1) CN102491072B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105314365B (en) * 2014-06-26 2017-09-26 宝山钢铁股份有限公司 The method for monitoring flux mass change on-line
CN106406261B (en) * 2016-11-23 2018-11-09 北京首钢自动化信息技术有限公司 A kind of raw materials for sintering storehouse blanking ingredient method for real time tracking
CN114100492B (en) * 2021-10-18 2023-08-25 唐山钢铁集团微尔自动化有限公司 Control method for synchronous alignment of material flow points of sintering multi-row proportioning bins

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5775852A (en) * 1996-03-15 1998-07-07 Pro Line Systems, Inc. Apparatus and method for adding dry materials to liquid drilling mud system
CN101373374A (en) * 2008-09-25 2009-02-25 中冶长天国际工程有限责任公司 Bin control method and apparatus in sintering process
CN101386376A (en) * 2008-10-31 2009-03-18 中冶长天国际工程有限责任公司 Large-sized silo charging intelligent control method and system
CN101929799A (en) * 2009-06-26 2010-12-29 中冶长天国际工程有限责任公司 Device and method for controlling discharge of sintering bunker group

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5775852A (en) * 1996-03-15 1998-07-07 Pro Line Systems, Inc. Apparatus and method for adding dry materials to liquid drilling mud system
CN101373374A (en) * 2008-09-25 2009-02-25 中冶长天国际工程有限责任公司 Bin control method and apparatus in sintering process
CN101386376A (en) * 2008-10-31 2009-03-18 中冶长天国际工程有限责任公司 Large-sized silo charging intelligent control method and system
CN101929799A (en) * 2009-06-26 2010-12-29 中冶长天国际工程有限责任公司 Device and method for controlling discharge of sintering bunker group

Also Published As

Publication number Publication date
CN102491072A (en) 2012-06-13

Similar Documents

Publication Publication Date Title
CN102491072B (en) Method and device for controlling material discharging of material bin of sintering and burdening system
CN102514914B (en) Feeding control method for bunkers of sintering proportioning system and feeding control device for bunkers
CN102662363A (en) Remote automatic control system and method for bucket wheel stacker reclaimers
CN103386716A (en) Reclaimed rubber kneader automatic flipping and feeding device
CN112269363B (en) Intelligent scheduling method for multi-bin group combined feeding
CN103009482A (en) Full-digital automatic control fire clay mixing method and device
CN102974252A (en) Double helix mixer
CN104493967A (en) System for preparing ceramsite through sludge
CN101373374B (en) Bin control method and apparatus in sintering process
CN104911291A (en) Blast furnace multiple-material preparation system and method in concentrated weighing mode
CN102680061A (en) Powder ash material weighing system and weighing method
CN104531982A (en) Method and device for controlling feeding in sintering burden process
CN203141805U (en) Feeding device convenient for switching feed of extruder
CN105752687A (en) Conveying device and processing system
CN103640092A (en) Feeding control method, apparatus and system thereof, aggregate storage bin and stirring station
CN202700444U (en) Automatic burdening system for wooden-plastic material
CN210846258U (en) Full-automatic feeding and stirring system for batteries
CN104244605A (en) Method for improving SMT production efficiency and SMT device utilization rate
CN104552611B (en) Control system and method for prefabricated concrete mixing plant
CN109991945A (en) Mixing plant and concrete pump combined control system
CN212610420U (en) Optimization device for interlocking process of batching belt system
CN101957230A (en) Method and system for detecting short mold of materials in sinter burdening
CN202826134U (en) Automatic glue turning and feeding device of reclaimed rubber milling machine
CN106925415A (en) A kind of ceramic raw material energy-saving control method and system
CN103216261B (en) Three times Mining automation filling systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant