CN102468619A - Lifter special for overhauling of 220-kilvolt overhead ground wire of power transmission line - Google Patents

Lifter special for overhauling of 220-kilvolt overhead ground wire of power transmission line Download PDF

Info

Publication number
CN102468619A
CN102468619A CN2010105422389A CN201010542238A CN102468619A CN 102468619 A CN102468619 A CN 102468619A CN 2010105422389 A CN2010105422389 A CN 2010105422389A CN 201010542238 A CN201010542238 A CN 201010542238A CN 102468619 A CN102468619 A CN 102468619A
Authority
CN
China
Prior art keywords
lifter
transmission line
strutbeam
balance
kilvolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105422389A
Other languages
Chinese (zh)
Inventor
盛从兵
邵震
朱国营
何铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Puyang Power Supply Co of Henan Electric Power Co Ltd
Original Assignee
Puyang Power Supply Co of Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Puyang Power Supply Co of Henan Electric Power Co Ltd filed Critical Puyang Power Supply Co of Henan Electric Power Co Ltd
Priority to CN2010105422389A priority Critical patent/CN102468619A/en
Publication of CN102468619A publication Critical patent/CN102468619A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a lifter special for overhauling of a 220-kilvolt overhead ground wire of a power transmission line. The lifter comprises a balancing strut beam, wherein the balancing strut beam is a square shoulder type balancing strut beam; clamping apparatus is arranged on the lower part of the balancing strut beam; lifting rods are arranged at two ends of the balancing strut beam; and lifting hooks are arranged at the lower ends of the lifting rods. The lifter has a simple structure and good safety performance, is durable and tight in connection, is convenient to operate, shortens the working time by 50 percent, and can greatly improve the working efficiency.

Description

220 kilovolts of lightning conducters of transmission line overhaul special-purpose lifter
Technical field
The present invention relates to a kind of electric power facility apparatus for examination and repair, be specifically related to 220 kilovolts of lightning conducters of a kind of transmission line and overhaul special-purpose lifter.
Background technology
220 kilovolts of lightning conducter service kits that use at present are made up of truss structure and palm cucurbit two parts of angle steel processing.During use it is installed in the top of 220 kilovolts of goat's horn cross-arms,, on the palm cucurbit hitch point mounted thereto, promotes lightning conducter then and change the annex gold utensil with this job platform as the palm cucurbit.Mainly there is following deficiency in existing operation tool: (1) this instrument is made up of truss structure and palm cucurbit two parts of the processing of ∠ 50 * 5 angle steel, and the instrument total weight reaches 14 kilograms, and is very heavy, is not easy to use.(2) this instrument and goat's horn cross-arm connecting portion are insecure, lack bracing structure, therefore along the line direction poor stability, are prone to take place rollover and cause lightning conducter to come off, and its security performance has satisfied not the safety in production needs.Need disengaging section cross-arm member when (3) this instrument is installed, operation sequence is loaded down with trivial details, and using wastes time and energy, and changes 1 place's lightning conducter annex gold utensil and need use about 1 hour.
Summary of the invention
The objective of the invention is to overcome the problems referred to above that exist in the prior art, provide 220 kilovolts of lightning conducters of a kind of transmission line to overhaul special-purpose lifter.
For realizing above-mentioned purpose, the technical scheme that the present invention adopts is following:
220 kilovolts of lightning conducters of transmission line of the present invention overhaul special-purpose lifter; This lifter comprises the balance strutbeam, and described balance strutbeam is provided with jig for flat shoulder formula balance strutbeam in balance strutbeam bottom; Be provided with lifting arm at balance strutbeam two ends, the lifting arm lower end is provided with suspension hook.
Described lifting arm is a leading screw.Also can adopt gear driven type.
On the lifting arm of the left and right sides, be provided with rotary handle among the present invention.
The present invention is simple in structure, connects fasteningly, durable in use, and security performance is good; Easy to operate, the activity duration shortens half the, can reach to increase substantially operating efficiency; Material is light, and instrument weight is reduced to 5.1 kilograms; Reduce line maintenance operation interruption duration, improve the business economic benefit.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Embodiment
As shown in Figure 1,220 kilovolts of lightning conducters of transmission line of the present invention overhaul special-purpose lifter, and this lifter comprises balance strutbeam 1; Described balance strutbeam is flat shoulder formula balance strutbeam; Be provided with jig 2 in balance strutbeam 1 bottom, be provided with lifting arm 3 at balance strutbeam 1 two ends, described lifting arm is a leading screw.The lifting arm lower end is provided with suspension hook 5.On the lifting arm of the left and right sides, be provided with rotary handle 4.
Operation principle of the present invention is following: lifter of the present invention is fixed on the ground line bracket at goat's horn cross-arm top of 220kV circuit; Lightning conducter is put into the suspension hook 5 of two screw adjustable type structures arranged side by side; Tighten the hasp bolt, with instrument fixed card jail; Rotation adjustment handle promotes lightning conducter to correct position; Remove the lightning conducter annex gold utensil that needs replacing, and the gold utensil that more renews; Rotation adjustment handle makes lightning conducter return to original position; Removal tool finishes operation.

Claims (3)

1. 220 kilovolts of lightning conducters of a transmission line overhaul special-purpose lifter; It is characterized in that: this lifter comprises the balance strutbeam, and described balance strutbeam is provided with jig for flat shoulder formula balance strutbeam in balance strutbeam bottom; Be provided with lifting arm at balance strutbeam two ends, the lifting arm lower end is provided with suspension hook.
2. 220 kilovolts of lightning conducters of transmission line according to claim 1 overhaul special-purpose lifter, it is characterized in that: described lifting arm is a screw mandrel.
3. 220 kilovolts of lightning conducters of transmission line according to claim 1 overhaul special-purpose lifter, it is characterized in that: on the lifting arm of the left and right sides, be provided with rotary handle.
CN2010105422389A 2010-11-14 2010-11-14 Lifter special for overhauling of 220-kilvolt overhead ground wire of power transmission line Pending CN102468619A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105422389A CN102468619A (en) 2010-11-14 2010-11-14 Lifter special for overhauling of 220-kilvolt overhead ground wire of power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105422389A CN102468619A (en) 2010-11-14 2010-11-14 Lifter special for overhauling of 220-kilvolt overhead ground wire of power transmission line

Publications (1)

Publication Number Publication Date
CN102468619A true CN102468619A (en) 2012-05-23

Family

ID=46071917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105422389A Pending CN102468619A (en) 2010-11-14 2010-11-14 Lifter special for overhauling of 220-kilvolt overhead ground wire of power transmission line

Country Status (1)

Country Link
CN (1) CN102468619A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108802437A (en) * 2018-05-31 2018-11-13 国网山东省电力公司青岛供电公司 Attachment device for arrester commissioning test
CN110571705A (en) * 2019-09-20 2019-12-13 国网辽宁省电力有限公司营口供电公司 Line pole pylon air ground line hooking device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201247928Y (en) * 2008-08-18 2009-05-27 天津市电力公司 Overhead ground wire hoist
CN201435594Y (en) * 2009-05-12 2010-03-31 聂新华 Elevator of lightning wire
CN201868786U (en) * 2010-11-14 2011-06-15 河南省电力公司濮阳供电公司 Special repairing lifter for 220KV lightning wire of power transmission line

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201247928Y (en) * 2008-08-18 2009-05-27 天津市电力公司 Overhead ground wire hoist
CN201435594Y (en) * 2009-05-12 2010-03-31 聂新华 Elevator of lightning wire
CN201868786U (en) * 2010-11-14 2011-06-15 河南省电力公司濮阳供电公司 Special repairing lifter for 220KV lightning wire of power transmission line

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108802437A (en) * 2018-05-31 2018-11-13 国网山东省电力公司青岛供电公司 Attachment device for arrester commissioning test
CN108802437B (en) * 2018-05-31 2020-08-14 国网山东省电力公司青岛供电公司 Connecting device for lightning arrester handover test
CN110571705A (en) * 2019-09-20 2019-12-13 国网辽宁省电力有限公司营口供电公司 Line pole pylon air ground line hooking device

Similar Documents

Publication Publication Date Title
CN202333597U (en) Overhead-groundwire lifter
CN103266779B (en) A kind of sliding and lifting construction equipment and method thereof of crossing horizontal obstacle thing
CN105071296A (en) Structurally-improved high-voltage distribution line rod pole-mounted line hoisting device
CN201868786U (en) Special repairing lifter for 220KV lightning wire of power transmission line
CN201838934U (en) Novel portable adjustable rod upper platform
CN201228461Y (en) Flange assembly device
WO2012100595A1 (en) Tool for replacing ceramic rod type insulator
CN104836161A (en) Hanger frame of fixed-steering pulley
CN202423969U (en) Overhead ground wire lifter
CN102468619A (en) Lifter special for overhauling of 220-kilvolt overhead ground wire of power transmission line
CN201778531U (en) Fixing base of auxiliary embraced bar
CN208982630U (en) External clamping angle steel fixed pulley
CN103001152A (en) Overhead ground wire lifter of power transmission line
CN202978098U (en) Overhead ground wire lifter
CN202423997U (en) Combined ground wire lifting mechanism
CN203033658U (en) Tire fixture
CN204823892U (en) High stability hoist
CN204402335U (en) A kind of strain insulator Special maintenance tool
CN202369320U (en) Carrying frame for motors
CN202785234U (en) Saw blade dismounting device of sawing machine
CN201424347Y (en) Assistant lifting device for hosting bridge tower arch ribs
CN205172139U (en) Supplementary pole tumbler bearing of embracing of transmission line head of mast
CN205472332U (en) Rotatable simple and easy armful of pole hoist
CN205141333U (en) Earth connection hangs specialized tool
CN203377549U (en) Small holding pole attached to tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120523